Surat today
• Population - 45.85 Lakhs (2011)
• Municipal Area – 326.51 sqkm
• 2nd largest city in Gujarat
• 9th largest city in India
• Large Migrant Population
-56 % of the city’s population
-80% of those living in squatter settlements
-50% Migrants from other states
• Manufacturing City: (Diamond & Textiles)
- 42 % of the world’s total rough diamond cutting and
polishing
- 70 % of the nation’s total rough diamond cutting and
polishing
- 40 % of the nation’s total diamond exports
- 40 % of the nation’s total man made fabric production
-18 % of the nation’s total man made fibre export
Surat
Delhi Mumbai Industrial Corridor
Surat With No Public Transport
Challenge for Surat to create Sustainable High Quality Public Transport
Surat with Limited Public Transport
• Rapid Growth – 38 lakh population
• High City Mobility – 38 lakh Passenger
trips per day
• Inadequacies in the road network
•Incomplete Road Network
•Missing Hierarchy
•Lack of uniformity In ROW
•Constraints – River, Canal, Khadi, Railway
Line
Mobility Challenges
• Inadequate Public Transport
3-Wheelers act As Public Transit (7-9 lakh trips)
100 buses introduced recently (45 000 trips)
• Intrusion Of Regional Goods And Passenger
Vehicles Into The Cities
• High Road Fatalities
• Congestion
• Sensitive Air Quality
Corridor Assessment
• Traffic Generators/ Destinations
• Socio- Economic Factors
• Travel Demand
• Factors affecting BRTS implementation:
Critical Consideration:
Post Improvement Service Quality (perceived) - Different
User Groups
• Nobody should be facing worsening situation
• Existing Private Vehicle users – Must at least receive same
level of service. Preferably improved level of service
• Mass transit Users – Must receive substantially improve
quality of service
Existing Roads
Proposed Roads
Legend:
Hazira
Industrial
Estate
Airport
Surat
Rly. stn
Amroli
Sarthana
Sachin
GIDC
Proposed ring road
network – 110 kms.
Proposed radial road
network – 215 kms.
Future road network
(2035)
Existing river bridges- 7
Proposed river bridges
7 +1 widening
Existing RuB- 7
Existing RoB - 4
Proposed RoB/RuB - 15
Structuring urban road network
PROPOSALS
details
SURAT BRTS
Phase 1
Wide RoadsSelecting Network in Phase 1 - Wide Roads
No RoadsSelecting Network - No Roads
Selecting Network - Slum Upgradation
TRANSIT VOLUMES
07-06-11 01:16
MODULE: 6.22
CEPTUNIV....kp
EMME/2 PROJECT: UTP MODEL FOR AHMEDABAD IPTS PROJECT
SCENARIO :2000 Year 2000-base year model
WINDOW:
91247/ -15779
113441/866.513
LINKS:
type=2
TRANSIT LINES:
r1 r11
r12 r2
r3 r4
r5 r6
r7 r8
r9
50000
40000
30000
20000
10000
SCALE: 4000
30881
15054
20213
1
8
4
4
50543
53338
1
7
3
1
6
1
7
7
3
0
11189
35157
18434
25243
19879
2
6
8
9
9786
54811
14099
4017
16963
18418
8859
14534
13750
1
8
8
7
2
5
7
9
10511
15923
11833
15788
54607
11388
1
3
5
0
2
24443
8892
15920
10209
19986
17669
25522
16406
29171
2
0
5
2
8
16445
74224
64858
2
3
6
5
3
20534
15468
21960
19487
7844
19662
44531
71962
30848
41010
41325
36723
22919
9294
37008
17728
37932
21490
23006
10294
16591
14183
16839
16640
18518
15532
22695
14549
19913 10262
18038
16736
16802
6526
25820
38426
5629
13230
10267
18664
14993
24984
18081
14448
19849
9334
8677
4673
24852
63903
20483
20949 14819
53814
58648
17011
Demand on existing road (without canal road) Demand on existing road (with canal road)
BRT Demand
Selecting Network – Canal Road BRTS
Creating new opportunities
Demand follows Supply
SURAT BRTS NETWORK – Phase 1+2+3
PHASE 1
• Year of Sanction 2008
• Start Year of implementation – 2009
• Phase 1 Corridors – 30 km
 Corridor 1 (10 km) Completion date – 2013
 Corridor 2 (20 km) Completion date – 2014
PHASE 2
PHASE 3
• Network length - 42 kms
• Network length - 30 kms
`
Kosad EWS
Valak
Sarthana
Simada
Magob city
limit
Gajera junc.
Dabholi char
rasta
Jahangirpura
Adajan
patia
Pal
Dumas resort
ONGC
Daksheshwar
St. Thomas
school junc.
Anuwrat
Dwar.
