SlideShare ist ein Scribd-Unternehmen logo
1 von 31
Monitoring and Evaluation of
Private Sector Development
Hiroyuki Hatashima
Private Sector Evaluation,
Independent Evaluation Group (IEG)
World Bank Group
Canadian Evaluation Society Conference
June 11, 2013
IEG is part of a larger array of
evaluation and control mechanisms
2
World Bank Group
President / Management
Management’s Internal
Accountability Framework
And Systems
•Self Evaluation
•Monitoring (QAG, DOTS, AS)
•Institutional Integrity
•Internal Audit
•Compliance Advisor/ Ombudsman
(IFC, MIGA)
Independent
Evaluation
Group
Inspection
Panel
Board of
Executive Directors
IEG seeks to address both
accountability and learning
• Accountability for results:
– Is the Bank Group doing what it says?
– Is it achieving its objectives?
– To what extent is it contributing to development outcomes?
– With what results and development impact?
• Learning:
– What projects and programs achieve results –
relevance, efficacy, and efficiency – and why?
– How can M&E be strengthened in the Bank Group and in
client countries?
3
Three main messages
Evaluation Across Boundaries
• Private Sector operations have specific data
gathering advantage/disadvantage based on
their business model
• M&E systems should adopt to the business
practices to be effective and efficient
• M&E can influence learning, quality of work
and outcome
Outline of Presentation
1. Context of Private Sector Development Assistance
2. Types of World Bank Group Private Sector
Development interventions
3. Technical Assistance projects M&E
4. Private Sector Investment projects M&E
5. Use and Influence of M&E
1.1 Context: Private Sector As Important Player
1. The private sector has taken on an essential
role in contributing a wide range of
development issues.
2. Potential of private sector to contribute to
development solution is still underutilized.
3. M&E essential for track progress, assess
outcome & performance and generating
knowledge of what works, what does not, and
why.
Are the monitoring and evaluation systems of IFC
and MIGA equipped to inform the organizations on
their performance and results?
Systems functions
• To what extent does
the mechanism in
place ensure that
M&E systems
generate
credible, timely, and
relevant
information?
Use and Influence
• To what extent does
M&E information
support evidence-
based decision
making and
learning?
Effectiveness and
Efficiency
• What has been the
impact of the M&E
outputs and use on
project quality and
development
outcomes?
1.2 Assessing M&E systems –
Evaluation Questions
Outline of Presentation
1. Context of Private Sector Development Assistance
2. Types of World Bank Group Private Sector
Development interventions
3. Technical Assistance projects M&E
4. Private sector Investment projects M&E
5. Use and Influence of M&E
The World Bank Group consists of
five closely related institutions:
• IBRD: The International Bank for
Reconstruction and Development
• IDA: The International Development
Association
• IFC: International Finance Corporation
• MIGA: The Multilateral Investment
Guarantee Agency
• ICSID: The International Center for the
Settlement of Investment Disputes
1. Types of WBG Private Sector Development
interventions
1. Interventions through the Public Sector to influence
the Private Sector
 World Band Financial and Private Sector Development
projects,
 IFC’s Advisory Services projects to government (Investment
Climate, PPP)
2. Direct interventions in partnership with the private
sector and public entities operating commercially
 IFC’s investments and MIGA’s guarantees
3. Blend interventions
 IFC’s Advisory Services to private companies, but with a
strong public good component
Outline of Presentation
1. Context of Private Sector Development Assistance
2. Types of World Bank Group Private Sector
Development interventions
3. Technical Assistance projects M&E
4. Private Sector Investment projects M&E
5. Business Models and M&E
3.1. Technical Assistances follow
logical model results measurement
ImpactOutcomesOutputsActivitiesInputs
 Resources used
for advisory
services projects
 Programs
associated with an
advisory project
 Example:
– Provide
advisory
services to
local
companies
 Immediate
deliverables of
the project
 Example:
– Diagnostic
report and
recommendati
ons made
– 10 managers
were trained
– Legislation
drafted
 Changes in
knowledge, behavi
ors, and attitudes
as a result of
intervention with
attribution of
changes to the
project
 Example:
– Legislative or
inst reforms
– Changes in
agricultural
techniques, or
CG practices
 Consequences
resulting from an
intervention
including
improvements in
clients’
performance and
effects beyond
direct
beneficiaries
 Example:
– increased
investment, sal
es, jobs
Track indicators
Project Supervision Report
(PSR)
Supervise
Approve Disburse Completion
Commit
M&E system
Logframe,
Identify indicators
Project
Completion
Report
(PCR)
3.2. M&E follows project cycle
Development Effectiveness Framework
Strategic
Relevance
Was it the right
project at the
right time?
Output
Achievement
Were “key”
deliverables
achieved? To
what extent were
clients satisfied
with the advisory
service?
Outcome
Achievement
Were intended
short & medium-
term changes in
behavior
achieved?
Efficiency
Were costs
reasonable vis-à-
vis results?
Impact
Achievement
Were intended longer-
term effects achieved?
What would have
happened without the
intervention? (What is
the counterfactual?)
• These combine into a “synthesis” rating
In addition: Assessment of IFC Role & Contribution:
– Was IFC particularly catalytic or innovative in its advisory services?
– Was IFC able to play a unique role not easily filled by others?
3.2. Advisory Services Project
Completion Report as Self-Evaluation
3.4 Technical Assistance M&E –
ways to adopt to business practices
Progress
 Integration with project cycle
 M&E officer playing important and
formal roles in quality assurance
 Quality control cycle
established
 M&E officers sign-off, Development
Impact Dept reviews
 M&E quality improved
 Quality of logical framework, baseline
data, quality of results discussion – all
improved
Challenges
 Standard indicators not
sufficient to track results
 Inadequate information in
PCR to justify
outcome/impact ratings
 Post completion follow-up
system not systematic
 Work quality assessment not
covered in PCR
Outline of Presentation
1. Context of Private Sector Development Assistance
2. Types of World Bank Group Private Sector
Development interventions
3. IFC Advisory Services (Technical Assistance)
projects M&E
4. Private Sector investment projects M&E
5. Use and Influence of M&E
4.1. Characteristics of Private Sector investments
supported by IFC and MIGA
 Operations subject to market test
