Excavations
Excavation Hazards ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Injury and Death ,[object Object],[object Object],[object Object]
Definitions ,[object Object],[object Object],[object Object],[object Object],[object Object]
Focus of Training ,[object Object],[object Object],[object Object],[object Object]
Protection of Employees ,[object Object],[object Object],[object Object],[object Object]
Requirements for  Protective Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Design of Protective Systems ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Protect Employees Exposed to Potential Cave-ins ,[object Object],[object Object],[object Object]
Cave-in Hazard This excavation has inadequate  support posts and egress access Inadequate protective system
Inadequate Protective System  This worker is in a trench with no protective system, that is not sloped or benched and has no means of egress
Factors Involved in Designing a Protective System ,[object Object],[object Object],[object Object],[object Object],[object Object]
Shoring ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Trench Shield ,[object Object]
Hydraulic Trench Support ,[object Object],[object Object],[object Object]
Materials and  Equipment ,[object Object],[object Object],[object Object]
Protection from Vehicles ,[object Object],[object Object],[object Object],[object Object],[object Object]
Hazardous Conditions The weight and vibrations of the crane make this a very hazardous condition.  They should not be working under this crane.
Spoils ,[object Object],[object Object],[object Object],[object Object]
Other Excavation Hazards Water accumulation Oxygen deficiency Toxic fumes Access/Egress Falls Mobile equipment
Water is Hazardous ,[object Object],Note that these workers are not wearing hardhats to protect them from materials falling into the trench
Water = Cave-in Hazard These workers must be protected from cave-in.  Note the water in the bottom of the trench.  This is a very hazardous condition!
Hazardous Atmosphere ,[object Object],[object Object],[object Object],[object Object]
Means of Egress ,[object Object],This ladder does not meet the requirements of the standard The ladder should extend 3 feet  above the excavation
Access and Egress These two ladders which are lashed together are not an adequate means of egress The ladder should extend 3 feet  above the top of the  excavation
Protection from Falls, Falling Loads, and Mobile Equipment ,[object Object],[object Object],[object Object],[object Object],[object Object]
Competent Person   ,[object Object],[object Object],[object Object],[object Object],[object Object]
Inspections of Excavations ,[object Object],[object Object],[object Object],[object Object]
Inspections of Excavations ,[object Object],[object Object],[object Object]
Site Evaluation Planning ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Fissure
Summary ,[object Object],[object Object],[object Object],[object Object]

Weitere ähnliche Inhalte

Was ist angesagt?

Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
Ranjith Kumar
 
NGI-Excavation Hazards
NGI-Excavation HazardsNGI-Excavation Hazards
NGI-Excavation Hazards
lifecombo
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
IrfanAwan25
 
Construction safety lecture-1
Construction safety  lecture-1Construction safety  lecture-1
Construction safety lecture-1
Saleem Malik
 
3. safety guidelines for construction workers
3. safety guidelines for construction workers 3. safety guidelines for construction workers
3. safety guidelines for construction workers
Content Mutual
 
12 construction safety
12 construction safety12 construction safety
12 construction safety
azak80
 

Was ist angesagt? (20)

Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Health and Safety in Construction PPT
Health and Safety in Construction  PPTHealth and Safety in Construction  PPT
Health and Safety in Construction PPT
 
Excavation
ExcavationExcavation
Excavation
 
Safety in various construction operations –
Safety in various construction operations –Safety in various construction operations –
Safety in various construction operations –
 
Construction safety
Construction  safetyConstruction  safety
Construction safety
 
Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
 
NGI-Excavation Hazards
NGI-Excavation HazardsNGI-Excavation Hazards
NGI-Excavation Hazards
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Construction safety lecture-1
Construction safety  lecture-1Construction safety  lecture-1
Construction safety lecture-1
 
Pipeline Construction Safety
Pipeline Construction SafetyPipeline Construction Safety
Pipeline Construction Safety
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
 
