Value Engineering-Constructability
 VALUE ENGINEERING
 Value Engineering (VE) has been defined as:
 the systematic effort directed at analyzing the
functional requirements of:
 systems
 equipment
 facilities
 procedures
 and supplies for the purpose of achieving the
essential function at the lowest total (life-cycle)
cost.
Value Engineering-Constructability
 Also, all the efforts are focused on meeting needed
issues such as:
 Performance;
 Reliability;
 quality, maintainability;
 aesthetics,
 Safety;
 fire resistance;
 while, at the same time, achieving lowest life-cycle
cost.
Value Engineering-Constructability
 Constructability implementation can
act as a predecessor to value
engineering.
 Providing information through
constructor input and lessons
learned from past projects such
that value engineering may be
more effective.
Value Engineering
Implementation of value engineering involves
several steps:
1. Information;
2. functional analysis;
3. creative mind;
4. Evaluation;
5. planning & proposal;
6. Implementation;
7. follow-up.
Value Engineering
 The creative step involves a brainstorming
session where life-cycle cost alternatives, for
design components are considered.
Value engineering may be performed in two
ways:
 (1) Proactively
 (2) Reactively
Value Engineering(Value Analysis)
 What Is Value Engineering?
 Value Engineering (V.E.), also known as Value Analysis,
 is a systematic and function-based approach to
improving the value of products, projects, or processes.
 VE involves a group of people following a structured
process.
 The process helps team members communicate better
across boundaries.
 understand different perspectives,
 innovate, and analyze.
Value Engineering
 What does Value Engineering do?
 Value Engineering improves value.
 On a major road development, improvements
to value might include:
 reducing the life cycle cost of an interchange,
enhancing safety in a design;
 or reducing impacts to the public by
shortening the duration of a construction
project.
Value Engineering
 Value Engineering uses a combination of
creative and analytical techniques to identify
alternative ways to achieve objectives.
 The use of Function Analysis differentiates
Value Engineering from other problem solving
approaches.
 VE focuses on delivering the product or service
at the best price.
 This is achieved by incorporating those value
characteristics deemed most important by the
customer.
Value Engineering
How does V.E. work?
 V.E. follows a structured thought process
to evaluate options.
 Every V.E. session goes through a
number of steps:
 Gather information -What is being done
now?
 Measure Performance -How will the
alternatives be measured?
Value Engineering
 Analyse Functions -What must be done?
What does it Cost?
 Generate Ideas (Brainstorming) -What else
will do the job?
 Evaluate and Rank Ideas -Which Ideas are
the best?
 Develop and Expand Ideas -What are the
impacts? What is the cost? What is the
performance?
 Present Ideas Sell Alternatives
Value Engineering
People involved in VE should be able of
establishing the following:
 effective challenge to design criteria and
accepted standards;
 access and evaluation of operational and
maintenance cost;
 focus on high cost areas and replace with
lower;
 selection of effective alternatives.
Value Engineering
There are four important steps most be taken in
modified VE job plan. They are as follow:
 1. Information Phase
 -Briefing by the Client
 -Feasibility study with client presence,
 -Outline proposals
 -Scheme design
Value Engineering
2-VE Steps
Validation or preparation of cost estimate
 Familiarisation and breakdown of data into
elements-cost models
 Functional evaluation of areas to isolate high
cost, poor value areas,
3-Speculative Phase
 Team review of project-idea listing
 Development of final idea listing.
Value Engineering
4-Analytical Phase
 Evaluation of ideas listing
 Selection of high cost areas for in-depth study,
 Team brainstorming for generation of possible
alternatives suitable for in-depth analysis
 Investigate alternatives
 Team review of analysis
 Preparation of proposal drafts.
Value Engineering
Proposal Phase
 Review of results from analytical phase with
client to gain additional information and enhance
implementation.
 Review and revision of proposal
 Preparation of final proposals
 Report, including cost estimate review
Value Engineering
 What are the benefits of V.E.?
 Value Engineering is a tool that will improve
Mangers ability to manage projects;
 solve problems;
 Innovate;
 communicate.
 A VE program in an organization will give the
organisation a definitive tool to improve value in
any product, project or process.
Value Engineering
 The advantages of carrying out a VE are:
 Cost savings;
 risk reduction;
 schedule improvements;
 improved designs and better collaboration
have been the outcomes of investment in
VE studies.
 The return from the investment in VE
normally exceeds 10:1.
Value Engineering
CASE STUDY
 A commercial office development was to be
constructed using JCT 2007 following the
completion of the design.
 The client was reluctant to accept the financial
feasibility study.
 Therefore, it was decided to VE the design down
to an acceptable cost.
Value Engineering
Solution
 The value engineering team decided
during the initial information stage to
target 3 main areas, such as;
 primary criteria: ratio of net let table area
to gross building area
Value Engineering
 architectural review: attempting to
relax specifications without affecting
the overall quality of the building.
 The basement, plant rooms, service
cores and the cladding system were
all identified as possible targets.
Value Engineering
 engineering review- targets included:
 superstructure
 public health requirement
 smoke extraction systems
 environmental services installations.
 A brain storming approach was adopted for
the creation of alternative ideas.
 The scope of value improvement was listed
as:
Value Engineering
 the basic shape of the original design
was critical as being wasteful in terms
of the resultant net let table floor area.
 Alternatively proposals were made for
improving floor layouts, leading to 80%
net let able floor area, compared to the
75%.
Value Engineering
 potential savings were identified by
concentrating the major plant items in
the basement areas and reducing the
extend of the basement ductwork by
relocating the air shafts.
 Rationalisations were also suggested
for the layout and number of lift cores.
Value Engineering
 a significant simplification was perceived
to be possible if the dimensions of the
central atrium and the width of the
entrance were adjusted to coincide with
the structural grid.
 build ability principles were applied to the
external cladding resulting in the
suggested use of composite steel framed
panels to fit the storey heights and column
centres.
Value Engineering
 The proposed toilets were also reviewed and
a considerable saving was recognised as
being possible by the incorporation of pre-
fabricated toilet pods.
 Form the cost figures it can be seen that the
alternative design proposals represented a
construction saving of 2.1 million.
 The cost of VE WAS £43,000.
Value Engineering
Value Engineering

