SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Downloaden Sie, um offline zu lesen
BRIAN NICHOLLS
PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT
Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting
1 | P a g e
PROFILE
The Senior Project Controls Manager who ensures project controls policies/procedures and work products are well
developed, available, adhered to and functioning in accordance with corporate and project standards. Expertise in creating
consistency between the project estimate, cost accounts (COA) and work breakdown structures (WBS), and CPM
schedules. Recognized as Subject Matter Expert (SME) on Primavera software systems. Created, implemented and
managed hundreds of simple schedules of >$1M, as well as multi-million and multi-billion dollar national and global
initiatives. Well-versed in leading project controls departments and mentoring. Experienced in directing earned value
methodologies, cost tracking and metrics reporting, planning/schedule creation and management, critical path
methodology, forecasting, planning/scheduling and cost & risk analytics.
Project Controls Management
Project Management & Program Planning
Project Estimation, Coordination & Delivery
Program Management & Planning, Execution
Earned Value Management
Schedule Analysis & Control
Risk Analysis & Management
CPM Planning/Scheduling
Cost Engineering & Tracking
Change Management
EPC/EPCM Delivery
Project Engineering
EXPERIENCE
NICHOLLS CONSULTING SERVICES Sugar Land, TX
Consultant/Senior Project Controls Manager – (Jan 1987 to Present): I provide consulting services, Expert Witness Analysis and
reporting regarding all aspects of project controls; cost tracking, EVM and CPM planning/scheduling utilizing Primavera P6 or Microsoft
Project and a variety of Cost Management software systems. My primary function as Owner’s representative, with clientele including
Owners and EPC/EPCM companies in industrial and commercial sectors such as Oil & Gas - Up-Stream - Mid Stream - Down-Stream;
Power Transmission & Delivery; Power Generation; Industrial Planning Services for Shutdowns and Turnarounds; Vendor Fabrication
& Delivery; Infrastructure, Earthwork, Roadways/Bridges, Utilities; Airport Facilities in (Las Vegas, Tampa, Orlando and Miami);
Entertainment Venues, Theme Parks and Movie Production Planning/Scheduling. Additionally, provided proposal re-writes and
updates for project controls-related sections of RFQs, PEPs as well as estimate integration for cost and schedule values.
AECOM / URS - (Direct) White Plains, NY
Senior Project Controls Manager - Primavera SME – (Feb to Sep 2015): Designated as seconded Project Controls Manager for the
NY Power Authority (NYPA) as owner’s rep for 25-year, $729-M systems upgrade program for St. Lawrence District BaRR & T-LEM
projects.
Revised and updated the integration of Primavera P6 and MS Project detail information into the Program Level 1, 2, 3 and 4
Program Planning Schedule.
Master Program included interfacing with 4 complete and separate projects with Critical resource assignments in engineering
services and field technician availability.
Advised in-house and outside engineering, procurement services, and direct field contractors in plan/schedule creation and
maintenance on semi-monthly updates for inclusion and update into the master program schedule.
CH2M HILL – (Direct) Houston, TX
Project Controls Manager - Primavera SME – (Jul 2011 to Feb 2015): Impacted projects for OG&C, Power and Water divisions.
Guided project planning and scheduling, estimate resource assessment and integration, cost reporting/tracking, EVM, and CPM
implementation. Instrumentally contributed project controls analysis to management teams leading underperforming projects.
Advised corporate and project management in overcoming operational, financial and organizational challenges.
PCM Lead on NY Power Authority (NYPA) as owner’s rep for 25-year, $729-M systems upgrade program for St. Lawrence
District BaRR & T-LEM projects.
PCM Lead $2.8-B Greenfield Fertilizer program from Pre FEED - FEED - Detail Design to full-on EPC Program.
Produced quantifiable data-driven reports that transformed daily/weekly/monthly SOP business into a sustainable operation
that successfully delivered the program and project requirements on time and on budget.
Designated as EPC - PCM & SME for Energy & Chemicals O&G Divisions to train and mentor staff while maintaining
department’s Project Controls Enterprise Wide systems for Planning, Schedule and Cost tracking.
Insured, implemented and maintaining division policies/procedures and QA/QC requirements. Steered Primavera P6 training