Chowk
Bhagal
Katargam
Railway
Station
Udhana
Darwaza
Aaimata
Kharwarnagar
Hirabaug
Amroli
Parvat patiya
1
1
2
3
3
4
5
5
9
6
9
7
10A
10A
8
8
8
8
8
10B
Sachin
Sachin
GIDC
Elevated
corridor
`
Kosad EWS
Valak Junc.
Sarthana
Simada
Magob city
limit
Gajera junc.
Dabholi char
rasta
Daksheshwar
Chowk
Bhagal
Katargam
Railway
Station
Udhana
Darwaza
Aaimata
Kharwarnagar
Hirabaug
Amroli
Parvat patiya
3
4
5
5
9
6
9
7
10A
10A
8
8
8
8
8
10B
Sachin
Sachin
GIDC
- Phase I
-Phase II
- Phase III
- Phase IV
LEGEND
- Major Junctions
Elevated
corridor
PHASE 4
• 3.5 km long elevated corridor
connecting railway station and city
center
Public Transport Coverage
BRT Network Length: 102 km.
Feeder Network Length: 157 km.
Total PT Network Length: 250 km.
Built up coverage: 80%
Total Built up area: 166 sqkm.
Built up covered: 133 sqkm
SURAT BRTS NETWORK COVERAGE
Wide RoadsPhase 1 – Work Status
CORRIDOR 1
Udhna Sachin (10 km)
• Road work - Scheduled to be
completed and operational by May,
2013
• Prototype Bus Stop completed
• 19 bus stops under construction –
Scheduled to be completed and
operational by May, 2013
CORRIDOR 2
Canal Corridor (20 km)
• Canal edge lining work under
construction
• Road work under construction
• Bus stops tender uploaded
Legend
BRTS Phase 1 network
(30.5 kms.)
BRTS Phase 2+3 network
(72 kms.)
50 Bus Stations (Phase 1 – 30 kms.)
75 Bus Stations (Phase 2 – 42 kms.)
59 Bus Stations (Phase 3 – 30 kms.)
500-600 meter spacing
Sitilink - Transit Line diagram
Phase 1 - Ongoing Work at Udhana Sachin corridor
Phase 1 - Ongoing Work at Udhana Sachin corridor
Phase 1 - Ongoing Work at Canal Road
Canal edge work in progress
Working days 7-10 days in a Month – due to flow
of water by Irrigation dept.
Phase 1 Status
Prototype Bus Station Completed Prototype Bus Station Completed
Activity Area Trees retained along Footpath
BRTS Bus Station Prototype Implemented
Phase 1 Status : 19 Bus stations nearing Completion
Phase 1 Status : 19 Bus stations nearing Completion
BRTS Bus Station along Canal
Fuel station
Bus parking area
Drivers facility
• Workshop
Staff parking area And
Fire exit
Services
Worker’s
facility
Bus parking area
General
Inspection
BRTS Workshop & Depot facility:
Under Construction at Bhestan
SURAT BRTS
BRTS Facilities – Workshop, depots, Drivers’ Facility
BRTS Interchange station, BRTS Control Centre
Under Construction (Phase I)
Plot to be finalized from SMC for Phase I
Plot to be finalized from SMC for Phase II
2.5Km distance to reach origin of BRT
Route
Kosad
Jahingirpura
Dumas Resort
(TP 65 Vesu- Bharthana- Althan)
Plot to be reviewed and allotted
Bhestan
Saroli City Limit
Magob
(TP 53- Magob –Dumbhal Draft)
Plot to be reviewed and allotted
Valak
Pal
Strategic location of workshop depot shall minimize dead
kms. During start of oprations.
Proposed location towards the starting point of routes
Scrutinize availability of plot within 2-5 kms.
Proposed BRTS Bus Workshops & Depots
Workshop and depot at BhestanProposed BRTS Bus Workshops & Depots
• Drivers’ drive buses in critical
Urban traffic conditions
• Responsible for Passenger safety
• Lack of rest between trips and
schedule often affects physical
and mental state
• Basic facilities like drinking water,
toilet facility, rest room proposed
at end terminal locations
Need for Drivers’ facility
Jahangirpura
Kosad
Valak
Magob
Sachin
ONGC Circle
Drivers’ facility and end terminal
Drivers’ facility and end terminal
Hazira
Gems &
jewelry
park
Diamond
industry/
markets
South Guj.
University
Surat Rly. stn
Apparel
Park
Sachin GIDC Kharwarnagar
Junction
Textile
Markets
Public institutions
Pandesara
GIDCAIRPORT
RAILWAY LINE
REGIONAL BUS TERMINALS
(GSRTC)
RAILWAY STATIONS
BRTS PHASE I CORRIDORS
Udhna Rly Stn.
Utran Rly Stn.
Transit Line DiagramBRTS Phase I Corridors
BRTS Interchange Station at Kharwarnagar
A MAJOR
TRANSFER
STATION!
Existing Traffic movement Proposed Traffic movement