Weitere ähnliche Inhalte

Was ist angesagt?

VALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTVALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTAbhay Sharma
 
Value engineering practical
Value engineering practicalValue engineering practical
Value engineering practicalAbada Saad
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyAditya Deshpande
 
Fundamentals of value engineering
Fundamentals of value engineering Fundamentals of value engineering
Fundamentals of value engineering Karim Ragab
 
Value management presentation
Value management presentationValue management presentation
Value management presentationKoh Chiun Liang
 
Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Projectajmal4
 
Life cycle cost analysis
Life cycle cost analysisLife cycle cost analysis
Life cycle cost analysisAnkur Bansal
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industryRubnawaz Bhatti
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & managementManit Agarwal
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
Sustainable Construction
Sustainable ConstructionSustainable Construction
Sustainable ConstructionMohsen, S Ab
 
Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction siteRonak Jain
 

Was ist angesagt? (20)

VALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPTVALUE ENGINEERING ANALYSIS PPT
VALUE ENGINEERING ANALYSIS PPT
 
Value engineering practical
Value engineering practicalValue engineering practical
Value engineering practical
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case Study
 
Fundamentals of value engineering
Fundamentals of value engineering Fundamentals of value engineering
Fundamentals of value engineering
 
118 sustainable construction
118 sustainable construction118 sustainable construction
118 sustainable construction
 
Value management presentation
Value management presentationValue management presentation
Value management presentation
 
Value Engineering for Roads & Highways Project
Value Engineering for Roads & Highways ProjectValue Engineering for Roads & Highways Project
Value Engineering for Roads & Highways Project
 
Life cycle cost analysis
Life cycle cost analysisLife cycle cost analysis
Life cycle cost analysis
 
Project cost control
Project cost controlProject cost control
Project cost control
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Life cycle assessment
Life cycle assessmentLife cycle assessment
Life cycle assessment
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Role of project management in construction industry
Role of project management in construction industryRole of project management in construction industry
Role of project management in construction industry
 
An introduction to value management
An introduction to value managementAn introduction to value management
An introduction to value management
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Sustainable Construction
Sustainable ConstructionSustainable Construction
Sustainable Construction
 
Material management on construction site
Material management on construction siteMaterial management on construction site
Material management on construction site
 

Andere mochten auch

Value Engineering And Value Analysis
Value Engineering And Value AnalysisValue Engineering And Value Analysis
Value Engineering And Value Analysisthombremahesh
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineeringAyush dixit
 
What is VAVE
What is VAVE What is VAVE
What is VAVE Reff Ren
 
Value Engineering, What's not to love?
Value Engineering, What's not to love?Value Engineering, What's not to love?
Value Engineering, What's not to love?Nick Grant
 
Value Analysis & Value Engineering
Value Analysis & Value EngineeringValue Analysis & Value Engineering
Value Analysis & Value EngineeringHimangi Thattey
 