3. safety guidelines for construction workers
3. safety guidelines for construction workers 3. safety guidelines for construction workers
3. safety guidelines for construction workers
 
Trenching shoring
Trenching shoringTrenching shoring
Trenching shoring
 
Construction safety management
Construction safety managementConstruction safety management
Construction safety management
 
construction site safety and management
construction site safety and managementconstruction site safety and management
construction site safety and management
 
Safety equipment's during construction
Safety equipment's during constructionSafety equipment's during construction
Safety equipment's during construction
 
12 construction safety
12 construction safety12 construction safety
12 construction safety
 
Working at heights
Working at heightsWorking at heights
Working at heights
 

Andere mochten auch

Archaeology Power Point
Archaeology Power PointArchaeology Power Point
Archaeology Power Point
Linda Smith
 
3.1.2 hazmat classes
3.1.2 hazmat classes3.1.2 hazmat classes
3.1.2 hazmat classes
prssncdcc
 

Andere mochten auch (20)

Excavation Techniques and Analysis
Excavation Techniques and AnalysisExcavation Techniques and Analysis
Excavation Techniques and Analysis
 
Shoring
ShoringShoring
Shoring
 
Archaeology Power Point
Archaeology Power PointArchaeology Power Point
Archaeology Power Point
 
Temporary works
Temporary worksTemporary works
Temporary works
 
Engineering methods to control soil erosion
Engineering methods to control soil erosionEngineering methods to control soil erosion
Engineering methods to control soil erosion
 
Soil erosion2
Soil erosion2Soil erosion2
Soil erosion2
 
soil erosion and conservation
soil erosion and conservationsoil erosion and conservation
soil erosion and conservation
 
Bio engineering methods and their control for soil erosion
Bio engineering methods and their control for soil erosionBio engineering methods and their control for soil erosion
Bio engineering methods and their control for soil erosion
 
SOIL CONSERVATION
SOIL CONSERVATIONSOIL CONSERVATION
SOIL CONSERVATION
 
EXCAVATIONS
EXCAVATIONSEXCAVATIONS
EXCAVATIONS
 
Soil conservation ppt
Soil conservation pptSoil conservation ppt
Soil conservation ppt
 
explosives
explosivesexplosives
explosives
 
Explosive engineering
Explosive engineeringExplosive engineering
Explosive engineering
 
UG Explosives and Blasting
UG Explosives and BlastingUG Explosives and Blasting
UG Explosives and Blasting
 
Explosive Engineering labs
Explosive Engineering labsExplosive Engineering labs
Explosive Engineering labs
 
3.1.2 hazmat classes
3.1.2 hazmat classes3.1.2 hazmat classes
3.1.2 hazmat classes
 
Explosives
ExplosivesExplosives
Explosives
 
Soil erosion
Soil erosionSoil erosion
Soil erosion
 
Soil Erosion
Soil ErosionSoil Erosion
Soil Erosion
 
Soil erosion
Soil erosionSoil erosion
Soil erosion
 

Ähnlich wie Excavations ppt

Superintendent Training 2008 - Meeting #7
Superintendent Training 2008 - Meeting #7Superintendent Training 2008 - Meeting #7
Superintendent Training 2008 - Meeting #7
beckbuilds
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Waqas Ahmad
 

Ähnlich wie Excavations ppt (20)

Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Excavation & Trench Safety by NUCA
Excavation & Trench Safety by NUCAExcavation & Trench Safety by NUCA
Excavation & Trench Safety by NUCA
 
Excavations c
Excavations cExcavations c
Excavations c
 
3. excavations2
3. excavations23. excavations2
3. excavations2
 
Excavations by Summit Staffing Inc
Excavations by Summit Staffing IncExcavations by Summit Staffing Inc
Excavations by Summit Staffing Inc
 
Excavation Safety Training by OSHAX.Org
Excavation Safety Training by OSHAX.OrgExcavation Safety Training by OSHAX.Org
Excavation Safety Training by OSHAX.Org
 
