By Darren Riding. AKA. – WATCHDOG…
Background
 Protection of the Environment Operations Act
sections 143 and 144
 Environment Planning and Assessment Act
sections 76,76A and 76B
 Possible Offenders/Situations.
 Owners of the waste - Source Site
 Transporter of the waste
 Location of Depositing of waste
Prevention – Start at the Source Site
 WORKCOVER
Notification of
Asbestos Demolition
Work
 Council (DA) or
Private Certifier
(CDC) Notification of
Development Site
CONTRACTOR OWNER BUILDER
CONTRACTOR SITE
 Workcover
 EPA
 Council
OWNER/BUILDER SITE
 EPA
 Council
 Workcover ?
What avenues are open ?
BONDED ASBESTOS FRIABLE ASBESTOS
 Asbestos fibres that are
bonded in a base
material. Typically this
is a cement type
material or a plastic
membrane.
 White (Chrysotile)
 Brown (Amosite)
 Any material that
contains Asbestos in the
form of a powder or can
be crumbled, pulverised
or reduced to powder
by hand pressure when
dry.
 Blue (Crocidolite)
BONDED ASBESTOS FRIABLE ASBESTOS
 When bonded material becomes extensively
damaged by fire it may become friable.
 Water blasting Asbestos cement will cause
fibres to become liberated.
 Extensive hail damage may cause the sheeting
to become friable.
 Where weathering has caused the substrate to
break down and the bonded material can be
crushed by hand.
 Mechanical damage has crushed the bonded
matrix to powder.
BEFORE OR DURING A
FIRE
AFTER A FIRE
BEFORE A FIRE AFTER A FIRE
BONDED ASBESTOS IN SOIL
 Bonded Asbestos in soil to be treated as bonded
material and can be cleaned by a bonded licenced
operator.
 If bonded material has been reduced to powder, can
be crumbled by hand or there are free fibre bundles
detected in the soil then the soil is treated as having
Friable Asbestos in the soil.
 Friable Asbestos in the soil has to be removed by a
Friable Licensed Contractor.
Asbestos cement
sheeting fragments on
the ground surfaces
within the subfloor of
the
building
Dust containing asbestos
cement sheeting fragments on
the upper surfaces of the timber
framework
 The asbestos assessment of the site has
identified scattered fragments of AC to
building rubble piles in the front yard,
grassed areas in the front yard, within and
below the partially demolished residential
house, grassed areas down both sides of the
residential house, to the building rubble pile
at the rear of the house and remaining
asbestos cement sheeting to the internal
main bathroom, internal kitchen and gable
wall sheeting on both ends of the residential
house.
 One bulk asbestos cement fragment from
the front yard building rubble pile returned
positive for asbestos, while one bulk
asbestos cement fragment returned negative
from the rear yard building rubble pile. Soil
sampling carried out for asbestos fibres did
not return any results,
 However, due to the wide spread
contamination of asbestos cement fragments
from previous demolition works outside
and inside the residential house, the
contamination should be deemed as friable
from an asbestos risk management
perspective and associated asbestos
remediation activities. However the full
vertical extent to the soil is not known and
further investigation maybe be required.
WHEN CAN YOU LEAVE ASBESTOS MATERIAL IN THE SOIL
 There is no legal requirement to remove insitu
Asbestos
 Depending on the final use of a site, it may be
feasible to leave the material in situ.
 On sensitive sites such as schools and Hospitals
all Asbestos material should be removed.
 If Asbestos material is left in place after a
redevelopment Approval from the Appropriate
Regulatory Authority needs to be obtained.
Example
 Overseas Developer bought
an old Pottery production
site.
 Site was full of Asbestos
throughout the ground from
the old kilm
 Wanted to develop site for
townhouses.
 Selling Points –
Waterfrontage to smelly
drainage easement, 24 hour
views to Motorway with
heavy traffic noise.
 The Winning option – Local
Council has new reserve.
BURY OR MIX ASBESTOS
IN LANDFILL BURN ASBESTOS WASTE
 Location Road, Wallacia
 ******************************
 POI: N K @ N T
 D.O.B: 20/09/1969
 ADD 1: , Bass Hill
 ADD 2: , Constitution Hill
 CHARGES: PCA, Steal Motor Vehicle, Cargo theft, Assault, Traffic
 INTELL: People smuggling, Firearms, Cargo theft x 7, B,E&S x 8,
 *******************************
 Occupants: L Family
 Firearm Holder: B P L
 D.O.B: 01/01/1956
 Firearms: 1 x Single barrel shotgun and 1 x .22 Rifle.
 Safe audit conducted and passed on 13th March 2013.
 *******************************
 Police have recently received information about the mentioned POI dumping asbestos at the above
