General Safety Rules for Contractors / Contractor’s Workers
SCOPE OF WORK
 Safety is the responsibility of the Contractor and his staff /employees/workmen
engaged/ deployed for execution of work under the Contract, individually and
collectively. For this purpose, the Contractor staff means and includes all its
Associates /Sub-contractors / Vendors/Sub-vendors and their Staff employees
/workmen deployed for execution of the work covered under the contract. The
Contractor should ensure that his workmen participate in the safety awareness,
health care and safety training programmes whenever such programmes are
organized by the Employer or the Contractor.
 The Contractor’s scope of work shall include, (but not be limited to execution of
work/contract) adequate safety arrangement for men, machines and materials etc.
engaged during the execution of contract.
 While executing the contract, the contractor/his supervisor has to ensure safety of
surroundings with regard to Employer's work place/site and other contractor's
men/machine/materials/ system etc.
NECESSARY DOCUMENTATION
 Height Pass - A document to be issued to a worker for working at height after
imparting him the necessary training
 Safety Requirments / Precautions - Before starting a work at height, all the safety
requirements (like safety belts, protective helmets and safety nets) shall be decided
as per the need of the area/site by the executing agency in collaboration with the
safety officer and the contractor. These shall be documented
REQUIREMENTS OF WORKERS FOR WORKING AT HEIGHT
 Every worker to be deployed for working at height shall be examined and certified
by a Registered Medical Practitioner for physical and mental fitness, which shall
include general fitness and freedom from epilepsy, high blood pressure, obesity and
vertigo.
Page 2 of 13
Page 2 of 13
 Every worker, before deployment for working at height shall be imparted the
training for working at height which shall include competency in the use of safety
belts and allied equipment. This training shall be in addition to the general safety
training imparted by the Safety Engineering Department.
 After successful completion of training and tests, the worker shall be issued a
Height Pass which shall be valid for a maximum period of one year. On expiry, it
shall be renewed after the worker passes the tests once again.
EXECUTION OF WORK AT HEIGHT
 Height work procedure shall be applicable to contractors whenever work on height
is involved;
 All safety precautions prescribed in document mentioned above shall be complied
with by the executing agency.
 Safety net shall be used wherever considered necessary by the executing officer and
safety officer. Safety net made of non-inflammable material shall be used where
there is a possibility of welding spark, molten material, burning spark or material,
etc., falling on it.
 Before starting the day's work, the site shall be inspected by the executing officer
for ensuring compliance of all safety aspects. After ensuring compliance of all
safety aspects, the contractor, the Executing Officer and the Safety Officer shall
sign the document giving clearance for starting the work. In the event of
discontinuation of the work and before re-starting, the site inspection shall be re-
done, as above by the executing officer
 Supervision by Supervisor (s) or Executive (s) shall be ensured for 100% of the
time.
 Work at height shall be permitted only when a reasonable level of natural sunlight is
available as per the discretion of the contractor, the executing officer and the safety
officer. The work shall not be permitted in cloudy weather because of the possibility
of electrocution by lightning or even getting disturbed by the sound of thunder and
there by falling down. When work at height is done indoors, there shall be adequate
illumination
Page 3 of 13
Page 3 of 13
DETAILED PRODECURE/PROTOCOL
 Before starting the work, a safe work procedure /protocol shall be prepared and signed
jointly by the executing department representative of Safety Department and the
Contractor his representative. This procedure/protocol shall be prepared by breaking
the whole job into small elements and listing them separately in the sequence. Against
these elements, the agency responsible for doing it would be mentioned. Any other
details about these elements, may also be mentioned in the remarks column
GENERAL TEkMS & CONDITIONS
 SUPERVISOR
This contractor shall engage qualified and competent supervisors for execution the
contract. The supervisor must be able to (i) Read drawing (ii) Understand the safety
aspect of the job (iii) Take necessary precautionary measures (iv) Ensure leadership for
the safe execution of the job
GATE PASS
 The contractor shall, in accordance with prescribed procedure, obtain Gate Passes
(PHOTO PASSES) from Employer's Security Department who shall make it available
to the contractor, to enable the contractor and its staff / employees / workmen to enter
the work area inside the plant as well as unenclosed (open) work area like township.
The contractor shall make arrangements for instant photography for those contract
workers who may be required to go to work in emergency and do not have photo
passes
 SAFETY INDUCTION : In order to provide basic industrial safety training to the
workers of contractor, Employer will provide on request, the general safety Induction to
the workmen/supervisor at Safety Engineering Department. The contractor shall submit
the list of persons with full detail for the job of safety induction to the engineer for
arranging the same. The contractor shall not engage untrained personnel for executing
any contract inside the works. Job safety induction will be a compulsory thing for every
job to start with.
Page 4 of 13
Page 4 of 13
 If at any point of time, contractor feels or needs any special safety training for carrying
out a particular job, the same shall be arranged by the concerned engineer of the
Employer. For this, the contractor shall inform the concerned engineer of the Employer
well in advance to commencement of such job.
 The contractor shall motivate and encourage Its employees/workmen to make personal
contribution towards enhancing safety on the basis of their knowledge and experience.
The contractor shall have adequate number of Pocket Sized Safety Booklet containing
safety instructions, prepared on the basis of Employer's model safety book for
contractor's. He shall issue them to all his employees/workmen and ensure that they
read it before commencing the work. The safety instructions from the Safety Booklet
shall be read and explained by the Contractor or his representative to those
employees/workmen who are illiterate and cannot read and ensure that they have
understood. If the employees are singing in the attendance register, the Contractor shall
arrange to write ’Safety Sentence’ on the top of each page below which each employee
will either sign or put thumb impression as a token of his/her attendance and also for
having read/understood the safety instructions;
The 'Safety Sentence’ shall be "I have read/understood the safety instructions and
I shall work according to these instruction.”
 The work areas where a different system of keeping attendance exists, the Contractor
or its representative shall furnish the list of employees/workmen deployed on the job on