Existing and Proposed Traffic Movements
BRTS Interchange
Station
•3 bus bays per direction
•Overtaking lanes
•Interchange area
•Common entry points
BRT + BRT
Interchange
Ticketing
Passenger
access
Paid area
Easy Passenger
transfers
BRTS Interchange at Kharwarnagar
BRTS Interchange at Kharwarnagar
BRTS Control Centre at Kharwarnagar
Tender process in progress
Sitilink – Operations, Management and control
ATCS control room
BRTS Control Centre at Kharwarnagar
Sitilink Operations Control
Audio – Visual room
Call centre
Card Initialization
ITS enabled
ATCS – Control room
SURAT BRTS
Operations Plan
BRT Network
Feeder Network
Public Transit Network
BRT Network:
Speed: 23 km/hr.
HDW: 5 min.
Feeder Network:
Speed: 18 km/hr.
HDW: 10 min
Pass. Volume per Day
BRT Network
Feeder Network
34000
BRTS + Feeder Network Volumes
Jahangirpura
Pal
ONGC circle
Sachin GIDC
Magob
Valak
Amroli
Hira
bazaarSurat
Rly Stn
Dabholi
Kharwar
nagar
BRTS Routes – 11 trunk routes
SURAT BRTS
Innovations in Transit Oriented Development
Developing Public Spaces along BRTS
Existing canal
BRT Lanes
BRT Interchange Station
Split Flyovers
Mixed traffic lanes
Pedestrian paths
Available plots
Kharwarnagar junction design proposal
15,889.62 sq.m.
5525.18 sq.m.
PARCEL A
PARCEL B
PARCEL C
3000 sq.m.
Parcel A : TRANSIT HUB / Offices/ commercial/ retail/ hotels/
restaurants/ entertainment zones- multiplex
Parcel B : BRT control station / Public parks / amphitheatre
Parcel C : Rehabilitation of project affected units
THE TWO PILLARS OF SURAT : THE TEXTILE AND DIAMOND INDUSTRY
CONCEPT:
THE PROGRESS OF SURAT IS HUGELY INDEBTED TO THE TWO MAIN STAY INDUSTRIES – THE TEXTILE
AND THE DIAMOND – IN WHICH SURAT IS A GLOBAL POWER TO RECKON WITH. THE CONCEPT OF THE
ENTIRE PROJECT IS TO PAY TRIBUTE TO THE TWO INDUSTRIES AND THEREBY RECOGNISE ITS
CONTRIBUTION IN MAKING SURAT ONE OF THE FASTEST DEVELOPING CITIES OF THE WORLD.
THE FOLDS OF THE TEXTILE AND THE GLITTER OF THE POLISHED DIAMOND BECOME IMPORTANT
ELEMENTS IN THE CREATION OF THIS ICONIC BUILDING OF SURAT WHICH SHALL ASPIRE TO BECOME
THE ULTIMATE PUBLIC DESTINATION IN THE CITY OF SURAT.
Concept – The Hub
STAR RATED
HOTEL
HI-END
RESTAURANT
OFFICES
OFFICES
HELIPAD
RETAIL
S
RETAIL
S
OFFICE PARKING /
VISITOR’S PARKING
MID DAY BRTS
BUS PARKING
PROPOSED FLY
OVER BRIDGE
PUBLIC ENTRY
TO THE
PARKING
AMPHI
THEATRE
BRTS
CONTROL
CENTRE
LINEAR CIRCULATION
CONNECTING PARCEL A
AND PARCEL B
RECREATIONA
L PARK
OUT DOOR FOOD
COURT
UNDULATING
LANDSCAPE WITH
PATHWAY AND SITTING
MULTIPLEX,
ENTERTAINMENT
ZONE, PUBLIC
LIBRARY, ZONE
OFFICE FOR SMC
EXCLUSIV
E
RETAILS
BRT
INTERCHANGE
The project components..
3D SIMULATED VIEW
• Public space create attraction points for
people to gather
• Creating opportunities for people for
recreation and leisure
• Public Parks, Childrens’ play areas, kiosks,
Sculptural and playful street furniture
• Induce riderships for BRT
Developing Public Spaces along BRTS
Veer Narmad
South Gujarat
University
Agriculture University
Govt.
Medical
College
Anjana Sewage
treatment Plant
Anuvrat Dwar
Kharwarnagar
Lake
Pilot stretches
Pilot stretches
Developing Public Spaces along BRTS
SVNIT Surat
• Identifying and Connecting Open spaces
• Institutional areas become less inhabited after
working hours
• Activating street edges as public space – Creating
new opportunities
BRTS Bus Shelter
Informal sitting
MixedTraffic Lane
BRTS Bus Shelter
Green Public
Spaces Along
BRTS Corridor
Informal sitting
SVNIT
Veer Narmad South Gujarat
University
Exhibition SpaceExhibition Space
MixedTraffic Lane
Developing Public Spaces along BRTS
BRTS Lane
Informal
Sitting
Informal
Sitting
Informal
Sitting
Exhibition Space
Exhibition Space
Mounds
Informal sitting
Children’s play area
Kiosk
Paved Arae
Paved Arae
Paved Arae
BRTS Corridor along Canal
Developing Public Spaces along BRTS
Thank you
Surat BRTS - Abhijit Lokre

