SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
AGRI-CLINICS AND AGRI-BUSINESS CENTRES (ACABC) SCHEME
1. AGRI-CLINICS AND AGRI-BUSINESS
CENTRES (ACABC) SCHEME
Dr. J. Diraviam
Senior Scientist and Head
Nodal Officer, ICAR Krishi Vigyan Kendra,
Saraswathi Foundation for Rural Development and Training
Pulutheri, R.T.Malai Post, Kulithalai Tk
Karur Dist.621 313
2. OBJECTIVES
• TO PROVIDE EXTENSION AND
OTHER SERVICES TO THE FARMERS
• TO SUPPORT AGRICULTURAL
DEVELOPMENT
• TO CREATE GAINFUL SELF-
EMPLOYMENT OPPORTUNITEIS
3. CONCEPT / DEFINITION
• AGRI-CLINICS :
TO PROVIDE EXPERT ADVICE &
SERVICES WHICH WOULD ENHANCE
PRODUCTIVITY AND ENSURE
INCREASED INCOME TO FARMERS
• AGRI-BUSINESS CENTRES :
COMMERCIAL AGRI-VENTURES FOR
INCOME GENERATION &
ENTREPRENEURSHIP DEVELOPMENT
4. ELIGIBLE PERSONS
GRADUATES IN AGRICULTURE & ALLIED
SUBJECTS ALLIED SUBJECTS
DIPLOMA HOLDERS (WITH 50% MARKS)/PG
DIPLOMA HOLDERS IN AGRI AND ALLIED
SUBJECTS FROM SAU, STATE AGRI. & ALLIED
DEPTS. AND STATE DEPT OF TECHNICAL
EDUCATION.
BIOLOGICAL SCIENCE GRADUATES WITH PG IN
AGRI AND ALLIED SUBJECTS.
DEGREE HOLDERS IN COURSES RECOGNISED BY
UGC HAVING MORE THAN 60% OF THE CONTENT
IN AGRI. & ALLIED SUBJECTS.
5. ELIGIBLE PERSONS CONTD….
DIPLOMA/PG DIPLOMA HOLDERS IN COURSES WITH
>60% OF COURSE CONTENT IN AGRI & ALLIED
SUBJECTS, AFTER B.SC. IN BIOLOGICAL SCIENCES
FROM RECOGNISED COLLEGES AND UNIVERSITIES
AGRICULTURE RELATED COURSES AT
INTERMEDIATE (+2) LEVEL WITH AT LEAST 55%
MARKS
DIPLOMA IN AGRICULTURE & ALLIED SUBJECTS
OFFERED BY OTHER AGENCIES ARE ALSO ELIGIBLE
SUBJECT TO APPROVAL OF DEPARTMENT OF
AGRICULTURE AND COOPERATION, GOI ON THE
RECOMMENDATION OF THE STATE GOVERNMENT
CANDIDATES SHOULD BE TRAINED
6. AREA OF OPERATION
• BOTH RURAL AND URBAN AREAS
• GEOGRAPHICAL LOCATION :
NO RESTRICTION
7. FULL FINANCIAL SUPPORT FOR
TRAINING/HAND HOLDING
(MANAGE)
CREDIT (BANKS)
CREDIT– LINKED BACK ENDED
SUBSIDY THROUGH NABARD
9. PROJECT COST
INDIVIDUAL CEILING : ` 20 LAKH (` 25 LAKH
IN CASE OF EXTREMELY SUCCESSFUL
PROJECTS)
GROUP CEILING : ` 100 LAKH (AT LEAST 5
TRAINED PERSONS OUT OF WHICH ONE
COULD BE FROM MANAGEMENT
BACKGROUND)