any particular day and on top of which the following sentence shall be recorded by the
representative of the Contractor.
 The contractor shall provide Safety Induction everyday before start of the job i.e.
briefing the nature of work to be carried out and the necessary precautions to be taken
while executing the job/contract during the particular day.
 Contractors shall follow all special safety precautions issed by the Executing Authority
or his site Engineer from time to time.
LEGAL AND PENAL
 The Contractor shall abide by the provisions of all statutory acts and rules as applicable
Page 5 of 13
Page 5 of 13
and maintain Register & Documents, submit periodic Reports & Returns, furnish
information/report relating to accidents occuring in the areas of work to competent
authority in time.
 The contractor shall be liable for prosecution and penalty in accordance with and as
prescribed under law of the land, terms & conditions of Contract as well as rules of the
company relating to safety, for non observance of those provisions.
 The contractor shall keep the company indemnified against all losses/claims due to
accidents/injuries/damages caused at the contractor's works site. He shall be fully
responsible for accidents caused due to the contractor or his agents' or workmen's
negligence or carelessness in regard to the observance of the safety requirements and
shall be liable to pay compensation for injuries.
 The Engineer or the Head of the Safety Department or their authorized nominees, upon
their satisfaction that the Contractor is not conforming to the Safety requirements, may
direct stoppage of work and direct the Contractor to rectify the defects or supply the
facility/equipment (as the case may be). The Contractor shall not proceed with the
work until he has complied with such directions to the satisfaction of the
Engineer/Safety Department
 The Contractor shall ensure that all his employees/workmen are covered under
'Workmen Compendation Act' and shall pay compensation to his workmen as and
when the eventuality for the same arises
 To ensure effective enforcement of Hie rules and regulations relating to safety
precaution, the arrangements made by the Contractor shall be open to inspection by the
engineer or his representatives, Safety Engineer & Labour Officer.
PPE & SAFETY APPLIANCES
 The Contractor shall provide all the PPE (Personal Protective Equipment) and safety
appliances required to carry out the job to all the workmen deployed by Contractor and
also ensure that his workmen use those PPE and safety appliances while on the job The
contractor shall not pay any cash amount in lieu of PPE to the workers
The PPE and safety appliances provides by the Contractor shall be of the standard as
prescribed
Page 6 of 13
Page 6 of 13
 If the Contractor fails to ensure provision of safety appliances required to carry out the
job safety to the workmen and that its workmen do not use the PPE and safety
appliances as needed for safe working, the Engineer and the Safety Engineering
Department upon the satisfaction that the Contractor is not conforming to the Safety
requirements may direct the Contractor for stoppage of work and require the Contractor
to correct the defects.
The Contractor shall not proceed with the work until he has complied with the
direction to the satisfaction of Engineer and Safety Engineering Department.
SITE CLEARANCE
 Prior to commencement of work, the Contractor shall obtain a clearance from Safety
Engineering Department of the Employer and concerned department / section of the
Employer where the Job is to be carried out. The Employer / Engineer shall not permit
the Contractor to commence the work unless Contractor or its representative produces
such clearance certificate The department concerned shall grant such clearance after
ensuring that:
 The Contractor himself has undergone Safety Induction Training organized by the
Employer's Safety Engineering Department in the preceding tweleve months
 The Contractor has arranged PPE and safety appliances for himself and all his
workmen, as required.
 In order to process the work permit issued by the Employer or Employer’s representa-
tive for which the "Work Clearance Form" shall be filled in triplicate by the Contractor
for record of:
 Safety
 Department / Section of the Employer granting clearance an
 Contractor
 The Contractor and his supervisiors along with the Contract document and job
instruction received from the Employer, will come to Employer’s Safety Engineering
Department where the Contractor will obtain Safety clearance. The Contractor is not
permitted to start the job without clarance from Employer's Safety Engineering
Page 7 of 13
Page 7 of 13
Department.
 The Contractor shall posses handling equipment, tools and tackles of adequate capacity
and tested quality.
 Contractor shall obtain specific permission for "Procedure for Working at Height by
Contractor's Workers" from the Engineer or the Company's Safety Department before
commencing the following :
 Working in an operating plant/ equipment
 Working at height
 Working in areas expected to have toxic/poisonous gases.
 Major site activity irrespective of the clearance already obtained
 Wherever there are hazards of electricity, moving machinery etc.
 The executing department shall take necessary shutdown of operating plant before
commencement of job in that area The Contractor shall ensure that the shut-down/
clearance is taken before sending workers to such locations particularly in the area
where there are hazards of gases, electricity, moving machinery etc
SKILL & COMPETENCE OF WORKMEN
 The Contractor shall be responsible to engage competent and skilled workers.
 Before starting the day's job, the Contractor shall ensure that safety briefing has been
downto his workers by himself or his supervisors who have been imparted Safety
Induction earlier and also maintain records to this effect.
PHYSICAL FITNESS OF WORKMEN
 The Contractor shall ensure that this employees workmen subject themselves to such
mendical examination as required under the law or under the Company's rules and keep
a record of the same.
 The Contractor shall not permit any employee/workman to enter the work area under
the influence of alcohol.
DEALING WITH ACCIDENT
 The Contractor shall maintain a safety register, keep records of all minor or major
accidents, serious or averted (near miss) accidents, with or without injuries to human
Page 8 of 13
Page 8 of 13
beings and shall submit a report about the accidents to the Engineer promptly, on the
form prescribed by Employer.
 The Contractor's supervisor/officer incharge shall arrange to take the injured person
first to Plant Medical Unit with IOW (Injury on Work) form and under no
circumstances, take the injured person directly to his own doctors.
 The Contractor shall not interfere with the site of accident, unless inspected and/or
permitted by the competent authorities
 The Contractor shall arrange to avoid any sort of commotion at site in the event of an
accident
MISCELLANEOUS
Safety Records (Statutory Records)
The Contractor shall keep record of:
1) Test Certificates of all lifting tools and tackles, Pressure vessels, etc.
2) Periodical inspection report of Safety appliances.
3) Maintaining accident analysis report, in proper format in consultation with
Employeer’s Engineer.
