SlideShare ist ein Scribd-Unternehmen logo
1 von 22
Downloaden Sie, um offline zu lesen
Pacific Beach Community Planning Group – ad hoc Subcommittee
May 24, 2016
Presentation Overview
 Welcome/Introductions
 Mobility Hub Overview
 Existing Conditions Review
 Summary of Community Input
 Mobility Concepts
 Input Gathering Exercise
Specific Plan Process
Specific Plan Context - Mid-Coast Rail Study Area / Nearby Planning Studies
Specific Plan Study Area
Approved Balboa Station Concept
Approved Balboa Station Concept
 Pedestrian facilities
 Bicycle lockers
 2 new signals on Morena
 1 new signal on Balboa
Subcommittee Involvement
Input at key project milestones:
 Kick-off / Existing Conditions / Preliminary
Concept Review (December 2015)
 Refined Concept Discussion (Tonight)
 Environmental Impact Report Scoping
Meeting (Early Summer 2016)
 Draft Specific Plan (Fall/Winter 2016)
Additional Community Engagement
 Subcommittee meetings
 Pop-up community events
 Regular updates to Planning Groups
 Online engagement:
 www.balboastationplan.org
Zoning
Residential
Commercial
Industrial
 Maximum building height in plan area is 30 feet –
to remain in place
 Regulated by Coastal Height Limit and
Clairemont Mesa Height Limit Overlay Zones
Mobility – Review of Existing Challenges
 Challenging area for pedestrians to walk adjacent to
the site (lack of sidewalks; lack of separation from
vehicles; steep slopes)
 Challenging area for bicyclists to get to the site (no
facilities on Garnet / Balboa, no facilities on Morena)
 Heavy vehicle traffic in area; roads designed for
vehicle traffic
 Limited width on Garnet / Balboa with I-5 freeway
undercrossing – what modes should get
preference?
 Steep slopes and grade differences
Mobility Previously Planned Facilities
 Station project providing some pedestrian
connections along Morena Blvd and to Garnet
Ave / Balboa Ave
 Planned bicycle connections
 Rose Creek Trail extension
(north)
 Balboa Avenue bike lanes
(paint)
 Morena Boulevard bike
facility
Mobility Goals
 Bicycle connections
 Striving for comfortable route for average bicyclist – even if longer distance
 Wayfinding signs
 Pedestrian environment
 Complete missing sidewalks and improve pedestrian experience
 Pedestrian-scale lighting for pedestrian route to/from station
 Wayfinding signs
 Vehicle Connections
 Evaluating intersection improvements at Mission Bay Dr/ Garnet Ave (pending preferred bike network)
 Evaluating intersection improvements at Mission Bay Dr/ Grand Ave
 Modifications to ramps along Garnet Ave / Balboa Ave at Morena Blvd and I-5
Mobility Goals
 Transit connections
 Connection between the station and the beach
 Connection between the station and other areas in community
would be similar to existing routes
 Provide comfortable walking areas near transit
 Other station features
 Bike share program on site
 Car share program on site
 UtilizeApp-enabled ride share services; dedicate pick-up / drop-off area
Mobility/Land Use – Opportunities and Constraints
 Private properties (storage, car dealerships) limit potential
crossing locations
 Minimum changes to land use characteristics result in
minimum changes to mobility patterns
Preliminary Concepts - East
Connections to the east
 Balboa Ave only direct option to the east
 Specific Plan to include completing
sidewalk network and improved bicycle
facilities “up the hill”
Preliminary Concepts – Morena Blvd
Connections to the south and north via Morena Blvd
 Morena Boulevard is primary connection to south
 Planned bicycle improvements, either striping
or separated bike facility
 Need consistent facility along Morena Boulevard
that ties into site layout
Preliminary Concepts – North Options
Other connection to the north
 Option 1 – Morena Boulevard to Santa Fe
Street connection to Rose Creek Trail at
north end
 Option 2 – Damon Ave connection to Rose
Creek Trail east of freeway
 Option 3 – Damon Ave connection to Rose
Creek Trail west of freeway
 Main challenges are elevation differences
and crossing Garnet / Balboa – getting to
Santa Fe Street or Damon Ave
LOOKING FOR INPUT IN
BREAKOUT SESSION!
Option 3: Damon Ave connection to
Rose Creek Trail west of freeway
Preliminary Concepts – West Options
Alternative 1 – Avoid Garnet Ave / Balboa Ave; Cross I-5
FEEDBACK ON SPECIFIC
FEATURES – NOT AN ALL
OR NOTHING APPROACH
LOOKING FOR INPUT IN
BREAKOUT SESSION!
Preliminary Concepts - West Options
Alternative 2 Garnet Ave/Balboa Ave Striping
FEEDBACK ON SPECIFIC
FEATURES – NOT AN ALL
OR NOTHING APPROACH
LOOKING FOR INPUT IN
BREAKOUT SESSION!
Preliminary Concepts - West Options
Alternative 3 Garnet Ave / Balboa Ave Separated Bike Facility
LOOKING FOR INPUT IN
BREAKOUT SESSION!
FEEDBACK ON SPECIFIC
FEATURES – NOT AN ALL
OR NOTHING APPROACH
Concept Review and Comment
 Opportunity and Constraints
 North Study Area – 3 options
 South Study Area – 3 options