Ch. 03 Excuvation.PPT
Ch. 03 Excuvation.PPTCh. 03 Excuvation.PPT
Ch. 03 Excuvation.PPT
 
Excavation and Trenching.pptx
Excavation and Trenching.pptxExcavation and Trenching.pptx
Excavation and Trenching.pptx
 
Trenching Safety Training by State of Georgia
Trenching Safety Training by State of GeorgiaTrenching Safety Training by State of Georgia
Trenching Safety Training by State of Georgia
 
Safety in excavation
Safety in excavationSafety in excavation
Safety in excavation
 
Superintendent Training 2008 - Meeting #7
Superintendent Training 2008 - Meeting #7Superintendent Training 2008 - Meeting #7
Superintendent Training 2008 - Meeting #7
 
Excavation Hazards
Excavation HazardsExcavation Hazards
Excavation Hazards
 
12 trenching and excavation safety
12 trenching and excavation safety12 trenching and excavation safety
12 trenching and excavation safety
 
Excavations Safety Training by Safety Excellence
Excavations Safety Training by Safety ExcellenceExcavations Safety Training by Safety Excellence
Excavations Safety Training by Safety Excellence
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
 
Construction safety
Construction safetyConstruction safety
Construction safety
 
Excavation.ppt
Excavation.pptExcavation.ppt
Excavation.ppt
 
Excavation & Trenching by PATHS
Excavation & Trenching by PATHSExcavation & Trenching by PATHS
Excavation & Trenching by PATHS
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptx
 
Task Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdfTask Risk Worksheet Rev1.pdf
Task Risk Worksheet Rev1.pdf
 

Mehr von Colleen True

Mehr von Colleen True (16)

Ppeppt general industry
Ppeppt general industryPpeppt general industry
Ppeppt general industry
 
Respiratory ppt
Respiratory pptRespiratory ppt
Respiratory ppt
 
Wv late nightretailppt
Wv late nightretailpptWv late nightretailppt
Wv late nightretailppt
 
Egress fireppt
Egress firepptEgress fireppt
Egress fireppt
 
Fall protectionppt
Fall protectionpptFall protectionppt
Fall protectionppt
 
Electrical pptgi
Electrical pptgiElectrical pptgi
Electrical pptgi
 
Haz comppt
Haz compptHaz comppt
Haz comppt
 
Ppeppt general industry
Ppeppt general industryPpeppt general industry
Ppeppt general industry
 
Machine Guarding Ppt
Machine Guarding PptMachine Guarding Ppt
Machine Guarding Ppt
 
Stairs Ladders Ppt
Stairs Ladders PptStairs Ladders Ppt
Stairs Ladders Ppt
 
Materials Handling Ppt
Materials Handling PptMaterials Handling Ppt
Materials Handling Ppt
 
Flammables Ppt
Flammables PptFlammables Ppt
Flammables Ppt
 
Hand powertoolsppt
Hand powertoolspptHand powertoolsppt
Hand powertoolsppt
 
Bloodborne ppt
Bloodborne pptBloodborne ppt
Bloodborne ppt
 
Safety healthppt
Safety healthpptSafety healthppt
Safety healthppt
 
Walk worksurfacesppt
Walk worksurfacespptWalk worksurfacesppt
Walk worksurfacesppt
 

Kürzlich hochgeladen

Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
lizamodels9
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
dlhescort
 

Kürzlich hochgeladen (20)

Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 

Excavations ppt

  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. Cave-in Hazard This excavation has inadequate support posts and egress access Inadequate protective system
  • 11. Inadequate Protective System This worker is in a trench with no protective system, that is not sloped or benched and has no means of egress
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18. Hazardous Conditions The weight and vibrations of the crane make this a very hazardous condition. They should not be working under this crane.
  • 19.
  • 20. Other Excavation Hazards Water accumulation Oxygen deficiency Toxic fumes Access/Egress Falls Mobile equipment
  • 21.
  • 22. Water = Cave-in Hazard These workers must be protected from cave-in. Note the water in the bottom of the trench. This is a very hazardous condition!
  • 23.
  • 24.
  • 25. Access and Egress These two ladders which are lashed together are not an adequate means of egress The ladder should extend 3 feet above the top of the excavation
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.