and standardization for schedule development and maintenance.
BRIAN NICHOLLS
PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT
Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting
2 | P a g e
Guided integration of planning, schedule/cost management procedures, reporting requirements, standardized formats of WBS
with COA and the proper use/training for subsequent projects and program implementation.
THE SHAW GROUP - (Contract & Direct) Robinson, IL
Senior Project Planning/Scheduling Lead - Primavera SME – (Nov 2009 to Jun 2011): Directed CPM construction planning and
scheduling of $329-M EPC Mobile Source Air Toxins (MSAT) capital improvement project for Marathon Petroleum Company in
Robinson, IL. Maintained overall project construction schedule, cost tracking integration by developing, utilizing daily, weekly, by-
weekly and monthly reporting for 9 subcontracts and 1 fully integrated project file. Coordinated and maintained quality relationships
between project teams, owner’s representatives and sub-contractors utilizing regularly scheduled project reviews and ad-hoc
meetings to discuss the quality and quantity calculations regarding production values effecting schedule driven critical and near critical
path work resulting in ownership by all participants in the life and health of the schedule and cost tracking information. The project
delivered on and on budget.
MUSTANG ENGINEERING – (Direct) Houston, TX
Senior Project Controls Planner – (Feb 2007 to Sep 2009): Managed CPM Scheduling, EVM tracking and cost controls on capital
improvements for midstream, downstream and pipeline petrochemical projects. Lead planner/scheduler on several projects for the
capital projects group midstream operations primarily in LNG terminals and Carbon Capture projects.
CB&I - (Contract & Direct) The Woodlands, TX
Project Controls Planner – (Feb 2006 to Feb 2007): Oversaw project controls planning of EPC projects to ensure accurate
representation of all schedule information. Impacted broad base of projects from engineering office as well as the field. Created and
managed project schedules for Mid-Stream LNG and Down-Stream on-site facilities and clients.
Recreated and quantified entire schedule for $3.8-B PERU LNG (PLNG) construction and commissioning requirements, providing
engineering and purchasing schedule target deliverable requirements, to achieve fully-integrated schedule. Included PM’s schedule
template for Engineering & Procurement implementation requirements.
Provided program analytics on delays impacting the Gulf Coast projects impacted by Hurricane Katrina. Presented schedule
and cost information to management and owners for incorporation into project recovery.
Served at Valero Refinery in Houston as Project Controls Specialist tracking and reporting on turnover packages and defining
outstanding items delaying system turnover package milestone dates for every package.
CAPITAL EXCAVATING, INC. – (Direct) Chandler, AZ
Civil Construction Estimator/PM – (Feb 2004 to Nov 2005): Directed all aspects of estimating process, from finding new clients,
quantifying required materials and associated values, defining scope of work, and pricing estimates and negotiating new contracts.
Coordinated startup of new projects, purchased materials and rental equipment, and scheduled design and maintenance. Developed
and implemented new comprehensive spreadsheets for gathering data, as well as subsequent pricing and utilization of owned
equipment, rented equipment, fuel consumption management, material purchases and subcontractor work resulting in an increase
of profits by 10% and a reduction of overheads by 15% or better.
EDWARD KRAEMER & SONS – (Contract) Phoenix, AZ
Project Controls Planning Engineer – (Jan 2003 to Feb 2004): Managed contract schedule via Primavera P3 on $94.9-M+ (TIC)
SR51 Design Build 11 mile HOV Lanes project. Ensured accurate distribution of pertinent information to project participants by
integrating 3 sub-projects controlled by 3 Project Managers into 1 master schedule and reporting process. Facilitated change order
management and partnered with the ADOT project management team to qualify and quantify resulting impacts, for $8.8-M in total
impacts to the project. The project was delivered on time and on budget.
THE SHAW GROUP – (Contract) Granbury, TX
Project Controls Planner – (Mar to Oct 2002): A.E.S. Granbury L.L.C., Wolf Hollow Power Plant 750 MW (NG): Instrumentally
drove progression of plant construction project and turnover packages by daily and weekly updating Primavera schedule with