Weitere ähnliche Inhalte

Was ist angesagt?

TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentShruthi Kshirasagar
 
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)liquorstud
 
Transit Oriented Development - TOD - Human Settlement Planning - Architecture
Transit Oriented Development - TOD - Human Settlement Planning - Architecture Transit Oriented Development - TOD - Human Settlement Planning - Architecture
Transit Oriented Development - TOD - Human Settlement Planning - Architecture YuktaYogeesh1
 
Master Plan & Delhi Master Plan
Master Plan & Delhi Master PlanMaster Plan & Delhi Master Plan
Master Plan & Delhi Master PlanSahil Kaundal
 
Varanasi development plan analysis
Varanasi development plan analysisVaranasi development plan analysis
Varanasi development plan analysisAvanitaSharma
 
kolkata and Rajarhat City Planning: A Brief Description
kolkata and Rajarhat City Planning: A Brief Descriptionkolkata and Rajarhat City Planning: A Brief Description
kolkata and Rajarhat City Planning: A Brief DescriptionMihir Adhikary
 
Neighborhood planning in capital city of chandigarh an appraisal
Neighborhood planning in capital city of chandigarh  an appraisal  Neighborhood planning in capital city of chandigarh  an appraisal
Neighborhood planning in capital city of chandigarh an appraisal JIT KUMAR GUPTA
 
Town planning case study Palava city, Lodha.
Town planning case study Palava city, Lodha.Town planning case study Palava city, Lodha.
Town planning case study Palava city, Lodha.Anupama Krishnan
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUttipec Dda
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented developmentPalak Khandelwal
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectFabiha Rahman
 
gandhinagar town planning literature study
  gandhinagar town planning literature study  gandhinagar town planning literature study
gandhinagar town planning literature studyTanmay Roy
 

Was ist angesagt? (20)

Urban study of Adyar
Urban study of AdyarUrban study of Adyar
Urban study of Adyar
 
TOD - Transit Oriented Development
TOD - Transit Oriented DevelopmentTOD - Transit Oriented Development
TOD - Transit Oriented Development
 
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
Master Plan Amritsar - 2031 (Accessibility in Peri-Urban areas)
 
Transit Oriented Development - TOD - Human Settlement Planning - Architecture
Transit Oriented Development - TOD - Human Settlement Planning - Architecture Transit Oriented Development - TOD - Human Settlement Planning - Architecture
Transit Oriented Development - TOD - Human Settlement Planning - Architecture
 
Master Plan & Delhi Master Plan
Master Plan & Delhi Master PlanMaster Plan & Delhi Master Plan
Master Plan & Delhi Master Plan
 
Varanasi development plan analysis
Varanasi development plan analysisVaranasi development plan analysis
Varanasi development plan analysis
 
ahmedabad BRTS study
ahmedabad BRTS studyahmedabad BRTS study
ahmedabad BRTS study
 
Navi mumbai
Navi mumbaiNavi mumbai
Navi mumbai
 
kolkata and Rajarhat City Planning: A Brief Description
kolkata and Rajarhat City Planning: A Brief Descriptionkolkata and Rajarhat City Planning: A Brief Description
kolkata and Rajarhat City Planning: A Brief Description
 
Neighborhood planning in capital city of chandigarh an appraisal
Neighborhood planning in capital city of chandigarh  an appraisal  Neighborhood planning in capital city of chandigarh  an appraisal
Neighborhood planning in capital city of chandigarh an appraisal
 
Report
ReportReport
Report
 
Town planning case study Palava city, Lodha.
Town planning case study Palava city, Lodha.Town planning case study Palava city, Lodha.
Town planning case study Palava city, Lodha.
 
UTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINESUTTIPEC STREET DESIGN GUIDELINES
UTTIPEC STREET DESIGN GUIDELINES
 
Bhubaneswar Street Design Guidelines
Bhubaneswar Street Design GuidelinesBhubaneswar Street Design Guidelines
Bhubaneswar Street Design Guidelines
 
Report
ReportReport
Report
 
Transit Oriented Development.
Transit Oriented Development.Transit Oriented Development.
Transit Oriented Development.
 
ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development Project
 
gandhinagar town planning literature study
  gandhinagar town planning literature study  gandhinagar town planning literature study
gandhinagar town planning literature study
 

Ähnlich wie Surat BRTS - Abhijit Lokre

428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptxRAKESHPANDEY754083
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSKona Mahesh
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...BRTCoE
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS OverviewNishit kadia
 
highway development in india
highway development in indiahighway development in india
highway development in indiaPrathi Baa
 
China’s brt development in the last decade
China’s brt development in the last decadeChina’s brt development in the last decade
China’s brt development in the last decadeBRTCoE
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand viharSneha Lata
 
Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumarSanjeev Dyamannavar
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Prashant Inamdar
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015Norma Nun
 
Metro elevated structures AR.pdf
Metro elevated structures AR.pdfMetro elevated structures AR.pdf
Metro elevated structures AR.pdfAshutoshRankawat
 