Direct Beneficiaries pay for service
Some degree of competition
Sponsors motivated by profitability
 Third party effects (TPE) with no market feedback
Economic distortions
Positive and negative externalities
Provide rationale for public intervention
 Development Agency’s involvement
Consistent with market principles
Focused on third party effects (TPE)
Neighbors /
Environment
CustomersGovernment /
Taxpayers
Employees
4.2 Assessing Development Results - Stakeholder
Framework
Competitors
Producers of
Complementary
Products
Suppliers
New Entrants
Project
Company
(financiers)
4.3. Performance dimensions of IFC
investments and MIGA guarantees
Objective Stakeholders Criteria Standards Assessment
Development
Outcome
Financiers Business
success
(Market test)
Market
benchmarks for
ROIC
Actual financial
statements and
objectives at approval
Customers,
suppliers,
employees,
government
Economic
sustainability
(Third party
effect)
Social benchmarks
for ERR
Actual financial
statements, adjusted
by economic prices
and values
Neighbors,
environment
Environment and
social effects
(Third party
effects)
WBG performance
standards
Actual impact and
compliance with
performance
standards
Competitors, new
entrants, producers
of complementary
products
Private sector
development
(Third party
effect)
Objectives on
competition,
ownership
structure,
demonstration
effects
Qualitative
assessment of
achievements of
objectives on
competition,
ownership structure,
demonstration effects
Track indicators and
development outcomes
Supervise
DOTS*
*IFC’s Development Outcome Tracking System
Approve Disburse Repaid / Exit
Commit
Identify indicators
Expanded
Supervision
Report (XPSR)
4.4. M&E to adopt investment
project cycle
21
Development Outcome Framework
Financial
Performance
Financiers
Economic
Performance
Gov’t, taxpayers
employees,
customers,
suppliers
Envi. & Social
Performance
Neighbors &
Environment
Private Sector
Development
Demo. effects,
linkages, corp.
gov, investment
climate & new
entrants
+
Standard Development Reach Indicators
IFC-wide: Taxes, employment (incl. female)
Plus sector-specific: e.g. MSME loans, utility connections
• Development Outcome: Overall effect on country’s development
• Framework: Derived from Good Practice Standards for Private Sector
Evaluation (investments)
• Each with specific indicators, benchmarks
3.2. Performance Assessment
2.2 Investment project M&E
Challenges
•Difficult to gather info beyond
company”
•Gaps in tracking private sector
development outcome
– Missing indicators, discrepancies
between stated outcome and
indicators
•Reliance on client-submitted
data
– Some data based largely on
assumptions
•Financial Institutions –
challenges in getting sub-
project level information
Advantages
•Financial data- good quality
and frequently updated;
•Enforcement via contracts /
covenants
•Integration with project cycle
– Use of standard indicators, with
baseline and target
•Quality control cycle
established
–Dept. review, Development Impact
Dept review, External Assurance for
Annual Report
Political Risk Guarantee Business model
and M&E challenges (MIGA)
Business Model
•Core competency as
guarantee underwriting,
not financing
•Arms-length relationship
to project enterprises;
•No statutory reporting
requirement from projects;
•Constraints to access –
–No membership on project
company boards of directors
Challenges
In data gathering
In communicating with
project entities
Challenges in
contextual analysis
Industry / sector
intelligence
23
Function of M&E in MIGA:
significant progress in intro of self-evaluation and
indicators.
Achievements
•New monitoring system
for Environment & Social
•Mainstreaming self-
evaluation
•Development indicator
tracking system
introduced
Areas of improvement
Challenges in data gathering
Inconsistent E&S follow-up on
missing documents
DEIS –ex-ante data not
covering all indicators.
Pool of evaluation not
adequate to report portfolio
results
24
Outline of Presentation
1. Context of Private Sector Development Assistance
2. Types of WBG Private Sector Development
interventions
3. Technical Assistance projects M&E
4. Private Sector Investment projects M&E
5. Use and influence of M&E
3.1 Lessons can have a positive influence on
results
IFC Investment
•Lack of lessons / application of
lessons at appraisal associated
with poor outcome
– 80% of unsuccessful projects – low
quality at entry was main factor
– Low DO with low quality at entry =
40% of them without lessons
60% of them lessons were not
integrated in design.
•Improved performance by
learning from past failures
(Agribusiness case study)
– Newer successful projects applied
lessons from earlier failed projects
IFC Advisory
 Lessons influence design and
implementation
 New template asks “how
lessons have been applied to
project design”
 Wealth of lessons from PCR
 Segmented categories of lessons
 High use of past project PCR in
new projects
 Low use of “SmartLessons”
 M&E officers review at entry
3.2 Issues have been detected during
supervision and actions have been taken
IFC Investment
•High quality of supervision work:
83% high (XPSR)
•Half of XPSR identified issues
during supervision, 90% of them
were detected, 63% of them
were fully addressed during
supervision.
•Credit and Environment risk
systems as the most frequently
used monitoring systems
IFC Advisory
 PSR widely used
 95% of staff used PSR to
make adjustment.
 88% of supervision issues
identified in PCR captured in
PSR.
 Poor supervision critical factor
of 25% of projects rated low in
DE
3.3 M&E information is increasingly
used in IFC Strategies
• Increasing use of M&E data
• Annual Strategy process
– Development impact Dept. provide data and
participate discussion.
– Guidance: asks development issues to cover
• Ratings and reach data used in strategy formulation
– Historical DOTS rating comparisons between
sectors – prioritization of subsector
– DOTS ratings vs. profitability
– Gap analysis using “reach indicators” – strategy to
sharpen focus, areas to reach (i.e. BOP)
– Development return of different options using reach
data (reach per $ cost of capital)
Three main messages
• Private Sector operations have specific data
gathering advantage/disadvantage based on
their business model
• M&E systems should adopt to the business
practices to be effective and efficient
• M&E can influence learning, quality of work
and outcome
Outstanding issues
• Difficult to estimate benefit of M&E
–Need innovative approach, some
assumptions about counterfactuals;
Monitoring and Evaluation of
Private Sector Development
Hiroyuki Hatashima
Private Sector Evaluation,
Independent Evaluation Group (IEG)
World Bank Group
Canadian Evaluation Society Conference
June 11, 2013