Hinweis der Redaktion

  1. 1926 Subpart P ‑ Excavations This presentation is designed to assist trainers conducting OSHA 10-hour Construction Industry outreach training for workers. Since workers are the target audience, this presentation emphasizes hazard identification, avoidance, and control – not standards. No attempt has been made to treat the topic exhaustively. It is essential that trainers tailor their presentations to the needs and understanding of their audience. This presentation is not a substitute for any of the provisions of the Occupational Safety and Health Act of 1970 or for any standards issued by the U.S. Department of Labor. Mention of trade names, commercial products, or organizations does not imply endorsement by the U.S. Department of Labor.
  2. Instructor note: OSHA Standard Exemptions: House foundation/basement excavations (including those that become trenches by definition when formwork, foundations, or walls are constructed) are exempt from the OSHA standard. The specific information regarding the interpretation of this exemption may be found on the OSHA public web site. Reference 29 CFR 1926.652. The exemption specifies height and width for the excavation, impact of water and environmental conditions, soil and equipment factors, and operation of heavy equipment in the vicinity.
  3. Reference 1926.650 Shield (shield system) -- a structure able to withstand a cave-in and protect employees with the structure. Shields can be permanent structure or can be designed to be portable and moved along as work progresses. Also known as trench box or trench shield. Shoring (shoring system) -- a structure such as a metal hydraulic, mechanical or timber shoring system that supports the sides of an excavation and which is designed to prevent cave-ins. Sloping (sloping system) -- protects employees from cave-ins by excavating to form sides of an excavation that are inclined away from the excavation to prevent cave-ins. The angle of incline varies with differences in such factors as the soil type, environmental conditions of exposure, and application of surcharge loads.
  4. The discussion of this topic covers four main points. At the conclusion of the training, you should be able to: 1. State the greatest risk that is present at an excavation. 2. Briefly describe the three main methods for protecting employees from cave-ins. 3. Name at least three factors that pose a hazard to employees working in excavations, and at least one way to eliminate or reduce each of the hazards. 4. Describe the role of a competent person at an excavation site.
  5. Reference 1926.652(a) Protective system – a method of p rotecting employees from cave-ins, from material that could fall or roll from an excavation face or into an excavation, or from the collapse of adjacent structures. Protective systems include support systems, sloping and benching systems, shield systems, and other systems that provide the necessary protection.
  6. Several factors come into play when developing a total “protective system”. The design of of the system itself, how materials and equipment are handled in and around the excavation, and installation and removal of protective system components.
  7. Reference 1926.652, 1926.652(b), 1926.652(c) Benching -- excavating the sides of an excavation to form one or a series of horizontal levels or steps, usually with vertical or near-vertical surfaces between levels. Shoring or shielding is used when the location or depth of the cut makes sloping back to the maximum allowable slope impractical. There are two basic types of shoring, timber and aluminum hydraulic. Trench boxes (shielding) are different from shoring because instead of supporting the trench face, they are mostly serve to protect workers from cave-ins. The excavated area between the outside of the trench box and the face of the trench should be as small as possible. The space between the trench box and the excavation side may be backfilled (or other means may be used) to prevent lateral movement of the box. Shields may not be subjected to loads exceeding those which the system was designed to withstand. Trench boxes may be used in combination with sloping and benching.
  8. Reference 1926.652(a) Each employee in an excavation shall be protected from cave-ins by an adequate protective system except when: Excavations are made entirely in stable rock; or Excavations are less than 5 feet in depth and examination of the ground by a competent person provides no indication of a potential cave-in. Protective systems shall have the capacity to resist without failure all loads that are intended or could reasonably be expected to be applied or transmitted to the system. Reference 1926.652(b) Design of sloping and benching systems.
