SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Carol Rodger – Curriculum Vitae
Name: Carol Rodger
Address: 66 Saughtonhall Drive, Edinburgh, EH12 5TL
Phone no: 07742 151205
Email: carol.rodger11@tiscali.co.uk
________________________________________________________________________________________________
Employment History
July 2015–present
People’s Postcode Lottery
Usingmainly Agilemethodology, I currently work as a Business Analystfor People’s Postcode Lottery. I am working on
a number of projects as well as changemanagement. My Projects have included implementing Salesforcefor one of
our teams and implementation of our new website.
Duties included:
 Organisingand takingpartin workshops and meetings with product owners/stakeholders to elicitand
analysebusiness requirements
 Documenting Business Requirements in Requirements Traceability Matrixes and in BusinessRequirements
Documents
 Documenting user Stories in the Jira system
 Organisingand chairingmeetings with key product owners/stakeholders to ensure business requirements are
successfully captured and prioritised by business impactusingtheMoSCoW prioritization method
 Quality checkingDesign Documents provided by vendors to ensure all requirements have been captured
 Mappingout as-is and to-beBusiness Processes usingVisio
 Takingpart in Business Process Map walk-throughs with key Stakeholder groups to ensure they understand
and agree to the new processes mapped in the Visio documents
 Takingpart in Sprint planningand Scrum meetings
 Supporting UAT by analysingproblems identified duringthetesting effort to determine if they are defects
 Providingtesters with support and guidancein their testing efforts
 Providingchangecontrol guidanceand documenting any changes to requirements in Change Request
documents
 Helpingto put in placea BA framework/methodology for new BAs to follow
 Courses:‘QA ManagingProjects in Agilewith Scrum’ and ‘ADM-201: SalesforceAdministration Essentials for
New Admins’
_____________________________________________________
April 2010–June 2015
Franklin Templeton Investments
Usingmainly Waterfall methodology, I worked for the International TA PMO at Franklin Templeton Investments. I
started as a Test Analystinvolved in testing and supportingthe implementation of a new operating system. I then
became a Business Analystand worked on a major projectto implement a major UK product onto our operating
system, as well as some smaller projects.
January 2014–June 2015
BusinessAnalyst
Duties included:
 Organisingand takingpartin workshops and meetings with product owners/stakeholders to elicitand
analysebusiness requirements
 Documenting Business Requirements in Requirements Traceability Matrixes and in BusinessRequirements
Documents
 Organisingand chairing meetings with key product owners/stakeholders to ensure business requirements are
successfully captured and prioritised by business impactusingtheMoSCoW prioritization method
 Quality checkingDesign Documents provided by vendors to ensure all requirements have been captured
 Compiling Target Operating Models to map high-level 'As Is' operations to new 'To Be' operations
 Compiling Business OperatingModels to further define the ‘To Be’ operational tasks and the teams expected
to carry outthose tasks
 Takingpart in 'To Be' Business Process Mappingworkshops with key Subject Matter Experts to map out new
business processes
 Mapping out the new Business Processes in Visio diagrams
 Taking part in Business Process Map walk-throughs with key Stakeholder groups to ensure they understand
and agree to the new processes mapped in the Visio documents
 Determining test scenarios required for User Acceptance Testing (UAT)
 Preparing test scripts required for User Acceptance Testing
 Supporting UAT by analysingproblems identified duringthetesting effort to determine if they are defects
 Providing testers with support and guidancein their testing efforts
 Providing changecontrol guidanceand documenting any changes to requirements in Change Request
documents
April 2010–December 2013
Test Analyst
Duties included:
 Analysing design documents, requirements documents or change request documents to enable the creation
of test scripts
 Creating test scripts to be used to carry out detailed testing of a new operating system, new functionality and
defect fixes
 Carryingout checkingand testing in the test environment to ensure test scripts areaccurate
 Liaisingwith business analysts and key Subject Matter Experts to ensure test scripts areaccurateand easy to
follow
 Gaining detailed knowledge of the new operating system to enableaccurate testing and test scriptcreation
of a wide variety of topics
 Participatingin System Integration Testing and User Acceptance testing
 Leading a team of testers carryingoutUser Acceptance Testing, ensuringaccuratetesting and providing
guidanceand support
 Compiling weekly testing status reports to provide Managers with testing progress and adviseof any defects
detected
 Leading a team from the business carryingoutModel Officetesting, ensuringaccuratetesting and providing
guidanceand support
 Raising systemdefects identified duringtesting phases in Quality Centre
 Managingdefects and liaisingwith systemdevelopers to ensure speedy resolution