Weitere ähnliche Inhalte

Was ist angesagt?

Link And Place A Guide To Street Planning And Design By Prof Peter Jones
Link And Place   A Guide To Street Planning And Design By Prof Peter JonesLink And Place   A Guide To Street Planning And Design By Prof Peter Jones
Link And Place A Guide To Street Planning And Design By Prof Peter Jones
gueste0b5fe
 
Planning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, MonaghanPlanning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, Monaghan
Paul Coyle
 
Simmons us 82 fm 989 txk 060909
Simmons   us 82 fm 989 txk 060909Simmons   us 82 fm 989 txk 060909
Simmons us 82 fm 989 txk 060909
Brian Bochner
 

Was ist angesagt? (19)

Section 2 Inventory and Assessment
Section 2  Inventory and AssessmentSection 2  Inventory and Assessment
Section 2 Inventory and Assessment
 
041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete041916-HBP-Media Packet-Complete
041916-HBP-Media Packet-Complete
 
Orlando Main Streets Bicycle and Pedestrian Study
Orlando Main Streets Bicycle and Pedestrian StudyOrlando Main Streets Bicycle and Pedestrian Study
Orlando Main Streets Bicycle and Pedestrian Study
 
Bird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundaboutsBird Rock CA corridor with roundabouts
Bird Rock CA corridor with roundabouts
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 
GA400 trail presentation - 30% design
GA400 trail presentation - 30% designGA400 trail presentation - 30% design
GA400 trail presentation - 30% design
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road Project
 
Link And Place A Guide To Street Planning And Design By Prof Peter Jones
Link And Place   A Guide To Street Planning And Design By Prof Peter JonesLink And Place   A Guide To Street Planning And Design By Prof Peter Jones
Link And Place A Guide To Street Planning And Design By Prof Peter Jones
 
Lafayette Downtown Congestion Study - 15 Strategies
Lafayette Downtown Congestion Study - 15 StrategiesLafayette Downtown Congestion Study - 15 Strategies
Lafayette Downtown Congestion Study - 15 Strategies
 
Lower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 ConstructionLower Don Valley Trail 2015 Construction
Lower Don Valley Trail 2015 Construction
 
Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)
 
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
Steeles Avenue Widening and Morningside Avenue Extension - Display Panels, Ju...
 
Ce 4710 presentation 2
Ce 4710 presentation 2Ce 4710 presentation 2
Ce 4710 presentation 2
 
Planning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, MonaghanPlanning Report; Assembly Halls, Monaghan
Planning Report; Assembly Halls, Monaghan
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Simmons us 82 fm 989 txk 060909
Simmons   us 82 fm 989 txk 060909Simmons   us 82 fm 989 txk 060909
Simmons us 82 fm 989 txk 060909
 
Jan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public MeetingJan 11 2016 Bloor St. E. Public Meeting
Jan 11 2016 Bloor St. E. Public Meeting
 
PIC 2 Display Boards
PIC 2 Display BoardsPIC 2 Display Boards
PIC 2 Display Boards
 

Ähnlich wie Pb Community Planning Group May 24

Wpc.sw barriers
Wpc.sw barriersWpc.sw barriers
Wpc.sw barriers
WPCwalks
 
120619ppt 12 s1084000 council stratpol presentation
120619ppt 12 s1084000 council stratpol presentation120619ppt 12 s1084000 council stratpol presentation
120619ppt 12 s1084000 council stratpol presentation
Transport Planning
 