GROUP COULD BE 2 OR MORE TRAINED
PERSONS
PERSON WITH MANAGEMENT BACKGROUND
ONLY TO BE INCLUDED IN GROUP OF 5 OR
10. PROJECT COST CONTD….
• COMPUTER /PRINTER/BROADBAND
CONNECTION (1 MBPS ATLEAST) –
AN INTEGRAL PART OF TFO
• CREDIT SANCTIONED BY BANK COULD
BE HIGHER DEPENDING ON VIABILITY/
FEASIBILITY
• AT LEAST 10% OF THE PROJECT COST
SHOULD BE IN CAPITAL FORM
• INSURANCE COULD BE A PART OF TFO
11. EXTREMELY SUCCESSFUL PROJECTS
PROJECT COST LIMIT IS EXTENDED BY
` 5 LAKH I.E. ` 20 LAKH + ` 5 LAKH = `
25 LAKH)
TO BE APPROVED BY EMPOWERED
STEERING COMMITTEE USING ABOVE
CRITERIA
BASED ON DEFINED CRITERIA AND
SCORING FOR THE SAME
12. TERM LOAN
SHOULD BE COMPOSITE
(FIXED CAPITAL + WC FOR 1 OPERATING
CYCLE)
REPAYMENT SCHEDULE IS TO BE DRAWN ON
THE TOTAL COMPOSITE LOAN INCLUDING
SUBSIDY
REPAYMENT PERIOD : 5-10 YEARS DEPENDING
ON ACTIVITY
MAX GRACE PERIOD : 2 YEARS
ROI ON LOAN : RBI GUIDELINES/POLICY OF
THE BANK
LOCK-IN PERIOD : 3 YEARS
13. MARGIN MONEY
AS PER RBI GUIDELINES
NO MARGIN FOR LOAN UPTO ` 5
LAKH
50% OF THE MARGIN MONEY AS
SOFT LOAN FROM NABARD
14. SECURITY
AS PER RBI GUIDELINES
LOANS UP TO ` 5 LAKH CAN BE
SECURED AGAINST
HYPOTHECATION OF ASSETS
CREATED
15. CREDIT LINKED COMPOSITE SUBSIDY
44% FOR WOMEN, SC/ST AND ALL
CATEGORIES OF BORROWERS FROM
NER, HILLY STATES
36% FOR ALL OTHERS
RELEASED UPFRONT IN ONE
INSTALMENT BY NABARD TO BANKS
AFTER SANCTION OF LOAN
ALL CANDIDATES TRAINED UNDER
THE SCHEME SHALL BE ELIGIBLE FOR
SUBSIDY IF LOAN IS SANCTIONED ON
OR AFTER 9.7.2006
16. CREDIT LINKED COMPOSITE SUBSIDY
BANK TO KEEP SUBSIDY IN ‘SUBSIDY
RESERVE FUND ACCOUNT
(BORROWER WISE)’
BANKS NOT TO CHARGE INTEREST
ON SUBSIDY PORTION
BALANCE IN THE ‘SUBSIDY RESERVE
FUND ACCOUNT’ WILL NOT FORM
PART OF DTL
17. CREDIT LINKED COMPOSITE SUBSIDY
REVISED TFO CEILING APPLICABLE TO
CASES SANCTIONED AFTER 4.8.10
CASES SANCTIONED BUT NOT CLOSED
SHALL BE CONVERTED TO COMPOSITE
SUBSIDY- DIFFERENTIAL AMOUNT
BETWEEN PAYBLE AND PAID
ASSISTANCE TO BE RELEASED IN ONE
LUMPSUM ON OBTAINING A CLAIM
FROM THE BANK
18. CREDIT LINKED COMPOSITE SUBSIDY
BENEFIT OF SUBSIDY CAN BE EXTENDED
TWICE TO A SINGLE BORROWER WITHIN
THE OVERALL CEILING
WHEN 2 INDEPENDENT PROJECTS ARE
FINANCED TO THE SAME BENEFICIARY
(SUBSIDY WOULD BE AS PER ADMISSIBLE
TFO CEILINGS BY CONSIDERING THE TFO
OF BOTH THE PROJECTS TOGETHER)
EXPANSION OF AN EXISTING PROJECT
OF A BORROWER (ONLY ON THE TFO
FOR EXPANSION AND THE COST OF THE
EXISTING PROJECT IS NOT INCLUDED)
19. CREDIT LINKED COMPOSITE SUBSIDY
FRESH/EXPANSION PROJECTS
SANCTIONED BY BANKS BEFORE
4.8.10:
TFO CEILING WILL BE `10 LAKH
(INDIVIDUAL)
FRESH/EXPANSION PROJECTS
SANCTIONED BY BANKS ON OR AFTER
4.8.10 :
TFO CEILING WILL BE ` 20 LAKH
(INDIVIDUAL)
20. PROCEDURE
AGRIPRENEUR TO SUBMIT PROJECT
PROPOSAL FOR LOAN AND SUBSIDY TO
BANKS
BANKS TO APPRAISE, SANCTION AND
DISBURSE THE FIRST INSTALMENT
BANKS TO CLAIM SUBSIDY FROM NABARD
WITH A BRIEF PROJECT PROFILE-CUM-
CLAIM FORM
ROS ARE EXPECTED TO DISPOSE OFF THE
CLAIMS WITHIN A FORTNIGHT FROM THE
DATE OF RECEIPT OF THE CLAIMS
BANKS TO SUBMIT UTILIZATION
CERTIFICATE
21.
DELIVERY OF EXTENSION SERVICES
SHALL BE THE MAIN COMPONENT
RECORD OF ADVISORY SERVICES
(PRESCRIBED PROFORMA) IS TO BE
MAINTAINED BY THE UNIT
ANY TWO OFFICIAL MAY TAKE UP
PERIODIC/SURPRISE VISIT FOR
VERIFYING RECORDS OF ADVISORY
SERVICES
22.