information provided from the field to a “Level 4 & 5,” detail and reported daily progress to management. Overhauled schedule and
cost control programs from scratch out of Excel and Access, then transferred the data too Primavera.
Vilinc SOLUTIONS, INC. (VSI) – (Contract) Granbury, TX
Project Controls Planner Consultant – (Dec 2001 to Mar 2002): A.E.S. Granbury L.L.C., Wolf Hollow Power Plant 750 MW (NG):
Led weekly schedule and ad-hoc meetings, loaded data into Primavera P3, and reviewed cost and schedule data with project
BRIAN NICHOLLS
PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT
Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting
3 | P a g e
executives. Revised and implemented schedule/cost systems impacts and indicated delays to the contract values. Collaborated with
40 project and 20 owner project team members to define the sphere of schedule/cost responsibilities. Enron bankruptcy ended
this contract
VALLEY CREST LANDSCAPING – (Direct) Orlando, FL
Project Engineer & Estimator – (Jan 1998 to Nov 2000): Implemented and maintained accurate distribution of pertinent cost and
schedule information related to multiple project assignments. Participated in negotiations with owners, subcontractors and vendors
to manage hardscape finished products, rockwork, landscape and irrigation plans from design intent to completed product for multi-
million dollar, high-visibility T&M contracts in Orlando, FL at Universal Studios and Disney sites, TIC value $38+M. Additionally,
responsible for Estimating services and contract buyouts on private, commercial, City of Orlando public projects that were Design
Build, T&M and various Fixed Price projects, TIC value $140+M. I served in these capacities in the main and on-site management
offices.
BEERS CONSTRUCTION CO. / SKANSKA – (Contract) Orlando, FL
Project Planner/Scheduler – (Jun 1997 to Jan 1998): Created and maintained an optimize contract schedule via Primavera P3 for
$32+M Marvel Superhero Island (T&M not to exceed) contract at Universal Studios Islands of Adventure. The project encompassed
site-wide utilities, 7 multi-use buildings, roller coaster, and interracial colored hardscape concrete, landscaping and various theme
park finishes consistent with representing Marvel Studios values and visual formats.
JOHNSON BROTHERS CORP. – (Direct) Bartow, FL
Universal Islands of Adventure Infrastructure - Project Controls Manager - (Jan 1996 to Jun 1997): Original Contract Value
$14.65+M plus T&M change order value $5.35+M involving over 200 T&M Change Orders.
Contract/Project Controls Specialist - (Jan 1994 to Jan 1995): Tracked Combined Cycle (Coal-Gasification) Power Plant via
Primavera P3 for $33+M TECO Polk Power Station Unit 1 Infrastructure project and directly created, oversaw and managed the project
schedule CPM & EVM for $12.4+M Civil/structural contract. Maintained all information regarding progress and materials delivery.
Created weekly and monthly reports for owners and subcontractors.
Universal Islands of Adventure Infrastructure - Microsoft Network Administrator – (Jan 1996 to Jun 1997): Responsibilities
included network system management and the documentation control program called Expedition by Primavera Systems. I set up the
system and assisted in the maintenance and training of appropriate personnel, adjusted the program as needed and recreated the
reports needed to control the flow of all project information and the proper distribution/implementation of all project data.
Independent Financial Planner / Author Aug 1986 to Jun 1989
Self-Employed Financial Planner Phoenix, AZ
General Contractor & Concrete Contractor May 1975 to Jul 1986
Construction Contractor Tucson & Phoenix, AZ
EDUCATION & CERTIFICATIONS
Pima Community College – Tucson, AZ (1975 – 1977) - Fire Science and General Construction Principles for Fire Safety
1975 - 1978 – Tucson Fire Department Training Classes
Certification - (1995, 1996, 1997, 1998, 1999) - Primavera Systems, Inc. - Primavera Systems “Trainer” and “Train the Trainer” certification
Certification – 2013 – Deltek Systems - Deltek Acumen Fuse – Schedule Diagnostics
Certification – 2014 – Oracle Primavera Systems, Inc. - Primavera Pertmaster – Risk Analysis
Software Skills
Primavera 6 (all versions) – Expert, 29 plus years, Primavera Subject Matter Expert (SME) - Expert,10 Plus Years,
SureTrak (R) Project Manager (SureTrak (R)) - Expert, 10 Plus Years, Primavera Expedition/ Project Manager (R) - Expert, 10 Plus Years,
Primavera P3 & P5 Alpha & Beta Testing Consultant, Expedition Alpha & Beta Testing Consultant,
MS Project - Advanced, 10 Plus Years,
MS Office Pro - Word, Excel, PowerPoint & Access - Advanced -30 Plus Years

