SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
White Paper
These advances have reduced the time
to certify each cable link to just a few
seconds. Faster testers have certainly
shaved costs required for cable installers
to test and certify their work. Still, there
are additional steps in any installation
that consume valuable time, which
ultimately translate to additional costs.
Savvy business owners and test device
providers now realize there are more
opportunities to reduce time spent for many
test-related functions, helping cable operators to
reap new profits in the process.
The old adage,
“Time is Money” applies in
a big way to cable testing.
Over the last 20 years,
the enterprise cabling
installation industry has
benefitted from advances
in testing and certification
tools and technologies.
HOW TO
INCREASE
PROFITS IN CABLE
INSTALLATIONS?
SAVE TIME.
Fluke Networks www.flukenetworks.com2
White Paper
To identify, quantify, and confirm ways to make testing and certification more efficient, Fluke Networks recently asked cable installers
about the time they spent performing various test-related functions. The surveys yielded some surprising results. One big take-away:
effectively dealing with problems and inefficiencies during the testing process definitely improves profit margins. In fact, some companies
reported as much as ten percent profit added to their bottom line! They did this by using systems that reduce testing time wasters. This
additional profit means more revenues for cable installers, or if they choose to pass along their savings to prospective customers, it means
more competitive bids.
In one survey, US installers reported that 63 percent of their time was spent actually installing cable. After the installation was complete,
fourteen percent of their typical project time involved tasks related to testing, six percent went to reporting, eight percent was spent on
re-work, and nine percent was dedicated to contingencies and other activities. The non-installation parts of the job – testing, reporting,
re-working and troubleshooting – represent ripe opportunities for cutting costs by deploying test systems with expanded capabilities.
Reducing errors during planning and setup, eliminating testing mistakes caused by inexperienced workers, avoiding delays caused when
less experienced installers are idle and waiting for more help from experienced managers, condensing time on troubleshooting, reducing
the need for retesting, streamlining inefficient reporting processes, and avoiding unnecessary travel time were all actions companies cited
that can reduce costs and increase profits.
Advanced testers improve productivity
Cable installers using standard testers reported an average of 20 hours spent addressing problems in the course of completing an average
1000-link job. They reduced the average number of hours troubleshooting problems to just seven hours when they used advanced testing
systems. This represents a whopping 65% productivity gain!
Improved planning and setup is an essential first step to reduce time and costs. A test system that offers a single job management
function to track all job requirements at the outset can pay big dividends during the course of the job. Such a system can efficiently set
the job requirements and progress from setup to systems acceptance, making sure that all tests are completed accurately.
When test parameters can be set up in one central point and transmitted using the cloud by both technicians and administrative staff,
it saves time and reduces errors. Advanced testing systems eliminate travel to and from the office for test reporting, resulting in more
accurate reporting and faster project closeout.
Shortage of skilled workers requires new methods for cable testing
In the field, installers definitely don’t want mistakes and employ a number of approaches to minimize them. One method is to hire more
skilled employees. However, there is a shortage of workers with an understanding of the nuances of cable and fiber testing. Seventy-eight
percent of the global installation company owners Fluke surveyed report that finding good workers is a challenge.
More training for inexperienced staff members can certainly help to eliminate time-wasting mistakes – Fluke Networks trains thousands
of technicians in their Certified Cabling Test Technician (CCTT) program. Unfortunately, training can be expensive. Classes require a small
tuition charge, and two days away from the jobsite, plus travel if local classes aren’t conveniently available, adds up. Then there is a
turnover issue. Not only do cabling contractors see the typical turnover issues of any business, but its job-driven nature means a steady
inflow and outflow of temporary workers. Making a significant investment in training a worker who in all likelihood will be working for a
competitor next month is not smart business.
Highly experienced project managers at cable installation firms have the knowledge to make sure that mistakes are avoided. Indeed, more
than 80% of installer owners report that their project managers ensure that things are done right. Unfortunately, the very nature of today’s
cable installation business makes this tough to do. Most contractors work on multiple jobs at the same time, and at a single job, installers
have to move from floor to floor and wait for construction teams to finish other parts of the job. Seventy percent of installers report
moving a tester from one job to another and then back at least once every month. Given that a majority of project managers report being
stretched too thin, it’s unlikely that they would be able to successfully chase their testers around making sure they’re always set up and
used properly.
Fluke Networks www.flukenetworks.com3
White Paper
Since training is costly, and hiring more experienced workers plus more project managers to supervise them takes a big bite out of the
bottom line, a better approach is to design testing systems so that there is less room for error.
Cleverly designing and automating some of the testing functions to avoid errors is a key way to make the testing process more efficient.
More than 800 installers worldwide were questioned and almost half reported having to retest links because they were tested to the wrong
limits. Thirty-seven percent reported dealing with negative loss fiber measurements. (A negative loss in a fiber is like recording a negative
time in a 100-meter dash – something obviously is incorrect.)
Fixing the root cause of many test problems: improper set-up
The root cause of negative fiber loss readings is improper reference set-up in the instrument. Setting fiber reference levels properly is
critical to good measurements, but it is a relatively complex process. If any of the steps are performed improperly, every reading made
from that point with the tester will be incorrect. The testing device itself can eliminate errors by leading the operator through the set-up
process step by step and checking that it has been done right. The sequence of Fluke Networks device screens below shows some of the
steps in the process. As each is completed, the user taps “NEXT” and the tester verifies that the step was completed and presents the next