location. The information obtained shows the POI is charging $1,000 per load of asbestos taken and
dumped at the above location.
 In September 2013, the POI was involved in an GBH assault on two persons at the above mentioned
location.
 This information has been passed onto Mr Darren RIDING from Regional Illegal Dumping Squad
who are aware of the POI and the location.
If Investigating a matter, ensure the Appropriate Authority is
investigating the matter
 LEGAL OPTIONS
 Warnings
 Fines
 Court Matters
 REMEDIATION
OPTIONS
 Clean Up Notices
 Prevention Notices
 Orders
 REQUIREMENTS OF CLEAN UP/PREVENTION NOTICE:
 As an Authorised Officer of-------------, I direct you to take the
following clean-up / prevention actions:
 Install and Maintain Soil and Sedimentation Erosion Control
Devices (in accordance to the Blue Book Forth Edition Published
by LANDCOM) around the entire development site which has
not been undertaken.
 Install a suitable Stabilised Site Access (in accordance to the
Blue Book Forth Edition Published by LANDCOM).
 Ensure the site is fully enclosed with a 1.8m high security fence
around the entire development site which has not been
undertaken including approved dust control netting.
 Additionally to the above, with the removal of all demolition material
from-----------------------, Engage the services of a Suitable Qualified
Company or persons to undertake and submit full reports of the
material within the premise.
 These reports are to include but not limited to:
 Hygienist Report (HR) (AS 1199.2-2003, ISO 2859-2:1985) prior and
after removal this to include the entire ground surface and possible
underlining surfaces.
 Asbestos Removal Control Plan
 Asbestos Classification and Risk Assessment
 Asbestos Air Monitoring and Clearance Inspection
 Buried Asbestos Materials (Unexpected Finds Protocols)
 Environment Impact Study (EIS)Environment Management Plan
(EMP)
 Waste Management Plan (WMP) including locations and method of
disposal.
 Waste Data File (WDF) including all receipts and vehicle movement
from the premise.
 These reports have to be submitted to ------------Council in which
approval of these reports have to be obtained from -------------Council
prior to any material being removed from the premise. Once approved
copies are to be left at the premise during the removal of all material.
 Once approval is obtained from ------------Council of
all reports, remove all waste/sedimentation/ fuel
and or liquid substances from the property/ies
 All waste/sedimentation/ fuel and or liquid
substances to be conveyed to approved waste
facilities in which receipts for each load are to be
obtained in which a copy is to be attached to the
Waste Data File for inspection at any time by an
Authorised Officer.
 Additionally copies of all receipts for the disposal of
the waste/sedimentation/ fuel and or liquid
substances from the waste facility to be forwarded
within 7 days of the waste/sedimentation/ fuel and
or liquid substances been taken to the waste facilities.
 All work on or around------------------, are to be
undertaken during approved working hours
approved by --------------------------Council.
 Any work requiring Approved Development
Applications are to be sought and approved
prior to any of the work to be undertaken.
 Care shall be taken in the method of excavation
of the waste material from the premises thereof
to ensure the topography of the land remain in
the profile and the general condition in which
they were before the waste material was placed
on the premises and to prevention the flow of
dust and small particles into neighbour
properties and the public road reserve.
 Remove all waste/sedimentation/ and or liquid substances
from the road, gutter, drains, storm water network and
creeks/streams surrounding the properties at-------------------
------------------------------.
 Ensure the road, gutter, drains, storm water network and
creeks/streams within and surrounding the properties ------
----------------are clean and free of waste/sedimentation/
fuel and or liquid substances.
 The removal of the all the above mentioned from -------------
-----------are to be completed by----------------.
 If you have not complied with the requirements of this
Notice by the required date, you still have a continuing
obligation to comply with this Notice after that date
(subject to revocation or variation of this Notice by---------
----------------------------)
 TERMS OF ORDER 12
 Section 121B Environmental Planning & Assessment Act 1979