Bike Park Master Plan – Site Discussion Mtg #2
Bike Park Master Plan – Site Discussion Mtg #2Bike Park Master Plan – Site Discussion Mtg #2
Bike Park Master Plan – Site Discussion Mtg #2
Cosumnes CSD
 

Ähnlich wie Pb Community Planning Group May 24 (20)

Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
Little River Turnpike Bicycle Corridor Study: Public Meeting #2: Sept. 26, 2016
 
Wpc.sw barriers
Wpc.sw barriersWpc.sw barriers
Wpc.sw barriers
 
GBT Long Range Transit Plan 9/23/15
GBT Long Range Transit Plan 9/23/15GBT Long Range Transit Plan 9/23/15
GBT Long Range Transit Plan 9/23/15
 
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
Reston Network Analysis: Existing Phasing Analysis and 2050 Tier 3
 
Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)Beal Parkway Public Meeting (Oct. 14, 2014)
Beal Parkway Public Meeting (Oct. 14, 2014)
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
PB Subcommittee Presentation 12/14/17
PB Subcommittee Presentation 12/14/17PB Subcommittee Presentation 12/14/17
PB Subcommittee Presentation 12/14/17
 
City Bayfront Connectivity Nov 08 Presentation
City Bayfront Connectivity Nov 08 PresentationCity Bayfront Connectivity Nov 08 Presentation
City Bayfront Connectivity Nov 08 Presentation
 
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
Mason District 2017 VDOT Repaving: Complete Streets-Improving Bicycle and Ped...
 
120619ppt 12 s1084000 council stratpol presentation
120619ppt 12 s1084000 council stratpol presentation120619ppt 12 s1084000 council stratpol presentation
120619ppt 12 s1084000 council stratpol presentation
 
Bike Park Master Plan – Site Discussion Mtg #2
Bike Park Master Plan – Site Discussion Mtg #2Bike Park Master Plan – Site Discussion Mtg #2
Bike Park Master Plan – Site Discussion Mtg #2
 
Congestion Reduction Plan Strategies
Congestion Reduction Plan StrategiesCongestion Reduction Plan Strategies
Congestion Reduction Plan Strategies
 
ThinkBike Chattanooga 9.24.13
ThinkBike Chattanooga 9.24.13ThinkBike Chattanooga 9.24.13
ThinkBike Chattanooga 9.24.13
 
July 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual WorkshopJuly 13, 2021 BPAC Virtual Workshop
July 13, 2021 BPAC Virtual Workshop
 
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
Complete Freeways: Evaluation of Florida's Bicycles on Limited Access Facilit...
 
January 12, 2021 BPAC Virtual Workshop
January 12, 2021 BPAC Virtual Workshop January 12, 2021 BPAC Virtual Workshop
January 12, 2021 BPAC Virtual Workshop
 
College Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation UpdateCollege Station Comprehensive Plan Transportation Update
College Station Comprehensive Plan Transportation Update
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016
 
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
Achieving Separated Cycling Facilities in a Constrained Town Centre Environme...
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentation
 
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation -  Humble BeginningsZechariah Boodey Farmstead Collaborative presentation -  Humble Beginnings
Zechariah Boodey Farmstead Collaborative presentation - Humble Beginnings
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...Booking open Available Pune Call Girls Shukrawar Peth  6297143586 Call Hot In...
Booking open Available Pune Call Girls Shukrawar Peth 6297143586 Call Hot In...
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
Scaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP processScaling up coastal adaptation in Maldives through the NAP process
Scaling up coastal adaptation in Maldives through the NAP process
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
The Most Attractive Pune Call Girls Handewadi Road 8250192130 Will You Miss T...
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 