 Chairingdaily defect callswith testers and developers to discuss defects raised and track resolution
_____________________________________________________
November2007–November 2009
Citigroup
On joiningCitigroup I was involved in a projectto develop a box management and dealingsystemfor an external
client.I then worked for a trade processingteam, responsiblefor processingtrades through the fund accounting
system on behalf of three external clients.
June 2008–November 2009
Supervisor,Transaction Control Team
Duties included:
 Supervisingand trainingof team
 PreparingDaily Task listfor team
 Dealingwith any staff-related issues as they happen
 Ensuringall tasks arecompleted accurately and in a timely manner
 Monitoringincomingtrades (includingEquities and Bonds,Derivatives,Deposits,FXs) on accountingsystem
and processingin time for various pricingpoints
 Repairingfailed trades
 Processingsubscriptionsand redemptions
 Liaisingwith the external clients to ensure outstandingqueries areresolved in a timely manner and dealing
with any ad-hoc queries from them
 Handlingqueries from other teams and ensuringthey are dealt with in a timely manner
 Overseeing the Risk and Control Self-Assessment for the team
 Resolution of errors and breaches
 Creating procedures for the teams’ tasks
November 2007–June 2008
Team Leader, UnitMatching and DealingTeam
Duties included:
 Supervisingand trainingof team
 Setting objectives for the team
 Dealingwith any staff-related issues as they happen
 Ensuringall tasks arecompleted to prepare for testing phases
 Creating test scripts in order to carry out detailed testing of new system
 Ensuringthat all testingphases arecarried out within the timescales setby the project team
 Ensuringthat all problems and queries areresolved in preparation for system going live
 Creating a Transition Plan detailingtheend state model for the team in preparation for moving from the
Model Officeto Business as Usual
 Ensuringall processes arein placefor system going live
 Testing new updates to the system
 Developing the working procedures necessary for the team
 Creating a trainingplan for new starts
_____________________________________________________
November2005–November 2007
First New Zealand Wrap UK Ltd
On joiningFNZ I was involved in the development and successful implementation of a Wrap Platformfor an external
clientuntil the system went livein May 2006. I then worked as a Dealer in the Operations Team.
May 2006–November 2007
Dealer
Duties included:
 Monitoringof Platformfor all new business placed
 Producingdealingfaxes and placingdealswith fund managers
 Collating,pricingand completingdeals usingthe Platform
 Resolution of errors and breaches
 Handlingqueries from the external clientand external fund managers
 Trainingand supervision of new staff
November 2005–May 2006
Project Analyst/SystemTester
Duties included:
 Testing new updates to the Wrap Platform
 Supervisinga team of testers from the external clientand dealingeffectively with projectqueries
 Developing the working procedures necessary for the Operations Team
_____________________________________________________
March 1999–November 2005
Mellon European Fund Services
Workingas both a Retail Dealer and Agent Services Administrator,my responsibilitieswere across a broad spectrum
of activities.
February 2002–November 2005
Retail Dealer
Duties included:
 Handlingdeals via telephone/fax/application form/EMX
 Inputting of deals into internal computer system
 Calculatingand checkingmanagers box positions
 Daily pricing of funds
 Producingmonthly BACS tapes for regular savers
 Managingqueries from agents
 Resolution of errors and breaches
 Planningthe workday for the team
March 1999–February 2002
Agent ServicesAdministrator
Duties included:
 IFA databaseadministration
 Providingagents with up to date policy information
 Managingdiverserange of correspondence from agents
 Handlingtelephone queries from agents
 Organising paymentof commission to agents
 Deputising for the team leader and planningthe workday for the team
_____________________________________________________
January 1999–February 1999
Transco
Temporary employment as officeadministrator
March 1995–December 1999
Scottish Cultural Press (bookpublisher)
Duties included:
 Editingand proof-readingof books
 Marketing and promotional work
 Typesetting and design of books
 Liaising with authors,printers,designers and sales-reps
 Production
 General officeadministration
__________________________________________________________________________________________
Education
1991–1994: Napier University, Edinburgh
Degree: BA Publishing
1985–1991: Aberdeen Grammar School
O Grades: English;Maths; Geography; French; Art; Arithmetic; Anatomy, Physiology and Health; Biology;Chemistry;
Physics
Highers: English;Maths; Geography; French
______________________________________________________________________________________________
References
Human Resources
People’s Postcode Lottery
76 George Street
Edinburgh EH2 3BU
Human Resources
Franklin Templeton Investments
5 Morrison Street
Edinburgh EH3 8BH
Human Resources
Citigroup
1st Floor,Holyrood Park House
106 Holyrood Road
Edinburgh EH8 8AS
Human Resources
FNZ Wrap UK Ltd
1 Tanfield
Edinburgh EH3 5DA
Human Resources Department
Mellon European Fund Services
2 Festival Square
Edinburgh EH3 9SU