 Order 12 (b): To do such things as are specified in the order to restore premises to the condition in which they were before building
was unlawfully erected or before work was unlawfully carried out. Work has been unlawfully carried out.

 Terms of Order

 Submit a report from a suitably qualified person detailing the extent of filling on the site. This report is to detail
the previous and current ground levels.

 Timeframe
 Thirty (30) days from the date of the Order


 Submit a report from a suitably qualified person or company attesting to the type of material contained within the
unauthorised landfill throughout the whole of the premises including the identification of any contaminants
found.
The report must meet the AS 1199.2-2003 and ISO2859-2:1985 Standards.
The report must also stipulate how the site is to be remediated including the entire ground surface and possible
underlining surfaces as well as Unexpected Finds Protocols.

 Timeframe
 Thirty (30) days from the date of the Order

 REASON FOR ORDER

 The unauthorised fill material has the ability to impact on the property, surrounding properties and the environment
by the way of altered drainage patterns (flooding), possible land contamination and water pollution from
unestablished soil.

 The report is required in compliance pursuant to Work, Health and safety Standards and Environmental Standards to
ensure safety and possible environment concerns not just for yourself but your family, contractors and the
surrounding neighbours.

 From the report it will establish the manner in which the unauthorised land fill is to be removed and where the
appropriate location or facility of that material can be properly disposed of.
 Independent NATA
Certified/Qualified
Person of Company
 Sampling Undertaken
 Not by Company
Undertaking Work to
remove waste
 Not just visual site
Inspection
 Safer Work sites
 Ease of neighbouring
residents concerns
 Limited media
concerns
 Reduced Politician or
Councillor Concerns
 Contractors on Notice
131050131555
Qui Dederit Cacas
Effective building site and pollution issues with asbestos

Weitere ähnliche Inhalte

Ähnlich wie Effective building site and pollution issues with asbestos

Asbestos – How to investigate Asbestos related complaints
Asbestos – How to investigate Asbestos related complaintsAsbestos – How to investigate Asbestos related complaints
Asbestos – How to investigate Asbestos related complaintsDarren Riding JP
 
Construction Environmental Awareness and Training POSTER
Construction Environmental Awareness and Training  POSTERConstruction Environmental Awareness and Training  POSTER
Construction Environmental Awareness and Training POSTERDavid H Moloney
 
Wisconsin Asbestos Seminar Session 502 Steps 1 & 2
Wisconsin Asbestos Seminar Session 502 Steps 1 & 2Wisconsin Asbestos Seminar Session 502 Steps 1 & 2
Wisconsin Asbestos Seminar Session 502 Steps 1 & 2Balestrieri Group
 
Coal handling-guidelines
Coal handling-guidelinesCoal handling-guidelines
Coal handling-guidelinesPRABIR DATTA
 
Demolition of existing boiler house
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler houseAnatoliZ
 
A Part 14 Environment
A  Part 14 EnvironmentA  Part 14 Environment
A Part 14 EnvironmentJames McCann
 
12 daniel c. meess - 4955983 - side loading vault system and method for the...
12   daniel c. meess - 4955983 - side loading vault system and method for the...12   daniel c. meess - 4955983 - side loading vault system and method for the...
12 daniel c. meess - 4955983 - side loading vault system and method for the...Mello_Patent_Registry
 
