ANNUAL TURNAROUND JUNE 2015 Page | 1
REPORT ON PRIMARY
REFORMER
CATALYST
UNLOADING AND
LOADING
ANNUAL TURNAROUND JUNE 2015 Page | 2
PRIMARY REFORMER CATALYST REPLACEMENT PLANNED JOB FOR
ANNUAL TURNAROUND 2015 AT MANGALORE CHEMICALS AND
FERTILIZERS LIMITED, PANAMBUR, MANGALORE, KARNATAKA- 575010.
PROCESS CREW MEMBERS
 K. SELVAN
 DHARMARAJ. D. D
 K. P. DEVADIGA
 PRASHANT. A
 SHARATH. A
 SILAMBARASAN
 PRASHANTH. K
 VINAYA
 ABHAY
 ABDUL
 ROHIT
 BHARATH
 JEEVAN
 YASHWANTH
 SACHIN
ANNUAL TURNAROUND JUNE 2015 Page | 3
SUMMARY
After the successful operational period for the year 2014-2015, inspection of
primary reformer tubes and replacement of primary reformer catalyst was planned to
provide solution for the high reformer tube skin temperatures.
Sud Chemie (Catalyst Supplying Firm) took the initiative of supplying the two
layered catalyst for the primary reformer. Catalyst was made available as per our
requirement with bottom layer having 42% of Ni Catalyst (Reformax 330 G90 LDP- 10
hole- 19*16mm) and 58% of NiK Catalyst (Reformax 250- 5 hole- 16*16mm).
Bottom layer catalyst:
REFORMAX 330 G90 LDP (10 hole) - 19*16mm
49 drums of new catalyst and 1 drum of old catalyst were available.
Drum info- Net weight- 156 kgs/Gross weight- 176 kgs/Volume- 200 liters.
Density- 780 kg/m3.
ANNUAL TURNAROUND JUNE 2015 Page | 4
Top layer catalyst:
REFORMAX 250 (5 hole)- 16*16mm
68 drums of new catalyst were available.
Drum info- Net weight- 216 kgs/Gross weight- 236 kgs/Volume- 200 liters.
Density- 1080 kg/m3.
CR- Asia was given the contract for unloading and uniform loading of primary
reformer catalysts. Services included reformer tubes counter weight adjustment, tube
flanges bolt loosening/tightening (without hammer- pneumatic torque allowed), shifting of
spent/new catalyst drums, visual display of individual reformer tube internal surface with
video cam assembly, for spent catalyst sampling, empty/loaded catalyst dip and differential
pressure (DP) checking, catalyst unloading by BIVAC pump and loading by UNIDENSE
method.
ANNUAL TURNAROUND JUNE 2015 Page | 5
DETAILED REPORT
After planned ammonia plant shutdown, reformer cooling using inert gas (Nitrogen)
was prolonged for LTCO convertor bed cooling (@1000 hours on 10th June, 2015).
Depressurization of front end was done at HT guard inlet vent point after isolating HTCO
convertor inlet isolation valve. After depressurizing, following jobs were done in the
mentioned order (Jobs completed in approximately 8 hours)-
 Reformer feed spaded (FRRC-203 d/s)
 Make gas boiler(H201) outlet spaded
 Reformer furnace man way covers opened
 Reformer outlet T-plug removed
 All reformer burner guns removed
 Demineralized water flushing done for fuel naphtha header towards raw naphtha
storage tank
 Reformer fuel naphtha strainer spaded (SM1 u/s)
 Reformer tube counter weight locked
 Reformer tube and pigtail flanges insulation removed
All 224 tube flanges bolt removal initiated. Long pigtail to short pigtail flange
removed and respective orifices positions were marked and tied to the same flanges (Jobs
completed in approximately 24 hours).
Unloading of primary reformer was started at 1825 hours on 10th June, 2015. CR-
Asia BIVAC with a single hose was used for unloading with vacuum reading of -350 mm
Hg/-0.135 inch Hg. Dust sample was collected from bottom T- plug and handed over to Q/C
& Lab for analyzing. With completion of catalyst unloading for “A” & “B” row, rigs for
measuring differential pressure across tubes were being made ready for MCFL rig. [Note: A
second vacuum hose was made ready and utilized to accelerate the catalyst unloading
process. A metal tip nozzle was being used in case of compacted spent catalyst unloading. A
mark with tape was made on each hose being inserted into tubes to make sure the catalyst
support grid was not being damaged for every tube.]
ANNUAL TURNAROUND JUNE 2015 Page | 6
Spent catalyst sampling was done for the following tubes A24, A44, A48, B16 and
D16. As decided, samples were collected at heights of 3m, 6m and 9m for all the 5 tubes.
Reformer catalyst unloading for all 224 tubes was completed on 12th June, 2015 (Job
completed in approximately 48 hours). The spent catalyst was being collected in the
provided Mangala Urea bags and shifted to the reformer bottom shed. All 224 tubes empty
dip readings were noted down. Later that night at 2230 hours, all reformer tubes inner
surface cleaning by stainless steel wire mesh was initiated. To extract the excess scale
formation inside the reformer tubes, arrangement was made with a buffing plate (Diameter
100mm) having connected rods (threaded with nut and bolt) for extension as the plate
moves inside the tube. As the assembly was not much efficient and the potential risk of it
getting clogged was more, the arrangement was rejected.
Simultaneously bottom layer Ni catalyst drums were being shifted from the storage
area to shed (reformer bottom area) and top layer NiK catalyst to shed (stores area). [Note:
Catalyst drums were being shifted in absence of rain. Drum rolling to be avoided. Keep the
drums on wooden pallets, avoid stacking them up. Protect from rain and stagnant water by
providing tarpaulin cover. Keep the lids on, avoid catalyst exposure and do not damage the
drums.]
DP measurement details:
CR-ASIA DP apparatus orifice diameter: 8mm.
MCF DP rig orifice downstream hose length/diameter: 6.00mts/ 0.75”.
Orifice u/s instrument air maintained pressure: 4.00 kg/cm2. (Transmitter range: 0-10
kg/cm2.g).
Orifice d/s pressure indicates DP. (Transmitter range: 0-4 kg/cm2.g).
ANNUAL TURNAROUND JUNE 2015 Page | 7
Inner deposits collected from some of
the reformer tubes.
Composition:
Nickel 33.91%
Iron 18.65%
Chromium 05.16%
Aluminum 0.42%
Calcium 0.12%
Magnesium 0.062%
Copper 0.08%
Potash 0.062%
Vanadium 0.035%
Lead ND
Sulfides as S <10ppm
Chloride <1ppm