Metro elevated structures AR.pdf
Metro elevated structures AR.pdfMetro elevated structures AR.pdf
Metro elevated structures AR.pdfAshutoshRankawat
 

Ähnlich wie Surat BRTS - Abhijit Lokre (20)

Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
428836159-Presentation-on-Mumbai-Ahmadabad-High-Speed-Rail-Project.pptx
 
INTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMSINTELLIGENT TRANSPORTATION SYSTEMS
INTELLIGENT TRANSPORTATION SYSTEMS
 
Brts
BrtsBrts
Brts
 
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
 
Ahmedabad BRTS Overview
Ahmedabad BRTS OverviewAhmedabad BRTS Overview
Ahmedabad BRTS Overview
 
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTSBRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
BRTS Association of Indian and Asian Cities, and Ahmedabad BRTS
 
R.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdfR.R.A.C.L-WB1.pdf
R.R.A.C.L-WB1.pdf
 
highway development in india
highway development in indiahighway development in india
highway development in india
 
China’s brt development in the last decade
China’s brt development in the last decadeChina’s brt development in the last decade
China’s brt development in the last decade
 
Brt planning week
Brt planning weekBrt planning week
Brt planning week
 
SEM 1 PRESENTATION
SEM 1 PRESENTATIONSEM 1 PRESENTATION
SEM 1 PRESENTATION
 
Transportation analysis at anand vihar
Transportation analysis at anand viharTransportation analysis at anand vihar
Transportation analysis at anand vihar
 
Final
FinalFinal
Final
 
Cantonment metro station a case study1 rajkumar
Cantonment metro station   a case study1  rajkumarCantonment metro station   a case study1  rajkumar
Cantonment metro station a case study1 rajkumar
 
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Metro elevated structures AR.pdf
Metro elevated structures AR.pdfMetro elevated structures AR.pdf
Metro elevated structures AR.pdf
 
Metro elevated structures AR.pdf
Metro elevated structures AR.pdfMetro elevated structures AR.pdf
Metro elevated structures AR.pdf
 
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IASCity Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
City Bus Service Modernisation "BusKaroPlus" - Anjum Parwez, IAS
 

Mehr von WRI Ross Center for Sustainable Cities

Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesRestoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesWRI Ross Center for Sustainable Cities
 
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureUnlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureWRI Ross Center for Sustainable Cities
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectWRI Ross Center for Sustainable Cities
 
CK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningCK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningWRI Ross Center for Sustainable Cities
 

Mehr von WRI Ross Center for Sustainable Cities (20)

Restoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari VillageRestoration of Urban Blue Acres_Case of Rajokari Village
Restoration of Urban Blue Acres_Case of Rajokari Village
 
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakesRestoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
Restoration of Urban Blue Acres_Nualgi Pyco-remediation of sewage and lakes
 
Restoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. PuneRestoration of Urban Blue Acres_Green Water Revoln. Pune
Restoration of Urban Blue Acres_Green Water Revoln. Pune
 
Restoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts VenturesRestoration of Urban Blue Acres_Biostarts Ventures
Restoration of Urban Blue Acres_Biostarts Ventures
 
Restoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for CitiesRestoration of Urban Blue Acres_Biome Water for Cities
Restoration of Urban Blue Acres_Biome Water for Cities
 
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYDRestoration of Urban Blue Acres_Relevance of Global Outlook to HYD
Restoration of Urban Blue Acres_Relevance of Global Outlook to HYD
 
Restoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_AyalaRestoration of Urban Blue Acres_Ayala
Restoration of Urban Blue Acres_Ayala
 
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYDRestoration of Urban Blue Acres_Multi-stakeholder forum HYD
Restoration of Urban Blue Acres_Multi-stakeholder forum HYD
 
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the FutureUnlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
Unlock Bengaluru 2018: Roadmap to the Townships and Campuses of the Future
 
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
Unlock Bengaluru 2018: Water - Are we nearing Day Zero?
 
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization ProjectCK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
CK2018: Assessment of Istanbul Historic Peninsula Pedestrianization Project
 
CK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, ColombiaCK2018: Green Corridor TOD Project - Cali, Colombia
CK2018: Green Corridor TOD Project - Cali, Colombia
 
CK2018: Land value capture in Brazil
CK2018: Land value capture in BrazilCK2018: Land value capture in Brazil
CK2018: Land value capture in Brazil
 
CK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from MexicoCK2018: Urban Development - Examples from Mexico
CK2018: Urban Development - Examples from Mexico
 
CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing CK2018: Working with Partners & Data Sharing
CK2018: Working with Partners & Data Sharing
 
CK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action PlanningCK2018: Global Convenant of Mayors approach to Climate Action Planning
CK2018: Global Convenant of Mayors approach to Climate Action Planning
 
CK2018: GHG Platform India
CK2018: GHG Platform IndiaCK2018: GHG Platform India
CK2018: GHG Platform India
 