HSE-BMS-003 Environmental Management.ppt
HSE-BMS-003 Environmental Management.pptHSE-BMS-003 Environmental Management.ppt
HSE-BMS-003 Environmental Management.pptPokikoMikoto
 
Environmental Issues in Land Development: Legal Requirements and Recent Enfor...
Environmental Issues in Land Development: Legal Requirements and Recent Enfor...Environmental Issues in Land Development: Legal Requirements and Recent Enfor...
Environmental Issues in Land Development: Legal Requirements and Recent Enfor...Dave Scriven-Young
 
Baobab / Boab Presentation. Marketing media. Export.
Baobab / Boab Presentation. Marketing media. Export.Baobab / Boab Presentation. Marketing media. Export.
Baobab / Boab Presentation. Marketing media. Export.Josef Perner.
 
Wisconsin Asbestos Seminar Session 602 Steps 3 & 4
Wisconsin Asbestos Seminar Session 602 Steps 3 & 4Wisconsin Asbestos Seminar Session 602 Steps 3 & 4
Wisconsin Asbestos Seminar Session 602 Steps 3 & 4Balestrieri Group
 
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides 2017 0926 - Middletown - Tighe&Bond EHS breakfast slides
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides Wayne Bates
 
HCB Manual gtz 2008.doc
HCB Manual gtz 2008.docHCB Manual gtz 2008.doc
HCB Manual gtz 2008.docFeteneBefekadu
 
Noise Analysis | Gaurav Singh Rajput
Noise Analysis | Gaurav Singh Rajput Noise Analysis | Gaurav Singh Rajput
Noise Analysis | Gaurav Singh Rajput Gaurav Singh Rajput
 

Ähnlich wie Effective building site and pollution issues with asbestos (20)

Asbestos – How to investigate Asbestos related complaints
Asbestos – How to investigate Asbestos related complaintsAsbestos – How to investigate Asbestos related complaints
Asbestos – How to investigate Asbestos related complaints
 
Construction Environmental Awareness and Training POSTER
Construction Environmental Awareness and Training  POSTERConstruction Environmental Awareness and Training  POSTER
Construction Environmental Awareness and Training POSTER
 
Short termim workplan_20100602_part3
Short termim workplan_20100602_part3Short termim workplan_20100602_part3
Short termim workplan_20100602_part3
 
Wisconsin Asbestos Seminar Session 502 Steps 1 & 2
Wisconsin Asbestos Seminar Session 502 Steps 1 & 2Wisconsin Asbestos Seminar Session 502 Steps 1 & 2
Wisconsin Asbestos Seminar Session 502 Steps 1 & 2
 
Coal handling-guidelines
Coal handling-guidelinesCoal handling-guidelines
Coal handling-guidelines
 
Environmental control measures
Environmental control measuresEnvironmental control measures
Environmental control measures
 
Demolition of existing boiler house
Demolition of existing boiler houseDemolition of existing boiler house
Demolition of existing boiler house
 
A Part 14 Environment
A  Part 14 EnvironmentA  Part 14 Environment
A Part 14 Environment
 
Philex Padcal Mine PAB Resolution
Philex Padcal Mine PAB ResolutionPhilex Padcal Mine PAB Resolution
Philex Padcal Mine PAB Resolution
 
FHA INSPECTION CHECK LIST (Prepared for use with FHA/HUD Handbook 4150.2
FHA INSPECTION CHECK LIST (Prepared for use with FHA/HUD Handbook 4150.2 FHA INSPECTION CHECK LIST (Prepared for use with FHA/HUD Handbook 4150.2
FHA INSPECTION CHECK LIST (Prepared for use with FHA/HUD Handbook 4150.2
 
Legacy waste management
Legacy waste managementLegacy waste management
Legacy waste management
 
12 daniel c. meess - 4955983 - side loading vault system and method for the...
12   daniel c. meess - 4955983 - side loading vault system and method for the...12   daniel c. meess - 4955983 - side loading vault system and method for the...
12 daniel c. meess - 4955983 - side loading vault system and method for the...
 