Sulfate <1ppm
Phosphate <1ppm
After the cleaning of tubes, visual inspection was done using the video cam and
remote display. D31 reformer tube catalyst grid support was found damaged (On 16th
June, 2015). At the same time dip readings and DP checking across empty tube (with MCFL
rig) was initiated and completed. It was replaced with a new grid support and was cross
checked with the old dip and DP readings. CR-Asia rig connections were made ready and
DP checking for each reformer tube was initiated.
At reformer top; arrangement were being made for catalyst weighing, catalyst dust
blowing, protection from rain and provision of breeze free surroundings. Some reformer
tubes (49 in nos.) having DP values (with CR-Asia rig) more than 0.04kg/cm2.g were
decided to be cleaned again by removal of catalyst grid support. After tube cleaning and
checking the improved DP readings for the respective tubes, catalyst grid supports were
boxed up and clearance was given for catalyst loading (On 1600 hrs on 19th June, 2015).
ANNUAL TURNAROUND JUNE 2015 Page | 8
Test loading of first layer (Ni) catalyst was done for the first tube of each row i.e. A1,
B1, C1 and D1 in presence of Sud Chemie representative. Dip and DP readings were noted
down as a reference value for rest of the tubes. It was decided to go ahead with 5 buckets of
catalyst for each tube weighing 7kgs. Supervision was deputed to employees to follow up
the catalyst weighing, catalyst drum being utilized and correctional weight for each tube.
[Note- Weighing machine was deployed from ABC plant to weigh catalyst for loading.
Instrument air connection was provided from PICV-2211 tapping for checking reformer tube
DP and catalyst dust blowing. A separate instrument air connection was provided from F-
4210 area for air wench to lift catalyst drums.]
As catalyst available was close to the amount needed after loading “A” and “B” row
tubes, it was decided to load remaining tubes with maximum of 36kgs till all tubes are
covered. Dip readings were noted of all reformer tubes filled with Ni catalyst. Later dip
corrections were done by additional top up for selective tubes to get the dip reading closer
to 7.2m (Completed by 0700hrs on 21st June, 2015). DP readings for all tubes with Ni
catalyst were noted down with CR-Asia rig and later with MCFL rig. As for the Ni catalyst
loading, all new catalyst was utilized and 1 drum old catalyst weighing 112.8kg/141liters
was unutilized which was shifted to DAP plant storage.
After getting approval of DP and dip readings, clearance was given for loading of
second layer (NiK) catalyst. Test loading was done for first tube of each row i.e. A1, B1, C1
and D1. Dip and DP readings were noted down as a reference value for the rest of the tubes.
It was decided to go ahead with 7 buckets for each tube weighing 10kgs. After loading of
NiK catalyst for all tubes, dip readings were noted down and correction were done by
additional top up for selective tubes to get the dip reading closer to 0.8m (Completed by
0600hrs on 23rd June, 2015). DP readings for NiK catalyst were noted down using CR-Asia
and later with MCFL rig. DP correction was done for B1 and B49 tubes as the respective DP
readings were on the lower side. For NiK catalyst, 3 full drums of catalyst and a partly filled
drum was shifted to catalyst storage (725 liters in total).
ANNUAL TURNAROUND JUNE 2015 Page | 9
After getting of approval of DP and dip readings, it was decided to box up all
reformer tube flanges. Later orifices and long pigtail to short pigtail flanges were boxed up.
Reformer tubes counter weights were released properly. Housekeeping was done at
reformer top and insulation job was kept pending as high pressure leak test and flange
bolts hot tightening had to be done. Instrument air connections were normalized for TICV-
211 and TI-231. Empty drums were filled with spent catalyst and content displaying
hazardous sticker was pasted on each drum.
DIP HEIGHTS FIXED FOR LOADING
 Empty dip height from tube top flange to the catalyst support grid- 11.83 meters.
 Empty dip height from tube top flange to the top surface of Reformax330 (G90 LDP-
10 holed) catalyst- 7.20 meters.
 Empty dip height from tube top flange to the top surface of Reformax250 (5 holed)
catalyst- 0.80 meters.
 Allowable DP variation from average DP of 224 tubes- +3% to -3%.
AVERAGE TUBE DP AFTER EACH LAYER OF CATALYST LOADING WITH CR-ASIA RIG
Average tube DP after loading Reformax 330-G90 LDP catalyst- 0.1837 bar.g
Average tube DP after loading Reformax 250 catalyst- 0.5462 bar.g
CATALYST CONSUMPTION FOR ALL 224 TUBES
Total Reformax 330-G90 LDP catalyst utilized- 8138.156 kilograms.
Total Reformax 250 catalyst utilized- 15160.843 kilograms.
Hence, total catalyst utilized- 23298.999 kilograms.
ANNUAL TURNAROUND JUNE 2015 Page | 10
APPROXIMATE TIME REQUIREMENT:
 Time required for T plug dropping. : 05 hrs
 Time required for reformer tube to : 25.50 hrs
short pigtail flange & short pigtail.
to long pigtail flange disconnection.
 Time required for catalyst unloading. : 52.50 hrs
 Time require for tube inner surface cleaning
and tube visual inspection. : 88 hrs.
 Dead time due to reformer tube inspection : 06 hrs.
 Time required for catalyst support grid
removal, cleaning and box up. Empty tube
DP measurement was done simultaneously. : 56 hrs.
 Time required for Reformax-330-G90 LDP
catalyst loading. : 30 hrs
 Dead time due to power failure. : 01 hrs.
 Time required for 1st layer catalyst
dip and DP measurement/adjustment. : 08 hrs.
 Time required for Reformax-250 catalyst
loading. : 48.50hrs
 Time required for 2nd layer catalyst
dip and DP measurement/adjustment. : 12 hrs.
 Time required for tubes boxing up. : 36 hrs
 Time required for t plug boxing up. : 05hrs
 Dead time due to radiography. : 08 hrs
 Total time required. : 381.50 hrs