4) Safety record as per Factory Rules/ Safety Codes or any other statutory provision shall
also be maintained. However, necessary help in this regard can be taken from the
concerned Safety Organization / Personal Dept.
GAS LINE
To work in dangerous gas lines e g. Coke Ovens gas line. Blast Furance gas line. LD
gas line etc, Employer will provide job safety induction to the Contractor's personnel.
For this the Contractor shall give in writing the list of personnel likely to work in gas
line (new/old) to the Engineer, who in turn will arrange the safety induction to the
Contractor's workers The Contractor shall ensure the presence of his personnel at place
of safety induction (normally Central Gas Safety Station. and follow the steps, general
rules & regulations as imparted during training
Electrician/Other Electrical Personnel
Page 9 of 13
Page 9 of 13
 The Contractor shall engage qualified and competent electricians and other electricial
personnel while working on electrical lines (which may be High Tension, Medium
Tension and Low Tension electrical line) for safe execution of contract. The
electricians and other electrical personnel must possess requisite certificate issued from
competent authority
Electrical Equipment
 The Contractor shall ensure proper earthing of all electrical equipment/ machinery
prior to start of the machine. The Contractor shall also ensure daily examination of the
earthing of equipment/ machinery prior to start of the job in order to avoid electrical
hazards
 The Contractor shall ensure use of proper cable / welding cable / power cable / control
cable) as the case may be. The joints of the cables shall be perfectly insulated The
Contractor shall also ensure the use of proper plugs, sockets and other electrical fittings
while executing any contract.
Scaffolding/Lifting/Lowering/Dismantling of Equipment of Fabricated Structures
 For safe execution of the contract. Contractor shall make a programme of a
piece/whole job, in sequence of steps involved in execution and the required safety
measures to be taken during the execution of the job.
The Contractor shall ensure the use of sufficiently strong scaffolding with
sufficiently strong hand railings during the execution of the job. Scaffold/Platform to
be used by more than two persons has to be approved by Site Engineer and the
concerned Safety Organization, jointly.
 The Contractor shall ensure the use of scaffolding at Construction Site by his personnel
working at height, fabricated as per standard drawing for scaffolding.
 If the scaffolding as per the standard drawing is not found suitable at site, the
Contractor shall make necessary modifications to strengthen the same,
 For any Civil Engineenng job, the Contractor will provide adequate support before
casting or any superstructure and provide approach, scaffolding etc., in such a manner
Page 10 of 13
Page 10 of 13
that it is safe easy for movement of men. women and materials.
 The Contractor shall make his own arrangement for the area lighting/spot lightingat
Fabrication Yard. The Employer will provide power source at one point only near to
the Fabrication Yard.
 The Employer will provide area lighting at erection site only. The Contractor shall
make his own arrangement for spot lighting. The source of power supply at the nearest
possible point will be shown by Engineer at site.
HOUSE KEEPING
 The Contractor shall ensure good house keeping in his working area, fabricating yard
as well as at erection site. The safe approach to the working place must be ensured.
Place for keeping raw materials, finished materials semifinished materials should be
clearly marked with proper identification. Machine component shall be kept properly
under shed
 The Contractor shall keep the scrap materials at one place duly barricaded and shall
remove the same regularly form the work place.
 The Contractor shall stack properly the fabricated or any other items likely to be
erected very shortly at erection site, in such a way that the materials do not cause
congestion at site or create unsafe condition for free safe approach
Barrication
 The Contractor shall ensure barrication of the unsafe area, which can lead to accident to
any unknown person working in that area. In order to remove unsafe condition and
prevent accident, the unsafe area such as trench/pit/foundation, any type of opening
made or left in any floor of the building etc must be barricaded.
 The hand railings shall be immediately provided in all the floors, stairs, etc before
proceeding for thuther erection/dismantling.
 Removal of muck from road sides, shall be done as soon as possible.
 The Contractor shall be responsible for removing all unwanted materials/scaffolds from
work site.
 The Contractor shall issue written as well as oral instructions from time to time, in
Page 11 of 13
Page 11 of 13
addition to the precautions, measures spelt out above so as to ensure that the workers
adhere to safety norms specifically needed for the particular job during the execution of
work.
 The Contractor shall ensure that compressed air is not used for removing dust from
one's clothes. Compressed air shall not be blown against anyone as it may injure or
even kill him/her.
 The Contractor shall provide, maintain and arrange for periodical checking of adequate
numbers of fire extinguishers of appropriate type and other facilities (e g. sand buckets,
asbestos covering etc) in fire prone areas.
 The Contractor shall provide clearly demarcated access and exits at work site to take
care in case of outbreak of fire or any other eventuality.
 The Contractor shall ensure that smoking or keeping naked light near gas lines, valves
and any other equipment connected with the gas distribution system and handling of all
inflammable material is not done as it is strictly prohibited.
 The Contractor shall ensure that no one takes rest/shelter below any dumped slag
boulder or any other pit/excavation, near any stock of materials, electrical installations
and gas lines, etc.
 The Contractor shall ensure availability of first aid box at the working sites.
Page 12 of 13
Page 12 of 13
HEIGHT PASS
SN…… Date ……
This is to Certify that the undermentioned person has been permitted to work
at height.
1) Name : ____________________
2) Father s Name : _____________
3) Designation : _______________
4) Age :____ Yrs.
5) Validity upto Date From………….. to ……………………
……………….. …………………………..
Signature/Left Thumb Impression of
Worker
Signature-of Authorized of. Executive
of safety Engg. Department
Name & Seal
PHOTO
Page 13 of 13
Page 13 of 13
CHECKLIST OF REQUIREMENTS/PRECAUTIONS FOR
WORKING AT HEIGHT
1) Name of Department executing the job : ………………
2) Name of departmental representative(s): ………….
……………………………..
3) Name(s) of contractor's supervisor : ……….. ………………
4) Name of Contractor: ………….
5) location of work : _..............
6) Brief description of work : ………………
7) No. of persons deployed for the job…………..
8) Names of persons deployed to do the job at height:
9) No. of persons issued height passes
10) All persons have been imparted training for working at height by Safety
Engineering department : Yes/No.
11) Head of Operation Deptt. has been informed of this job: Yes/No.
12) Shut downs of following operating equipment have been obtained
EOT Crane Yes / No
Belt Coveyor Yes / No
Gas Line Yes / No
Bus Bar Yes / No
………….. Yes / No
….. ……….. Yes / No
…………… Yes / No

