3. Construction Activities
Area Activities Date
Rosemount Drive – North Side
• Closure for Massey Creek Culvert
reconstruction – wall removal at
existing culvert underway
Extended to mid August 2020
Massey Creek Culvert • Connection of existing culvert Ongoing – Late June 2020
Birchmount Road to Kennedy
Road
• Permanent sidewalk and curb
installation, boulevard restoration
and driveway tie-ins.
Late April – Late July 2020
Thermos Road to Rosemount
Drive – North sidewalks
• Formwork and granular compaction Ongoing – Early June 2020
Hakimi/Lebovic Stop
• Platform rebar installation
• Shelter Installation
Ongoing – Mid June 2020
July 2020
Ionview Stop
• Stop construction: Excavation,
conduits, structural
Ongoing – Mid June 2020
Victoria Park Ave to Ionview
Road
• Guideway construction COMPLETE
Birchmount Road and Eglinton
Ave E
• Eastbound left turn lane removal
Fall 2020
Pharmacy Avenue and Eglinton
Ave E
• Northbound and southbound Left
turn Removals
Fall 2020
5. 5
Hakimi and Lebovic Avenue
May 25, 2020 to Late July 2020
• Crews will be constructing stop platforms at the Hakimi and Lebovic Avenue and
Eglinton Avenue East intersection.
• The westbound TTC bus stop will be shifted east of the intersection.
• The eastbound TTC bus stop will be shifted west of the intersection.
6. Rosemount Drive and Eglinton Ave E
6
• Early January – Mid August 2020
• North side closure for Massey Creek Culvert reconstruction.
7. Birchmount Road to Kennedy Road
Late April – Late July 2020
7
• Permanent sidewalk and curb installation, boulevard restoration and
driveway tie-ins.
• The work will impact the eastbound and westbound curb lanes, work will be
completed in sections.
8. Rosemount Drive to Ionview Road
Early May to Mid June 2020
8
• Permanent sidewalk and curb installation, boulevard restoration and
driveway tie-ins on the north side of Eglinton Avenue East between
Rosemount Drive and Ionview Road.
• Daily lane restrictions will be required.
• Temporary pedestrian detour will be implemented as early as May 25, 2020
for approximately two (2) weeks.
9. Ionview Road to Kennedy Road
May 28 - June 11
9
• Driveway tie-ins and boulevard restoration is ongoing on Eglinton Avenue East,
between Rosemount Drive and Kennedy Road.
• Temporary rolling driveway closures will be required on the north side of
Eglinton Avenue East between Ionview Road and Kennedy Road for removal of
existing asphalt and curbs.
• Closures will be in place for a maximum of four (4) hours each and will be
performed one at time. Signage will be installed directing vehicles to available
driveway access.
10. 10
Fall 2020 – The eastbound and westbound
left turn will be prohibited at Birchmount
Road permanently. Left turns are available
at nearby streets including Warden Ave
and Kennedy Rd.
November 13, 2019– The westbound left
turn will be prohibited at Birchmount Road
permanently. Left turns are available at
nearby streets including Warden Ave and
Kennedy Rd.
Left Turn Removals: Birchmount Road
15. Kennedy Station Construction Activities
Area Activities Date
Kennedy Station Main
Station Box
• Concrete Works
• Support of excavation
• Underground mechanical and
electrical works
• Waterproofing
• Masonry and sheet metal works
Ongoing - Late 2020
Kennedy Station – East of
GO
• Concrete, Electrical and
Mechanical Works Ongoing - Late 2020
Kennedy Station West
Portal and GO platform
• Backfilling
• Installation of Structural Steel
Ongoing - Late 2020
Eglinton Ave E and
Kennedy Road
Intersection
• Decking Removal – East Side Early May – Early July 2020
18. Kennedy Rd and Eglinton Ave E
Early May – Early July 2020
Kennedy Station has advanced to a state to allow the temporary traffic deck to be removed
from the roadway. The removal will take place in two stages. The removal of the decking will
improve road surface quality.
19. Kennedy Station - Progress Photos
Main Entrance – Overview
of Concrete Works
GO West Platform
Roofing