Weitere ähnliche Inhalte

Was ist angesagt?

Ammonia Formation over Steam Reforming Catalysts
Ammonia Formation over Steam Reforming CatalystsAmmonia Formation over Steam Reforming Catalysts
Ammonia Formation over Steam Reforming CatalystsGerard B. Hawkins
 
Steam Reforming - Practical Operations
Steam Reforming - Practical OperationsSteam Reforming - Practical Operations
Steam Reforming - Practical OperationsGerard B. Hawkins
 
Steam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive ReviewSteam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive ReviewGerard B. Hawkins
 
Ammonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingAmmonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingGerard B. Hawkins
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsGerard B. Hawkins
 
Calculation of an Ammonia Plant Energy Consumption:
Calculation of an Ammonia Plant Energy Consumption:  Calculation of an Ammonia Plant Energy Consumption:
Calculation of an Ammonia Plant Energy Consumption: Gerard B. Hawkins
 
Various ammonia technology
Various ammonia technologyVarious ammonia technology
Various ammonia technologyPrem Baboo
 
Start Up Procedures for Primary Reforming Catalyst
Start Up Procedures for Primary Reforming CatalystStart Up Procedures for Primary Reforming Catalyst
Start Up Procedures for Primary Reforming CatalystGerard B. Hawkins
 
Ammonia synthesis converter
Ammonia synthesis converterAmmonia synthesis converter
Ammonia synthesis converterPrem Baboo
 
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
(LTS) Low Temperature Shift Catalyst - Comprehensive OverviewGerard B. Hawkins
 
A presentation on reformer new
A presentation on reformer newA presentation on reformer new
A presentation on reformer newGowri Shankar
 
Primary Reforming Flowsheets
Primary Reforming FlowsheetsPrimary Reforming Flowsheets
Primary Reforming FlowsheetsGerard B. Hawkins
 
101 Things That Can Go Wrong on a Primary Reformer - Best Practices Guide
101 Things That Can Go Wrong on a Primary Reformer -  Best Practices Guide101 Things That Can Go Wrong on a Primary Reformer -  Best Practices Guide
101 Things That Can Go Wrong on a Primary Reformer - Best Practices GuideGerard B. Hawkins
 
Catalyst Catastrophes in Syngas Production - II
Catalyst Catastrophes in Syngas Production - IICatalyst Catastrophes in Syngas Production - II
Catalyst Catastrophes in Syngas Production - IIGerard B. Hawkins
 
Pre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementPre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementGerard B. Hawkins
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignGerard B. Hawkins
 
Steam Reforming - (ATM) Approach to Equilibrium
Steam Reforming - (ATM) Approach to EquilibriumSteam Reforming - (ATM) Approach to Equilibrium
Steam Reforming - (ATM) Approach to EquilibriumGerard B. Hawkins
 

Was ist angesagt? (20)

Ammonia CO2 Removal Systems
Ammonia CO2 Removal SystemsAmmonia CO2 Removal Systems
Ammonia CO2 Removal Systems
 
