108 Delancey Street
Lower Eastside Manhattan
April 4, 1984
By: David M. Ulrich and Keith Malmberg
Drawings by David M. Ulrich in AutoCAD 2010
Purpose : To retrofit a concrete masonry unit (CMU) and
wood floor construction building with structural steel and
concrete slab on metal decking
DM
A
Consultants and Construction Managers
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
Cross section of existing building
• Five floors of wood
flooring (beams/joists)
Building 1 Building 2
• Two buildings share central
load-bearing wall
• Building 1 and Building 2
interiors are completely
separate
• Current system utilizes
continuous CMU stem wall
footings
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
Proposed Retrofit Agenda
• Remove 2nd Floor and
Central CMU bearing wall
Building 1 Building 2
• Replace 1st floor with
structural steel and slab-on-
metal decking
• Retrofit continuous stem
wall footings into three main
spread footings
• Utilize wide-flange columns,
beams, and girders in lieu of
structural masonry
• Removal of 2nd floor
resulting in large space with
vaulted ceiling
Cross section of proposed retrofit
2nd Floor
• Installation of three spread
footings into existing bearing
wall (Epoxy Installation)
• Support the multi-wythe
CMU bearing wall from 3rd
Floor to Roof
Base Plate with
(4) 3/4" Threaded rods
W10x49 ColumnW12x26 Beam
3 1/2" conc. slab
on 22ga. metal deck
W12x50 Girder
Steel retrofit design
Here are some basic
components of the
proposed retrofit design
W 12 x 50
What Does This Mean?
12” Flange-to-Flange dimension
50 lbs per linear foot
W Shape
13" UNO 10" min embed
Footing to steel column connection
Concrete Slab-on-Grade
Wide Flange column
Spread Footing
Non-shrink grout
Base Plate + Threaded Rods
Footing Installation
Subgrade assessment
Form Installation
Undisturbed Native Soils?
No
Firm and Unyielding Soils?
Use a flat bucket for excavation
Replace soils removed
Footing Dimensions
Location
No
Over excavate to dense soils
Adequate form bracing to
support lateral load of concrete
Ensure column will load footing
as designed
1
2
Spread Footing Concrete Placement
1
2
3
Secure rebar prior to concrete
placement (3” from earth per ACI)
Place anchor bolts correctly in
relation to the rebar mat per
plans
Mechanically consolidate concrete
with a vibrator
4 Leave adequate clearance below
base plate template for non-shrink
grout
3 Inches
Footing ‘spreads’ load from the
footing bottom to earth beneath
Notice the column assembly
In the center of the footing
Correct Spread Footing Load Path
Spread Footing Loading
OK NOT OK NOT OK NOT OK
1 2 3 4
GOOD
BAD
Eccentric LoadingStandard Central Loading
To Remove Floor #1 and #2 we will
need Shoring.
• Floors need to be shored
prior to removal of load-
bearing wall sections
• Shoring can be rented until
concrete has reached full
strength and is adequate for
support
• Falsework of this magnitude is
not to be ‘site-designed’ by a
contractor.
• Consult with an engineer
for shoring design
Adjustable screw with baseplate
108 Delancey Street
12" CMU Block Wall
8" CMU Block Wall
Spread Footings
104 Delancey St 106 Delancey St
5StoriesAbove
Concrete stem wall foundation
and Concrete Masonry Unit
walls (CMU blocks)
Three critical spread footings
along shared central wall
Multi-wythe CMU walls of
different block width
1
2
3
Floor Plan
A
B
C
A vague list of what went wrong
• Lack of field supervision and inspection oversight
• Lack of step-by-step construction sequence resulting in lateral
instability
• No shop drawings
• Spread footings were installed incorrectly
• Spread footings were installed below 50% of design strength
• Spread footings were eccentrically loaded
• Shoring schedule out of sequence
• Removal of 3rd floor and pouring one side created a twisting force
• Lack of lateral support coupled with eccentrically loaded
footings created an inevitable collapse
What went wrong with the footings?
• Footing dimensions were installed wrong (contractor at fault)
• Footing were eccentrically loaded (contractor at fault)
Actual footing installation
A
B C
• Some of the footings were less than 40% design size
Did the contractor have structural plans?
Footing dimensions
AS DESIGNED BY ENGINEER
Footing Length Width Ft2
% Design
A 8'6 5'6 47 ft2
44%
A 4'8 4'7 21 ft2
B 5'6 7'0 39 ft2
51%
B 5'9 3'6 20 ft2
C 5'6 7'0 39 ft2
36%
C 4'2 3'4 14 ft2
Designed Footing Dimensions
Installed Footing Dimensions
44%
51% 36%
What went wrong with the shoring?
1. The contractor removed both sides the 3rd floor
2. The contractor only poured back one side of floor 3
3. Floor 3 had no lateral stability when it began to twist
THE END