Weitere ähnliche Inhalte

Was ist angesagt?

SHIRAJUL KARIM- Resume
SHIRAJUL KARIM- ResumeSHIRAJUL KARIM- Resume
SHIRAJUL KARIM- ResumeShirajul Karim
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality ManagementGiO Friginal
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer
 
Project quality management (1)
Project quality management (1)Project quality management (1)
Project quality management (1)CQU
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Managementasim78
 
Core tools apqp, ppap, fmea, spc and msa
Core tools   apqp, ppap, fmea, spc and msa Core tools   apqp, ppap, fmea, spc and msa
Core tools apqp, ppap, fmea, spc and msa Mouhcine Nahal
 
Advanced Product Quality Planning presentation
Advanced Product Quality Planning presentationAdvanced Product Quality Planning presentation
Advanced Product Quality Planning presentationPRASHANT KSHIRSAGAR
 
360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellenceguestf2e1db
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRSPaul Morffew
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpointDjamadaMuhamedKAGUSU
 
00 safety_quality_construction
00  safety_quality_construction00  safety_quality_construction
00 safety_quality_constructionAdhitomo Wirawan
 
A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...
A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...
A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...dheimann5
 
Zen QA Presentation
Zen QA PresentationZen QA Presentation
Zen QA Presentationbaapaa
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Kiran Walimbe
 
Process certification
Process certificationProcess certification
Process certificationJean Denis
 

Was ist angesagt? (20)

SHIRAJUL KARIM- Resume
SHIRAJUL KARIM- ResumeSHIRAJUL KARIM- Resume
SHIRAJUL KARIM- Resume
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Quality management
Quality managementQuality management
Quality management
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015
 
Project quality management (1)
Project quality management (1)Project quality management (1)
Project quality management (1)
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Core tools apqp, ppap, fmea, spc and msa
Core tools   apqp, ppap, fmea, spc and msa Core tools   apqp, ppap, fmea, spc and msa
Core tools apqp, ppap, fmea, spc and msa
 
Advanced Product Quality Planning presentation
Advanced Product Quality Planning presentationAdvanced Product Quality Planning presentation
Advanced Product Quality Planning presentation
 
360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence360logica_Testing_center_of_excellence
360logica_Testing_center_of_excellence
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
 
08 project quality management
08 project quality management08 project quality management
08 project quality management
 
Project Quality Management powerpoint
Project Quality Management powerpointProject Quality Management powerpoint
Project Quality Management powerpoint
 
Contractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality AssuranceContractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality Assurance
 
00 safety_quality_construction
00  safety_quality_construction00  safety_quality_construction
00 safety_quality_construction
 
A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...
A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...
A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...
 
Zen QA Presentation
Zen QA PresentationZen QA Presentation
Zen QA Presentation
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
 
Process certification
Process certificationProcess certification
Process certification
 
Project quality management
Project quality managementProject quality management
Project quality management
 

Andere mochten auch

Tabla comparativa teorías de cv
Tabla comparativa teorías de cvTabla comparativa teorías de cv
Tabla comparativa teorías de cvJose Acosta
 
Datos p rocesados (1) sicaya
Datos p rocesados (1) sicayaDatos p rocesados (1) sicaya
Datos p rocesados (1) sicayannarsa
 
Fantastic Fakes and how to find them
Fantastic Fakes and how to find themFantastic Fakes and how to find them
Fantastic Fakes and how to find themLoïc Hervier
 
Casting a spell quiz
Casting a spell   quizCasting a spell   quiz
Casting a spell quizelkako38
 
Analisis de huevos y parasitos en heces fecales
Analisis de huevos y parasitos en heces fecalesAnalisis de huevos y parasitos en heces fecales
Analisis de huevos y parasitos en heces fecalesNicorg212
 
македонија под Oсманлиска власт
македонија под Oсманлиска властмакедонија под Oсманлиска власт
македонија под Oсманлиска властbrane71
 