Ammonia Formation over Steam Reforming Catalysts
Ammonia Formation over Steam Reforming CatalystsAmmonia Formation over Steam Reforming Catalysts
Ammonia Formation over Steam Reforming Catalysts
 
Steam Reforming - Practical Operations
Steam Reforming - Practical OperationsSteam Reforming - Practical Operations
Steam Reforming - Practical Operations
 
Steam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive ReviewSteam Reforming - A Comprehensive Review
Steam Reforming - A Comprehensive Review
 
Steam Reforming - Poisons
Steam Reforming - PoisonsSteam Reforming - Poisons
Steam Reforming - Poisons
 
Ammonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator trainingAmmonia Synthesis Flowsheet - Operator training
Ammonia Synthesis Flowsheet - Operator training
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia Plants
 
Calculation of an Ammonia Plant Energy Consumption:
Calculation of an Ammonia Plant Energy Consumption:  Calculation of an Ammonia Plant Energy Consumption:
Calculation of an Ammonia Plant Energy Consumption:
 
Various ammonia technology
Various ammonia technologyVarious ammonia technology
Various ammonia technology
 
Start Up Procedures for Primary Reforming Catalyst
Start Up Procedures for Primary Reforming CatalystStart Up Procedures for Primary Reforming Catalyst
Start Up Procedures for Primary Reforming Catalyst
 
Ammonia synthesis converter
Ammonia synthesis converterAmmonia synthesis converter
Ammonia synthesis converter
 
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
(LTS) Low Temperature Shift Catalyst - Comprehensive Overview
 
A presentation on reformer new
A presentation on reformer newA presentation on reformer new
A presentation on reformer new
 
Primary Reforming Flowsheets
Primary Reforming FlowsheetsPrimary Reforming Flowsheets
Primary Reforming Flowsheets
 
101 Things That Can Go Wrong on a Primary Reformer - Best Practices Guide
101 Things That Can Go Wrong on a Primary Reformer -  Best Practices Guide101 Things That Can Go Wrong on a Primary Reformer -  Best Practices Guide
101 Things That Can Go Wrong on a Primary Reformer - Best Practices Guide
 
Secondary Reforming Burners
Secondary Reforming BurnersSecondary Reforming Burners
Secondary Reforming Burners
 
Catalyst Catastrophes in Syngas Production - II
Catalyst Catastrophes in Syngas Production - IICatalyst Catastrophes in Syngas Production - II
Catalyst Catastrophes in Syngas Production - II
 
Pre-reformer Operations Technical Supplement
Pre-reformer Operations Technical SupplementPre-reformer Operations Technical Supplement
Pre-reformer Operations Technical Supplement
 
Steam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer DesignSteam Reforming - Types of Reformer Design
Steam Reforming - Types of Reformer Design
 
Steam Reforming - (ATM) Approach to Equilibrium
Steam Reforming - (ATM) Approach to EquilibriumSteam Reforming - (ATM) Approach to Equilibrium
Steam Reforming - (ATM) Approach to Equilibrium
 

Andere mochten auch

Steam Reforming - Catalyst Loading
Steam Reforming - Catalyst LoadingSteam Reforming - Catalyst Loading
Steam Reforming - Catalyst LoadingGerard B. Hawkins
 
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Gerard B. Hawkins
 
Catalyst Selection - Buy Model Overview
Catalyst Selection - Buy Model OverviewCatalyst Selection - Buy Model Overview
Catalyst Selection - Buy Model Overviewarisy
 
Pooja joshy organiations study at sud chemie
Pooja joshy organiations study at sud chemiePooja joshy organiations study at sud chemie
Pooja joshy organiations study at sud chemieLibu Thomas
 
60167331 secondary-reformer
60167331 secondary-reformer60167331 secondary-reformer
60167331 secondary-reformerKhai Huynh
 
Finalized readings (mcfl rig).
Finalized readings (mcfl rig).Finalized readings (mcfl rig).
Finalized readings (mcfl rig).Dharmaraj Daddikar
 
SOUTHERN PETROCHEMICALS INDUSTRIES CORPORATION LIMITED
SOUTHERN PETROCHEMICALS INDUSTRIES CORPORATION LIMITEDSOUTHERN PETROCHEMICALS INDUSTRIES CORPORATION LIMITED
SOUTHERN PETROCHEMICALS INDUSTRIES CORPORATION LIMITEDDharmaraj Daddikar
 
PREPARATION FOR BOILER FEED WATER PRODUCTION
PREPARATION FOR BOILER FEED WATER PRODUCTIONPREPARATION FOR BOILER FEED WATER PRODUCTION
PREPARATION FOR BOILER FEED WATER PRODUCTIONDharmaraj Daddikar
 
Steam Reforming - Carbon Formation
Steam Reforming - Carbon FormationSteam Reforming - Carbon Formation
Steam Reforming - Carbon FormationGerard B. Hawkins
 
Chapter 6c -_ht_design_consideration_-_latest
Chapter 6c -_ht_design_consideration_-_latestChapter 6c -_ht_design_consideration_-_latest
Chapter 6c -_ht_design_consideration_-_latestHelena Francis
 
Chapter 6b -_hydrotreating_hds_catalyst
Chapter 6b -_hydrotreating_hds_catalystChapter 6b -_hydrotreating_hds_catalyst
Chapter 6b -_hydrotreating_hds_catalystHelena Francis
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampGerard B. Hawkins
 