Weitere ähnliche Inhalte

Was ist angesagt?

02 Embedding Bce
02 Embedding Bce02 Embedding Bce
02 Embedding Bce
BCE A&E
 
Facets of project analysis
Facets of project analysisFacets of project analysis
Facets of project analysis
dmkanchepalya
 
Ceg Baldrige Report 10 21 08
Ceg Baldrige Report 10 21 08Ceg Baldrige Report 10 21 08
Ceg Baldrige Report 10 21 08
Kurt Schoch
 
Embedding BCE - Project review methodology
Embedding BCE - Project review methodologyEmbedding BCE - Project review methodology
Embedding BCE - Project review methodology
JISC BCE
 

Was ist angesagt? (20)

129 Brumby Icgfm
129 Brumby Icgfm129 Brumby Icgfm
129 Brumby Icgfm
 
Exposure Draft ISA 600 – Group Audits
Exposure Draft ISA 600 – Group AuditsExposure Draft ISA 600 – Group Audits
Exposure Draft ISA 600 – Group Audits
 
Addressing the Complex Challenges of Today's Acquisition Professional
Addressing the Complex Challenges of Today's Acquisition ProfessionalAddressing the Complex Challenges of Today's Acquisition Professional
Addressing the Complex Challenges of Today's Acquisition Professional
 
project selection
project selectionproject selection
project selection
 
Results based management
Results based managementResults based management
Results based management
 
02 Embedding Bce
02 Embedding Bce02 Embedding Bce
02 Embedding Bce
 
Recent Outcomes Evaluations of Legal Aid Tech Projects
Recent Outcomes Evaluations of Legal Aid Tech ProjectsRecent Outcomes Evaluations of Legal Aid Tech Projects
Recent Outcomes Evaluations of Legal Aid Tech Projects
 
Presentation on the Proposed Technology-related Revisions to the Code
Presentation on the Proposed Technology-related Revisions to the CodePresentation on the Proposed Technology-related Revisions to the Code
Presentation on the Proposed Technology-related Revisions to the Code
 
Facets of project analysis
Facets of project analysisFacets of project analysis
Facets of project analysis
 
