Dwarika Bhushan Sharma
67
Followers
Personal Information
Unternehmen/Arbeitsplatz
Delhi, India India
Beruf
.HSE Admin cum Officer
Branche
Real Estate/ Construction / Architecture
Info
Looking for a New Job.
Tags
concrete pump checks on arrival to site prior to s
• gas
• sewerage
prevent vertically stored objects from sliding or
ensure stability of piles of products/materials
and environmental plan
safety
project health
• worker competency
• manual handling
• falling materials
• work at height
•
• worker struck by vehicle
• reversing vehicles
• workers in plant operating radius
very high risk of fatality
• plant reversing – risk of serious injury to pede
• incident due to use of defective plant or associ
• operator visibility
• plant / pedestrian interaction
• failure due to use of un-certificated plant
access to work areas by personnel and plant. mater
• telecoms
• water
1 purpose
don’t walk by
sort it
say it
see it
5 - clowns belong in the circu
4 - safety is the lifeline of
2-there's a safe way to do eve
pick up
stop falls
pick u
clean up
3-stop falls
chemicals saffety
hazardous che safety poster
hazardous chemicals
risk of damage to low depth
presence of live underground
ensure that the works areas
where works are undertaken at
• lift planning
• use of mobile crane
including access
work area
guide to use risk assessment
workplace stress
difficulty concentrating
short temper
inability to sleep
frequent headaches
scaffolding safety
power cords safety
head protection
hazcom
hand tools
flu prevention
grinders & saws
forklifts
foot & leg protection
falling objects
boom collapse
if provided.
use outriggers
if working near traffic
brakes and wheel chocks
broken bone
could face falls
aerial lift accidents
aerial lifts are vehicle
business operations
health and safely objective
sustainability objectives
risks and opportunities
environmental objectives
except in an emergency. in case of emergency alway
or manufacturer has derated the forklift [reduced
an authorised dealer
unless it is designed so you can do this stand on
competent and authorised to do so use a forklift o
unless the forklift is designed specifically for t
certified and authorised to do so travel with a bu
unless trained
lift loads greater than the capacity of the forkli
never:
safe operation & carrying loads
or lift trucks.
fork trucks
rider operated forklifts
stack or tier materials. they include pallet truck
lift
a forklift is a powered truck used to carry
forklift safety
and retinal burns.
explosion
the unit can expose welders to fire
the arc welder is very safe. if used improperly
from the primary (input) voltage if you touch a le
however
arc welding is safe if the unit is properly instal
permanent flss controlled floors removal of packin
substructure
superstructure (concrete)
building works & mep 1st fix
wet trades
basic risk start point
fire risk evaluation & reduction levels
trouble breathing persistent pain or pressure in t
headache cough sore throat fever general feeling
construction plant and equipment
safety man and machine presentation june-2019 rev-
tournament 2020
cricket team-poster
are you good cricket player? join “compnay” team c
there are several safety tips to follow to help pr
man and machine interface
safe work practices & tips:
grinders & saws safely use
• reduced visibility for equipment and other
occupational health and fitness to work
night work safety
never allow people to be below a suspended load at
moving falling objects safety
safe work practices and tips
hse alert # power cords
"company name" construction has the following qhse
qhse at "company name" construction is given utmos
control and management of combustible materials ar
even knowing this the planning
is even higher in the g.c.c. and the region. the c
subcontractor and employee “cultural” issues
it is vital that everyone is aware of the common c
or you can help start/allow them. in order to mini
fire will end. fire is a major risk both to person
heat and oxygen) if we remove 1 element
code of practice c.o.p # 01 fire prevention requi
worker exposure to direct sun whist working on sca
• scaffold erected for long periods
maintenance of tower scaffold • adverse weather
dismantling of tower scaffold • works at height
aluminium tower scaffold erection and use (classif
• scaffold specific design
components and erection standards (classified as
tower scaffold design
• use of plant – forklift etc.
• storage of materials for scaffold
• vehicles and workers in same working area
access to work areas by personnel aluminum tower
prior to works use of excavator for excavating ndr
planned excavation for ndrc pit in areas where liv
• noise
• fuel storage
• fuel leakage – environmental risk
• incident due to incorrect earthing
site generators – offices and site • temporary su
• use of incorrectly rated fuses
damage to unprotected cables
• tripping hazard
• incorrect earthing
• non-adherence to colour coding of wiring
• use of substandard connections
• use of substandard electrical fixtures and fitti
temporary electrics - offices • electrical connect
• fire
installation of distribution boards to work areas
emergency lighting • power failure • workers unabl
• workers blinded by direct light source when movi
• incident due to insufficient lighting
• slips and trips
works undertaken in areas of low light or night wo
• injury from broken glass from halogen lights
• burns from halogen lights
• work undertaken by incompetent workers
• electric shock or electrocution from incorrect i
temporary electric supply for temporary lighting •
• edge protection erected for long periods
maintenance of edge protection • adverse weather
• use of unsupervised or untrained personnel
• manual handling injuries
• injury from falling objects
• injury from fall from heights
dismantling of edge protection • works at height
• installation of protection
• working over other trades
boards etc.) to lift shafts (classified as tempor
mesh
hole protection installation (hand rails
boards etc.) to risers and penetrations (classifi
boards etc.) to leading edges (classified as temp
edge protection installation (hand rails
• use of unsupervised or untrained personnel to er
• protection specific design
edge protection design and erection standards (cl
• injury due to failure to ensure adequate pre-che
• worker injury due to working on pressurized syst
re-testing in the event of failure • re-testing wi
• poor response in the event of an emergency
• emergency procedures not briefed to task workers
• high pressure water/air injection. emergency pro
flying objects
• weld/seal/fitting failure
• end caps/plugs ejecting under high pressure
• instrument failure resulting in system over-pres
• valve/connection failure
• rupture/failure in pipe lines during testing
• uncontrolled stored energy release
pressure testing • high pressure to pipework
• inadequate signage to test area
signage to test area • personnel in area • unautho
• worker struck by high pressure water release
• workers struck by flying materials
establishing exclusion zones • personnel in area •
• disposal of used/empty containers
emergency procedures • action to be taken in an em
use of substances and chemicals on site • use of s
prior to / at site delivery • hazardous substances
removal of waste concrete and rebar • truck operat
• use of hand held breakers
undertaking breaking works – manual operation usin
demolition (supervision) • plant operations around
demolition of concrete structure • excavator break
plant checks on arrival to site prior to site acce
• etc.