step. Note the use of color coding on the cabling further reduces the chances of error.
Of course, there are many places in the cable certification where mistakes can occur. Each of these can be examined and the poka-yoke
approach can be used to prevent or call attention to the mistakes. By eliminating these mistakes, contractors can reduce costs, increase
profitability, and reduce the time to systems acceptance and therefore payment.
According to Fluke Networks customers, another step in the cable certification process that requires more time than necessary is
troubleshooting when problems crop up. According to more than 300 contractors who participated in a US survey, one of the biggest time
wasters in the testing process is the time teams have to wait for a lead technician to troubleshoot: this averages 4.6 hours a month for
copper, and 3.8 hours a month for fiber.
For example, our research found that only 30% of technicians were able to set up custom fiber testing limits; and 64% of firms reported
delays in the prior six months while waiting for a tech to set up custom fiber limits.
Making reporting more efficient
Another big time waster is inefficient reporting. One big problem for many firms is the time they spend each month to transport testers
to a PC so results can be downloaded to create required reports. They report that 4.4 hours a month is spent just getting the information
to the right place. A test system that manages all of the results from multiple testers using one cloud-based PC software application can
seamlessly access tester data to track progress and generate reports. Overall reporting costs were halved for companies that used test
systems with advanced reporting capabilities – from 4% overall project cost to 2% for a 1000-link average job.
Fluke Networks www.flukenetworks.com4
White Paper
Fluke Networks engineers designed the Versiv cable testing system to efficiently complete all tasks associated with testing cable
installations, from planning and setup, through project management, testing troubleshooting and reporting. Its ProjX™ System manages
job requirements and progress from setup to systems acceptance, making sure all tests are completed correctly. The Taptive™ User Interface
simplifies set up, eliminates errors and speeds troubleshooting. The LinkWare Live cloud service gives control of the whole process: testers
can be set up and tracked and results can be inspected from any mobile device while the job is in process. Installers can upload and
integrate results from multiple testers at multiple jobsites to quickly generate reports with the de-facto industry standard LinkWare PC.
Fluke Networks interviewed companies that used 100% Versiv systems, companies that deployed some percentage of Versiv devices, and
those that had no Versiv products. Fluke Networks compared the efficiency of Versiv cable testing system users against shops with a
mixture of devices and no Versiv systems. Overall, Versiv owners spend up to 66% less time on testing and reporting issues. The findings
show that total spend on testing and reporting goes down from 15% to 8% to 5%, adding 7% and 10% to the overall profit margin, as
Versiv penetration increases from 0% to 50% to 100%. Saving time saves money and that’s good news for the bottom line.
About Fluke Networks
Fluke Networks is the worldwide leader in certification, troubleshooting, and installation tools for professionals who install and maintain
critical network cabling infrastructure. From installing the most advanced data centers to restoring service in the worst weather, our
combination of legendary reliability and unmatched performance ensure jobs are done efficiently.
For more information, visit www.flukenetworks.com/versiv
White Paper
Fluke Networks operates in more than 50 countries
worldwide. To find your local office contact details,
go to www.flukenetworks.com/contact
Corporate Office:
Fluke Networks
P.O. Box 777 Everett, WA USA 98206-0777
1-800-283-5853
e-mail: info@flukenetworks.com
European Office:
Fluke Networks
P.O. Box 1550, 5602 BN Eindhoven
Germany 0049-(0)682 2222 0223
France 0033-(0)1780 0023
UK 0044-(0)207 942 0721
e-mail: sales.core@flukenetworks.com
5
©2016 Fluke Corporation. All rights Reserved.
CertiFiber®
Pro - Accelerates every step of the fiber certification process.
The CertiFiber Pro improves the efficiency of fiber certification with a 3 second, dual wavelength, dual fiber, test
time. The Taptive user interface simplifies set-up, eliminates errors and speeds troubleshooting. A set reference
wizard ensures correct reference setting and eliminates negative loss errors. Built on the future-ready Versiv
platform, CertiFiber Pro provides merged Tier 1 (Basic) / Tier 2 (Extended) testing and reporting when paired
with OptiFiber Pro module. A convenient quad module supports both singlemode and multimode and is multimode
Encircled Flux compliant. Copper certification and Wi-Fi Analysis and Ethernet troubleshooting modules are also
available. Analyze test results and create professional test reports using LinkWare Management Software.
DSX-5000 CableAnalyzer™
- Accelerates every step of the copper
certification process.
The DSX-5000 CableAnalyzer improves the efficiency of copper certification with unmatched speed for testing Cat
6A and Class FA while meeting darft IEC Level V – the most stringent accuracy requirement. The ProjX Management
System helps ensure jobs are done correctly the first time and helps tracks progress from set-up to systems
acceptance. Versiv platform supports modules for fiber testing (Both OLTS and OTDR) and Wi-Fi Analysis and Ethernet
troubleshooting. The platform is easily upgradeable to support future standards. Troubleshoot faults faster with the
Taptive user interface which graphically displays the source of failures including crosstalk, return loss and shield
faults. Analyze test results and create professional test reports using LinkWare™ Management Software.
OptiFiber®
Pro OTDR – Built for the Enterprise.
OptiFiber Pro is the industry’s first OTDR built from the ground up to meet the challenges of enterprise fiber
infrastructures. This troubleshooting and certification tool combines uncomplicated power, unparalleled efficiency
and the exact functions needed for troubleshooting campus, data center and storage fiber networks.
The OptiFiber Pro OTDR elevates fiber testing with the industry’s only smartphone interface that turns a technician
into a fiber expert. The DataCenter OTDR configuration eliminates uncertainty and errors that occur when testing
data center fiber. Its ultra-short dead zones enable testing of fiber patchcords in virtualized data centers.
These capabilities, plus the fastest-in-the-industry trace times, make the OptiFiber Pro OTDR a must-have tool.
FI-7000 FiberInspector™
Pro - 2-second automated PASS/
FAIL certification of fiber end-faces.
Graphical indication of problem areas due to contamination, pits, chips, and scratches.
Certify to industry standards - IEC 61300-3-35 and eliminate human subjectivity from end-face
measurements.
More information at: www.flukenetworks.com/versiv