Quality Management for Firms
Quality Management for FirmsQuality Management for Firms
Quality Management for Firms
 
Ceg Baldrige Report 10 21 08
Ceg Baldrige Report 10 21 08Ceg Baldrige Report 10 21 08
Ceg Baldrige Report 10 21 08
 
Infrastrcture project management
Infrastrcture project managementInfrastrcture project management
Infrastrcture project management
 
Pfm reform webinar master slides
Pfm reform webinar master slidesPfm reform webinar master slides
Pfm reform webinar master slides
 
Feasibility matrix
Feasibility matrixFeasibility matrix
Feasibility matrix
 
Effective ex post Evaluation: Purpose and Challenges
Effective ex post Evaluation: Purpose and ChallengesEffective ex post Evaluation: Purpose and Challenges
Effective ex post Evaluation: Purpose and Challenges
 
Gus Caporusso6 12 Resume
Gus Caporusso6 12 ResumeGus Caporusso6 12 Resume
Gus Caporusso6 12 Resume
 
Project management by hamidun
Project management by hamidunProject management by hamidun
Project management by hamidun
 
Embedding BCE - Project review methodology
Embedding BCE - Project review methodologyEmbedding BCE - Project review methodology
Embedding BCE - Project review methodology
 
Pm Session 2
Pm Session 2Pm Session 2
Pm Session 2
 
Bankauditin it env
Bankauditin it envBankauditin it env
Bankauditin it env
 

Ähnlich wie Monitoring and Evaluation of International Development Assistance to the Private Sector

Sme finance impactassessmentframework
Sme finance impactassessmentframeworkSme finance impactassessmentframework
Sme finance impactassessmentframework
Dr Lendy Spires
 

Ähnlich wie Monitoring and Evaluation of International Development Assistance to the Private Sector (20)

Monitoring and Evaluation of Private Sector Development
Monitoring and Evaluation of Private Sector DevelopmentMonitoring and Evaluation of Private Sector Development
Monitoring and Evaluation of Private Sector Development
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Unit 2 rorest based enterprse.pptx
Unit 2 rorest based enterprse.pptxUnit 2 rorest based enterprse.pptx
Unit 2 rorest based enterprse.pptx
 
Sme finance impactassessmentframework
Sme finance impactassessmentframeworkSme finance impactassessmentframework
Sme finance impactassessmentframework
 
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan PerezAPR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
APR Workshop 2010-Participatory Monitoring & Evaluation-Susan Perez
 
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan PerezAPR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
APR Workshop 2010-Monitoring and Evaluation (2)- Susan Perez
 
Investor Demand for Environmental, Social, Governance (ESG) Disclosures
Investor Demand for Environmental, Social, Governance (ESG) Disclosures Investor Demand for Environmental, Social, Governance (ESG) Disclosures
Investor Demand for Environmental, Social, Governance (ESG) Disclosures
 
Environmental analysis and techniques
Environmental analysis and techniquesEnvironmental analysis and techniques
Environmental analysis and techniques
 
Module 4.2 - Performance management
Module 4.2 - Performance managementModule 4.2 - Performance management
Module 4.2 - Performance management
 
Strategic Management
Strategic ManagementStrategic Management
Strategic Management
 
Slideshareersion strategic report regulations guidance for companies and inv...
Slideshareersion strategic report regulations  guidance for companies and inv...Slideshareersion strategic report regulations  guidance for companies and inv...
Slideshareersion strategic report regulations guidance for companies and inv...
 
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
Evaluating the performance of OECD Committees -- Kevin Williams, OECD Secreta...
 
2nd Generation Construction procurement Reform -Published at IPPC 2012 at Se...
2nd Generation Construction procurement Reform  -Published at IPPC 2012 at Se...2nd Generation Construction procurement Reform  -Published at IPPC 2012 at Se...
2nd Generation Construction procurement Reform -Published at IPPC 2012 at Se...
 
Introductory guide to the ISO 20121 Event Sustainability Management System fo...
Introductory guide to the ISO 20121 Event Sustainability Management System fo...Introductory guide to the ISO 20121 Event Sustainability Management System fo...
Introductory guide to the ISO 20121 Event Sustainability Management System fo...
 
007 benefits management-use of it
007 benefits management-use of it007 benefits management-use of it
007 benefits management-use of it
 
Project cycle
Project cycleProject cycle
Project cycle
 
Strategic management
Strategic managementStrategic management
Strategic management
 
2014 survey-monitoring-evaluation-v4
2014 survey-monitoring-evaluation-v42014 survey-monitoring-evaluation-v4
2014 survey-monitoring-evaluation-v4
 
M&E.ppt
M&E.pptM&E.ppt
M&E.ppt
 
Evaluation of SME and entreprenuership programme - Jonathan Potter & Stuart T...
Evaluation of SME and entreprenuership programme - Jonathan Potter & Stuart T...Evaluation of SME and entreprenuership programme - Jonathan Potter & Stuart T...
Evaluation of SME and entreprenuership programme - Jonathan Potter & Stuart T...
 

