On Tuesday, May 24, 2016, the project team presented preliminary recommendations to the public at a Pacific Beach Community Planning Group ad hoc Subcommittee meeting.
11. Mobility – Review of Existing Challenges
Challenging area for pedestrians to walk adjacent to
the site (lack of sidewalks; lack of separation from
vehicles; steep slopes)
Challenging area for bicyclists to get to the site (no
facilities on Garnet / Balboa, no facilities on Morena)
Heavy vehicle traffic in area; roads designed for
vehicle traffic
Limited width on Garnet / Balboa with I-5 freeway
undercrossing – what modes should get
preference?
Steep slopes and grade differences
12. Mobility Previously Planned Facilities
Station project providing some pedestrian
connections along Morena Blvd and to Garnet
Ave / Balboa Ave
Planned bicycle connections
Rose Creek Trail extension
(north)
Balboa Avenue bike lanes
(paint)
Morena Boulevard bike
facility
13. Mobility Goals
Bicycle connections
Striving for comfortable route for average bicyclist – even if longer distance
Wayfinding signs
Pedestrian environment
Complete missing sidewalks and improve pedestrian experience
Pedestrian-scale lighting for pedestrian route to/from station
Wayfinding signs
Vehicle Connections
Evaluating intersection improvements at Mission Bay Dr/ Garnet Ave (pending preferred bike network)
Evaluating intersection improvements at Mission Bay Dr/ Grand Ave
Modifications to ramps along Garnet Ave / Balboa Ave at Morena Blvd and I-5
14. Mobility Goals
Transit connections
Connection between the station and the beach
Connection between the station and other areas in community
would be similar to existing routes
Provide comfortable walking areas near transit
Other station features
Bike share program on site
Car share program on site
UtilizeApp-enabled ride share services; dedicate pick-up / drop-off area
15. Mobility/Land Use – Opportunities and Constraints
Private properties (storage, car dealerships) limit potential
crossing locations
Minimum changes to land use characteristics result in
minimum changes to mobility patterns
16. Preliminary Concepts - East
Connections to the east
Balboa Ave only direct option to the east
Specific Plan to include completing
sidewalk network and improved bicycle
facilities “up the hill”
17. Preliminary Concepts – Morena Blvd
Connections to the south and north via Morena Blvd
Morena Boulevard is primary connection to south
Planned bicycle improvements, either striping
or separated bike facility
Need consistent facility along Morena Boulevard
that ties into site layout
18. Preliminary Concepts – North Options
Other connection to the north
Option 1 – Morena Boulevard to Santa Fe
Street connection to Rose Creek Trail at
north end
Option 2 – Damon Ave connection to Rose
Creek Trail east of freeway
Option 3 – Damon Ave connection to Rose
Creek Trail west of freeway
Main challenges are elevation differences
and crossing Garnet / Balboa – getting to
Santa Fe Street or Damon Ave
LOOKING FOR INPUT IN
BREAKOUT SESSION!
Option 3: Damon Ave connection to
Rose Creek Trail west of freeway
19. Preliminary Concepts – West Options
Alternative 1 – Avoid Garnet Ave / Balboa Ave; Cross I-5
FEEDBACK ON SPECIFIC
FEATURES – NOT AN ALL
OR NOTHING APPROACH
LOOKING FOR INPUT IN
BREAKOUT SESSION!
20. Preliminary Concepts - West Options
Alternative 2 Garnet Ave/Balboa Ave Striping
FEEDBACK ON SPECIFIC
FEATURES – NOT AN ALL
OR NOTHING APPROACH
LOOKING FOR INPUT IN
BREAKOUT SESSION!
21. Preliminary Concepts - West Options
Alternative 3 Garnet Ave / Balboa Ave Separated Bike Facility
LOOKING FOR INPUT IN
BREAKOUT SESSION!
FEEDBACK ON SPECIFIC
FEATURES – NOT AN ALL
OR NOTHING APPROACH
22. Concept Review and Comment
Opportunity and Constraints
North Study Area – 3 options
South Study Area – 3 options