Weitere ähnliche Inhalte

Was ist angesagt?

WORK PERMIT REGISTER Form # HSEQ - WPR Rev 2.docx
WORK PERMIT REGISTER Form # HSEQ - WPR Rev 2.docxWORK PERMIT REGISTER Form # HSEQ - WPR Rev 2.docx
WORK PERMIT REGISTER Form # HSEQ - WPR Rev 2.docxDwarika Bhushan Sharma
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit SystemGagan Tanwar
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overviewzz_bedee
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction TrainingThe Pathway Group
 
HSE policy
HSE policyHSE policy
HSE policyTaqvi11
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Toolbox Talk
Toolbox TalkToolbox Talk
Toolbox Talktxheaven
 
Health and Safety duties
Health and Safety dutiesHealth and Safety duties
Health and Safety dutiesElsie Lessing
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher trainingJost2012
 
working at height
working at heightworking at height
working at heightJYOTHISHKT
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meetingsssaravana
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.pptIrfanAwan25
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmitsistrain
 

Was ist angesagt? (20)

WORK PERMIT REGISTER Form # HSEQ - WPR Rev 2.docx
WORK PERMIT REGISTER Form # HSEQ - WPR Rev 2.docxWORK PERMIT REGISTER Form # HSEQ - WPR Rev 2.docx
WORK PERMIT REGISTER Form # HSEQ - WPR Rev 2.docx
 
Work Permit System
Work Permit SystemWork Permit System
Work Permit System
 
Health safety induction_overview
Health safety induction_overviewHealth safety induction_overview
Health safety induction_overview
 
Health & Safety Induction Training
Health & Safety Induction TrainingHealth & Safety Induction Training
Health & Safety Induction Training
 
HSE Management System
HSE Management SystemHSE Management System
HSE Management System
 
HSE policy
HSE policyHSE policy
HSE policy
 
LOTO Training.ppt
LOTO Training.pptLOTO Training.ppt
LOTO Training.ppt
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
Toolbox Talk
Toolbox TalkToolbox Talk
Toolbox Talk
 