Synthesis catalyst converter explanation
Synthesis catalyst converter explanationSynthesis catalyst converter explanation
Synthesis catalyst converter explanationDharmaraj Daddikar
 
Catalysis in hydtotreating and hydrocracking
Catalysis in hydtotreating and hydrocrackingCatalysis in hydtotreating and hydrocracking
Catalysis in hydtotreating and hydrocrackingKaneti Pramod
 
Feedstock Purfication in Hydrogen Plants
Feedstock Purfication in Hydrogen PlantsFeedstock Purfication in Hydrogen Plants
Feedstock Purfication in Hydrogen PlantsGerard B. Hawkins
 
PD230 Catalytic Reforming
PD230 Catalytic ReformingPD230 Catalytic Reforming
PD230 Catalytic ReformingpetroEDGE
 

Andere mochten auch (20)

Steam Reforming - Catalyst Loading
Steam Reforming - Catalyst LoadingSteam Reforming - Catalyst Loading
Steam Reforming - Catalyst Loading
 
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
Steam Reformer Surveys - Techniques for Optimization of Primary Reformer Oper...
 
Catalyst Selection - Buy Model Overview
Catalyst Selection - Buy Model OverviewCatalyst Selection - Buy Model Overview
Catalyst Selection - Buy Model Overview
 
Pooja joshy organiations study at sud chemie
Pooja joshy organiations study at sud chemiePooja joshy organiations study at sud chemie
Pooja joshy organiations study at sud chemie
 
60167331 secondary-reformer
60167331 secondary-reformer60167331 secondary-reformer
60167331 secondary-reformer
 
Finalized readings (mcfl rig).
Finalized readings (mcfl rig).Finalized readings (mcfl rig).
Finalized readings (mcfl rig).
 
Catalyst unloading details
Catalyst unloading detailsCatalyst unloading details
Catalyst unloading details
 
HALDIA PETROCHEMICALS LIMITED
HALDIA PETROCHEMICALS LIMITEDHALDIA PETROCHEMICALS LIMITED
HALDIA PETROCHEMICALS LIMITED
 
SOUTHERN PETROCHEMICALS INDUSTRIES CORPORATION LIMITED
SOUTHERN PETROCHEMICALS INDUSTRIES CORPORATION LIMITEDSOUTHERN PETROCHEMICALS INDUSTRIES CORPORATION LIMITED
SOUTHERN PETROCHEMICALS INDUSTRIES CORPORATION LIMITED
 
Hydrogen Recovery
Hydrogen RecoveryHydrogen Recovery
Hydrogen Recovery
 
PREPARATION FOR BOILER FEED WATER PRODUCTION
PREPARATION FOR BOILER FEED WATER PRODUCTIONPREPARATION FOR BOILER FEED WATER PRODUCTION
PREPARATION FOR BOILER FEED WATER PRODUCTION
 
Steam Reforming - Carbon Formation
Steam Reforming - Carbon FormationSteam Reforming - Carbon Formation
Steam Reforming - Carbon Formation
 
Chapter 6c -_ht_design_consideration_-_latest
Chapter 6c -_ht_design_consideration_-_latestChapter 6c -_ht_design_consideration_-_latest
Chapter 6c -_ht_design_consideration_-_latest
 
Chapter 6b -_hydrotreating_hds_catalyst
Chapter 6b -_hydrotreating_hds_catalystChapter 6b -_hydrotreating_hds_catalyst
Chapter 6b -_hydrotreating_hds_catalyst
 
Key Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit RevampKey Considerations for a Reforming Unit Revamp
Key Considerations for a Reforming Unit Revamp
 
Synthesis catalyst converter explanation
Synthesis catalyst converter explanationSynthesis catalyst converter explanation
Synthesis catalyst converter explanation
 
Catalysis in hydtotreating and hydrocracking
Catalysis in hydtotreating and hydrocrackingCatalysis in hydtotreating and hydrocracking
Catalysis in hydtotreating and hydrocracking
 
catalytic reforming
catalytic reformingcatalytic reforming
catalytic reforming
 
Feedstock Purfication in Hydrogen Plants
Feedstock Purfication in Hydrogen PlantsFeedstock Purfication in Hydrogen Plants
Feedstock Purfication in Hydrogen Plants
 
PD230 Catalytic Reforming
PD230 Catalytic ReformingPD230 Catalytic Reforming
PD230 Catalytic Reforming
 

Ähnlich wie Reformer Catalyst Report

Experimental Analysis of Heat Transfer Enhancement in a Double Pipe Heat Exch...
Experimental Analysis of Heat Transfer Enhancement in a Double Pipe Heat Exch...Experimental Analysis of Heat Transfer Enhancement in a Double Pipe Heat Exch...
Experimental Analysis of Heat Transfer Enhancement in a Double Pipe Heat Exch...IRJET Journal
 
A case study of thinning of ng (natural gas) injection line in mp section bef...
A case study of thinning of ng (natural gas) injection line in mp section bef...A case study of thinning of ng (natural gas) injection line in mp section bef...
A case study of thinning of ng (natural gas) injection line in mp section bef...Prem Baboo
 