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCCCK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
CK2018: Climate Actions for Cities India's NDC, NAPCC and SAPCC
 
CK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus FleetsCK2018: Barriers and Global Innovations for Electric Bus Fleets
CK2018: Barriers and Global Innovations for Electric Bus Fleets
 
CK2018: Electric Vehicle Financing
CK2018: Electric Vehicle FinancingCK2018: Electric Vehicle Financing
CK2018: Electric Vehicle Financing
 

Kürzlich hochgeladen

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 

Kürzlich hochgeladen (20)

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 

Surat BRTS - Abhijit Lokre

  • 1. Surat Bus Rapid Transit System Abhijit Lokre, Associate Professor / Faculty of Planning, Centre of Excellence in Urban Transport, CEPT University, Ahmedabad
  • 2. Surat Bus Rapid Transit System April 2013 An Initiative of : SURAT MUNICIPAL CORPORATION Abhijit Lokre / Associate Professor / Faculty of Planning Centre of Excellence in Urban Transport, CEPT University, Ahmedabad
  • 3. Surat today • Population - 45.85 Lakhs (2011) • Municipal Area – 326.51 sqkm • 2nd largest city in Gujarat • 9th largest city in India • Large Migrant Population -56 % of the city’s population -80% of those living in squatter settlements -50% Migrants from other states • Manufacturing City: (Diamond & Textiles) - 42 % of the world’s total rough diamond cutting and polishing - 70 % of the nation’s total rough diamond cutting and polishing - 40 % of the nation’s total diamond exports - 40 % of the nation’s total man made fabric production -18 % of the nation’s total man made fibre export Surat Delhi Mumbai Industrial Corridor
  • 4. Surat With No Public Transport
  • 5. Challenge for Surat to create Sustainable High Quality Public Transport Surat with Limited Public Transport
  • 6. • Rapid Growth – 38 lakh population • High City Mobility – 38 lakh Passenger trips per day • Inadequacies in the road network •Incomplete Road Network •Missing Hierarchy •Lack of uniformity In ROW •Constraints – River, Canal, Khadi, Railway Line Mobility Challenges • Inadequate Public Transport 3-Wheelers act As Public Transit (7-9 lakh trips) 100 buses introduced recently (45 000 trips) • Intrusion Of Regional Goods And Passenger Vehicles Into The Cities • High Road Fatalities • Congestion • Sensitive Air Quality
  • 7. Corridor Assessment • Traffic Generators/ Destinations • Socio- Economic Factors • Travel Demand • Factors affecting BRTS implementation: Critical Consideration: Post Improvement Service Quality (perceived) - Different User Groups • Nobody should be facing worsening situation • Existing Private Vehicle users – Must at least receive same level of service. Preferably improved level of service • Mass transit Users – Must receive substantially improve quality of service
  • 8. Existing Roads Proposed Roads Legend: Hazira Industrial Estate Airport Surat Rly. stn Amroli Sarthana Sachin GIDC Proposed ring road network – 110 kms. Proposed radial road network – 215 kms. Future road network (2035) Existing river bridges- 7 Proposed river bridges 7 +1 widening Existing RuB- 7 Existing RoB - 4 Proposed RoB/RuB - 15 Structuring urban road network PROPOSALS details
  • 10. Wide RoadsSelecting Network in Phase 1 - Wide Roads
  • 12. Selecting Network - Slum Upgradation
  • 13. TRANSIT VOLUMES 07-06-11 01:16 MODULE: 6.22 CEPTUNIV....kp EMME/2 PROJECT: UTP MODEL FOR AHMEDABAD IPTS PROJECT SCENARIO :2000 Year 2000-base year model WINDOW: 91247/ -15779 113441/866.513 LINKS: type=2 TRANSIT LINES: r1 r11 r12 r2 r3 r4 r5 r6 r7 r8 r9 50000 40000 30000 20000 10000 SCALE: 4000 30881 15054 20213 1 8 4 4 50543 53338 1 7 3 1 6 1 7 7 3 0 11189 35157 18434 25243 19879 2 6 8 9 9786 54811 14099 4017 16963 18418 8859 14534 13750 1 8 8 7 2 5 7 9 10511 15923 11833 15788 54607 11388 1 3 5 0 2 24443 8892 15920 10209 19986 17669 25522 16406 29171 2 0 5 2 8 16445 74224 64858 2 3 6 5 3 20534 15468 21960 19487 7844 19662 44531 71962 30848 41010 41325 36723 22919 9294 37008 17728 37932 21490 23006 10294 16591 14183 16839 16640 18518 15532 22695 14549 19913 10262 18038 16736 16802 6526 25820 38426 5629 13230 10267 18664 14993 24984 18081 14448 19849 9334 8677 4673 24852 63903 20483 20949 14819 53814 58648 17011 Demand on existing road (without canal road) Demand on existing road (with canal road) BRT Demand Selecting Network – Canal Road BRTS Creating new opportunities Demand follows Supply