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GMohan Kumar G
 
concept of value engineering-construction industry.
concept of value engineering-construction industry.concept of value engineering-construction industry.
concept of value engineering-construction industry.SJMIT,now NMAMIT NITTE
 
Week2 value management introduction
Week2 value management introductionWeek2 value management introduction
Week2 value management introductionlogan gracieuse
 
Cost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringCost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringQuEST Global
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process ReengineeringT HARI KUMAR
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1Pankaj Nalwa
 
Clic.., B,Ch,D,F,H,S,T
Clic.., B,Ch,D,F,H,S,TClic.., B,Ch,D,F,H,S,T
Clic.., B,Ch,D,F,H,S,TSchool Irabia
 
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)JiWoon Yi
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_Swetlina .
 

Andere mochten auch (18)

Value Engineering And Value Analysis
Value Engineering And Value AnalysisValue Engineering And Value Analysis
Value Engineering And Value Analysis
 
Value analysis and value engineering
Value analysis and value engineeringValue analysis and value engineering
Value analysis and value engineering
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
What is VAVE
What is VAVE What is VAVE
What is VAVE
 
VALUE ANALYSIS
VALUE ANALYSISVALUE ANALYSIS
VALUE ANALYSIS
 
Value analysis
Value analysisValue analysis
Value analysis
 
Value Engineering, What's not to love?
Value Engineering, What's not to love?Value Engineering, What's not to love?
Value Engineering, What's not to love?
 
Value Analysis & Value Engineering
Value Analysis & Value EngineeringValue Analysis & Value Engineering
Value Analysis & Value Engineering
 
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_GValue_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
Value_Analysis_and_Value_Engineering, A_seminar_by_Mohan_Kumar_G
 
concept of value engineering-construction industry.
concept of value engineering-construction industry.concept of value engineering-construction industry.
concept of value engineering-construction industry.
 
Week2 value management introduction
Week2 value management introductionWeek2 value management introduction
Week2 value management introduction
 
Cost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringCost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value Engineering
 
Value Analysis Value Engineering & Business Process Reengineering
Value Analysis Value Engineering  &  Business Process ReengineeringValue Analysis Value Engineering  &  Business Process Reengineering
Value Analysis Value Engineering & Business Process Reengineering
 
Benefits of value analysis
Benefits of value analysisBenefits of value analysis
Benefits of value analysis
 
Value Engineering Part 1
Value Engineering Part 1Value Engineering Part 1
Value Engineering Part 1
 
Clic.., B,Ch,D,F,H,S,T
Clic.., B,Ch,D,F,H,S,TClic.., B,Ch,D,F,H,S,T
Clic.., B,Ch,D,F,H,S,T
 
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
5 영국의 건설사업관리 발전방향 saleem akram 이사(ciob)
 
Value engineering _2_
Value engineering _2_Value engineering _2_
Value engineering _2_
 

Ähnlich wie 122 value engineering

Value engineering significance
Value engineering significanceValue engineering significance
Value engineering significanceYash Patel
 
Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projectsnitinrane33
 
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...ssuser149600
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projectsnitinrane33
 
Value engineering in residential house construction
Value engineering in residential house constructionValue engineering in residential house construction
Value engineering in residential house constructionIAEME Publication
 
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONIAEME Publication
 
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)Dr Fereidoun Dejahang
 
041 integrating lean construction (2)
041 integrating lean construction (2)041 integrating lean construction (2)
041 integrating lean construction (2)drdej19
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET Journal
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Minn Lwin
 
Value Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxValue Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxPareshSwami2
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptxDevenJally1
 
Introduction to value engineering and value analysis
Introduction to value engineering and value analysisIntroduction to value engineering and value analysis
Introduction to value engineering and value analysisPrathamesh Kadam
 
IRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET Journal
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group AssignmentArissa Loh
 
Value engineering and Analysis
Value engineering and AnalysisValue engineering and Analysis
Value engineering and AnalysisChaitanya Chenna
 
VALUE ENGINNERING.pdf
VALUE ENGINNERING.pdfVALUE ENGINNERING.pdf
VALUE ENGINNERING.pdfParvDhonde1
 
VALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxVALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxDeeshaKhamar1
 
Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPMA Consultants
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET Journal
 

Ähnlich wie 122 value engineering (20)

Value engineering significance
Value engineering significanceValue engineering significance
Value engineering significance
 
Application of Value Engineering in Commercial Building Projects
Application of Value Engineering in  Commercial Building ProjectsApplication of Value Engineering in  Commercial Building Projects
Application of Value Engineering in Commercial Building Projects
 
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
572021116-WINSEM2021-22-ECE3502-ETH-VL2021220501486-Reference-Material-I-15-0...
 