  9. Reference 1926.652(a) and 1926.652(c)(1) Designs for aluminum hydraulic shoring shall be in accordance with paragraph (c)(2), but if manufacturer's tabulated data cannot be utilized, designs shall be in accordance with appendix D. Employees exposed to potential cave-ins must be protected by sloping or benching the sides of the excavation, by supporting the sides of the excavation, or by placing a shield between the side of the excavation and the work area. 1926 Subpart P Appendix D Aluminum Hydraulic Shoring for Trenches Contains information that can be used when aluminum hydraulic shoring is provided as a method of protection against cave-ins in trenches that are not more than 20 feet deep.
  10. Reference 1926.652(a) and (b) and (c)
  11. 1926.652(c) The employer or his designee must select and construct designs of support systems, shield systems, and other protective systems Trenches more than 5 feet require shoring or must have a stabilized slope Trenches less than 5 feet - a competent person must inspect to determine that a protection system is not necessary in soils where there is no indication of a potential cave-in In hazardous soil conditions trenches under 5 feet need protection
  12. Reference 1926.652 (d) Materials and equipment used for protective systems shall be free from damage or defects that might impair their proper function. Manufactured materials and equipment used for protective systems shall be used and maintained in a manner that is consistent with the recommendations of the manufacturer, and in a manner that will prevent employee exposure to hazards. When material or equipment that is used for protective systems is damaged, a competent person shall examine the material or equipment and evaluate its suitability for continued use. If the competent person cannot assure the material or equipment is able to support the intended loads or is otherwise suitable for safe use, then such material or equipment shall be removed from service, and shall be evaluated and approved by a registered professional engineer before being returned to service.
  13. Reference 1926.651(f) Warning system for mobile equipment When mobile equipment is operated adjacent to an excavation, or when such equipment is required to approach the edge of an excavation, and the operator does not have a clear and direct view of the edge of the excavation, a warning system shall be utilized such as barricades, hand or mechanical signals, or stop logs. If possible, the grade should be away from the excavation.
  14. In addition to the unprotected trench, a cave-in hazard is increased by machinery which gets too close. Even normal vehicular traffic, such as that along an adjacent interstate or road through an industrial part may impact an excavation. The vibrations from continuous or heavy traffic may undermine the soil and cause a cave-in.
  15. Reference 1926.651(j)(2) Protect employees from materials or equipment that could fall or roll into excavations. You may also use retaining devices that are sufficient to prevent materials or equipment from falling or rolling into excavations
  16. 1926.651(h) Employees shall not work in excavations in which there is accumulated water, or in excavations in which water is accumulating, unless adequate precautions have been taken to protect employees against the hazards posed by water accumulation. The precautions necessary to protect employees adequately vary with each situation, but could include special support or shield systems to protect from cave-ins, water removal to control the level of accumulating water, or use of a safety harness and lifeline. If water is controlled or prevented from accumulating by the use of water removal equipment, the water removal equipment and operations shall be monitored by a competent person to ensure proper operation. If excavation work interrupts the natural drainage of surface water (such as streams), diversion ditches, dikes, or other suitable means shall be used to prevent surface water from entering the excavation and to provide adequate drainage of the area adjacent to the excavation.
  17. Must also test where oxygen deficiency or a hazardous atmosphere could reasonably be expected to exist, before an employee enters the excavation. If hazardous conditions exist, controls such as proper respiratory protection or ventilation must be provided. Also, controls used to reduce atmospheric contaminants to acceptable levels must be tested regularly. Where adverse atmospheric conditions may exist or develop in an excavation, the employer also must provide and ensure that emergency rescue equipment, (e.g., breathing apparatus, a safety harness and line, basket stretcher, etc.) is readily available. This equipment must be attended when used. Employees shall not be permitted to work in hazardous and/or toxic atmospheres. Such atmospheres include those with: -- less than 19.5% oxygen, -- a combustible gas concentration greater than 20% of the lower flammable limit, and, -- concentrations of hazardous substance that exceed those specified in the Threshold Limit Values for airborne contaminants established by the ACGIH.