  • 14. SURAT BRTS NETWORK – Phase 1+2+3 PHASE 1 • Year of Sanction 2008 • Start Year of implementation – 2009 • Phase 1 Corridors – 30 km  Corridor 1 (10 km) Completion date – 2013  Corridor 2 (20 km) Completion date – 2014 PHASE 2 PHASE 3 • Network length - 42 kms • Network length - 30 kms ` Kosad EWS Valak Sarthana Simada Magob city limit Gajera junc. Dabholi char rasta Jahangirpura Adajan patia Pal Dumas resort ONGC Daksheshwar St. Thomas school junc. Anuwrat Dwar. Chowk Bhagal Katargam Railway Station Udhana Darwaza Aaimata Kharwarnagar Hirabaug Amroli Parvat patiya 1 1 2 3 3 4 5 5 9 6 9 7 10A 10A 8 8 8 8 8 10B Sachin Sachin GIDC Elevated corridor ` Kosad EWS Valak Junc. Sarthana Simada Magob city limit Gajera junc. Dabholi char rasta Daksheshwar Chowk Bhagal Katargam Railway Station Udhana Darwaza Aaimata Kharwarnagar Hirabaug Amroli Parvat patiya 3 4 5 5 9 6 9 7 10A 10A 8 8 8 8 8 10B Sachin Sachin GIDC - Phase I -Phase II - Phase III - Phase IV LEGEND - Major Junctions Elevated corridor PHASE 4 • 3.5 km long elevated corridor connecting railway station and city center
  • 15. Public Transport Coverage BRT Network Length: 102 km. Feeder Network Length: 157 km. Total PT Network Length: 250 km. Built up coverage: 80% Total Built up area: 166 sqkm. Built up covered: 133 sqkm SURAT BRTS NETWORK COVERAGE
  • 16. Wide RoadsPhase 1 – Work Status CORRIDOR 1 Udhna Sachin (10 km) • Road work - Scheduled to be completed and operational by May, 2013 • Prototype Bus Stop completed • 19 bus stops under construction – Scheduled to be completed and operational by May, 2013 CORRIDOR 2 Canal Corridor (20 km) • Canal edge lining work under construction • Road work under construction • Bus stops tender uploaded Legend BRTS Phase 1 network (30.5 kms.) BRTS Phase 2+3 network (72 kms.)
  • 17. 50 Bus Stations (Phase 1 – 30 kms.) 75 Bus Stations (Phase 2 – 42 kms.) 59 Bus Stations (Phase 3 – 30 kms.) 500-600 meter spacing Sitilink - Transit Line diagram
  • 18. Phase 1 - Ongoing Work at Udhana Sachin corridor
  • 19. Phase 1 - Ongoing Work at Udhana Sachin corridor
  • 20. Phase 1 - Ongoing Work at Canal Road Canal edge work in progress Working days 7-10 days in a Month – due to flow of water by Irrigation dept.
  • 21. Phase 1 Status Prototype Bus Station Completed Prototype Bus Station Completed Activity Area Trees retained along Footpath
  • 22. BRTS Bus Station Prototype Implemented
  • 23. Phase 1 Status : 19 Bus stations nearing Completion
  • 24. Phase 1 Status : 19 Bus stations nearing Completion
  • 25. BRTS Bus Station along Canal
  • 26. Fuel station Bus parking area Drivers facility • Workshop Staff parking area And Fire exit Services Worker’s facility Bus parking area General Inspection BRTS Workshop & Depot facility: Under Construction at Bhestan
  • 27. SURAT BRTS BRTS Facilities – Workshop, depots, Drivers’ Facility BRTS Interchange station, BRTS Control Centre
  • 28. Under Construction (Phase I) Plot to be finalized from SMC for Phase I Plot to be finalized from SMC for Phase II 2.5Km distance to reach origin of BRT Route Kosad Jahingirpura Dumas Resort (TP 65 Vesu- Bharthana- Althan) Plot to be reviewed and allotted Bhestan Saroli City Limit Magob (TP 53- Magob –Dumbhal Draft) Plot to be reviewed and allotted Valak Pal Strategic location of workshop depot shall minimize dead kms. During start of oprations. Proposed location towards the starting point of routes Scrutinize availability of plot within 2-5 kms. Proposed BRTS Bus Workshops & Depots
  • 29. Workshop and depot at BhestanProposed BRTS Bus Workshops & Depots
  • 30. • Drivers’ drive buses in critical Urban traffic conditions • Responsible for Passenger safety • Lack of rest between trips and schedule often affects physical and mental state • Basic facilities like drinking water, toilet facility, rest room proposed at end terminal locations Need for Drivers’ facility
  • 32. Drivers’ facility and end terminal