Weitere ähnliche Inhalte

Was ist angesagt?

Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CVRoberto Guevara
 
Alexander Joy Cartwright Iv Cpa V4
Alexander  Joy Cartwright Iv Cpa V4Alexander  Joy Cartwright Iv Cpa V4
Alexander Joy Cartwright Iv Cpa V4mrbaseball
 
TDWALTON 14-JUN-16
TDWALTON 14-JUN-16TDWALTON 14-JUN-16
TDWALTON 14-JUN-16Trina Walton
 
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahMohamed Bamadhaf
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016Erwin D. Gibson
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - LatestPeter White
 
DHines Planner Scheduler Materials 3-1-17
DHines Planner Scheduler Materials 3-1-17 DHines Planner Scheduler Materials 3-1-17
DHines Planner Scheduler Materials 3-1-17 Deborah Hines
 
Updated CV
Updated CVUpdated CV
Updated CVIan Street
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016Brian Hannigan
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineerSankar Sundaram PMP
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...ijtsrd
 
Peter White CV
Peter White CV Peter White CV
Peter White CV Peter White
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
Mervyn_Stephens CV
Mervyn_Stephens CVMervyn_Stephens CV
Mervyn_Stephens CVMervyn Stephens
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cvjamli haythem
 
David Fitzsimmons Resume
David Fitzsimmons ResumeDavid Fitzsimmons Resume
David Fitzsimmons ResumeDavid Fitzsimmons
 
Resume_Sannikov Detailed
Resume_Sannikov DetailedResume_Sannikov Detailed
Resume_Sannikov DetailedAndrei Sannikov
 

Was ist angesagt? (18)

Roberto Guevara-CV
Roberto Guevara-CVRoberto Guevara-CV
Roberto Guevara-CV
 
Alexander Joy Cartwright Iv Cpa V4
Alexander  Joy Cartwright Iv Cpa V4Alexander  Joy Cartwright Iv Cpa V4
Alexander Joy Cartwright Iv Cpa V4
 
TDWALTON 14-JUN-16
TDWALTON 14-JUN-16TDWALTON 14-JUN-16
TDWALTON 14-JUN-16
 
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS Bamadefah
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
DHines Planner Scheduler Materials 3-1-17
DHines Planner Scheduler Materials 3-1-17 DHines Planner Scheduler Materials 3-1-17
DHines Planner Scheduler Materials 3-1-17
 
Updated CV
Updated CVUpdated CV
Updated CV
 
BMH - Detail Resume - August 2016
BMH - Detail Resume - August  2016BMH - Detail Resume - August  2016
BMH - Detail Resume - August 2016
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...Planning and Scheduling Construction Projects using Primavera Software A Case...
Planning and Scheduling Construction Projects using Primavera Software A Case...
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
Mervyn_Stephens CV
Mervyn_Stephens CVMervyn_Stephens CV
Mervyn_Stephens CV
 
Haythem jamli candidature cv
Haythem jamli   candidature cvHaythem jamli   candidature cv
Haythem jamli candidature cv
 
Vignesh Nagarajan CV
Vignesh Nagarajan CVVignesh Nagarajan CV
Vignesh Nagarajan CV
 