Weitere ähnliche Inhalte

Was ist angesagt?

Smith Jeremy Online Upload Resume 2016
Smith Jeremy Online Upload Resume 2016Smith Jeremy Online Upload Resume 2016
Smith Jeremy Online Upload Resume 2016
Jeremy Smith
 
Lessons learned in implementing test on-commit for mobile devices
Lessons learned in implementing test on-commit for mobile devicesLessons learned in implementing test on-commit for mobile devices
Lessons learned in implementing test on-commit for mobile devices
Johan Hoberg
 
Continuous integration testing fundamentals
Continuous integration testing fundamentalsContinuous integration testing fundamentals
Continuous integration testing fundamentals
Cygnet Infotech
 
Let the adventure begin the 80-20 testing - ingenuity
Let the adventure begin   the 80-20 testing - ingenuityLet the adventure begin   the 80-20 testing - ingenuity
Let the adventure begin the 80-20 testing - ingenuity
Indium Software
 

Was ist angesagt? (20)

Applying Agile Principles to Test Automation Development
Applying Agile Principles to Test Automation DevelopmentApplying Agile Principles to Test Automation Development
Applying Agile Principles to Test Automation Development
 
An Agile Testing Dashboard: Metrics that Matter
An Agile Testing Dashboard: Metrics that MatterAn Agile Testing Dashboard: Metrics that Matter
An Agile Testing Dashboard: Metrics that Matter
 
Designing for Testability: Differentiator in a Competitive Market
Designing for Testability: Differentiator in a Competitive MarketDesigning for Testability: Differentiator in a Competitive Market
Designing for Testability: Differentiator in a Competitive Market
 
Continuous Testing of Cloud Applications
Continuous Testing of Cloud ApplicationsContinuous Testing of Cloud Applications
Continuous Testing of Cloud Applications
 
Smith Jeremy Online Upload Resume 2016
Smith Jeremy Online Upload Resume 2016Smith Jeremy Online Upload Resume 2016
Smith Jeremy Online Upload Resume 2016
 
The Survey Says: Testers Spend Their Time Doing...
The Survey Says: Testers Spend Their Time Doing...The Survey Says: Testers Spend Their Time Doing...
The Survey Says: Testers Spend Their Time Doing...
 