Weitere ähnliche Inhalte

Was ist angesagt?

Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structuresMECandPMV
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Communications Branding
 
Allan block Commercial brochure
Allan block Commercial brochureAllan block Commercial brochure
Allan block Commercial brochurekristenjames
 
Top down construction
Top down constructionTop down construction
Top down constructionANUPAM TIWARI
 
Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Sai Towers P Ltd.
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Reporthiewyennee
 
Ppt supersstructure
Ppt supersstructurePpt supersstructure
Ppt supersstructureShrafatBalti
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelBlake Johnson
 
Retaining wall/level backfill
Retaining wall/level backfillRetaining wall/level backfill
Retaining wall/level backfillTimóteo Rocha
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRSAbhishek Mewada
 
IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006Manuj Ray
 
Insert some activities into primavera p6
Insert some activities into primavera p6Insert some activities into primavera p6
Insert some activities into primavera p6firdaus Muhammad Adnan
 

Was ist angesagt? (20)

Vip lounge
Vip loungeVip lounge
Vip lounge
 
Tilt up concrete structures
Tilt up concrete structuresTilt up concrete structures
Tilt up concrete structures
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
 
Mosque
MosqueMosque
Mosque
 
Allan block Commercial brochure
Allan block Commercial brochureAllan block Commercial brochure
Allan block Commercial brochure
 
Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
 
Top down construction
Top down constructionTop down construction
Top down construction
 
Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.Top down construction by Sai Towers P Ltd.
Top down construction by Sai Towers P Ltd.
 
Building Construction 2 Project 1 Report
Building Construction 2 Project 1 ReportBuilding Construction 2 Project 1 Report
Building Construction 2 Project 1 Report
 
Slip formwork technique
Slip formwork techniqueSlip formwork technique
Slip formwork technique
 
Slip form
Slip formSlip form
Slip form
 
Ppt supersstructure
Ppt supersstructurePpt supersstructure
Ppt supersstructure
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
 
Retaining wall/level backfill
Retaining wall/level backfillRetaining wall/level backfill
Retaining wall/level backfill
 
PRECAST CONCRETE STAIRS
  PRECAST CONCRETE STAIRS  PRECAST CONCRETE STAIRS
PRECAST CONCRETE STAIRS
 
IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006IBC ROUTE 139 June 9, 2006
IBC ROUTE 139 June 9, 2006
 
Insert some activities into primavera p6
Insert some activities into primavera p6Insert some activities into primavera p6
Insert some activities into primavera p6
 
FORM WORK & SLIPFORM
FORM WORK & SLIPFORMFORM WORK & SLIPFORM
FORM WORK & SLIPFORM
 
PreCast Construction
PreCast ConstructionPreCast Construction
PreCast Construction
 
Underpinning
UnderpinningUnderpinning
Underpinning
 

Ähnlich wie 108 delancey street

Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II ReportBolin Loong
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard buildingBirukYared3
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)Chong jiayi
 