David Fitzsimmons Resume
David Fitzsimmons ResumeDavid Fitzsimmons Resume
David Fitzsimmons Resume
 
Resume_Sannikov Detailed
Resume_Sannikov DetailedResume_Sannikov Detailed
Resume_Sannikov Detailed
 

Ă„hnlich wie Brian Nicholls resume 2016-08-11

Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016Erwin D. Gibson
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016Erwin D. Gibson
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7Sam Ghosh
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerSankar Sundaram PMP
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
CooperMS Resume 05272016
CooperMS Resume 05272016CooperMS Resume 05272016
CooperMS Resume 05272016Maryann Cooper
 
RINAL_PATEL
RINAL_PATELRINAL_PATEL
RINAL_PATELRinal Patel
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef samNermeen gerges
 
Resume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_SchedulingResume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_SchedulingQuentin McColgin
 
Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis
 
jamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinatorjamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinatorJames Dahlberg
 
Kiran H K 17-06-2016
Kiran H K 17-06-2016Kiran H K 17-06-2016
Kiran H K 17-06-2016Kiran Koramaddi
 
Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016Ron Mailhot
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins
 
Resume -Suniel Puri
Resume -Suniel PuriResume -Suniel Puri
Resume -Suniel PuriSuniel Puri
 

Ă„hnlich wie Brian Nicholls resume 2016-08-11 (20)

Peter Khalil CV
Peter Khalil CVPeter Khalil CV
Peter Khalil CV
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
CooperMS Resume 05272016
CooperMS Resume 05272016CooperMS Resume 05272016
CooperMS Resume 05272016
 
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
Lead_Planner_Ashfaq_Hussain_Resume_Jul2015
 
RINAL_PATEL
RINAL_PATELRINAL_PATEL
RINAL_PATEL
 
Randolph Angelito CV
Randolph Angelito CVRandolph Angelito CV
Randolph Angelito CV
 
Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
Resume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_SchedulingResume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_Scheduling
 
Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis resume June 2016
Dwayne Davis resume June 2016
 
jamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinatorjamesdahlbergturnaroundcoordinator
jamesdahlbergturnaroundcoordinator
 
Kiran H K 17-06-2016
Kiran H K 17-06-2016Kiran H K 17-06-2016
Kiran H K 17-06-2016
 
Roshanak Jalili CV
Roshanak Jalili CVRoshanak Jalili CV
Roshanak Jalili CV
 
Mailhot Resume_2016
Mailhot Resume_2016Mailhot Resume_2016
Mailhot Resume_2016
 
Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16Jordan Wallins Resume Sep 16
Jordan Wallins Resume Sep 16
 
RRV CV
RRV CVRRV CV
RRV CV
 
Resume -Suniel Puri
Resume -Suniel PuriResume -Suniel Puri
Resume -Suniel Puri
 

KĂĽrzlich hochgeladen

VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxSaqib Mansoor Ahmed
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningCIToolkit
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 

KĂĽrzlich hochgeladen (20)

Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Does Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptxDoes Leadership Possible Without a Vision.pptx
Does Leadership Possible Without a Vision.pptx
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Continuous Improvement Infographics for Learning
Continuous Improvement Infographics for LearningContinuous Improvement Infographics for Learning
Continuous Improvement Infographics for Learning
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 