  • 33. Hazira Gems & jewelry park Diamond industry/ markets South Guj. University Surat Rly. stn Apparel Park Sachin GIDC Kharwarnagar Junction Textile Markets Public institutions Pandesara GIDCAIRPORT RAILWAY LINE REGIONAL BUS TERMINALS (GSRTC) RAILWAY STATIONS BRTS PHASE I CORRIDORS Udhna Rly Stn. Utran Rly Stn. Transit Line DiagramBRTS Phase I Corridors BRTS Interchange Station at Kharwarnagar A MAJOR TRANSFER STATION!
  • 34. Existing Traffic movement Proposed Traffic movement Existing and Proposed Traffic Movements BRTS Interchange Station
  • 35. •3 bus bays per direction •Overtaking lanes •Interchange area •Common entry points BRT + BRT Interchange Ticketing Passenger access Paid area Easy Passenger transfers BRTS Interchange at Kharwarnagar
  • 36. BRTS Interchange at Kharwarnagar
  • 37. BRTS Control Centre at Kharwarnagar Tender process in progress Sitilink – Operations, Management and control ATCS control room
  • 38. BRTS Control Centre at Kharwarnagar Sitilink Operations Control Audio – Visual room Call centre Card Initialization ITS enabled ATCS – Control room
  • 41. BRT Network: Speed: 23 km/hr. HDW: 5 min. Feeder Network: Speed: 18 km/hr. HDW: 10 min Pass. Volume per Day BRT Network Feeder Network 34000 BRTS + Feeder Network Volumes
  • 42. Jahangirpura Pal ONGC circle Sachin GIDC Magob Valak Amroli Hira bazaarSurat Rly Stn Dabholi Kharwar nagar BRTS Routes – 11 trunk routes
  • 43. SURAT BRTS Innovations in Transit Oriented Development Developing Public Spaces along BRTS
  • 44. Existing canal BRT Lanes BRT Interchange Station Split Flyovers Mixed traffic lanes Pedestrian paths Available plots Kharwarnagar junction design proposal 15,889.62 sq.m. 5525.18 sq.m. PARCEL A PARCEL B PARCEL C 3000 sq.m. Parcel A : TRANSIT HUB / Offices/ commercial/ retail/ hotels/ restaurants/ entertainment zones- multiplex Parcel B : BRT control station / Public parks / amphitheatre Parcel C : Rehabilitation of project affected units
  • 45. THE TWO PILLARS OF SURAT : THE TEXTILE AND DIAMOND INDUSTRY CONCEPT: THE PROGRESS OF SURAT IS HUGELY INDEBTED TO THE TWO MAIN STAY INDUSTRIES – THE TEXTILE AND THE DIAMOND – IN WHICH SURAT IS A GLOBAL POWER TO RECKON WITH. THE CONCEPT OF THE ENTIRE PROJECT IS TO PAY TRIBUTE TO THE TWO INDUSTRIES AND THEREBY RECOGNISE ITS CONTRIBUTION IN MAKING SURAT ONE OF THE FASTEST DEVELOPING CITIES OF THE WORLD. THE FOLDS OF THE TEXTILE AND THE GLITTER OF THE POLISHED DIAMOND BECOME IMPORTANT ELEMENTS IN THE CREATION OF THIS ICONIC BUILDING OF SURAT WHICH SHALL ASPIRE TO BECOME THE ULTIMATE PUBLIC DESTINATION IN THE CITY OF SURAT. Concept – The Hub
  • 46. STAR RATED HOTEL HI-END RESTAURANT OFFICES OFFICES HELIPAD RETAIL S RETAIL S OFFICE PARKING / VISITOR’S PARKING MID DAY BRTS BUS PARKING PROPOSED FLY OVER BRIDGE PUBLIC ENTRY TO THE PARKING AMPHI THEATRE BRTS CONTROL CENTRE LINEAR CIRCULATION CONNECTING PARCEL A AND PARCEL B RECREATIONA L PARK OUT DOOR FOOD COURT UNDULATING LANDSCAPE WITH PATHWAY AND SITTING MULTIPLEX, ENTERTAINMENT ZONE, PUBLIC LIBRARY, ZONE OFFICE FOR SMC EXCLUSIV E RETAILS BRT INTERCHANGE The project components..
  • 48. • Public space create attraction points for people to gather • Creating opportunities for people for recreation and leisure • Public Parks, Childrens’ play areas, kiosks, Sculptural and playful street furniture • Induce riderships for BRT Developing Public Spaces along BRTS
  • 49. Veer Narmad South Gujarat University Agriculture University Govt. Medical College Anjana Sewage treatment Plant Anuvrat Dwar Kharwarnagar Lake Pilot stretches Pilot stretches Developing Public Spaces along BRTS SVNIT Surat • Identifying and Connecting Open spaces • Institutional areas become less inhabited after working hours • Activating street edges as public space – Creating new opportunities
  • 50. BRTS Bus Shelter Informal sitting MixedTraffic Lane BRTS Bus Shelter Green Public Spaces Along BRTS Corridor Informal sitting SVNIT Veer Narmad South Gujarat University Exhibition SpaceExhibition Space MixedTraffic Lane Developing Public Spaces along BRTS
  • 52. Informal sitting Children’s play area Kiosk Paved Arae Paved Arae Paved Arae BRTS Corridor along Canal Developing Public Spaces along BRTS