Application of Value Engineering in Construction Projects
Application of Value Engineering in Construction ProjectsApplication of Value Engineering in Construction Projects
Application of Value Engineering in Construction Projects
 
Value engineering in residential house construction
Value engineering in residential house constructionValue engineering in residential house construction
Value engineering in residential house construction
 
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTIONVALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
VALUE ENGINEERING IN RESIDENTIAL HOUSE CONSTRUCTION
 
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)
 
041 integrating lean construction (2)
041 integrating lean construction (2)041 integrating lean construction (2)
041 integrating lean construction (2)
 
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate IndustryIRJET- Value Engineering-An Approach to Enhance Real Estate Industry
IRJET- Value Engineering-An Approach to Enhance Real Estate Industry
 
Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725Application of-value-engineering-in-residential-building-ijertv9 is050725
Application of-value-engineering-in-residential-building-ijertv9 is050725
 
Value Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptxValue Engineering - PMPD Presentation_0.pptx
Value Engineering - PMPD Presentation_0.pptx
 
VA-VE Presentation.pptx
VA-VE Presentation.pptxVA-VE Presentation.pptx
VA-VE Presentation.pptx
 
Introduction to value engineering and value analysis
Introduction to value engineering and value analysisIntroduction to value engineering and value analysis
Introduction to value engineering and value analysis
 
IRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and ProgramsIRJET- The Application of Value Engineering to Highway Projects and Programs
IRJET- The Application of Value Engineering to Highway Projects and Programs
 
Value Management Group Assignment
Value Management Group AssignmentValue Management Group Assignment
Value Management Group Assignment
 
Value engineering and Analysis
Value engineering and AnalysisValue engineering and Analysis
Value engineering and Analysis
 
VALUE ENGINNERING.pdf
VALUE ENGINNERING.pdfVALUE ENGINNERING.pdf
VALUE ENGINNERING.pdf
 
VALUE ENGINNERING.pptx
VALUE ENGINNERING.pptxVALUE ENGINNERING.pptx
VALUE ENGINNERING.pptx
 
Practical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital ProjectsPractical Application of Value Engineering in Capital Projects
Practical Application of Value Engineering in Capital Projects
 
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
IRJET- Furniture Product Optimization by using Creative Phase of Value Engine...
 

Mehr von Dr Fereidoun Dejahang

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020Dr Fereidoun Dejahang
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrunDr Fereidoun Dejahang
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvementDr Fereidoun Dejahang
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-writeDr Fereidoun Dejahang
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sectorDr Fereidoun Dejahang
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurementDr Fereidoun Dejahang
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projectsDr Fereidoun Dejahang
 

Mehr von Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Kürzlich hochgeladen