WAFFLE SLAB.pptx
WAFFLE SLAB.pptxWAFFLE SLAB.pptx
WAFFLE SLAB.pptxAmol Pawar
 
Aim for quality in construction
Aim for quality in constructionAim for quality in construction
Aim for quality in constructionpracticalanswerssl
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle SlabAkshay Gawade
 
U-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGYU-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGYadityas07
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formworkKHUSHBU SHAH
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)ManviVarshney2
 
The Home Construction Process
The Home Construction ProcessThe Home Construction Process
The Home Construction Processjillainedawn
 
Joints in Reinorced Concrete Structure.pptx
Joints in Reinorced Concrete Structure.pptxJoints in Reinorced Concrete Structure.pptx
Joints in Reinorced Concrete Structure.pptxHuzaifaZafar15
 
Easy steps to build a besser block wall
Easy steps to build a besser block wallEasy steps to build a besser block wall
Easy steps to build a besser block wallkristenjames
 
Foundation_(Anshumi Tanna BCT-II).pptx
Foundation_(Anshumi Tanna BCT-II).pptxFoundation_(Anshumi Tanna BCT-II).pptx
Foundation_(Anshumi Tanna BCT-II).pptxAnshumiTanna
 

Ähnlich wie 108 delancey street (20)

Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Building construction ii report (1)
Building construction ii report  (1)Building construction ii report  (1)
Building construction ii report (1)
 
Jacketing (RR&S)
Jacketing (RR&S)Jacketing (RR&S)
Jacketing (RR&S)
 
WAFFLE SLAB.pptx
WAFFLE SLAB.pptxWAFFLE SLAB.pptx
WAFFLE SLAB.pptx
 
Aim for quality in construction
Aim for quality in constructionAim for quality in construction
Aim for quality in construction
 
Flat Grid / Waffle Slab
Flat Grid / Waffle SlabFlat Grid / Waffle Slab
Flat Grid / Waffle Slab
 
U-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGYU-BOOT BETON TECHNOLOGY
U-BOOT BETON TECHNOLOGY
 
IPT Training
IPT TrainingIPT Training
IPT Training
 
2022-07-13.pptx
2022-07-13.pptx2022-07-13.pptx
2022-07-13.pptx
 
Chapter 5 formwork
Chapter 5 formworkChapter 5 formwork
Chapter 5 formwork
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
 
UNIT 1a.pdf
UNIT 1a.pdfUNIT 1a.pdf
UNIT 1a.pdf
 
Foundation
FoundationFoundation
Foundation
 
The Home Construction Process
The Home Construction ProcessThe Home Construction Process
The Home Construction Process
 
Joints in Reinorced Concrete Structure.pptx
Joints in Reinorced Concrete Structure.pptxJoints in Reinorced Concrete Structure.pptx
Joints in Reinorced Concrete Structure.pptx
 
Earthquake damages
Earthquake damagesEarthquake damages
Earthquake damages
 
The conjuring
The conjuringThe conjuring
The conjuring
 
Easy steps to build a besser block wall
Easy steps to build a besser block wallEasy steps to build a besser block wall
Easy steps to build a besser block wall
 
Foundation_(Anshumi Tanna BCT-II).pptx
Foundation_(Anshumi Tanna BCT-II).pptxFoundation_(Anshumi Tanna BCT-II).pptx
Foundation_(Anshumi Tanna BCT-II).pptx
 