HSE-BMS-003 Environmental Management.ppt
HSE-BMS-003 Environmental Management.pptHSE-BMS-003 Environmental Management.ppt
HSE-BMS-003 Environmental Management.ppt
 
Environmental Issues in Land Development: Legal Requirements and Recent Enfor...
Environmental Issues in Land Development: Legal Requirements and Recent Enfor...Environmental Issues in Land Development: Legal Requirements and Recent Enfor...
Environmental Issues in Land Development: Legal Requirements and Recent Enfor...
 
Baobab / Boab Presentation. Marketing media. Export.
Baobab / Boab Presentation. Marketing media. Export.Baobab / Boab Presentation. Marketing media. Export.
Baobab / Boab Presentation. Marketing media. Export.
 
Wisconsin Asbestos Seminar Session 602 Steps 3 & 4
Wisconsin Asbestos Seminar Session 602 Steps 3 & 4Wisconsin Asbestos Seminar Session 602 Steps 3 & 4
Wisconsin Asbestos Seminar Session 602 Steps 3 & 4
 
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides 2017 0926 - Middletown - Tighe&Bond EHS breakfast slides
2017 0926 - Middletown - Tighe&Bond EHS breakfast slides
 
HCB Manual gtz 2008.doc
HCB Manual gtz 2008.docHCB Manual gtz 2008.doc
HCB Manual gtz 2008.doc
 
Law presentation
Law presentationLaw presentation
Law presentation
 
Noise Analysis | Gaurav Singh Rajput
Noise Analysis | Gaurav Singh Rajput Noise Analysis | Gaurav Singh Rajput
Noise Analysis | Gaurav Singh Rajput
 

Kürzlich hochgeladen

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 

Kürzlich hochgeladen (20)