Health and Safety duties
Health and Safety dutiesHealth and Safety duties
Health and Safety duties
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
Lockout tagout refresher training
Lockout tagout refresher trainingLockout tagout refresher training
Lockout tagout refresher training
 
working at height
working at heightworking at height
working at height
 
Safety commitee meeting
Safety commitee meetingSafety commitee meeting
Safety commitee meeting
 
HEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORTHEIGHT WORK SAFETY REPORT
HEIGHT WORK SAFETY REPORT
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
Safeworkpmits
SafeworkpmitsSafeworkpmits
Safeworkpmits
 
behavior based safety
behavior based safetybehavior based safety
behavior based safety
 

Ähnlich wie General safety for contractor workers

Contractor's _obligation.ppt
Contractor's _obligation.pptContractor's _obligation.ppt
Contractor's _obligation.pptBimal Chandra Das
 
presentation thesis kanios hse 0.5
presentation thesis kanios hse 0.5presentation thesis kanios hse 0.5
presentation thesis kanios hse 0.5Stathis Kanios
 
D.O. 13 Guidelines on Construction.ppt
D.O. 13 Guidelines on Construction.pptD.O. 13 Guidelines on Construction.ppt
D.O. 13 Guidelines on Construction.pptmakusogkita
 
DO_13_Salient_Features - OHSC Orientation.pdf
DO_13_Salient_Features - OHSC Orientation.pdfDO_13_Salient_Features - OHSC Orientation.pdf
DO_13_Salient_Features - OHSC Orientation.pdfwillymina2
 
Turn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS ToolkitTurn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS Toolkitturnkeygroupservices
 
Missing safety during construction
Missing safety during constructionMissing safety during construction
Missing safety during constructionGzing Muhamed
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docAtif767782
 
Safety in construction_Notes.pdf
Safety in construction_Notes.pdfSafety in construction_Notes.pdf
Safety in construction_Notes.pdfCivilhod15
 
Role of a safety offcer
Role of a safety offcerRole of a safety offcer
Role of a safety offcerKamleshYadav98
 
Julian Scott - Contract Law and CDM 2007 Regulations
Julian Scott -  Contract Law and CDM 2007 RegulationsJulian Scott -  Contract Law and CDM 2007 Regulations
Julian Scott - Contract Law and CDM 2007 RegulationsKhalida Suleymanova
 

Ähnlich wie General safety for contractor workers (20)

Contractor's _obligation.ppt
Contractor's _obligation.pptContractor's _obligation.ppt
Contractor's _obligation.ppt
 
presentation thesis kanios hse 0.5
presentation thesis kanios hse 0.5presentation thesis kanios hse 0.5
presentation thesis kanios hse 0.5
 
D.O. 13 Guidelines on Construction.ppt
D.O. 13 Guidelines on Construction.pptD.O. 13 Guidelines on Construction.ppt
D.O. 13 Guidelines on Construction.ppt
 
DO_13_Salient_Features - OHSC Orientation.pdf
DO_13_Salient_Features - OHSC Orientation.pdfDO_13_Salient_Features - OHSC Orientation.pdf
DO_13_Salient_Features - OHSC Orientation.pdf
 
Turn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS ToolkitTurn Key Group Services - OHS Toolkit
Turn Key Group Services - OHS Toolkit
 
AHU.pdf
AHU.pdfAHU.pdf
AHU.pdf
 
GTC546 HSE PPT
GTC546 HSE PPTGTC546 HSE PPT
GTC546 HSE PPT
 
Missing safety during construction
Missing safety during constructionMissing safety during construction
Missing safety during construction
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
mata Safety (1)
mata Safety (1)mata Safety (1)
mata Safety (1)
 
Form on1
Form on1Form on1
Form on1
 
Form on1
Form on1Form on1
Form on1
 
Safety in construction_Notes.pdf
Safety in construction_Notes.pdfSafety in construction_Notes.pdf
Safety in construction_Notes.pdf
 
Permit to Work.ppt
Permit to Work.pptPermit to Work.ppt
Permit to Work.ppt
 
Javed_cv
Javed_cvJaved_cv
Javed_cv
 
ROGEL resume up date as of AUG.
ROGEL resume up date as of AUG.ROGEL resume up date as of AUG.
ROGEL resume up date as of AUG.
 
Safety lec2
Safety lec2Safety lec2
Safety lec2
 
Srinivasa Rao - HSE
Srinivasa Rao - HSESrinivasa Rao - HSE
Srinivasa Rao - HSE
 
Role of a safety offcer
Role of a safety offcerRole of a safety offcer
Role of a safety offcer
 
Julian Scott - Contract Law and CDM 2007 Regulations
Julian Scott -  Contract Law and CDM 2007 RegulationsJulian Scott -  Contract Law and CDM 2007 Regulations
Julian Scott - Contract Law and CDM 2007 Regulations
 

Mehr von Bimal Chandra Das

Mehr von Bimal Chandra Das (20)

EMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdfEMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdf
 
construction macheinery Safety.pdf
construction macheinery Safety.pdfconstruction macheinery Safety.pdf
construction macheinery Safety.pdf
 
INTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdfINTRODUCTION TO SAFETY.pdf
INTRODUCTION TO SAFETY.pdf
 
IS 14489 Q.doc
IS 14489 Q.docIS 14489 Q.doc
IS 14489 Q.doc
 
Safety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.pptSafety Audit as per IS 14489.ppt
Safety Audit as per IS 14489.ppt
 