  18. Reference 1926.651(c(1) Structural ramps - Structural ramps that are used solely by employees as a means of access or egress from excavations shall be designed by a competent person. Structural ramps used for access or egress of equipment shall be designed by a competent person qualified in structural design, and shall be constructed in accordance with the design. - Ramps and runways constructed of two or more structural members shall have the structural members connected together to prevent displacement. - Structural members used for ramps and runways shall be of uniform thickness. - Cleats or other appropriate means used to connect runway structural members shall be attached to the bottom of the runway or shall be attached in a manner to prevent tripping. - Structural ramps used in lieu of steps shall be provided with cleats or other surface treatments o the top surface to prevent slipping.
  19. Reference 1926.651(c) and 1926.1053 (ladder)
  20. Falls and Equipment To protect employees from these hazards, OSHA requires the employer to take the following precautions: • Keep materials or equipment that might fall or roll into an excavation at least 2 feet from the edge of excavations, or have retaining devices, or both. • Provide warning systems such as mobile equipment, barricades, hand or mechanical signals, or stop logs, to alert operators of the edge of an excavation. If possible, keep the grade away from the excavation. • Provide scaling to remove loose rock or soil or install protective barricades and other equivalent protection to protect employees against falling rock, soil, or materials. • Prohibit employees from working on faces of sloped or benched excavations at levels above other employees unless employees at lower levels are adequately protected from the hazard of falling, rolling, or sliding material or equipment. • Prohibit employees under loads that are handled by lifting or digging equipment. To avoid being struck by any spillage or falling materials, require employees to stand away from vehicles being loaded or unloaded. If cabs of vehicles provide adequate protection from falling loads during loading and unloading operations, the operators may remain in them.
  21. Reference 1926.650(b) "Competent person" One who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them. Preamble Page 45909 – “Competent Person” The term is used throughout existing subpart P, but was not defined within the subpart, and there were no references to the existing definition in subpart C, in the proposal, OSHA added the definition to subpart P to help those using the standard.
  22. Reference 1926.651(k) Daily inspections of excavations, the adjacent areas, and protective systems shall be made by a competent person for evidence of a situation that could result in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions. An inspection shall be conducted by the competent person prior to the start of work and as needed throughout the shift. Inspections shall also be made after every rainstorm or other hazard increasing occurrence. These inspections are only required when employee exposure can be reasonably anticipated.
  23. Reference 1926.651(k) (2) Where the competent person finds evidence of a situation that could result in a possible cave-in, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions, exposed employees shall be removed from the hazardous area until the necessary precautions have been taken to ensure their safety.
  24. The following concerns must be addressed by a competent person: Evaluate soil conditions [1926 Subpart P Appendix A] and select appropriate protective systems [1926 Subpart P Appendix F]. Construct protective systems in accordance with the standard requirements [1926.652]. Preplan; contact utilities (gas, electric) to locate underground lines, plan for traffic control if necessary, determine proximity to structures that could affect choice of protective system. Test for low oxygen , hazardous fumes and toxic gases, especially when gasoline engine-driven equipment is running, or the dirt has been contaminated by leaking lines or storage tanks. Insure adequate ventilation or respiratory protection if necessary. Provide safe access into and out of the excavation. Provide appropriate protections if water accumulation is a problem. Inspect the site daily at the start of each shift, following a rainstorm, or after any other hazard-increasing event. Keep excavations open the minimum amount of time needed to complete operations. Surface crossing of trenches should not be made unless absolutely necessary. However, if necessary, they are only permitted under the following conditions: -- Vehicle crossings must be designed by and installed under the supervision of a registered professional engineer. -- Walkways or bridges must: -- have a minimum clear width of 20 inches, -- be fitted with standard rails, and -- extend a minimum of 24 inches past the surface edge of the trench.