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 

Effective building site and pollution issues with asbestos

  • 1. By Darren Riding. AKA. – WATCHDOG…
  • 3.
  • 4.
  • 5.
  • 6.  Protection of the Environment Operations Act sections 143 and 144  Environment Planning and Assessment Act sections 76,76A and 76B  Possible Offenders/Situations.  Owners of the waste - Source Site  Transporter of the waste  Location of Depositing of waste
  • 7.
  • 8. Prevention – Start at the Source Site
  • 9.  WORKCOVER Notification of Asbestos Demolition Work  Council (DA) or Private Certifier (CDC) Notification of Development Site
  • 11. CONTRACTOR SITE  Workcover  EPA  Council OWNER/BUILDER SITE  EPA  Council  Workcover ?
  • 13. BONDED ASBESTOS FRIABLE ASBESTOS  Asbestos fibres that are bonded in a base material. Typically this is a cement type material or a plastic membrane.  White (Chrysotile)  Brown (Amosite)  Any material that contains Asbestos in the form of a powder or can be crumbled, pulverised or reduced to powder by hand pressure when dry.  Blue (Crocidolite)
  • 15.  When bonded material becomes extensively damaged by fire it may become friable.  Water blasting Asbestos cement will cause fibres to become liberated.  Extensive hail damage may cause the sheeting to become friable.  Where weathering has caused the substrate to break down and the bonded material can be crushed by hand.  Mechanical damage has crushed the bonded matrix to powder.
  • 16. BEFORE OR DURING A FIRE AFTER A FIRE
  • 17. BEFORE A FIRE AFTER A FIRE
  • 18.
  • 19. BONDED ASBESTOS IN SOIL  Bonded Asbestos in soil to be treated as bonded material and can be cleaned by a bonded licenced operator.  If bonded material has been reduced to powder, can be crumbled by hand or there are free fibre bundles detected in the soil then the soil is treated as having Friable Asbestos in the soil.  Friable Asbestos in the soil has to be removed by a Friable Licensed Contractor.
  • 20. Asbestos cement sheeting fragments on the ground surfaces within the subfloor of the building Dust containing asbestos cement sheeting fragments on the upper surfaces of the timber framework
  • 21.  The asbestos assessment of the site has identified scattered fragments of AC to building rubble piles in the front yard, grassed areas in the front yard, within and below the partially demolished residential house, grassed areas down both sides of the residential house, to the building rubble pile at the rear of the house and remaining asbestos cement sheeting to the internal main bathroom, internal kitchen and gable wall sheeting on both ends of the residential house.  One bulk asbestos cement fragment from the front yard building rubble pile returned positive for asbestos, while one bulk asbestos cement fragment returned negative from the rear yard building rubble pile. Soil sampling carried out for asbestos fibres did not return any results,  However, due to the wide spread contamination of asbestos cement fragments from previous demolition works outside and inside the residential house, the contamination should be deemed as friable from an asbestos risk management perspective and associated asbestos remediation activities. However the full vertical extent to the soil is not known and further investigation maybe be required.
  • 22. WHEN CAN YOU LEAVE ASBESTOS MATERIAL IN THE SOIL
  • 23.  There is no legal requirement to remove insitu Asbestos  Depending on the final use of a site, it may be feasible to leave the material in situ.  On sensitive sites such as schools and Hospitals all Asbestos material should be removed.  If Asbestos material is left in place after a redevelopment Approval from the Appropriate Regulatory Authority needs to be obtained.
  • 24. Example  Overseas Developer bought an old Pottery production site.  Site was full of Asbestos throughout the ground from the old kilm  Wanted to develop site for townhouses.  Selling Points – Waterfrontage to smelly drainage easement, 24 hour views to Motorway with heavy traffic noise.  The Winning option – Local Council has new reserve.
  • 25.
  • 26. BURY OR MIX ASBESTOS IN LANDFILL BURN ASBESTOS WASTE
  • 27.  Location Road, Wallacia  ******************************  POI: N K @ N T  D.O.B: 20/09/1969  ADD 1: , Bass Hill  ADD 2: , Constitution Hill  CHARGES: PCA, Steal Motor Vehicle, Cargo theft, Assault, Traffic  INTELL: People smuggling, Firearms, Cargo theft x 7, B,E&S x 8,  *******************************  Occupants: L Family  Firearm Holder: B P L  D.O.B: 01/01/1956  Firearms: 1 x Single barrel shotgun and 1 x .22 Rifle.  Safe audit conducted and passed on 13th March 2013.  *******************************  Police have recently received information about the mentioned POI dumping asbestos at the above location. The information obtained shows the POI is charging $1,000 per load of asbestos taken and dumped at the above location.  In September 2013, the POI was involved in an GBH assault on two persons at the above mentioned location.  This information has been passed onto Mr Darren RIDING from Regional Illegal Dumping Squad who are aware of the POI and the location.
  • 28. If Investigating a matter, ensure the Appropriate Authority is investigating the matter
  • 29.  LEGAL OPTIONS  Warnings  Fines  Court Matters  REMEDIATION OPTIONS  Clean Up Notices  Prevention Notices  Orders
  • 30.  REQUIREMENTS OF CLEAN UP/PREVENTION NOTICE:  As an Authorised Officer of-------------, I direct you to take the following clean-up / prevention actions:  Install and Maintain Soil and Sedimentation Erosion Control Devices (in accordance to the Blue Book Forth Edition Published by LANDCOM) around the entire development site which has not been undertaken.  Install a suitable Stabilised Site Access (in accordance to the Blue Book Forth Edition Published by LANDCOM).  Ensure the site is fully enclosed with a 1.8m high security fence around the entire development site which has not been undertaken including approved dust control netting.