E- learning y entornos virtuales de Aprendizaje
E- learning y entornos virtuales de Aprendizaje E- learning y entornos virtuales de Aprendizaje
E- learning y entornos virtuales de Aprendizaje Jessica Flores
 

Andere mochten auch (11)

Resume - Copy
Resume - CopyResume - Copy
Resume - Copy
 
Tabla comparativa teorías de cv
Tabla comparativa teorías de cvTabla comparativa teorías de cv
Tabla comparativa teorías de cv
 
Datos p rocesados (1) sicaya
Datos p rocesados (1) sicayaDatos p rocesados (1) sicaya
Datos p rocesados (1) sicaya
 
sistema solar
sistema solarsistema solar
sistema solar
 
Cat 16-2016-01
Cat 16-2016-01Cat 16-2016-01
Cat 16-2016-01
 
Fantastic Fakes and how to find them
Fantastic Fakes and how to find themFantastic Fakes and how to find them
Fantastic Fakes and how to find them
 
Casting a spell quiz
Casting a spell   quizCasting a spell   quiz
Casting a spell quiz
 
Analisis de huevos y parasitos en heces fecales
Analisis de huevos y parasitos en heces fecalesAnalisis de huevos y parasitos en heces fecales
Analisis de huevos y parasitos en heces fecales
 
Periodic trends
Periodic trendsPeriodic trends
Periodic trends
 
македонија под Oсманлиска власт
македонија под Oсманлиска властмакедонија под Oсманлиска власт
македонија под Oсманлиска власт
 
E- learning y entornos virtuales de Aprendizaje
E- learning y entornos virtuales de Aprendizaje E- learning y entornos virtuales de Aprendizaje
E- learning y entornos virtuales de Aprendizaje
 

Ähnlich wie Carol Rodger CV 2016

Ähnlich wie Carol Rodger CV 2016 (20)

Hilary Martin CV 07 16
Hilary Martin CV 07 16Hilary Martin CV 07 16
Hilary Martin CV 07 16
 
Kate Warner_110816
Kate Warner_110816Kate Warner_110816
Kate Warner_110816
 
Chris Scocco Resume
Chris Scocco ResumeChris Scocco Resume
Chris Scocco Resume
 
Resume @ 20150608
Resume @ 20150608Resume @ 20150608
Resume @ 20150608
 
Rohith_Ram_Profile
Rohith_Ram_ProfileRohith_Ram_Profile
Rohith_Ram_Profile
 
Asad_F_Swati_Resume[1]
Asad_F_Swati_Resume[1]Asad_F_Swati_Resume[1]
Asad_F_Swati_Resume[1]
 
Genela-HASQTS-2015
Genela-HASQTS-2015Genela-HASQTS-2015
Genela-HASQTS-2015
 
G Holmes CV - BA-STA
G Holmes CV - BA-STAG Holmes CV - BA-STA
G Holmes CV - BA-STA
 
Ganesh_Gopalakrishnan
Ganesh_GopalakrishnanGanesh_Gopalakrishnan
Ganesh_Gopalakrishnan
 
Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016Geoff Harris - CV_Dec 2016
Geoff Harris - CV_Dec 2016
 
Resume_Saurabh jain
Resume_Saurabh jainResume_Saurabh jain
Resume_Saurabh jain
 
Cecilia boquecosa-resume
Cecilia boquecosa-resumeCecilia boquecosa-resume
Cecilia boquecosa-resume
 
New resume w_out cover_letter_kellykopp_email
New resume w_out cover_letter_kellykopp_emailNew resume w_out cover_letter_kellykopp_email
New resume w_out cover_letter_kellykopp_email
 
Jackie Sutherlin_Resume 2016
Jackie Sutherlin_Resume 2016Jackie Sutherlin_Resume 2016
Jackie Sutherlin_Resume 2016
 
Rowena Bradshaw Resume 2016
Rowena Bradshaw Resume 2016Rowena Bradshaw Resume 2016
Rowena Bradshaw Resume 2016
 