Report steffones
Report steffonesReport steffones
Report steffonesSteffones K
 
ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014Xavier MICHEL
 
TA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulTA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulMuhammad Asad Ullah
 
Optimal Design of a natural gas transmission system
Optimal Design of a natural gas transmission systemOptimal Design of a natural gas transmission system
Optimal Design of a natural gas transmission systemCini Gekpe
 
Transformer Bladder Replacement work Report
Transformer Bladder Replacement work ReportTransformer Bladder Replacement work Report
Transformer Bladder Replacement work ReportDanish Aslam
 
Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Robert Singleton
 
EC6 design improvements and confirmatory testing
EC6 design improvements and confirmatory testingEC6 design improvements and confirmatory testing
EC6 design improvements and confirmatory testingSNC-Lavalin
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015sathiya prabhu
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 ManuscriptNghi Nguyen
 
Assembly of al31 fp
Assembly of al31 fpAssembly of al31 fp
Assembly of al31 fpMohit Kudal
 

Ähnlich wie Reformer Catalyst Report (20)

Nitrogen purging
Nitrogen  purgingNitrogen  purging
Nitrogen purging
 
Presentation On Boiler Analysis
Presentation On Boiler AnalysisPresentation On Boiler Analysis
Presentation On Boiler Analysis
 
Experimental Analysis of Heat Transfer Enhancement in a Double Pipe Heat Exch...
Experimental Analysis of Heat Transfer Enhancement in a Double Pipe Heat Exch...Experimental Analysis of Heat Transfer Enhancement in a Double Pipe Heat Exch...
Experimental Analysis of Heat Transfer Enhancement in a Double Pipe Heat Exch...
 
A case study of thinning of ng (natural gas) injection line in mp section bef...
A case study of thinning of ng (natural gas) injection line in mp section bef...A case study of thinning of ng (natural gas) injection line in mp section bef...
A case study of thinning of ng (natural gas) injection line in mp section bef...
 
Report steffones
Report steffonesReport steffones
Report steffones
 
GNFC problems.pdf
GNFC problems.pdfGNFC problems.pdf
GNFC problems.pdf
 
ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014
 
TA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation OverhaulTA-2015 GE Frame-V Field Instrumentation Overhaul
TA-2015 GE Frame-V Field Instrumentation Overhaul
 
Optimal Design of a natural gas transmission system
Optimal Design of a natural gas transmission systemOptimal Design of a natural gas transmission system
Optimal Design of a natural gas transmission system
 
Transformer Bladder Replacement work Report
Transformer Bladder Replacement work ReportTransformer Bladder Replacement work Report
Transformer Bladder Replacement work Report
 
Compressor Valves
Compressor ValvesCompressor Valves
Compressor Valves
 
Presentation1
Presentation1Presentation1
Presentation1
 
Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)Felton LNG Tour Presentation (PG&E)
Felton LNG Tour Presentation (PG&E)
 
EC6 design improvements and confirmatory testing
EC6 design improvements and confirmatory testingEC6 design improvements and confirmatory testing
EC6 design improvements and confirmatory testing
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 
Urea 2000plus
Urea 2000plusUrea 2000plus
Urea 2000plus
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 Manuscript
 
Assembly of al31 fp
Assembly of al31 fpAssembly of al31 fp
Assembly of al31 fp
 

Kürzlich hochgeladen

Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 

Kürzlich hochgeladen (20)

Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 

Reformer Catalyst Report

  • 1. ANNUAL TURNAROUND JUNE 2015 Page | 1 REPORT ON PRIMARY REFORMER CATALYST UNLOADING AND LOADING
  • 2. ANNUAL TURNAROUND JUNE 2015 Page | 2 PRIMARY REFORMER CATALYST REPLACEMENT PLANNED JOB FOR ANNUAL TURNAROUND 2015 AT MANGALORE CHEMICALS AND FERTILIZERS LIMITED, PANAMBUR, MANGALORE, KARNATAKA- 575010. PROCESS CREW MEMBERS  K. SELVAN  DHARMARAJ. D. D  K. P. DEVADIGA  PRASHANT. A  SHARATH. A  SILAMBARASAN  PRASHANTH. K  VINAYA  ABHAY  ABDUL  ROHIT  BHARATH  JEEVAN  YASHWANTH  SACHIN
  • 3. ANNUAL TURNAROUND JUNE 2015 Page | 3 SUMMARY After the successful operational period for the year 2014-2015, inspection of primary reformer tubes and replacement of primary reformer catalyst was planned to provide solution for the high reformer tube skin temperatures. Sud Chemie (Catalyst Supplying Firm) took the initiative of supplying the two layered catalyst for the primary reformer. Catalyst was made available as per our requirement with bottom layer having 42% of Ni Catalyst (Reformax 330 G90 LDP- 10 hole- 19*16mm) and 58% of NiK Catalyst (Reformax 250- 5 hole- 16*16mm). Bottom layer catalyst: REFORMAX 330 G90 LDP (10 hole) - 19*16mm 49 drums of new catalyst and 1 drum of old catalyst were available. Drum info- Net weight- 156 kgs/Gross weight- 176 kgs/Volume- 200 liters. Density- 780 kg/m3.
  • 4. ANNUAL TURNAROUND JUNE 2015 Page | 4 Top layer catalyst: REFORMAX 250 (5 hole)- 16*16mm 68 drums of new catalyst were available. Drum info- Net weight- 216 kgs/Gross weight- 236 kgs/Volume- 200 liters. Density- 1080 kg/m3. CR- Asia was given the contract for unloading and uniform loading of primary reformer catalysts. Services included reformer tubes counter weight adjustment, tube flanges bolt loosening/tightening (without hammer- pneumatic torque allowed), shifting of spent/new catalyst drums, visual display of individual reformer tube internal surface with video cam assembly, for spent catalyst sampling, empty/loaded catalyst dip and differential pressure (DP) checking, catalyst unloading by BIVAC pump and loading by UNIDENSE method.
  • 5. ANNUAL TURNAROUND JUNE 2015 Page | 5 DETAILED REPORT After planned ammonia plant shutdown, reformer cooling using inert gas (Nitrogen) was prolonged for LTCO convertor bed cooling (@1000 hours on 10th June, 2015). Depressurization of front end was done at HT guard inlet vent point after isolating HTCO convertor inlet isolation valve. After depressurizing, following jobs were done in the mentioned order (Jobs completed in approximately 8 hours)-  Reformer feed spaded (FRRC-203 d/s)  Make gas boiler(H201) outlet spaded  Reformer furnace man way covers opened  Reformer outlet T-plug removed  All reformer burner guns removed  Demineralized water flushing done for fuel naphtha header towards raw naphtha storage tank  Reformer fuel naphtha strainer spaded (SM1 u/s)  Reformer tube counter weight locked  Reformer tube and pigtail flanges insulation removed All 224 tube flanges bolt removal initiated. Long pigtail to short pigtail flange removed and respective orifices positions were marked and tied to the same flanges (Jobs completed in approximately 24 hours). Unloading of primary reformer was started at 1825 hours on 10th June, 2015. CR- Asia BIVAC with a single hose was used for unloading with vacuum reading of -350 mm Hg/-0.135 inch Hg. Dust sample was collected from bottom T- plug and handed over to Q/C & Lab for analyzing. With completion of catalyst unloading for “A” & “B” row, rigs for measuring differential pressure across tubes were being made ready for MCFL rig. [Note: A second vacuum hose was made ready and utilized to accelerate the catalyst unloading process. A metal tip nozzle was being used in case of compacted spent catalyst unloading. A mark with tape was made on each hose being inserted into tubes to make sure the catalyst support grid was not being damaged for every tube.]
  • 6. ANNUAL TURNAROUND JUNE 2015 Page | 6 Spent catalyst sampling was done for the following tubes A24, A44, A48, B16 and D16. As decided, samples were collected at heights of 3m, 6m and 9m for all the 5 tubes. Reformer catalyst unloading for all 224 tubes was completed on 12th June, 2015 (Job completed in approximately 48 hours). The spent catalyst was being collected in the provided Mangala Urea bags and shifted to the reformer bottom shed. All 224 tubes empty dip readings were noted down. Later that night at 2230 hours, all reformer tubes inner surface cleaning by stainless steel wire mesh was initiated. To extract the excess scale formation inside the reformer tubes, arrangement was made with a buffing plate (Diameter 100mm) having connected rods (threaded with nut and bolt) for extension as the plate moves inside the tube. As the assembly was not much efficient and the potential risk of it getting clogged was more, the arrangement was rejected. Simultaneously bottom layer Ni catalyst drums were being shifted from the storage area to shed (reformer bottom area) and top layer NiK catalyst to shed (stores area). [Note: Catalyst drums were being shifted in absence of rain. Drum rolling to be avoided. Keep the drums on wooden pallets, avoid stacking them up. Protect from rain and stagnant water by providing tarpaulin cover. Keep the lids on, avoid catalyst exposure and do not damage the drums.] DP measurement details: CR-ASIA DP apparatus orifice diameter: 8mm. MCF DP rig orifice downstream hose length/diameter: 6.00mts/ 0.75”. Orifice u/s instrument air maintained pressure: 4.00 kg/cm2. (Transmitter range: 0-10 kg/cm2.g). Orifice d/s pressure indicates DP. (Transmitter range: 0-4 kg/cm2.g).