Mehr von CesToronto

Improving evaluations and utilization with statistical edge nested data desi...
Improving evaluations and utilization with statistical edge  nested data desi...Improving evaluations and utilization with statistical edge  nested data desi...
Improving evaluations and utilization with statistical edge nested data desi...
CesToronto
 
Evaluating through a Community of Practice: How 8 Evaluators are Improving Pr...
Evaluating through a Community of Practice: How 8 Evaluators are Improving Pr...Evaluating through a Community of Practice: How 8 Evaluators are Improving Pr...
Evaluating through a Community of Practice: How 8 Evaluators are Improving Pr...
CesToronto
 
Ces conference presentation 2013 final_june 2013
Ces conference presentation 2013 final_june 2013Ces conference presentation 2013 final_june 2013
Ces conference presentation 2013 final_june 2013
CesToronto
 
Indicators workshop ces 2013
Indicators workshop ces 2013Indicators workshop ces 2013
Indicators workshop ces 2013
CesToronto
 
Closing the Knowledge Gap Between Evaluators and Stakeholders
Closing the Knowledge Gap Between Evaluators and StakeholdersClosing the Knowledge Gap Between Evaluators and Stakeholders
Closing the Knowledge Gap Between Evaluators and Stakeholders
CesToronto
 

Mehr von CesToronto (20)

Why aren't Evaluators using Digital Media Analytics?
Why aren't Evaluators using Digital Media Analytics?Why aren't Evaluators using Digital Media Analytics?
Why aren't Evaluators using Digital Media Analytics?
 
Evaluation pal program monitoring and evaluation technology
Evaluation pal program monitoring and evaluation technologyEvaluation pal program monitoring and evaluation technology
Evaluation pal program monitoring and evaluation technology
 
Developing Performance Measures Through a Consultative Process
Developing Performance Measures Through a Consultative ProcessDeveloping Performance Measures Through a Consultative Process
Developing Performance Measures Through a Consultative Process
 
The international Partnership Initiative to promote Evaluation Capacity Devel...
The international Partnership Initiative to promote Evaluation Capacity Devel...The international Partnership Initiative to promote Evaluation Capacity Devel...
The international Partnership Initiative to promote Evaluation Capacity Devel...
 
Ces 2013 the role of technology and social media - raising the grade
Ces 2013   the role of technology and social media - raising the gradeCes 2013   the role of technology and social media - raising the grade
Ces 2013 the role of technology and social media - raising the grade
 
Evaluating Libraries' Business Services
Evaluating Libraries' Business Services Evaluating Libraries' Business Services
Evaluating Libraries' Business Services
 
Demonstrating Research Impact: Measuring Return on Investment with an Impact ...
Demonstrating Research Impact: Measuring Return on Investment with an Impact ...Demonstrating Research Impact: Measuring Return on Investment with an Impact ...
Demonstrating Research Impact: Measuring Return on Investment with an Impact ...
 
Improving evaluations and utilization with statistical edge nested data desi...
Improving evaluations and utilization with statistical edge  nested data desi...Improving evaluations and utilization with statistical edge  nested data desi...
Improving evaluations and utilization with statistical edge nested data desi...
 
Evaluating through a Community of Practice: How 8 Evaluators are Improving Pr...
Evaluating through a Community of Practice: How 8 Evaluators are Improving Pr...Evaluating through a Community of Practice: How 8 Evaluators are Improving Pr...
Evaluating through a Community of Practice: How 8 Evaluators are Improving Pr...
 
Ces 2013 negotiating evaluation design
Ces 2013   negotiating evaluation designCes 2013   negotiating evaluation design
Ces 2013 negotiating evaluation design
 
Ces conference presentation 2013 final_june 2013
Ces conference presentation 2013 final_june 2013Ces conference presentation 2013 final_june 2013
Ces conference presentation 2013 final_june 2013
 
Living the Values of Engagement and the Strategic View with Program Evaluatio...
Living the Values of Engagement and the Strategic View with Program Evaluatio...Living the Values of Engagement and the Strategic View with Program Evaluatio...
Living the Values of Engagement and the Strategic View with Program Evaluatio...
 
Avoiding Chartjunk
Avoiding Chartjunk Avoiding Chartjunk
Avoiding Chartjunk
 
Evaluation for Development: matching evaluation to the right user, the right...
Evaluation for Development:  matching evaluation to the right user, the right...Evaluation for Development:  matching evaluation to the right user, the right...
Evaluation for Development: matching evaluation to the right user, the right...
 