Indian Electricity Act 1910.pdf
Indian  Electricity  Act 1910.pdfIndian  Electricity  Act 1910.pdf
Indian Electricity Act 1910.pdf
 
Indian electricity IE RULES 1956.pdf
Indian electricity  IE RULES 1956.pdfIndian electricity  IE RULES 1956.pdf
Indian electricity IE RULES 1956.pdf
 
ACT&RULE West Bengal.ppt
ACT&RULE West Bengal.pptACT&RULE West Bengal.ppt
ACT&RULE West Bengal.ppt
 
Factories -ACT & RULE.ppt
Factories -ACT &  RULE.pptFactories -ACT &  RULE.ppt
Factories -ACT & RULE.ppt
 
SAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdfSAFETY COMMITTEE.pdf
SAFETY COMMITTEE.pdf
 
Check List for Crane Inspection.pdf
Check List for Crane Inspection.pdfCheck List for Crane Inspection.pdf
Check List for Crane Inspection.pdf
 
COST OF ACCIDENT.ppt
COST OF ACCIDENT.pptCOST OF ACCIDENT.ppt
COST OF ACCIDENT.ppt
 
Plant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffoldPlant ; equipment dismantling of scaffold
Plant ; equipment dismantling of scaffold
 
Safety in use of ladder
Safety in use of ladderSafety in use of ladder
Safety in use of ladder
 
Check list for conveyor belt inspection
Check list for conveyor belt inspectionCheck list for conveyor belt inspection
Check list for conveyor belt inspection
 
Selection of safety appliances
Selection of safety appliancesSelection of safety appliances
Selection of safety appliances
 
Risk
RiskRisk
Risk
 
Safety education and training
Safety education and trainingSafety education and training
Safety education and training
 
Use of PPEs
Use of PPEsUse of PPEs
Use of PPEs
 
Safety while Working at Height
Safety while Working at HeightSafety while Working at Height
Safety while Working at Height
 

Kürzlich hochgeladen

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 

Kürzlich hochgeladen (20)