Lessons learned in implementing test on-commit for mobile devices
Lessons learned in implementing test on-commit for mobile devicesLessons learned in implementing test on-commit for mobile devices
Lessons learned in implementing test on-commit for mobile devices
 
Continuous integration testing fundamentals
Continuous integration testing fundamentalsContinuous integration testing fundamentals
Continuous integration testing fundamentals
 
Introduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBIIntroduction to The Augustus Group and RBI
Introduction to The Augustus Group and RBI
 
Continuous Testing in Vegas
Continuous Testing in VegasContinuous Testing in Vegas
Continuous Testing in Vegas
 
Appium, Test-Driven Development, and Continuous Integration
Appium, Test-Driven Development, and Continuous IntegrationAppium, Test-Driven Development, and Continuous Integration
Appium, Test-Driven Development, and Continuous Integration
 
1330 anderson
1330 anderson1330 anderson
1330 anderson
 
Continuous testing webinar 041017 slideshare
Continuous testing webinar 041017 slideshareContinuous testing webinar 041017 slideshare
Continuous testing webinar 041017 slideshare
 
Metrics for (outsourced) test activities by Kees Blokland
Metrics for (outsourced) test activities by Kees BloklandMetrics for (outsourced) test activities by Kees Blokland
Metrics for (outsourced) test activities by Kees Blokland
 
Engineering DevOps to meet Business Goals
 Engineering DevOps to meet Business Goals Engineering DevOps to meet Business Goals
Engineering DevOps to meet Business Goals
 
Accounting for non functional and project requirements - cosmic and ifpug dev...
Accounting for non functional and project requirements - cosmic and ifpug dev...Accounting for non functional and project requirements - cosmic and ifpug dev...
Accounting for non functional and project requirements - cosmic and ifpug dev...
 
PradeepKombilath
PradeepKombilathPradeepKombilath
PradeepKombilath
 
Let the adventure begin the 80-20 testing - ingenuity
Let the adventure begin   the 80-20 testing - ingenuityLet the adventure begin   the 80-20 testing - ingenuity
Let the adventure begin the 80-20 testing - ingenuity
 
Latest Trends in Digital Testing in Europe: Strategies, Challenges & Measurin...
Latest Trends in Digital Testing in Europe: Strategies, Challenges & Measurin...Latest Trends in Digital Testing in Europe: Strategies, Challenges & Measurin...
Latest Trends in Digital Testing in Europe: Strategies, Challenges & Measurin...
 
The Business Case for Test Environment Management Services
The Business Case for Test Environment Management ServicesThe Business Case for Test Environment Management Services
The Business Case for Test Environment Management Services
 

Andere mochten auch

Al marai board report-2012-en
Al marai board report-2012-enAl marai board report-2012-en
Al marai board report-2012-en
Fatmatawfik
 
Trm market risk-alm.ppt by oliver germany
Trm   market risk-alm.ppt by oliver germanyTrm   market risk-alm.ppt by oliver germany
Trm market risk-alm.ppt by oliver germany
Emmanuel Okereke
 
Vc4 nm73 eq#4-3des
Vc4 nm73 eq#4-3desVc4 nm73 eq#4-3des
Vc4 nm73 eq#4-3des
17oswaldo
 
Fi Fi Webserver Hardwaredokumentation
Fi Fi Webserver HardwaredokumentationFi Fi Webserver Hardwaredokumentation
Fi Fi Webserver Hardwaredokumentation
guest0ac90f
 
Consumer cards marketing strategies (thai) alex
Consumer cards marketing strategies (thai) alexConsumer cards marketing strategies (thai) alex
Consumer cards marketing strategies (thai) alex
truc214
 
Encuesta de hábitos alimenticios 6º grado.
Encuesta de hábitos alimenticios 6º grado.Encuesta de hábitos alimenticios 6º grado.
Encuesta de hábitos alimenticios 6º grado.
uadacampana
 

Andere mochten auch (20)

36417 aed25ac6b42a0f9df9ca7c1b0c9eb2e5
36417 aed25ac6b42a0f9df9ca7c1b0c9eb2e536417 aed25ac6b42a0f9df9ca7c1b0c9eb2e5
36417 aed25ac6b42a0f9df9ca7c1b0c9eb2e5
 
Al marai board report-2012-en
Al marai board report-2012-enAl marai board report-2012-en
Al marai board report-2012-en
 
Armas indias
Armas indiasArmas indias
Armas indias
 
Intro to TechSoup Canada for National Sports Federations
Intro to TechSoup Canada for National Sports FederationsIntro to TechSoup Canada for National Sports Federations
Intro to TechSoup Canada for National Sports Federations
 