Brian Nicholls resume 2016-08-11

  • 1. BRIAN NICHOLLS PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting 1 | P a g e PROFILE The Senior Project Controls Manager who ensures project controls policies/procedures and work products are well developed, available, adhered to and functioning in accordance with corporate and project standards. Expertise in creating consistency between the project estimate, cost accounts (COA) and work breakdown structures (WBS), and CPM schedules. Recognized as Subject Matter Expert (SME) on Primavera software systems. Created, implemented and managed hundreds of simple schedules of >$1M, as well as multi-million and multi-billion dollar national and global initiatives. Well-versed in leading project controls departments and mentoring. Experienced in directing earned value methodologies, cost tracking and metrics reporting, planning/schedule creation and management, critical path methodology, forecasting, planning/scheduling and cost & risk analytics. Project Controls Management Project Management & Program Planning Project Estimation, Coordination & Delivery Program Management & Planning, Execution Earned Value Management Schedule Analysis & Control Risk Analysis & Management CPM Planning/Scheduling Cost Engineering & Tracking Change Management EPC/EPCM Delivery Project Engineering EXPERIENCE NICHOLLS CONSULTING SERVICES Sugar Land, TX Consultant/Senior Project Controls Manager – (Jan 1987 to Present): I provide consulting services, Expert Witness Analysis and reporting regarding all aspects of project controls; cost tracking, EVM and CPM planning/scheduling utilizing Primavera P6 or Microsoft Project and a variety of Cost Management software systems. My primary function as Owner’s representative, with clientele including Owners and EPC/EPCM companies in industrial and commercial sectors such as Oil & Gas - Up-Stream - Mid Stream - Down-Stream; Power Transmission & Delivery; Power Generation; Industrial Planning Services for Shutdowns and Turnarounds; Vendor Fabrication & Delivery; Infrastructure, Earthwork, Roadways/Bridges, Utilities; Airport Facilities in (Las Vegas, Tampa, Orlando and Miami); Entertainment Venues, Theme Parks and Movie Production Planning/Scheduling. Additionally, provided proposal re-writes and updates for project controls-related sections of RFQs, PEPs as well as estimate integration for cost and schedule values. AECOM / URS - (Direct) White Plains, NY Senior Project Controls Manager - Primavera SME – (Feb to Sep 2015): Designated as seconded Project Controls Manager for the NY Power Authority (NYPA) as owner’s rep for 25-year, $729-M systems upgrade program for St. Lawrence District BaRR & T-LEM projects. Revised and updated the integration of Primavera P6 and MS Project detail information into the Program Level 1, 2, 3 and 4 Program Planning Schedule. Master Program included interfacing with 4 complete and separate projects with Critical resource assignments in engineering services and field technician availability. Advised in-house and outside engineering, procurement services, and direct field contractors in plan/schedule creation and maintenance on semi-monthly updates for inclusion and update into the master program schedule. CH2M HILL – (Direct) Houston, TX Project Controls Manager - Primavera SME – (Jul 2011 to Feb 2015): Impacted projects for OG&C, Power and Water divisions. Guided project planning and scheduling, estimate resource assessment and integration, cost reporting/tracking, EVM, and CPM implementation. Instrumentally contributed project controls analysis to management teams leading underperforming projects. Advised corporate and project management in overcoming operational, financial and organizational challenges. PCM Lead on NY Power Authority (NYPA) as owner’s rep for 25-year, $729-M systems upgrade program for St. Lawrence District BaRR & T-LEM projects. PCM Lead $2.8-B Greenfield Fertilizer program from Pre FEED - FEED - Detail Design to full-on EPC Program. Produced quantifiable data-driven reports that transformed daily/weekly/monthly SOP business into a sustainable operation that successfully delivered the program and project requirements on time and on budget. Designated as EPC - PCM & SME for Energy & Chemicals O&G Divisions to train and mentor staff while maintaining department’s Project Controls Enterprise Wide systems for Planning, Schedule and Cost tracking. Insured, implemented and maintaining division policies/procedures and QA/QC requirements. Steered Primavera P6 training and standardization for schedule development and maintenance.