Pb Community Planning Group May 24

  • 1. Pacific Beach Community Planning Group – ad hoc Subcommittee May 24, 2016
  • 2. Presentation Overview  Welcome/Introductions  Mobility Hub Overview  Existing Conditions Review  Summary of Community Input  Mobility Concepts  Input Gathering Exercise
  • 4. Specific Plan Context - Mid-Coast Rail Study Area / Nearby Planning Studies
  • 7. Approved Balboa Station Concept  Pedestrian facilities  Bicycle lockers  2 new signals on Morena  1 new signal on Balboa
  • 8. Subcommittee Involvement Input at key project milestones:  Kick-off / Existing Conditions / Preliminary Concept Review (December 2015)  Refined Concept Discussion (Tonight)  Environmental Impact Report Scoping Meeting (Early Summer 2016)  Draft Specific Plan (Fall/Winter 2016)
  • 9. Additional Community Engagement  Subcommittee meetings  Pop-up community events  Regular updates to Planning Groups  Online engagement:  www.balboastationplan.org
  • 10. Zoning Residential Commercial Industrial  Maximum building height in plan area is 30 feet – to remain in place  Regulated by Coastal Height Limit and Clairemont Mesa Height Limit Overlay Zones
  • 11. Mobility – Review of Existing Challenges  Challenging area for pedestrians to walk adjacent to the site (lack of sidewalks; lack of separation from vehicles; steep slopes)  Challenging area for bicyclists to get to the site (no facilities on Garnet / Balboa, no facilities on Morena)  Heavy vehicle traffic in area; roads designed for vehicle traffic  Limited width on Garnet / Balboa with I-5 freeway undercrossing – what modes should get preference?  Steep slopes and grade differences
  • 12. Mobility Previously Planned Facilities  Station project providing some pedestrian connections along Morena Blvd and to Garnet Ave / Balboa Ave  Planned bicycle connections  Rose Creek Trail extension (north)  Balboa Avenue bike lanes (paint)  Morena Boulevard bike facility
  • 13. Mobility Goals  Bicycle connections  Striving for comfortable route for average bicyclist – even if longer distance  Wayfinding signs  Pedestrian environment  Complete missing sidewalks and improve pedestrian experience  Pedestrian-scale lighting for pedestrian route to/from station  Wayfinding signs  Vehicle Connections  Evaluating intersection improvements at Mission Bay Dr/ Garnet Ave (pending preferred bike network)  Evaluating intersection improvements at Mission Bay Dr/ Grand Ave  Modifications to ramps along Garnet Ave / Balboa Ave at Morena Blvd and I-5
  • 14. Mobility Goals  Transit connections  Connection between the station and the beach  Connection between the station and other areas in community would be similar to existing routes  Provide comfortable walking areas near transit  Other station features  Bike share program on site  Car share program on site  UtilizeApp-enabled ride share services; dedicate pick-up / drop-off area
  • 15. Mobility/Land Use – Opportunities and Constraints  Private properties (storage, car dealerships) limit potential crossing locations  Minimum changes to land use characteristics result in minimum changes to mobility patterns
  • 16. Preliminary Concepts - East Connections to the east  Balboa Ave only direct option to the east  Specific Plan to include completing sidewalk network and improved bicycle facilities “up the hill”
  • 17. Preliminary Concepts – Morena Blvd Connections to the south and north via Morena Blvd  Morena Boulevard is primary connection to south  Planned bicycle improvements, either striping or separated bike facility  Need consistent facility along Morena Boulevard that ties into site layout
  • 18. Preliminary Concepts – North Options Other connection to the north  Option 1 – Morena Boulevard to Santa Fe Street connection to Rose Creek Trail at north end  Option 2 – Damon Ave connection to Rose Creek Trail east of freeway  Option 3 – Damon Ave connection to Rose Creek Trail west of freeway  Main challenges are elevation differences and crossing Garnet / Balboa – getting to Santa Fe Street or Damon Ave LOOKING FOR INPUT IN BREAKOUT SESSION! Option 3: Damon Ave connection to Rose Creek Trail west of freeway
  • 19. Preliminary Concepts – West Options Alternative 1 – Avoid Garnet Ave / Balboa Ave; Cross I-5 FEEDBACK ON SPECIFIC FEATURES – NOT AN ALL OR NOTHING APPROACH LOOKING FOR INPUT IN BREAKOUT SESSION!
  • 20. Preliminary Concepts - West Options Alternative 2 Garnet Ave/Balboa Ave Striping FEEDBACK ON SPECIFIC FEATURES – NOT AN ALL OR NOTHING APPROACH LOOKING FOR INPUT IN BREAKOUT SESSION!
  • 21. Preliminary Concepts - West Options Alternative 3 Garnet Ave / Balboa Ave Separated Bike Facility LOOKING FOR INPUT IN BREAKOUT SESSION! FEEDBACK ON SPECIFIC FEATURES – NOT AN ALL OR NOTHING APPROACH
  • 22. Concept Review and Comment  Opportunity and Constraints  North Study Area – 3 options  South Study Area – 3 options