Cine Oriental/hindú
Cine Oriental/hindúCine Oriental/hindú
Cine Oriental/hindú
 
Digital 3D A New Way Of Advertising 2010
Digital 3D A New Way Of Advertising 2010Digital 3D A New Way Of Advertising 2010
Digital 3D A New Way Of Advertising 2010
 
Consulting Ahead July,2012
Consulting Ahead July,2012Consulting Ahead July,2012
Consulting Ahead July,2012
 
Tim warner seminario 2013
Tim warner seminario 2013Tim warner seminario 2013
Tim warner seminario 2013
 
Miku y los vocaloids
Miku y los vocaloidsMiku y los vocaloids
Miku y los vocaloids
 
Fit PräSentation Kernkompetenzen
Fit PräSentation  KernkompetenzenFit PräSentation  Kernkompetenzen
Fit PräSentation Kernkompetenzen
 
BDG Recruiting
BDG RecruitingBDG Recruiting
BDG Recruiting
 
Trm market risk-alm.ppt by oliver germany
Trm   market risk-alm.ppt by oliver germanyTrm   market risk-alm.ppt by oliver germany
Trm market risk-alm.ppt by oliver germany
 
Vc4 nm73 eq#4-3des
Vc4 nm73 eq#4-3desVc4 nm73 eq#4-3des
Vc4 nm73 eq#4-3des
 
Presentación Docor Comunicación
Presentación Docor ComunicaciónPresentación Docor Comunicación
Presentación Docor Comunicación
 
Fi Fi Webserver Hardwaredokumentation
Fi Fi Webserver HardwaredokumentationFi Fi Webserver Hardwaredokumentation
Fi Fi Webserver Hardwaredokumentation
 
Turismo sanitario o como reinventar la marca espana con salud
Turismo sanitario o como reinventar la marca espana con saludTurismo sanitario o como reinventar la marca espana con salud
Turismo sanitario o como reinventar la marca espana con salud
 
Consumer cards marketing strategies (thai) alex
Consumer cards marketing strategies (thai) alexConsumer cards marketing strategies (thai) alex
Consumer cards marketing strategies (thai) alex
 
Five steps to successfully telling your social media story, presented by Bria...
Five steps to successfully telling your social media story, presented by Bria...Five steps to successfully telling your social media story, presented by Bria...
Five steps to successfully telling your social media story, presented by Bria...
 
Encuesta de hábitos alimenticios 6º grado.
Encuesta de hábitos alimenticios 6º grado.Encuesta de hábitos alimenticios 6º grado.
Encuesta de hábitos alimenticios 6º grado.
 
Sesión 02 - Cómo registrar una marca
Sesión 02  - Cómo registrar una marcaSesión 02  - Cómo registrar una marca
Sesión 02 - Cómo registrar una marca
 

Ähnlich wie Whitepaper fluke

Ta3s - Testing Banking and Finance Applications
Ta3s - Testing Banking and Finance ApplicationsTa3s - Testing Banking and Finance Applications
Ta3s - Testing Banking and Finance Applications
Ta3s Solutions Private Limited
 
A Productive Method for Improving Test Effectiveness
A Productive Method for Improving Test EffectivenessA Productive Method for Improving Test Effectiveness
A Productive Method for Improving Test Effectiveness
Shradha Singh
 
Fluke Connect Condition Based Maintenance
Fluke Connect Condition Based MaintenanceFluke Connect Condition Based Maintenance
Fluke Connect Condition Based Maintenance
Frederic Baudart, CMRP
 
Fundamentals_of_testing.pdf
Fundamentals_of_testing.pdfFundamentals_of_testing.pdf
Fundamentals_of_testing.pdf
AndreeaDavid22
 

Ähnlich wie Whitepaper fluke (20)

Controlling interests editors
Controlling interests editorsControlling interests editors
Controlling interests editors
 
How can banks achieve assured release through effective user acceptance testing
How can banks achieve assured release through effective user acceptance testingHow can banks achieve assured release through effective user acceptance testing
How can banks achieve assured release through effective user acceptance testing
 
Automated Site Verification | Solution Brief | Infovista
Automated Site Verification | Solution Brief | InfovistaAutomated Site Verification | Solution Brief | Infovista
Automated Site Verification | Solution Brief | Infovista
 
Ta3s - Testing Banking and Finance Applications
Ta3s - Testing Banking and Finance ApplicationsTa3s - Testing Banking and Finance Applications
Ta3s - Testing Banking and Finance Applications
 
The Business Case for On-Demand Test Services
The Business Case for On-Demand Test ServicesThe Business Case for On-Demand Test Services
The Business Case for On-Demand Test Services
 