Indicators workshop ces 2013
Indicators workshop ces 2013Indicators workshop ces 2013
Indicators workshop ces 2013
 
CES Toronto 2013 Engaging Practitioners in Evaluation using the Risk Based Co...
CES Toronto 2013 Engaging Practitioners in Evaluation using the Risk Based Co...CES Toronto 2013 Engaging Practitioners in Evaluation using the Risk Based Co...
CES Toronto 2013 Engaging Practitioners in Evaluation using the Risk Based Co...
 
CES 2013 conference - Rethinking the Relationship between Monitoring and Eval...
CES 2013 conference - Rethinking the Relationship between Monitoring and Eval...CES 2013 conference - Rethinking the Relationship between Monitoring and Eval...
CES 2013 conference - Rethinking the Relationship between Monitoring and Eval...
 
Closing the Knowledge Gap Between Evaluators and Stakeholders
Closing the Knowledge Gap Between Evaluators and StakeholdersClosing the Knowledge Gap Between Evaluators and Stakeholders
Closing the Knowledge Gap Between Evaluators and Stakeholders
 
Ces 2013 - Doing Developmental Evaluation at the System Level
Ces 2013 - Doing Developmental Evaluation at the System LevelCes 2013 - Doing Developmental Evaluation at the System Level
Ces 2013 - Doing Developmental Evaluation at the System Level
 
Ces 2013 towards a cdn definition of evaluation
Ces 2013   towards a cdn definition of evaluationCes 2013   towards a cdn definition of evaluation
Ces 2013 towards a cdn definition of evaluation
 

Kürzlich hochgeladen

VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
dipikadinghjn ( Why You Choose Us? ) Escorts
 

Kürzlich hochgeladen (20)

VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
VIP Independent Call Girls in Mira Bhayandar 🌹 9920725232 ( Call Me ) Mumbai ...
 
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
Mira Road Memorable Call Grls Number-9833754194-Bhayandar Speciallty Call Gir...
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
Vip Call US 📞 7738631006 ✅Call Girls In Sakinaka ( Mumbai )
 
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
VIP Call Girl Service Andheri West ⚡ 9920725232 What It Takes To Be The Best ...
 
The Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfThe Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdf
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
 
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfShrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
 
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
VIP Call Girl in Mumbai 💧 9920725232 ( Call Me ) Get A New Crush Everyday Wit...
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
 
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
06_Joeri Van Speybroek_Dell_MeetupDora&Cybersecurity.pdf
 
Call Girls in New Friends Colony Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escort...
Call Girls in New Friends Colony Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escort...Call Girls in New Friends Colony Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escort...
Call Girls in New Friends Colony Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escort...
 
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
Kharghar Blowjob Housewife Call Girls NUmber-9833754194-CBD Belapur Internati...
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
 

Monitoring and Evaluation of International Development Assistance to the Private Sector