  • 2. BRIAN NICHOLLS PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting 2 | P a g e Guided integration of planning, schedule/cost management procedures, reporting requirements, standardized formats of WBS with COA and the proper use/training for subsequent projects and program implementation. THE SHAW GROUP - (Contract & Direct) Robinson, IL Senior Project Planning/Scheduling Lead - Primavera SME – (Nov 2009 to Jun 2011): Directed CPM construction planning and scheduling of $329-M EPC Mobile Source Air Toxins (MSAT) capital improvement project for Marathon Petroleum Company in Robinson, IL. Maintained overall project construction schedule, cost tracking integration by developing, utilizing daily, weekly, by- weekly and monthly reporting for 9 subcontracts and 1 fully integrated project file. Coordinated and maintained quality relationships between project teams, owner’s representatives and sub-contractors utilizing regularly scheduled project reviews and ad-hoc meetings to discuss the quality and quantity calculations regarding production values effecting schedule driven critical and near critical path work resulting in ownership by all participants in the life and health of the schedule and cost tracking information. The project delivered on and on budget. MUSTANG ENGINEERING – (Direct) Houston, TX Senior Project Controls Planner – (Feb 2007 to Sep 2009): Managed CPM Scheduling, EVM tracking and cost controls on capital improvements for midstream, downstream and pipeline petrochemical projects. Lead planner/scheduler on several projects for the capital projects group midstream operations primarily in LNG terminals and Carbon Capture projects. CB&I - (Contract & Direct) The Woodlands, TX Project Controls Planner – (Feb 2006 to Feb 2007): Oversaw project controls planning of EPC projects to ensure accurate representation of all schedule information. Impacted broad base of projects from engineering office as well as the field. Created and managed project schedules for Mid-Stream LNG and Down-Stream on-site facilities and clients. Recreated and quantified entire schedule for $3.8-B PERU LNG (PLNG) construction and commissioning requirements, providing engineering and purchasing schedule target deliverable requirements, to achieve fully-integrated schedule. Included PM’s schedule template for Engineering & Procurement implementation requirements. Provided program analytics on delays impacting the Gulf Coast projects impacted by Hurricane Katrina. Presented schedule and cost information to management and owners for incorporation into project recovery. Served at Valero Refinery in Houston as Project Controls Specialist tracking and reporting on turnover packages and defining outstanding items delaying system turnover package milestone dates for every package. CAPITAL EXCAVATING, INC. – (Direct) Chandler, AZ Civil Construction Estimator/PM – (Feb 2004 to Nov 2005): Directed all aspects of estimating process, from finding new clients, quantifying required materials and associated values, defining scope of work, and pricing estimates and negotiating new contracts. Coordinated startup of new projects, purchased materials and rental equipment, and scheduled design and maintenance. Developed and implemented new comprehensive spreadsheets for gathering data, as well as subsequent pricing and utilization of owned equipment, rented equipment, fuel consumption management, material purchases and subcontractor work resulting in an increase of profits by 10% and a reduction of overheads by 15% or better. EDWARD KRAEMER & SONS – (Contract) Phoenix, AZ Project Controls Planning Engineer – (Jan 2003 to Feb 2004): Managed contract schedule via Primavera P3 on $94.9-M+ (TIC) SR51 Design Build 11 mile HOV Lanes project. Ensured accurate distribution of pertinent information to project participants by integrating 3 sub-projects controlled by 3 Project Managers into 1 master schedule and reporting process. Facilitated change order management and partnered with the ADOT project management team to qualify and quantify resulting impacts, for $8.8-M in total impacts to the project. The project was delivered on time and on budget. THE SHAW GROUP – (Contract) Granbury, TX Project Controls Planner – (Mar to Oct 2002): A.E.S. Granbury L.L.C., Wolf Hollow Power Plant 750 MW (NG): Instrumentally drove progression of plant construction project and turnover packages by daily and weekly updating Primavera schedule with information provided from the field to a “Level 4 & 5,” detail and reported daily progress to management. Overhauled schedule and cost control programs from scratch out of Excel and Access, then transferred the data too Primavera. Vilinc SOLUTIONS, INC. (VSI) – (Contract) Granbury, TX Project Controls Planner Consultant – (Dec 2001 to Mar 2002): A.E.S. Granbury L.L.C., Wolf Hollow Power Plant 750 MW (NG): Led weekly schedule and ad-hoc meetings, loaded data into Primavera P3, and reviewed cost and schedule data with project