A Productive Method for Improving Test Effectiveness
A Productive Method for Improving Test EffectivenessA Productive Method for Improving Test Effectiveness
A Productive Method for Improving Test Effectiveness
 
Fluke Connect Condition Based Maintenance
Fluke Connect Condition Based MaintenanceFluke Connect Condition Based Maintenance
Fluke Connect Condition Based Maintenance
 
Service Virtualization: What, Who, When, and How
Service Virtualization: What, Who, When, and HowService Virtualization: What, Who, When, and How
Service Virtualization: What, Who, When, and How
 
Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2Software Testing and Quality Assurance Assignment 2
Software Testing and Quality Assurance Assignment 2
 
Why On-Demand Provisioning Enables Tighter Alignment of Test and Production E...
Why On-Demand Provisioning Enables Tighter Alignment of Test and Production E...Why On-Demand Provisioning Enables Tighter Alignment of Test and Production E...
Why On-Demand Provisioning Enables Tighter Alignment of Test and Production E...
 
Advanced Verification Methodology for Complex System on Chip Verification
Advanced Verification Methodology for Complex System on Chip VerificationAdvanced Verification Methodology for Complex System on Chip Verification
Advanced Verification Methodology for Complex System on Chip Verification
 
Fundamentals_of_testing.pdf
Fundamentals_of_testing.pdfFundamentals_of_testing.pdf
Fundamentals_of_testing.pdf
 
Industrialization of testing
Industrialization of testing Industrialization of testing
Industrialization of testing
 
Evolution of Test Automation
Evolution of Test AutomationEvolution of Test Automation
Evolution of Test Automation
 
Whitepaper: How to perform better test on SAP PI/PO
Whitepaper: How to perform better test on SAP PI/POWhitepaper: How to perform better test on SAP PI/PO
Whitepaper: How to perform better test on SAP PI/PO
 
Testing in Financial Services - Leveraging Process Maps
Testing in Financial Services - Leveraging Process MapsTesting in Financial Services - Leveraging Process Maps
Testing in Financial Services - Leveraging Process Maps
 
Some practical considerations and a
Some practical considerations and aSome practical considerations and a
Some practical considerations and a
 
Productivity Studies of Ultra High Density (UHD) Stitching Process
Productivity Studies of Ultra High Density (UHD) Stitching ProcessProductivity Studies of Ultra High Density (UHD) Stitching Process
Productivity Studies of Ultra High Density (UHD) Stitching Process
 
programming testing.pdf
programming testing.pdfprogramming testing.pdf
programming testing.pdf
 
programming testing.pdf
programming testing.pdfprogramming testing.pdf
programming testing.pdf
 