• ducting
• lift shafts
• pipework
• bridge decks
• ndrc pits
• manholes
• vessels
• tanks
prior to entry confined space working – • deep ex
planned confined space work in areas where live se
• workers trapped at height
• machine malfunction at height
• material fall from height
• fall from height
cradle operation
• collapse of cradle through damage or failure of
pre-use checks of suspended access cradle or platf
cradle checks on arrival to site prior to use • us
• workers in mewp operating radius
mewp operation (supervision) • mewp operations aro
• workers struck by working mewp
• collision with other plant and live traffic with
• operators climbing onto hand rails
• unauthorized use of mewp by untrained personnel
• mewp overturning
mewp operation (operator) • operator competency
mewp checks on arrival to site prior to site acces
19 use of mobile elevated work platforms risk asse
working platforms for high level block laying loa
forklifts etc. access scaffolding
vehicles/plant equipment movements for block deliv
• road works • road delineation • diversions • clo
17 traffic operations - working on live roads risk
scaffold design and erection standards (classifie
access to work areas by personnel and plant. scaff
formwork installation (classified as temporary str
15 formwork (temporary works) risk assessment temp
• plant operator unable to see task – screen cover
plant operation supervision • plant operations aro
• workers struck by working plant
• collision with plant and live traffic within sit
• unauthorized use of plant by untrained personnel
grader and roller operation (plant operator) • ope
grader /roller checks on arrival to site prior to
septic tank excavation etc. works at height (offic
working adjacent to public areas vehicles/plant
13 initial project site office set-up risk assessm
sheet piling rig checks on arrival to site prior t
12 sheet piling operations (temporary works) risk
piling rig checks on arrival to site prior to use
11 piling operations with rebar cage installation
10 use of mobile concrete pump risk assessment tem
setting up and testing of tower crane lifting of e
access of tower crane sections to work areas tow
9 lifting operations with tower crane risk assessm
crane supervision crane maintenance (revised 06-06
crane checks on arrival to site prior to use acces
use of powered access equipment for assembly of fa
prior to works use of excavator for excavating and
planned excavation in areas where live services ma
5 trial trenches (temporary works) risk assessment
4 cofferdams (temporary works) risk assessment tem
3 emergency management risk assessment templates
2 fire risk assessment template risk assessment te
1 guide to use risk assessment templates
environmental control measures
1 = applicable regulation not available)
environmental impacts register evaluation
safety and environmental manual
health
consultation and communication management hse-01
4.15 hse mandatory signage
1 purpose 3 2 responsibility 3 3 kpi’s and objecti
temporary works management plan
contents 1 purpose 3 2 performance measurement 3 3
monitoring schedule plan
2 acronyms and abbreviations 4
2 responsibility
1. introduction 3 2. scope 3
working at heights and fall prevention plan
legislation and references
fire prevention & protection plan “project name”
organization chart of response team
emergency escape route and assembly
12. waste management control plan 25
hse construction environment management plan
disposal and handling 16 9 inspection and monitori
1. introduction 4 1.1 benefits of construction was
sort it !!
say it !!
see it !!
workers live matter
mobile elevated work platforms
adverse weather
slips trips falls and bumps
fire prevention
driving in fog
crane & lifting operations in adverse weather
tyre wear-visual check
potential falls
poor housekeeping
10 ways for working safely @ heights
temporary fire “managed storage area”
delivery from store to workplace in building.
combustible materials store
check & direct
10 ways to prevent electrical fire
resolve before permitting/ instructing them to wor
please continue to work safelyand maintain in high
workers are you in a safe place to perform your ta
conduct weekly electrical & fire inspections
immediately report and act on non compliances
conduct fire prevention controls as per fire risk
provide designated combustible material waste area
immediately remove packaging upon delivery
provide regular tool box talks
provide extinguishers and operational firehose ree
provide temporary fire protection during installat
send combustible materials to combustible stores.
construct fully compliant combustible materials st
order materials in non combustible packing
prepare fire prevention & combustible materials ma
incomplete platform
no harness no cover on cradle danger of falling ma
danger of falling materials
look-up for safety : up to 50% of injures are caus
don’t walk by : look-up for hazards
plant-task selection matrix
all clear – safe to work
responsibility
how to work
slope
no t locks
no outriggers
not in cab
no seat belt
Mehr anzeigen