Syed_E_Res
Syed_E_ResSyed_E_Res
Syed_E_Res
 
Resume
ResumeResume
Resume
 
Jimmy_CV
Jimmy_CVJimmy_CV
Jimmy_CV
 
Lily Dzur_resume_c1
Lily Dzur_resume_c1Lily Dzur_resume_c1
Lily Dzur_resume_c1
 
Rana Mansoor Ahmed
Rana Mansoor AhmedRana Mansoor Ahmed
Rana Mansoor Ahmed
 

Carol Rodger CV 2016

  • 1. Carol Rodger – Curriculum Vitae Name: Carol Rodger Address: 66 Saughtonhall Drive, Edinburgh, EH12 5TL Phone no: 07742 151205 Email: carol.rodger11@tiscali.co.uk ________________________________________________________________________________________________ Employment History July 2015–present People’s Postcode Lottery Usingmainly Agilemethodology, I currently work as a Business Analystfor People’s Postcode Lottery. I am working on a number of projects as well as changemanagement. My Projects have included implementing Salesforcefor one of our teams and implementation of our new website. Duties included:  Organisingand takingpartin workshops and meetings with product owners/stakeholders to elicitand analysebusiness requirements  Documenting Business Requirements in Requirements Traceability Matrixes and in BusinessRequirements Documents  Documenting user Stories in the Jira system  Organisingand chairingmeetings with key product owners/stakeholders to ensure business requirements are successfully captured and prioritised by business impactusingtheMoSCoW prioritization method  Quality checkingDesign Documents provided by vendors to ensure all requirements have been captured  Mappingout as-is and to-beBusiness Processes usingVisio  Takingpart in Business Process Map walk-throughs with key Stakeholder groups to ensure they understand and agree to the new processes mapped in the Visio documents  Takingpart in Sprint planningand Scrum meetings  Supporting UAT by analysingproblems identified duringthetesting effort to determine if they are defects  Providingtesters with support and guidancein their testing efforts  Providingchangecontrol guidanceand documenting any changes to requirements in Change Request documents  Helpingto put in placea BA framework/methodology for new BAs to follow  Courses:‘QA ManagingProjects in Agilewith Scrum’ and ‘ADM-201: SalesforceAdministration Essentials for New Admins’ _____________________________________________________ April 2010–June 2015 Franklin Templeton Investments Usingmainly Waterfall methodology, I worked for the International TA PMO at Franklin Templeton Investments. I started as a Test Analystinvolved in testing and supportingthe implementation of a new operating system. I then became a Business Analystand worked on a major projectto implement a major UK product onto our operating system, as well as some smaller projects. January 2014–June 2015 BusinessAnalyst Duties included:  Organisingand takingpartin workshops and meetings with product owners/stakeholders to elicitand analysebusiness requirements  Documenting Business Requirements in Requirements Traceability Matrixes and in BusinessRequirements Documents
  • 2.  Organisingand chairing meetings with key product owners/stakeholders to ensure business requirements are successfully captured and prioritised by business impactusingtheMoSCoW prioritization method  Quality checkingDesign Documents provided by vendors to ensure all requirements have been captured  Compiling Target Operating Models to map high-level 'As Is' operations to new 'To Be' operations  Compiling Business OperatingModels to further define the ‘To Be’ operational tasks and the teams expected to carry outthose tasks  Takingpart in 'To Be' Business Process Mappingworkshops with key Subject Matter Experts to map out new business processes  Mapping out the new Business Processes in Visio diagrams  Taking part in Business Process Map walk-throughs with key Stakeholder groups to ensure they understand and agree to the new processes mapped in the Visio documents  Determining test scenarios required for User Acceptance Testing (UAT)  Preparing test scripts required for User Acceptance Testing  Supporting UAT by analysingproblems identified duringthetesting effort to determine if they are defects  Providing testers with support and guidancein their testing efforts  Providing changecontrol guidanceand documenting any changes to requirements in Change Request documents April 2010–December 2013 Test Analyst Duties included:  Analysing design documents, requirements documents or change request documents to enable the creation of test scripts  Creating test scripts to be used to carry out detailed testing of a new operating system, new functionality and defect fixes  Carryingout checkingand testing in the test environment to ensure test scripts areaccurate  Liaisingwith business analysts and key Subject Matter Experts to ensure test scripts areaccurateand easy to follow  Gaining detailed knowledge of the new operating system to enableaccurate testing and test scriptcreation of a wide variety of topics  Participatingin System Integration Testing and User Acceptance testing  Leading a team of testers carryingoutUser Acceptance Testing, ensuringaccuratetesting and providing guidanceand support  Compiling weekly testing status reports to provide Managers with testing progress and adviseof any defects detected  Leading a team from the business carryingoutModel Officetesting, ensuringaccuratetesting and providing guidanceand support  Raising systemdefects identified duringtesting phases in Quality Centre  Managingdefects and liaisingwith systemdevelopers to ensure speedy resolution  Chairingdaily defect callswith testers and developers to discuss defects raised and track resolution _____________________________________________________ November2007–November 2009 Citigroup On joiningCitigroup I was involved in a projectto develop a box management and dealingsystemfor an external client.I then worked for a trade processingteam, responsiblefor processingtrades through the fund accounting system on behalf of three external clients. June 2008–November 2009 Supervisor,Transaction Control Team Duties included:  Supervisingand trainingof team