Whitepaper fluke

  • 1. White Paper These advances have reduced the time to certify each cable link to just a few seconds. Faster testers have certainly shaved costs required for cable installers to test and certify their work. Still, there are additional steps in any installation that consume valuable time, which ultimately translate to additional costs. Savvy business owners and test device providers now realize there are more opportunities to reduce time spent for many test-related functions, helping cable operators to reap new profits in the process. The old adage, “Time is Money” applies in a big way to cable testing. Over the last 20 years, the enterprise cabling installation industry has benefitted from advances in testing and certification tools and technologies. HOW TO INCREASE PROFITS IN CABLE INSTALLATIONS? SAVE TIME.
  • 2. Fluke Networks www.flukenetworks.com2 White Paper To identify, quantify, and confirm ways to make testing and certification more efficient, Fluke Networks recently asked cable installers about the time they spent performing various test-related functions. The surveys yielded some surprising results. One big take-away: effectively dealing with problems and inefficiencies during the testing process definitely improves profit margins. In fact, some companies reported as much as ten percent profit added to their bottom line! They did this by using systems that reduce testing time wasters. This additional profit means more revenues for cable installers, or if they choose to pass along their savings to prospective customers, it means more competitive bids. In one survey, US installers reported that 63 percent of their time was spent actually installing cable. After the installation was complete, fourteen percent of their typical project time involved tasks related to testing, six percent went to reporting, eight percent was spent on re-work, and nine percent was dedicated to contingencies and other activities. The non-installation parts of the job – testing, reporting, re-working and troubleshooting – represent ripe opportunities for cutting costs by deploying test systems with expanded capabilities. Reducing errors during planning and setup, eliminating testing mistakes caused by inexperienced workers, avoiding delays caused when less experienced installers are idle and waiting for more help from experienced managers, condensing time on troubleshooting, reducing the need for retesting, streamlining inefficient reporting processes, and avoiding unnecessary travel time were all actions companies cited that can reduce costs and increase profits. Advanced testers improve productivity Cable installers using standard testers reported an average of 20 hours spent addressing problems in the course of completing an average 1000-link job. They reduced the average number of hours troubleshooting problems to just seven hours when they used advanced testing systems. This represents a whopping 65% productivity gain! Improved planning and setup is an essential first step to reduce time and costs. A test system that offers a single job management function to track all job requirements at the outset can pay big dividends during the course of the job. Such a system can efficiently set the job requirements and progress from setup to systems acceptance, making sure that all tests are completed accurately. When test parameters can be set up in one central point and transmitted using the cloud by both technicians and administrative staff, it saves time and reduces errors. Advanced testing systems eliminate travel to and from the office for test reporting, resulting in more accurate reporting and faster project closeout. Shortage of skilled workers requires new methods for cable testing In the field, installers definitely don’t want mistakes and employ a number of approaches to minimize them. One method is to hire more skilled employees. However, there is a shortage of workers with an understanding of the nuances of cable and fiber testing. Seventy-eight percent of the global installation company owners Fluke surveyed report that finding good workers is a challenge. More training for inexperienced staff members can certainly help to eliminate time-wasting mistakes – Fluke Networks trains thousands of technicians in their Certified Cabling Test Technician (CCTT) program. Unfortunately, training can be expensive. Classes require a small tuition charge, and two days away from the jobsite, plus travel if local classes aren’t conveniently available, adds up. Then there is a turnover issue. Not only do cabling contractors see the typical turnover issues of any business, but its job-driven nature means a steady inflow and outflow of temporary workers. Making a significant investment in training a worker who in all likelihood will be working for a competitor next month is not smart business. Highly experienced project managers at cable installation firms have the knowledge to make sure that mistakes are avoided. Indeed, more than 80% of installer owners report that their project managers ensure that things are done right. Unfortunately, the very nature of today’s cable installation business makes this tough to do. Most contractors work on multiple jobs at the same time, and at a single job, installers have to move from floor to floor and wait for construction teams to finish other parts of the job. Seventy percent of installers report moving a tester from one job to another and then back at least once every month. Given that a majority of project managers report being stretched too thin, it’s unlikely that they would be able to successfully chase their testers around making sure they’re always set up and used properly.
  • 3. Fluke Networks www.flukenetworks.com3 White Paper Since training is costly, and hiring more experienced workers plus more project managers to supervise them takes a big bite out of the bottom line, a better approach is to design testing systems so that there is less room for error. Cleverly designing and automating some of the testing functions to avoid errors is a key way to make the testing process more efficient. More than 800 installers worldwide were questioned and almost half reported having to retest links because they were tested to the wrong limits. Thirty-seven percent reported dealing with negative loss fiber measurements. (A negative loss in a fiber is like recording a negative time in a 100-meter dash – something obviously is incorrect.) Fixing the root cause of many test problems: improper set-up The root cause of negative fiber loss readings is improper reference set-up in the instrument. Setting fiber reference levels properly is critical to good measurements, but it is a relatively complex process. If any of the steps are performed improperly, every reading made from that point with the tester will be incorrect. The testing device itself can eliminate errors by leading the operator through the set-up process step by step and checking that it has been done right. The sequence of Fluke Networks device screens below shows some of the steps in the process. As each is completed, the user taps “NEXT” and the tester verifies that the