  • 7. ANNUAL TURNAROUND JUNE 2015 Page | 7 Inner deposits collected from some of the reformer tubes. Composition: Nickel 33.91% Iron 18.65% Chromium 05.16% Aluminum 0.42% Calcium 0.12% Magnesium 0.062% Copper 0.08% Potash 0.062% Vanadium 0.035% Lead ND Sulfides as S <10ppm Chloride <1ppm Sulfate <1ppm Phosphate <1ppm After the cleaning of tubes, visual inspection was done using the video cam and remote display. D31 reformer tube catalyst grid support was found damaged (On 16th June, 2015). At the same time dip readings and DP checking across empty tube (with MCFL rig) was initiated and completed. It was replaced with a new grid support and was cross checked with the old dip and DP readings. CR-Asia rig connections were made ready and DP checking for each reformer tube was initiated. At reformer top; arrangement were being made for catalyst weighing, catalyst dust blowing, protection from rain and provision of breeze free surroundings. Some reformer tubes (49 in nos.) having DP values (with CR-Asia rig) more than 0.04kg/cm2.g were decided to be cleaned again by removal of catalyst grid support. After tube cleaning and checking the improved DP readings for the respective tubes, catalyst grid supports were boxed up and clearance was given for catalyst loading (On 1600 hrs on 19th June, 2015).
  • 8. ANNUAL TURNAROUND JUNE 2015 Page | 8 Test loading of first layer (Ni) catalyst was done for the first tube of each row i.e. A1, B1, C1 and D1 in presence of Sud Chemie representative. Dip and DP readings were noted down as a reference value for rest of the tubes. It was decided to go ahead with 5 buckets of catalyst for each tube weighing 7kgs. Supervision was deputed to employees to follow up the catalyst weighing, catalyst drum being utilized and correctional weight for each tube. [Note- Weighing machine was deployed from ABC plant to weigh catalyst for loading. Instrument air connection was provided from PICV-2211 tapping for checking reformer tube DP and catalyst dust blowing. A separate instrument air connection was provided from F- 4210 area for air wench to lift catalyst drums.] As catalyst available was close to the amount needed after loading “A” and “B” row tubes, it was decided to load remaining tubes with maximum of 36kgs till all tubes are covered. Dip readings were noted of all reformer tubes filled with Ni catalyst. Later dip corrections were done by additional top up for selective tubes to get the dip reading closer to 7.2m (Completed by 0700hrs on 21st June, 2015). DP readings for all tubes with Ni catalyst were noted down with CR-Asia rig and later with MCFL rig. As for the Ni catalyst loading, all new catalyst was utilized and 1 drum old catalyst weighing 112.8kg/141liters was unutilized which was shifted to DAP plant storage. After getting approval of DP and dip readings, clearance was given for loading of second layer (NiK) catalyst. Test loading was done for first tube of each row i.e. A1, B1, C1 and D1. Dip and DP readings were noted down as a reference value for the rest of the tubes. It was decided to go ahead with 7 buckets for each tube weighing 10kgs. After loading of NiK catalyst for all tubes, dip readings were noted down and correction were done by additional top up for selective tubes to get the dip reading closer to 0.8m (Completed by 0600hrs on 23rd June, 2015). DP readings for NiK catalyst were noted down using CR-Asia and later with MCFL rig. DP correction was done for B1 and B49 tubes as the respective DP readings were on the lower side. For NiK catalyst, 3 full drums of catalyst and a partly filled drum was shifted to catalyst storage (725 liters in total).
  • 9. ANNUAL TURNAROUND JUNE 2015 Page | 9 After getting of approval of DP and dip readings, it was decided to box up all reformer tube flanges. Later orifices and long pigtail to short pigtail flanges were boxed up. Reformer tubes counter weights were released properly. Housekeeping was done at reformer top and insulation job was kept pending as high pressure leak test and flange bolts hot tightening had to be done. Instrument air connections were normalized for TICV- 211 and TI-231. Empty drums were filled with spent catalyst and content displaying hazardous sticker was pasted on each drum. DIP HEIGHTS FIXED FOR LOADING  Empty dip height from tube top flange to the catalyst support grid- 11.83 meters.  Empty dip height from tube top flange to the top surface of Reformax330 (G90 LDP- 10 holed) catalyst- 7.20 meters.  Empty dip height from tube top flange to the top surface of Reformax250 (5 holed) catalyst- 0.80 meters.  Allowable DP variation from average DP of 224 tubes- +3% to -3%. AVERAGE TUBE DP AFTER EACH LAYER OF CATALYST LOADING WITH CR-ASIA RIG Average tube DP after loading Reformax 330-G90 LDP catalyst- 0.1837 bar.g Average tube DP after loading Reformax 250 catalyst- 0.5462 bar.g CATALYST CONSUMPTION FOR ALL 224 TUBES Total Reformax 330-G90 LDP catalyst utilized- 8138.156 kilograms. Total Reformax 250 catalyst utilized- 15160.843 kilograms. Hence, total catalyst utilized- 23298.999 kilograms.
  • 10. ANNUAL TURNAROUND JUNE 2015 Page | 10 APPROXIMATE TIME REQUIREMENT:  Time required for T plug dropping. : 05 hrs  Time required for reformer tube to : 25.50 hrs short pigtail flange & short pigtail. to long pigtail flange disconnection.  Time required for catalyst unloading. : 52.50 hrs  Time require for tube inner surface cleaning and tube visual inspection. : 88 hrs.  Dead time due to reformer tube inspection : 06 hrs.  Time required for catalyst support grid removal, cleaning and box up. Empty tube DP measurement was done simultaneously. : 56 hrs.  Time required for Reformax-330-G90 LDP catalyst loading. : 30 hrs  Dead time due to power failure. : 01 hrs.  Time required for 1st layer catalyst dip and DP measurement/adjustment. : 08 hrs.  Time required for Reformax-250 catalyst loading. : 48.50hrs  Time required for 2nd layer catalyst dip and DP measurement/adjustment. : 12 hrs.  Time required for tubes boxing up. : 36 hrs  Time required for t plug boxing up. : 05hrs  Dead time due to radiography. : 08 hrs  Total time required. : 381.50 hrs