  • 3.  PreparingDaily Task listfor team  Dealingwith any staff-related issues as they happen  Ensuringall tasks arecompleted accurately and in a timely manner  Monitoringincomingtrades (includingEquities and Bonds,Derivatives,Deposits,FXs) on accountingsystem and processingin time for various pricingpoints  Repairingfailed trades  Processingsubscriptionsand redemptions  Liaisingwith the external clients to ensure outstandingqueries areresolved in a timely manner and dealing with any ad-hoc queries from them  Handlingqueries from other teams and ensuringthey are dealt with in a timely manner  Overseeing the Risk and Control Self-Assessment for the team  Resolution of errors and breaches  Creating procedures for the teams’ tasks November 2007–June 2008 Team Leader, UnitMatching and DealingTeam Duties included:  Supervisingand trainingof team  Setting objectives for the team  Dealingwith any staff-related issues as they happen  Ensuringall tasks arecompleted to prepare for testing phases  Creating test scripts in order to carry out detailed testing of new system  Ensuringthat all testingphases arecarried out within the timescales setby the project team  Ensuringthat all problems and queries areresolved in preparation for system going live  Creating a Transition Plan detailingtheend state model for the team in preparation for moving from the Model Officeto Business as Usual  Ensuringall processes arein placefor system going live  Testing new updates to the system  Developing the working procedures necessary for the team  Creating a trainingplan for new starts _____________________________________________________ November2005–November 2007 First New Zealand Wrap UK Ltd On joiningFNZ I was involved in the development and successful implementation of a Wrap Platformfor an external clientuntil the system went livein May 2006. I then worked as a Dealer in the Operations Team. May 2006–November 2007 Dealer Duties included:  Monitoringof Platformfor all new business placed  Producingdealingfaxes and placingdealswith fund managers  Collating,pricingand completingdeals usingthe Platform  Resolution of errors and breaches  Handlingqueries from the external clientand external fund managers  Trainingand supervision of new staff November 2005–May 2006 Project Analyst/SystemTester Duties included:  Testing new updates to the Wrap Platform  Supervisinga team of testers from the external clientand dealingeffectively with projectqueries
  • 4.  Developing the working procedures necessary for the Operations Team _____________________________________________________ March 1999–November 2005 Mellon European Fund Services Workingas both a Retail Dealer and Agent Services Administrator,my responsibilitieswere across a broad spectrum of activities. February 2002–November 2005 Retail Dealer Duties included:  Handlingdeals via telephone/fax/application form/EMX  Inputting of deals into internal computer system  Calculatingand checkingmanagers box positions  Daily pricing of funds  Producingmonthly BACS tapes for regular savers  Managingqueries from agents  Resolution of errors and breaches  Planningthe workday for the team March 1999–February 2002 Agent ServicesAdministrator Duties included:  IFA databaseadministration  Providingagents with up to date policy information  Managingdiverserange of correspondence from agents  Handlingtelephone queries from agents  Organising paymentof commission to agents  Deputising for the team leader and planningthe workday for the team _____________________________________________________ January 1999–February 1999 Transco Temporary employment as officeadministrator March 1995–December 1999 Scottish Cultural Press (bookpublisher) Duties included:  Editingand proof-readingof books  Marketing and promotional work  Typesetting and design of books  Liaising with authors,printers,designers and sales-reps  Production  General officeadministration __________________________________________________________________________________________
  • 5. Education 1991–1994: Napier University, Edinburgh Degree: BA Publishing 1985–1991: Aberdeen Grammar School O Grades: English;Maths; Geography; French; Art; Arithmetic; Anatomy, Physiology and Health; Biology;Chemistry; Physics Highers: English;Maths; Geography; French ______________________________________________________________________________________________ References Human Resources People’s Postcode Lottery 76 George Street Edinburgh EH2 3BU Human Resources Franklin Templeton Investments 5 Morrison Street Edinburgh EH3 8BH Human Resources Citigroup 1st Floor,Holyrood Park House 106 Holyrood Road Edinburgh EH8 8AS Human Resources FNZ Wrap UK Ltd 1 Tanfield Edinburgh EH3 5DA Human Resources Department Mellon European Fund Services 2 Festival Square Edinburgh EH3 9SU