step was completed and presents the next step. Note the use of color coding on the cabling further reduces the chances of error. Of course, there are many places in the cable certification where mistakes can occur. Each of these can be examined and the poka-yoke approach can be used to prevent or call attention to the mistakes. By eliminating these mistakes, contractors can reduce costs, increase profitability, and reduce the time to systems acceptance and therefore payment. According to Fluke Networks customers, another step in the cable certification process that requires more time than necessary is troubleshooting when problems crop up. According to more than 300 contractors who participated in a US survey, one of the biggest time wasters in the testing process is the time teams have to wait for a lead technician to troubleshoot: this averages 4.6 hours a month for copper, and 3.8 hours a month for fiber. For example, our research found that only 30% of technicians were able to set up custom fiber testing limits; and 64% of firms reported delays in the prior six months while waiting for a tech to set up custom fiber limits. Making reporting more efficient Another big time waster is inefficient reporting. One big problem for many firms is the time they spend each month to transport testers to a PC so results can be downloaded to create required reports. They report that 4.4 hours a month is spent just getting the information to the right place. A test system that manages all of the results from multiple testers using one cloud-based PC software application can seamlessly access tester data to track progress and generate reports. Overall reporting costs were halved for companies that used test systems with advanced reporting capabilities – from 4% overall project cost to 2% for a 1000-link average job.
  • 4. Fluke Networks www.flukenetworks.com4 White Paper Fluke Networks engineers designed the Versiv cable testing system to efficiently complete all tasks associated with testing cable installations, from planning and setup, through project management, testing troubleshooting and reporting. Its ProjX™ System manages job requirements and progress from setup to systems acceptance, making sure all tests are completed correctly. The Taptive™ User Interface simplifies set up, eliminates errors and speeds troubleshooting. The LinkWare Live cloud service gives control of the whole process: testers can be set up and tracked and results can be inspected from any mobile device while the job is in process. Installers can upload and integrate results from multiple testers at multiple jobsites to quickly generate reports with the de-facto industry standard LinkWare PC. Fluke Networks interviewed companies that used 100% Versiv systems, companies that deployed some percentage of Versiv devices, and those that had no Versiv products. Fluke Networks compared the efficiency of Versiv cable testing system users against shops with a mixture of devices and no Versiv systems. Overall, Versiv owners spend up to 66% less time on testing and reporting issues. The findings show that total spend on testing and reporting goes down from 15% to 8% to 5%, adding 7% and 10% to the overall profit margin, as Versiv penetration increases from 0% to 50% to 100%. Saving time saves money and that’s good news for the bottom line. About Fluke Networks Fluke Networks is the worldwide leader in certification, troubleshooting, and installation tools for professionals who install and maintain critical network cabling infrastructure. From installing the most advanced data centers to restoring service in the worst weather, our combination of legendary reliability and unmatched performance ensure jobs are done efficiently. For more information, visit www.flukenetworks.com/versiv
  • 5. White Paper Fluke Networks operates in more than 50 countries worldwide. To find your local office contact details, go to www.flukenetworks.com/contact Corporate Office: Fluke Networks P.O. Box 777 Everett, WA USA 98206-0777 1-800-283-5853 e-mail: info@flukenetworks.com European Office: Fluke Networks P.O. Box 1550, 5602 BN Eindhoven Germany 0049-(0)682 2222 0223 France 0033-(0)1780 0023 UK 0044-(0)207 942 0721 e-mail: sales.core@flukenetworks.com 5 ©2016 Fluke Corporation. All rights Reserved. CertiFiber® Pro - Accelerates every step of the fiber certification process. The CertiFiber Pro improves the efficiency of fiber certification with a 3 second, dual wavelength, dual fiber, test time. The Taptive user interface simplifies set-up, eliminates errors and speeds troubleshooting. A set reference wizard ensures correct reference setting and eliminates negative loss errors. Built on the future-ready Versiv platform, CertiFiber Pro provides merged Tier 1 (Basic) / Tier 2 (Extended) testing and reporting when paired with OptiFiber Pro module. A convenient quad module supports both singlemode and multimode and is multimode Encircled Flux compliant. Copper certification and Wi-Fi Analysis and Ethernet troubleshooting modules are also available. Analyze test results and create professional test reports using LinkWare Management Software. DSX-5000 CableAnalyzer™ - Accelerates every step of the copper certification process. The DSX-5000 CableAnalyzer improves the efficiency of copper certification with unmatched speed for testing Cat 6A and Class FA while meeting darft IEC Level V – the most stringent accuracy requirement. The ProjX Management System helps ensure jobs are done correctly the first time and helps tracks progress from set-up to systems acceptance. Versiv platform supports modules for fiber testing (Both OLTS and OTDR) and Wi-Fi Analysis and Ethernet troubleshooting. The platform is easily upgradeable to support future standards. Troubleshoot faults faster with the Taptive user interface which graphically displays the source of failures including crosstalk, return loss and shield faults. Analyze test results and create professional test reports using LinkWare™ Management Software. OptiFiber® Pro OTDR – Built for the Enterprise. OptiFiber Pro is the industry’s first OTDR built from the ground up to meet the challenges of enterprise fiber infrastructures. This troubleshooting and certification tool combines uncomplicated power, unparalleled efficiency and the exact functions needed for troubleshooting campus, data center and storage fiber networks. The OptiFiber Pro OTDR elevates fiber testing with the industry’s only smartphone interface that turns a technician into a fiber expert. The DataCenter OTDR configuration eliminates uncertainty and errors that occur when testing data center fiber. Its ultra-short dead zones enable testing of fiber patchcords in virtualized data centers. These capabilities, plus the fastest-in-the-industry trace times, make the OptiFiber Pro OTDR a must-have tool. FI-7000 FiberInspector™ Pro - 2-second automated PASS/ FAIL certification of fiber end-faces. Graphical indication of problem areas due to contamination, pits, chips, and scratches. Certify to industry standards - IEC 61300-3-35 and eliminate human subjectivity from end-face measurements. More information at: www.flukenetworks.com/versiv