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 

General safety for contractor workers

  • 1. Page 1 of 13 Page 1 of 13 General Safety Rules for Contractors / Contractor’s Workers SCOPE OF WORK  Safety is the responsibility of the Contractor and his staff /employees/workmen engaged/ deployed for execution of work under the Contract, individually and collectively. For this purpose, the Contractor staff means and includes all its Associates /Sub-contractors / Vendors/Sub-vendors and their Staff employees /workmen deployed for execution of the work covered under the contract. The Contractor should ensure that his workmen participate in the safety awareness, health care and safety training programmes whenever such programmes are organized by the Employer or the Contractor.  The Contractor’s scope of work shall include, (but not be limited to execution of work/contract) adequate safety arrangement for men, machines and materials etc. engaged during the execution of contract.  While executing the contract, the contractor/his supervisor has to ensure safety of surroundings with regard to Employer's work place/site and other contractor's men/machine/materials/ system etc. NECESSARY DOCUMENTATION  Height Pass - A document to be issued to a worker for working at height after imparting him the necessary training  Safety Requirments / Precautions - Before starting a work at height, all the safety requirements (like safety belts, protective helmets and safety nets) shall be decided as per the need of the area/site by the executing agency in collaboration with the safety officer and the contractor. These shall be documented REQUIREMENTS OF WORKERS FOR WORKING AT HEIGHT  Every worker to be deployed for working at height shall be examined and certified by a Registered Medical Practitioner for physical and mental fitness, which shall include general fitness and freedom from epilepsy, high blood pressure, obesity and vertigo.
  • 2. Page 2 of 13 Page 2 of 13  Every worker, before deployment for working at height shall be imparted the training for working at height which shall include competency in the use of safety belts and allied equipment. This training shall be in addition to the general safety training imparted by the Safety Engineering Department.  After successful completion of training and tests, the worker shall be issued a Height Pass which shall be valid for a maximum period of one year. On expiry, it shall be renewed after the worker passes the tests once again. EXECUTION OF WORK AT HEIGHT  Height work procedure shall be applicable to contractors whenever work on height is involved;  All safety precautions prescribed in document mentioned above shall be complied with by the executing agency.  Safety net shall be used wherever considered necessary by the executing officer and safety officer. Safety net made of non-inflammable material shall be used where there is a possibility of welding spark, molten material, burning spark or material, etc., falling on it.  Before starting the day's work, the site shall be inspected by the executing officer for ensuring compliance of all safety aspects. After ensuring compliance of all safety aspects, the contractor, the Executing Officer and the Safety Officer shall sign the document giving clearance for starting the work. In the event of discontinuation of the work and before re-starting, the site inspection shall be re- done, as above by the executing officer  Supervision by Supervisor (s) or Executive (s) shall be ensured for 100% of the time.  Work at height shall be permitted only when a reasonable level of natural sunlight is available as per the discretion of the contractor, the executing officer and the safety officer. The work shall not be permitted in cloudy weather because of the possibility of electrocution by lightning or even getting disturbed by the sound of thunder and there by falling down. When work at height is done indoors, there shall be adequate illumination
  • 3. Page 3 of 13 Page 3 of 13 DETAILED PRODECURE/PROTOCOL  Before starting the work, a safe work procedure /protocol shall be prepared and signed jointly by the executing department representative of Safety Department and the Contractor his representative. This procedure/protocol shall be prepared by breaking the whole job into small elements and listing them separately in the sequence. Against these elements, the agency responsible for doing it would be mentioned. Any other details about these elements, may also be mentioned in the remarks column GENERAL TEkMS & CONDITIONS  SUPERVISOR This contractor shall engage qualified and competent supervisors for execution the contract. The supervisor must be able to (i) Read drawing (ii) Understand the safety aspect of the job (iii) Take necessary precautionary measures (iv) Ensure leadership for the safe execution of the job GATE PASS  The contractor shall, in accordance with prescribed procedure, obtain Gate Passes (PHOTO PASSES) from Employer's Security Department who shall make it available to the contractor, to enable the contractor and its staff / employees / workmen to enter the work area inside the plant as well as unenclosed (open) work area like township. The contractor shall make arrangements for instant photography for those contract workers who may be required to go to work in emergency and do not have photo passes  SAFETY INDUCTION : In order to provide basic industrial safety training to the workers of contractor, Employer will provide on request, the general safety Induction to the workmen/supervisor at Safety Engineering Department. The contractor shall submit the list of persons with full detail for the job of safety induction to the engineer for arranging the same. The contractor shall not engage untrained personnel for executing any contract inside the works. Job safety induction will be a compulsory thing for every job to start with.
  • 4. Page 4 of 13 Page 4 of 13  If at any point of time, contractor feels or needs any special safety training for carrying out a particular job, the same shall be arranged by the concerned engineer of the Employer. For this, the contractor shall inform the concerned engineer of the Employer well in advance to commencement of such job.  The contractor shall motivate and encourage Its employees/workmen to make personal contribution towards enhancing safety on the basis of their knowledge and experience. The contractor shall have adequate number of Pocket Sized Safety Booklet containing safety instructions, prepared on the basis of Employer's model safety book for contractor's. He shall issue them to all his employees/workmen and ensure that they read it before commencing the work. The safety instructions from the Safety Booklet shall be read and explained by the Contractor or his representative to those employees/workmen who are illiterate and cannot read and ensure that they have understood. If the employees are singing in the attendance register, the Contractor shall arrange to write ’Safety Sentence’ on the top of each page below which each employee will either sign or put thumb impression as a token of his/her attendance and also for having read/understood the safety instructions; The 'Safety Sentence’ shall be "I have read/understood the safety instructions and I shall work according to these instruction.”  The work areas where a different system of keeping attendance exists, the Contractor or its representative shall furnish the list of employees/workmen deployed on the job on any particular day and on top of which the following sentence shall be recorded by the representative of the Contractor.  The contractor shall provide Safety Induction everyday before start of the job i.e. briefing the nature of work to be carried out and the necessary precautions to be taken while executing the job/contract during the particular day.  Contractors shall follow all special safety precautions issed by the Executing Authority or his site Engineer from time to time. LEGAL AND PENAL  The Contractor shall abide by the provisions of all statutory acts and rules as applicable