WHERE MISUTILIZATION OF SUBSIDY
HAS BEEN NOTICED BANK SHALL
REFUND THE SUBSIDY TO NABARD
A CONSOLIDATED REPORT IS TO BE
FINALIZED BY THE BANK BEFORE 3
YEARS LOCK-IN PERIOD FOR
FORWARDING TO NABARD/ATMA FOR
INFORMATION
TIME LIMIT FOR COMPLETION :
6 MONTHS FROM DATE OF DISB. OF
1ST
INSTALMENT (PLUS ADDITIONAL 6
MOTHS FOR JUSTIFYABLE DELAY)
23.
BENEFIT OF SUBSIDY IS NOT AVAILABLE
IF THE PROJECT IS NOT COMPLETED
WITHIN STIPULATED TIME & SUBSIDY IS
TO BE REFUNDED TO NABARD
INSURANCE TO BE TAKEN WHEREVER
REQUIRED
DISPLAY OF SIGN BOARD AT THE UNIT
PRE AND POST COMPLETION
INSPECTION OF PROJECT BY BANK
SUBSIDY SUBJECT TO AVAILABILITY OF
FUNDS FROM GOI
24. EMPOWERED STEERING COMMITTEE
SECRETARY (A&C) : CHAIRMAN
ADDL. SECY, DAC : MEMBER
AS & FA, DAC : MEMBER
DDG (EXTN.), ICAR : MEMBER
DG, MANAGE : MEMBER
ED, NABARD : MEMBER
JT. SECY (EXTN.) : MEMBER SECRETARY
GOI’S INTERPRETATION OF THE SCHEME
INSTRUCTIONS WILL BE FINAL
25. Innovations
• Creating awareness about ACABC
programmes through our KVK activities
• Using all social media to raise awareness
about the programme – Whatsapp, Facebook
• Inviting success FPO members to handle
session to candidates
• Providing exposure visits to FPOs, successful
farmers
• Availing Consultancy Service of a successful
Agripreneur for DPR preparation
• Utilizing KVK faculty for handholding support
26. Training
We invite applications through Local News papers
and All India Radio, Trichy
Scrutiny of the applications are done as per the
New guidelines
We conduct pre screening for selection of
candidates
For screening committee we invite members from
MANAGE, NABARD, Banker, Director of
Agriculture.
27. Training
For the inaugural and valedictory functions we
invite officials from NABARD , Agrl. Department
and Bank.
In the training we invite the faculty from the
following departments like NABARD, Department of
Agriculture, Horticulture, Marketing, Veterinary
sciences, Commercial Bank, Professors from
Agricultural University, Trichy
Conduct the Training Programmes as per the
guidelines
28. Schedule, Midterm Report & Final
Evaluation reports are sent to MANAGE on
time.
Registers are maintained for Daily
Attendance, Accommodation & for Follow-
up activity.
During the Training & Field Visits, daily
attendance register is maintained.
29. Feedback will be taken on individual
basis and overall feed back of the
program will be taken from
participants.
We collect all the DPR from the
participant on last day and we send it
to concerned banks.
We provide library and internet
facility to the trainees.
30. Handholding
• Forwarding project proposal to the
banks
• Visiting the established ventures
• Establishing rapport between
Agripreneurs and bankers
• Motivating the Agripreneurs to continue
the established ventures
31. Handholding
• Apprising the Agripreneurs about the guidelines governing
subsidy and interest components from time to time.
• Getting DPRs vetted by Agri Officer of commercial bank
• Meeting Department of Agriculture officials.
• Attending / Participating in meeting organized by
MANAGE alongwith the Agripreneurs
• Followup with NABARD for release of Subsidy
32. Market survey
Separate questionnaire for Market Survey.
The DPR is prepared strictly based on individual Market
Survey Reports.
DPR Preparation
Resource Person, Bank Officials and Nodal officer are involved
in the DPRs preparation.
The DPRs contain a place for Extension activities.
33. Involvement of State government &
ATMA
Maintaining rapport with ATMA to utilize the
services of trained Agripreneurs.
State Government, Bankers and University
officials are invited to the guest lectures for
Training and also to show successful
Enterprises which has helped in sensitizing
them and also building rapport.
34. Success stories – Raj agro service
Shri M.Rajkumar – SBI
Omalur, Rs 20 lakhs
I.D. No. TN 4112
Date of start: 30.12.13
Turnover: Rs 2 lakhs p.a.
Demonstration of Farm
machinery before Israel Deputy
Commissioner and high level
officers from 28 states at the
Indo Israel Cutflowers
Training Center, Thally,
Krishnagiri Dt. TN on 16-17,
Dec 2015