  • 1. Monitoring and Evaluation of Private Sector Development Hiroyuki Hatashima Private Sector Evaluation, Independent Evaluation Group (IEG) World Bank Group Canadian Evaluation Society Conference June 11, 2013
  • 2. IEG is part of a larger array of evaluation and control mechanisms 2 World Bank Group President / Management Management’s Internal Accountability Framework And Systems •Self Evaluation •Monitoring (QAG, DOTS, AS) •Institutional Integrity •Internal Audit •Compliance Advisor/ Ombudsman (IFC, MIGA) Independent Evaluation Group Inspection Panel Board of Executive Directors
  • 3. IEG seeks to address both accountability and learning • Accountability for results: – Is the Bank Group doing what it says? – Is it achieving its objectives? – To what extent is it contributing to development outcomes? – With what results and development impact? • Learning: – What projects and programs achieve results – relevance, efficacy, and efficiency – and why? – How can M&E be strengthened in the Bank Group and in client countries? 3
  • 4. Three main messages Evaluation Across Boundaries • Private Sector operations have specific data gathering advantage/disadvantage based on their business model • M&E systems should adopt to the business practices to be effective and efficient • M&E can influence learning, quality of work and outcome
  • 5. Outline of Presentation 1. Context of Private Sector Development Assistance 2. Types of World Bank Group Private Sector Development interventions 3. Technical Assistance projects M&E 4. Private Sector Investment projects M&E 5. Use and Influence of M&E
  • 6. 1.1 Context: Private Sector As Important Player 1. The private sector has taken on an essential role in contributing a wide range of development issues. 2. Potential of private sector to contribute to development solution is still underutilized. 3. M&E essential for track progress, assess outcome & performance and generating knowledge of what works, what does not, and why.
  • 7. Are the monitoring and evaluation systems of IFC and MIGA equipped to inform the organizations on their performance and results? Systems functions • To what extent does the mechanism in place ensure that M&E systems generate credible, timely, and relevant information? Use and Influence • To what extent does M&E information support evidence- based decision making and learning? Effectiveness and Efficiency • What has been the impact of the M&E outputs and use on project quality and development outcomes? 1.2 Assessing M&E systems – Evaluation Questions
  • 8. Outline of Presentation 1. Context of Private Sector Development Assistance 2. Types of World Bank Group Private Sector Development interventions 3. Technical Assistance projects M&E 4. Private sector Investment projects M&E 5. Use and Influence of M&E
  • 9. The World Bank Group consists of five closely related institutions: • IBRD: The International Bank for Reconstruction and Development • IDA: The International Development Association • IFC: International Finance Corporation • MIGA: The Multilateral Investment Guarantee Agency • ICSID: The International Center for the Settlement of Investment Disputes
  • 10. 1. Types of WBG Private Sector Development interventions 1. Interventions through the Public Sector to influence the Private Sector  World Band Financial and Private Sector Development projects,  IFC’s Advisory Services projects to government (Investment Climate, PPP) 2. Direct interventions in partnership with the private sector and public entities operating commercially  IFC’s investments and MIGA’s guarantees 3. Blend interventions  IFC’s Advisory Services to private companies, but with a strong public good component
  • 11. Outline of Presentation 1. Context of Private Sector Development Assistance 2. Types of World Bank Group Private Sector Development interventions 3. Technical Assistance projects M&E 4. Private Sector Investment projects M&E 5. Business Models and M&E
  • 12. 3.1. Technical Assistances follow logical model results measurement ImpactOutcomesOutputsActivitiesInputs  Resources used for advisory services projects  Programs associated with an advisory project  Example: – Provide advisory services to local companies  Immediate deliverables of the project  Example: – Diagnostic report and recommendati ons made – 10 managers were trained – Legislation drafted  Changes in knowledge, behavi ors, and attitudes as a result of intervention with attribution of changes to the project  Example: – Legislative or inst reforms – Changes in agricultural techniques, or CG practices  Consequences resulting from an intervention including improvements in clients’ performance and effects beyond direct beneficiaries  Example: – increased investment, sal es, jobs
  • 13. Track indicators Project Supervision Report (PSR) Supervise Approve Disburse Completion Commit M&E system Logframe, Identify indicators Project Completion Report (PCR) 3.2. M&E follows project cycle
  • 14. Development Effectiveness Framework Strategic Relevance Was it the right project at the right time? Output Achievement Were “key” deliverables achieved? To what extent were clients satisfied with the advisory service? Outcome Achievement Were intended short & medium- term changes in behavior achieved? Efficiency Were costs reasonable vis-à- vis results? Impact Achievement Were intended longer- term effects achieved? What would have happened without the intervention? (What is the counterfactual?) • These combine into a “synthesis” rating In addition: Assessment of IFC Role & Contribution: – Was IFC particularly catalytic or innovative in its advisory services? – Was IFC able to play a unique role not easily filled by others? 3.2. Advisory Services Project Completion Report as Self-Evaluation
  • 15. 3.4 Technical Assistance M&E – ways to adopt to business practices Progress  Integration with project cycle  M&E officer playing important and formal roles in quality assurance  Quality control cycle established  M&E officers sign-off, Development Impact Dept reviews  M&E quality improved  Quality of logical framework, baseline data, quality of results discussion – all improved Challenges  Standard indicators not sufficient to track results  Inadequate information in PCR to justify outcome/impact ratings  Post completion follow-up system not systematic  Work quality assessment not covered in PCR
  • 16. Outline of Presentation 1. Context of Private Sector Development Assistance 2. Types of World Bank Group Private Sector Development interventions 3. IFC Advisory Services (Technical Assistance) projects M&E 4. Private Sector investment projects M&E 5. Use and Influence of M&E
  • 17. 4.1. Characteristics of Private Sector investments supported by IFC and MIGA  Operations subject to market test Direct Beneficiaries pay for service Some degree of competition Sponsors motivated by profitability  Third party effects (TPE) with no market feedback Economic distortions Positive and negative externalities Provide rationale for public intervention  Development Agency’s involvement Consistent with market principles Focused on third party effects (TPE)