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 

Kürzlich hochgeladen (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 

122 value engineering

  • 2. Value Engineering-Constructability  VALUE ENGINEERING  Value Engineering (VE) has been defined as:  the systematic effort directed at analyzing the functional requirements of:  systems  equipment  facilities  procedures  and supplies for the purpose of achieving the essential function at the lowest total (life-cycle) cost.
  • 3. Value Engineering-Constructability  Also, all the efforts are focused on meeting needed issues such as:  Performance;  Reliability;  quality, maintainability;  aesthetics,  Safety;  fire resistance;  while, at the same time, achieving lowest life-cycle cost.
  • 4. Value Engineering-Constructability  Constructability implementation can act as a predecessor to value engineering.  Providing information through constructor input and lessons learned from past projects such that value engineering may be more effective.
  • 5. Value Engineering Implementation of value engineering involves several steps: 1. Information; 2. functional analysis; 3. creative mind; 4. Evaluation; 5. planning & proposal; 6. Implementation; 7. follow-up.
  • 6. Value Engineering  The creative step involves a brainstorming session where life-cycle cost alternatives, for design components are considered. Value engineering may be performed in two ways:  (1) Proactively  (2) Reactively
  • 7. Value Engineering(Value Analysis)  What Is Value Engineering?  Value Engineering (V.E.), also known as Value Analysis,  is a systematic and function-based approach to improving the value of products, projects, or processes.  VE involves a group of people following a structured process.  The process helps team members communicate better across boundaries.  understand different perspectives,  innovate, and analyze.
  • 8. Value Engineering  What does Value Engineering do?  Value Engineering improves value.  On a major road development, improvements to value might include:  reducing the life cycle cost of an interchange, enhancing safety in a design;  or reducing impacts to the public by shortening the duration of a construction project.
  • 9. Value Engineering  Value Engineering uses a combination of creative and analytical techniques to identify alternative ways to achieve objectives.  The use of Function Analysis differentiates Value Engineering from other problem solving approaches.  VE focuses on delivering the product or service at the best price.  This is achieved by incorporating those value characteristics deemed most important by the customer.
  • 10. Value Engineering How does V.E. work?  V.E. follows a structured thought process to evaluate options.  Every V.E. session goes through a number of steps:  Gather information -What is being done now?  Measure Performance -How will the alternatives be measured?
  • 11. Value Engineering  Analyse Functions -What must be done? What does it Cost?  Generate Ideas (Brainstorming) -What else will do the job?  Evaluate and Rank Ideas -Which Ideas are the best?  Develop and Expand Ideas -What are the impacts? What is the cost? What is the performance?  Present Ideas Sell Alternatives
  • 12.
  • 13.
  • 14.
  • 15. Value Engineering People involved in VE should be able of establishing the following:  effective challenge to design criteria and accepted standards;  access and evaluation of operational and maintenance cost;  focus on high cost areas and replace with lower;  selection of effective alternatives.
  • 16. Value Engineering There are four important steps most be taken in modified VE job plan. They are as follow:  1. Information Phase  -Briefing by the Client  -Feasibility study with client presence,  -Outline proposals  -Scheme design
  • 17. Value Engineering 2-VE Steps Validation or preparation of cost estimate  Familiarisation and breakdown of data into elements-cost models  Functional evaluation of areas to isolate high cost, poor value areas, 3-Speculative Phase  Team review of project-idea listing  Development of final idea listing.
  • 18. Value Engineering 4-Analytical Phase  Evaluation of ideas listing  Selection of high cost areas for in-depth study,  Team brainstorming for generation of possible alternatives suitable for in-depth analysis  Investigate alternatives  Team review of analysis  Preparation of proposal drafts.
  • 19. Value Engineering Proposal Phase  Review of results from analytical phase with client to gain additional information and enhance implementation.  Review and revision of proposal  Preparation of final proposals  Report, including cost estimate review
  • 20. Value Engineering  What are the benefits of V.E.?  Value Engineering is a tool that will improve Mangers ability to manage projects;  solve problems;  Innovate;  communicate.  A VE program in an organization will give the organisation a definitive tool to improve value in any product, project or process.
  • 21. Value Engineering  The advantages of carrying out a VE are:  Cost savings;  risk reduction;  schedule improvements;  improved designs and better collaboration have been the outcomes of investment in VE studies.  The return from the investment in VE normally exceeds 10:1.
  • 22. Value Engineering CASE STUDY  A commercial office development was to be constructed using JCT 2007 following the completion of the design.  The client was reluctant to accept the financial feasibility study.  Therefore, it was decided to VE the design down to an acceptable cost.
  • 23. Value Engineering Solution  The value engineering team decided during the initial information stage to target 3 main areas, such as;  primary criteria: ratio of net let table area to gross building area
  • 24. Value Engineering  architectural review: attempting to relax specifications without affecting the overall quality of the building.  The basement, plant rooms, service cores and the cladding system were all identified as possible targets.
  • 25. Value Engineering  engineering review- targets included:  superstructure  public health requirement  smoke extraction systems  environmental services installations.  A brain storming approach was adopted for the creation of alternative ideas.  The scope of value improvement was listed as:
  • 26. Value Engineering  the basic shape of the original design was critical as being wasteful in terms of the resultant net let table floor area.  Alternatively proposals were made for improving floor layouts, leading to 80% net let able floor area, compared to the 75%.
  • 27. Value Engineering  potential savings were identified by concentrating the major plant items in the basement areas and reducing the extend of the basement ductwork by relocating the air shafts.  Rationalisations were also suggested for the layout and number of lift cores.
  • 28. Value Engineering  a significant simplification was perceived to be possible if the dimensions of the central atrium and the width of the entrance were adjusted to coincide with the structural grid.  build ability principles were applied to the external cladding resulting in the suggested use of composite steel framed panels to fit the storey heights and column centres.
  • 29. Value Engineering  The proposed toilets were also reviewed and a considerable saving was recognised as being possible by the incorporation of pre- fabricated toilet pods.  Form the cost figures it can be seen that the alternative design proposals represented a construction saving of 2.1 million.  The cost of VE WAS £43,000.
  • 30.