108 delancey street

  • 1. 108 Delancey Street Lower Eastside Manhattan April 4, 1984 By: David M. Ulrich and Keith Malmberg Drawings by David M. Ulrich in AutoCAD 2010 Purpose : To retrofit a concrete masonry unit (CMU) and wood floor construction building with structural steel and concrete slab on metal decking DM A Consultants and Construction Managers
  • 2. 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor Cross section of existing building • Five floors of wood flooring (beams/joists) Building 1 Building 2 • Two buildings share central load-bearing wall • Building 1 and Building 2 interiors are completely separate • Current system utilizes continuous CMU stem wall footings
  • 3. 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor Proposed Retrofit Agenda • Remove 2nd Floor and Central CMU bearing wall Building 1 Building 2 • Replace 1st floor with structural steel and slab-on- metal decking • Retrofit continuous stem wall footings into three main spread footings • Utilize wide-flange columns, beams, and girders in lieu of structural masonry
  • 4. • Removal of 2nd floor resulting in large space with vaulted ceiling Cross section of proposed retrofit 2nd Floor • Installation of three spread footings into existing bearing wall (Epoxy Installation) • Support the multi-wythe CMU bearing wall from 3rd Floor to Roof
  • 5. Base Plate with (4) 3/4" Threaded rods W10x49 ColumnW12x26 Beam 3 1/2" conc. slab on 22ga. metal deck W12x50 Girder Steel retrofit design Here are some basic components of the proposed retrofit design W 12 x 50 What Does This Mean? 12” Flange-to-Flange dimension 50 lbs per linear foot W Shape
  • 6. 13" UNO 10" min embed Footing to steel column connection Concrete Slab-on-Grade Wide Flange column Spread Footing Non-shrink grout Base Plate + Threaded Rods
  • 7. Footing Installation Subgrade assessment Form Installation Undisturbed Native Soils? No Firm and Unyielding Soils? Use a flat bucket for excavation Replace soils removed Footing Dimensions Location No Over excavate to dense soils Adequate form bracing to support lateral load of concrete Ensure column will load footing as designed 1 2
  • 8. Spread Footing Concrete Placement 1 2 3 Secure rebar prior to concrete placement (3” from earth per ACI) Place anchor bolts correctly in relation to the rebar mat per plans Mechanically consolidate concrete with a vibrator 4 Leave adequate clearance below base plate template for non-shrink grout 3 Inches
  • 9. Footing ‘spreads’ load from the footing bottom to earth beneath Notice the column assembly In the center of the footing Correct Spread Footing Load Path
  • 10. Spread Footing Loading OK NOT OK NOT OK NOT OK 1 2 3 4 GOOD BAD Eccentric LoadingStandard Central Loading
  • 11. To Remove Floor #1 and #2 we will need Shoring. • Floors need to be shored prior to removal of load- bearing wall sections • Shoring can be rented until concrete has reached full strength and is adequate for support • Falsework of this magnitude is not to be ‘site-designed’ by a contractor. • Consult with an engineer for shoring design Adjustable screw with baseplate
  • 13. 12" CMU Block Wall 8" CMU Block Wall Spread Footings 104 Delancey St 106 Delancey St 5StoriesAbove Concrete stem wall foundation and Concrete Masonry Unit walls (CMU blocks) Three critical spread footings along shared central wall Multi-wythe CMU walls of different block width 1 2 3 Floor Plan A B C
  • 14. A vague list of what went wrong • Lack of field supervision and inspection oversight • Lack of step-by-step construction sequence resulting in lateral instability • No shop drawings • Spread footings were installed incorrectly • Spread footings were installed below 50% of design strength • Spread footings were eccentrically loaded • Shoring schedule out of sequence • Removal of 3rd floor and pouring one side created a twisting force • Lack of lateral support coupled with eccentrically loaded footings created an inevitable collapse
  • 15. What went wrong with the footings? • Footing dimensions were installed wrong (contractor at fault) • Footing were eccentrically loaded (contractor at fault) Actual footing installation A B C • Some of the footings were less than 40% design size Did the contractor have structural plans? Footing dimensions AS DESIGNED BY ENGINEER Footing Length Width Ft2 % Design A 8'6 5'6 47 ft2 44% A 4'8 4'7 21 ft2 B 5'6 7'0 39 ft2 51% B 5'9 3'6 20 ft2 C 5'6 7'0 39 ft2 36% C 4'2 3'4 14 ft2 Designed Footing Dimensions Installed Footing Dimensions 44% 51% 36%
  • 16. What went wrong with the shoring? 1. The contractor removed both sides the 3rd floor 2. The contractor only poured back one side of floor 3 3. Floor 3 had no lateral stability when it began to twist
  • 17.