  • 3. BRIAN NICHOLLS PROJECT CONTROLS MANAGER | PRIMAVERA SME | RISK ANALYSIST | EVM & CHANGE MANAGEMENT Sugar Land, TX | bnicholls44@hotmail.com | (713) 842-0866 – cell | linkedin.com/in/briannichollsconsulting 3 | P a g e executives. Revised and implemented schedule/cost systems impacts and indicated delays to the contract values. Collaborated with 40 project and 20 owner project team members to define the sphere of schedule/cost responsibilities. Enron bankruptcy ended this contract VALLEY CREST LANDSCAPING – (Direct) Orlando, FL Project Engineer & Estimator – (Jan 1998 to Nov 2000): Implemented and maintained accurate distribution of pertinent cost and schedule information related to multiple project assignments. Participated in negotiations with owners, subcontractors and vendors to manage hardscape finished products, rockwork, landscape and irrigation plans from design intent to completed product for multi- million dollar, high-visibility T&M contracts in Orlando, FL at Universal Studios and Disney sites, TIC value $38+M. Additionally, responsible for Estimating services and contract buyouts on private, commercial, City of Orlando public projects that were Design Build, T&M and various Fixed Price projects, TIC value $140+M. I served in these capacities in the main and on-site management offices. BEERS CONSTRUCTION CO. / SKANSKA – (Contract) Orlando, FL Project Planner/Scheduler – (Jun 1997 to Jan 1998): Created and maintained an optimize contract schedule via Primavera P3 for $32+M Marvel Superhero Island (T&M not to exceed) contract at Universal Studios Islands of Adventure. The project encompassed site-wide utilities, 7 multi-use buildings, roller coaster, and interracial colored hardscape concrete, landscaping and various theme park finishes consistent with representing Marvel Studios values and visual formats. JOHNSON BROTHERS CORP. – (Direct) Bartow, FL Universal Islands of Adventure Infrastructure - Project Controls Manager - (Jan 1996 to Jun 1997): Original Contract Value $14.65+M plus T&M change order value $5.35+M involving over 200 T&M Change Orders. Contract/Project Controls Specialist - (Jan 1994 to Jan 1995): Tracked Combined Cycle (Coal-Gasification) Power Plant via Primavera P3 for $33+M TECO Polk Power Station Unit 1 Infrastructure project and directly created, oversaw and managed the project schedule CPM & EVM for $12.4+M Civil/structural contract. Maintained all information regarding progress and materials delivery. Created weekly and monthly reports for owners and subcontractors. Universal Islands of Adventure Infrastructure - Microsoft Network Administrator – (Jan 1996 to Jun 1997): Responsibilities included network system management and the documentation control program called Expedition by Primavera Systems. I set up the system and assisted in the maintenance and training of appropriate personnel, adjusted the program as needed and recreated the reports needed to control the flow of all project information and the proper distribution/implementation of all project data. Independent Financial Planner / Author Aug 1986 to Jun 1989 Self-Employed Financial Planner Phoenix, AZ General Contractor & Concrete Contractor May 1975 to Jul 1986 Construction Contractor Tucson & Phoenix, AZ EDUCATION & CERTIFICATIONS Pima Community College – Tucson, AZ (1975 – 1977) - Fire Science and General Construction Principles for Fire Safety 1975 - 1978 – Tucson Fire Department Training Classes Certification - (1995, 1996, 1997, 1998, 1999) - Primavera Systems, Inc. - Primavera Systems “Trainer” and “Train the Trainer” certification Certification – 2013 – Deltek Systems - Deltek Acumen Fuse – Schedule Diagnostics Certification – 2014 – Oracle Primavera Systems, Inc. - Primavera Pertmaster – Risk Analysis Software Skills Primavera 6 (all versions) – Expert, 29 plus years, Primavera Subject Matter Expert (SME) - Expert,10 Plus Years, SureTrak (R) Project Manager (SureTrak (R)) - Expert, 10 Plus Years, Primavera Expedition/ Project Manager (R) - Expert, 10 Plus Years, Primavera P3 & P5 Alpha & Beta Testing Consultant, Expedition Alpha & Beta Testing Consultant, MS Project - Advanced, 10 Plus Years, MS Office Pro - Word, Excel, PowerPoint & Access - Advanced -30 Plus Years