  • 31.  Additionally to the above, with the removal of all demolition material from-----------------------, Engage the services of a Suitable Qualified Company or persons to undertake and submit full reports of the material within the premise.  These reports are to include but not limited to:  Hygienist Report (HR) (AS 1199.2-2003, ISO 2859-2:1985) prior and after removal this to include the entire ground surface and possible underlining surfaces.  Asbestos Removal Control Plan  Asbestos Classification and Risk Assessment  Asbestos Air Monitoring and Clearance Inspection  Buried Asbestos Materials (Unexpected Finds Protocols)  Environment Impact Study (EIS)Environment Management Plan (EMP)  Waste Management Plan (WMP) including locations and method of disposal.  Waste Data File (WDF) including all receipts and vehicle movement from the premise.  These reports have to be submitted to ------------Council in which approval of these reports have to be obtained from -------------Council prior to any material being removed from the premise. Once approved copies are to be left at the premise during the removal of all material.
  • 32.  Once approval is obtained from ------------Council of all reports, remove all waste/sedimentation/ fuel and or liquid substances from the property/ies  All waste/sedimentation/ fuel and or liquid substances to be conveyed to approved waste facilities in which receipts for each load are to be obtained in which a copy is to be attached to the Waste Data File for inspection at any time by an Authorised Officer.  Additionally copies of all receipts for the disposal of the waste/sedimentation/ fuel and or liquid substances from the waste facility to be forwarded within 7 days of the waste/sedimentation/ fuel and or liquid substances been taken to the waste facilities.
  • 33.  All work on or around------------------, are to be undertaken during approved working hours approved by --------------------------Council.  Any work requiring Approved Development Applications are to be sought and approved prior to any of the work to be undertaken.  Care shall be taken in the method of excavation of the waste material from the premises thereof to ensure the topography of the land remain in the profile and the general condition in which they were before the waste material was placed on the premises and to prevention the flow of dust and small particles into neighbour properties and the public road reserve.
  • 34.  Remove all waste/sedimentation/ and or liquid substances from the road, gutter, drains, storm water network and creeks/streams surrounding the properties at------------------- ------------------------------.  Ensure the road, gutter, drains, storm water network and creeks/streams within and surrounding the properties ------ ----------------are clean and free of waste/sedimentation/ fuel and or liquid substances.  The removal of the all the above mentioned from ------------- -----------are to be completed by----------------.  If you have not complied with the requirements of this Notice by the required date, you still have a continuing obligation to comply with this Notice after that date (subject to revocation or variation of this Notice by--------- ----------------------------)
  • 35.  TERMS OF ORDER 12  Section 121B Environmental Planning & Assessment Act 1979   Order 12 (b): To do such things as are specified in the order to restore premises to the condition in which they were before building was unlawfully erected or before work was unlawfully carried out. Work has been unlawfully carried out.   Terms of Order   Submit a report from a suitably qualified person detailing the extent of filling on the site. This report is to detail the previous and current ground levels.   Timeframe  Thirty (30) days from the date of the Order    Submit a report from a suitably qualified person or company attesting to the type of material contained within the unauthorised landfill throughout the whole of the premises including the identification of any contaminants found. The report must meet the AS 1199.2-2003 and ISO2859-2:1985 Standards. The report must also stipulate how the site is to be remediated including the entire ground surface and possible underlining surfaces as well as Unexpected Finds Protocols.   Timeframe  Thirty (30) days from the date of the Order   REASON FOR ORDER   The unauthorised fill material has the ability to impact on the property, surrounding properties and the environment by the way of altered drainage patterns (flooding), possible land contamination and water pollution from unestablished soil.   The report is required in compliance pursuant to Work, Health and safety Standards and Environmental Standards to ensure safety and possible environment concerns not just for yourself but your family, contractors and the surrounding neighbours.   From the report it will establish the manner in which the unauthorised land fill is to be removed and where the appropriate location or facility of that material can be properly disposed of.
  • 36.  Independent NATA Certified/Qualified Person of Company  Sampling Undertaken  Not by Company Undertaking Work to remove waste  Not just visual site Inspection
  • 37.  Safer Work sites  Ease of neighbouring residents concerns  Limited media concerns  Reduced Politician or Councillor Concerns  Contractors on Notice
  • 38.