  • 18. Neighbors / Environment CustomersGovernment / Taxpayers Employees 4.2 Assessing Development Results - Stakeholder Framework Competitors Producers of Complementary Products Suppliers New Entrants Project Company (financiers)
  • 19. 4.3. Performance dimensions of IFC investments and MIGA guarantees Objective Stakeholders Criteria Standards Assessment Development Outcome Financiers Business success (Market test) Market benchmarks for ROIC Actual financial statements and objectives at approval Customers, suppliers, employees, government Economic sustainability (Third party effect) Social benchmarks for ERR Actual financial statements, adjusted by economic prices and values Neighbors, environment Environment and social effects (Third party effects) WBG performance standards Actual impact and compliance with performance standards Competitors, new entrants, producers of complementary products Private sector development (Third party effect) Objectives on competition, ownership structure, demonstration effects Qualitative assessment of achievements of objectives on competition, ownership structure, demonstration effects
  • 20. Track indicators and development outcomes Supervise DOTS* *IFC’s Development Outcome Tracking System Approve Disburse Repaid / Exit Commit Identify indicators Expanded Supervision Report (XPSR) 4.4. M&E to adopt investment project cycle
  • 21. 21 Development Outcome Framework Financial Performance Financiers Economic Performance Gov’t, taxpayers employees, customers, suppliers Envi. & Social Performance Neighbors & Environment Private Sector Development Demo. effects, linkages, corp. gov, investment climate & new entrants + Standard Development Reach Indicators IFC-wide: Taxes, employment (incl. female) Plus sector-specific: e.g. MSME loans, utility connections • Development Outcome: Overall effect on country’s development • Framework: Derived from Good Practice Standards for Private Sector Evaluation (investments) • Each with specific indicators, benchmarks 3.2. Performance Assessment
  • 22. 2.2 Investment project M&E Challenges •Difficult to gather info beyond company” •Gaps in tracking private sector development outcome – Missing indicators, discrepancies between stated outcome and indicators •Reliance on client-submitted data – Some data based largely on assumptions •Financial Institutions – challenges in getting sub- project level information Advantages •Financial data- good quality and frequently updated; •Enforcement via contracts / covenants •Integration with project cycle – Use of standard indicators, with baseline and target •Quality control cycle established –Dept. review, Development Impact Dept review, External Assurance for Annual Report
  • 23. Political Risk Guarantee Business model and M&E challenges (MIGA) Business Model •Core competency as guarantee underwriting, not financing •Arms-length relationship to project enterprises; •No statutory reporting requirement from projects; •Constraints to access – –No membership on project company boards of directors Challenges In data gathering In communicating with project entities Challenges in contextual analysis Industry / sector intelligence 23
  • 24. Function of M&E in MIGA: significant progress in intro of self-evaluation and indicators. Achievements •New monitoring system for Environment & Social •Mainstreaming self- evaluation •Development indicator tracking system introduced Areas of improvement Challenges in data gathering Inconsistent E&S follow-up on missing documents DEIS –ex-ante data not covering all indicators. Pool of evaluation not adequate to report portfolio results 24
  • 25. Outline of Presentation 1. Context of Private Sector Development Assistance 2. Types of WBG Private Sector Development interventions 3. Technical Assistance projects M&E 4. Private Sector Investment projects M&E 5. Use and influence of M&E
  • 26. 3.1 Lessons can have a positive influence on results IFC Investment •Lack of lessons / application of lessons at appraisal associated with poor outcome – 80% of unsuccessful projects – low quality at entry was main factor – Low DO with low quality at entry = 40% of them without lessons 60% of them lessons were not integrated in design. •Improved performance by learning from past failures (Agribusiness case study) – Newer successful projects applied lessons from earlier failed projects IFC Advisory  Lessons influence design and implementation  New template asks “how lessons have been applied to project design”  Wealth of lessons from PCR  Segmented categories of lessons  High use of past project PCR in new projects  Low use of “SmartLessons”  M&E officers review at entry
  • 27. 3.2 Issues have been detected during supervision and actions have been taken IFC Investment •High quality of supervision work: 83% high (XPSR) •Half of XPSR identified issues during supervision, 90% of them were detected, 63% of them were fully addressed during supervision. •Credit and Environment risk systems as the most frequently used monitoring systems IFC Advisory  PSR widely used  95% of staff used PSR to make adjustment.  88% of supervision issues identified in PCR captured in PSR.  Poor supervision critical factor of 25% of projects rated low in DE
  • 28. 3.3 M&E information is increasingly used in IFC Strategies • Increasing use of M&E data • Annual Strategy process – Development impact Dept. provide data and participate discussion. – Guidance: asks development issues to cover • Ratings and reach data used in strategy formulation – Historical DOTS rating comparisons between sectors – prioritization of subsector – DOTS ratings vs. profitability – Gap analysis using “reach indicators” – strategy to sharpen focus, areas to reach (i.e. BOP) – Development return of different options using reach data (reach per $ cost of capital)
  • 29. Three main messages • Private Sector operations have specific data gathering advantage/disadvantage based on their business model • M&E systems should adopt to the business practices to be effective and efficient • M&E can influence learning, quality of work and outcome
  • 30. Outstanding issues • Difficult to estimate benefit of M&E –Need innovative approach, some assumptions about counterfactuals;
  • 31. Monitoring and Evaluation of Private Sector Development Hiroyuki Hatashima Private Sector Evaluation, Independent Evaluation Group (IEG) World Bank Group Canadian Evaluation Society Conference June 11, 2013

Hinweis der Redaktion

  1. IEG Private Sector Evaluation (IEGPE)*Evaluates the effectiveness of programs, projects, and activities and the strategies, policies and procedures that relate to them with particular attention to the achievement of objectives for private sector development Generates lessons for learningSupports the Board in ensuring WBG’s development effectiveness and accountability*Adapted from Director’s terms of reference approved by the Board (November 2005)