Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Pt. pks medan centre point
1. MEDAN CENTRE POINT, MEDAN
SITE PLAN OF APPARTMENT – MEDAN CENTRE POIN
PROPOSE OF
PERI FORMWORK
Proposed by PT Beton Perkasa Wijaksana
Regional Sales IV MEDAN
PERI VARIO GT24
COLUMN
CORE WALL
PERI LICO
PERI UP ROSSET
5. PERI Vario System
PERI GIRDER GT 24
GT 24 could use for vertical and horizontal formwork. Its mean ot give benefit
are :
1.Flexlible for application and optimalitation in site
2.Strong enough for wall/column formwork.
3.Manageable for Slabs and Beam
4.Cost effective for customized formwork solution
5.Has bending moment capasities up to 7 kNm, so fewer needed GT 24,
support and steel waler , its mean be able savings in labour cost.
6. PERI Vario System
For application, wall panel :
1.Assembling will do at Cikupa Workshop by PT BPW, for accuration panel refer to spesification requirment.
2.Formlining use Phonolik 4x8 -18 mm thickness, INCLUDING the Panel.
3.Its means all panel ready to use on construction site.
7.
8.
9. MEDAN CENTRE POINT, MEDAN
SITE PLAN OF APPARTMENT – MEDAN CENTRE POIN
PROPOSE OF
PERI FORMWORK
Proposed by PT Beton Perkasa Wijaksana
Regional Sales IV MEDAN
PERI VARIO GT24
COLUMN
CORE WALL
PERI LICO
PERI UP ROSSET
10.
11.
12. MEDAN CENTRE POINT, MEDAN
SITE PLAN OF APPARTMENT – MEDAN CENTRE POIN
PROPOSE OF
PERI FORMWORK
Proposed by PT Beton Perkasa Wijaksana
Regional Sales IV MEDAN
PERI VARIO GT24
COLUMN
CORE WALL
PERI LICO
PERI UP ROSSET
13. PERI UP ROSSET FOR SLAB BEAM SHORING SYSTEM
General Component
19. PERI UP ROSSET FOR ACCESS SCAFFOLDING (STAIR)
Reinforcement Scaffold
Stair Tower
Working Platform
20. PERI UP ROSSET FOR ACCESS SCAFFOLDING (STAIR)
Stair : General Component
21.
22.
23. MEDAN CENTRE POINT, MEDAN
SITE PLAN OF APPARTMENT – MEDAN CENTRE POIN
PROPOSE OF
PERI FORMWORK
Proposed by PT Beton Perkasa Wijaksana
Regional Sales IV MEDAN
PERI VARIO GT24
COLUMN
CORE WALL
PERI LICO
PERI UP ROSSET