  • 5. Page 5 of 13 Page 5 of 13 and maintain Register & Documents, submit periodic Reports & Returns, furnish information/report relating to accidents occuring in the areas of work to competent authority in time.  The contractor shall be liable for prosecution and penalty in accordance with and as prescribed under law of the land, terms & conditions of Contract as well as rules of the company relating to safety, for non observance of those provisions.  The contractor shall keep the company indemnified against all losses/claims due to accidents/injuries/damages caused at the contractor's works site. He shall be fully responsible for accidents caused due to the contractor or his agents' or workmen's negligence or carelessness in regard to the observance of the safety requirements and shall be liable to pay compensation for injuries.  The Engineer or the Head of the Safety Department or their authorized nominees, upon their satisfaction that the Contractor is not conforming to the Safety requirements, may direct stoppage of work and direct the Contractor to rectify the defects or supply the facility/equipment (as the case may be). The Contractor shall not proceed with the work until he has complied with such directions to the satisfaction of the Engineer/Safety Department  The Contractor shall ensure that all his employees/workmen are covered under 'Workmen Compendation Act' and shall pay compensation to his workmen as and when the eventuality for the same arises  To ensure effective enforcement of Hie rules and regulations relating to safety precaution, the arrangements made by the Contractor shall be open to inspection by the engineer or his representatives, Safety Engineer & Labour Officer. PPE & SAFETY APPLIANCES  The Contractor shall provide all the PPE (Personal Protective Equipment) and safety appliances required to carry out the job to all the workmen deployed by Contractor and also ensure that his workmen use those PPE and safety appliances while on the job The contractor shall not pay any cash amount in lieu of PPE to the workers The PPE and safety appliances provides by the Contractor shall be of the standard as prescribed
  • 6. Page 6 of 13 Page 6 of 13  If the Contractor fails to ensure provision of safety appliances required to carry out the job safety to the workmen and that its workmen do not use the PPE and safety appliances as needed for safe working, the Engineer and the Safety Engineering Department upon the satisfaction that the Contractor is not conforming to the Safety requirements may direct the Contractor for stoppage of work and require the Contractor to correct the defects. The Contractor shall not proceed with the work until he has complied with the direction to the satisfaction of Engineer and Safety Engineering Department. SITE CLEARANCE  Prior to commencement of work, the Contractor shall obtain a clearance from Safety Engineering Department of the Employer and concerned department / section of the Employer where the Job is to be carried out. The Employer / Engineer shall not permit the Contractor to commence the work unless Contractor or its representative produces such clearance certificate The department concerned shall grant such clearance after ensuring that:  The Contractor himself has undergone Safety Induction Training organized by the Employer's Safety Engineering Department in the preceding tweleve months  The Contractor has arranged PPE and safety appliances for himself and all his workmen, as required.  In order to process the work permit issued by the Employer or Employer’s representa- tive for which the "Work Clearance Form" shall be filled in triplicate by the Contractor for record of:  Safety  Department / Section of the Employer granting clearance an  Contractor  The Contractor and his supervisiors along with the Contract document and job instruction received from the Employer, will come to Employer’s Safety Engineering Department where the Contractor will obtain Safety clearance. The Contractor is not permitted to start the job without clarance from Employer's Safety Engineering
  • 7. Page 7 of 13 Page 7 of 13 Department.  The Contractor shall posses handling equipment, tools and tackles of adequate capacity and tested quality.  Contractor shall obtain specific permission for "Procedure for Working at Height by Contractor's Workers" from the Engineer or the Company's Safety Department before commencing the following :  Working in an operating plant/ equipment  Working at height  Working in areas expected to have toxic/poisonous gases.  Major site activity irrespective of the clearance already obtained  Wherever there are hazards of electricity, moving machinery etc.  The executing department shall take necessary shutdown of operating plant before commencement of job in that area The Contractor shall ensure that the shut-down/ clearance is taken before sending workers to such locations particularly in the area where there are hazards of gases, electricity, moving machinery etc SKILL & COMPETENCE OF WORKMEN  The Contractor shall be responsible to engage competent and skilled workers.  Before starting the day's job, the Contractor shall ensure that safety briefing has been downto his workers by himself or his supervisors who have been imparted Safety Induction earlier and also maintain records to this effect. PHYSICAL FITNESS OF WORKMEN  The Contractor shall ensure that this employees workmen subject themselves to such mendical examination as required under the law or under the Company's rules and keep a record of the same.  The Contractor shall not permit any employee/workman to enter the work area under the influence of alcohol. DEALING WITH ACCIDENT  The Contractor shall maintain a safety register, keep records of all minor or major accidents, serious or averted (near miss) accidents, with or without injuries to human
  • 8. Page 8 of 13 Page 8 of 13 beings and shall submit a report about the accidents to the Engineer promptly, on the form prescribed by Employer.  The Contractor's supervisor/officer incharge shall arrange to take the injured person first to Plant Medical Unit with IOW (Injury on Work) form and under no circumstances, take the injured person directly to his own doctors.  The Contractor shall not interfere with the site of accident, unless inspected and/or permitted by the competent authorities  The Contractor shall arrange to avoid any sort of commotion at site in the event of an accident MISCELLANEOUS Safety Records (Statutory Records) The Contractor shall keep record of: 1) Test Certificates of all lifting tools and tackles, Pressure vessels, etc. 2) Periodical inspection report of Safety appliances. 3) Maintaining accident analysis report, in proper format in consultation with Employeer’s Engineer. 4) Safety record as per Factory Rules/ Safety Codes or any other statutory provision shall also be maintained. However, necessary help in this regard can be taken from the concerned Safety Organization / Personal Dept. GAS LINE To work in dangerous gas lines e g. Coke Ovens gas line. Blast Furance gas line. LD gas line etc, Employer will provide job safety induction to the Contractor's personnel. For this the Contractor shall give in writing the list of personnel likely to work in gas line (new/old) to the Engineer, who in turn will arrange the safety induction to the Contractor's workers The Contractor shall ensure the presence of his personnel at place of safety induction (normally Central Gas Safety Station. and follow the steps, general rules & regulations as imparted during training Electrician/Other Electrical Personnel
  • 9. Page 9 of 13 Page 9 of 13  The Contractor shall engage qualified and competent electricians and other electricial personnel while working on electrical lines (which may be High Tension, Medium Tension and Low Tension electrical line) for safe execution of contract. The electricians and other electrical personnel must possess requisite certificate issued from competent authority Electrical Equipment  The Contractor shall ensure proper earthing of all electrical equipment/ machinery prior to start of the machine. The Contractor shall also ensure daily examination of the earthing of equipment/ machinery prior to start of the job in order to avoid electrical hazards  The Contractor shall ensure use of proper cable / welding cable / power cable / control cable) as the case may be. The joints of the cables shall be perfectly insulated The Contractor shall also ensure the use of proper plugs, sockets and other electrical fittings while executing any contract. Scaffolding/Lifting/Lowering/Dismantling of Equipment of Fabricated Structures  For safe execution of the contract. Contractor shall make a programme of a piece/whole job, in sequence of steps involved in execution and the required safety measures to be taken during the execution of the job. The Contractor shall ensure the use of sufficiently strong scaffolding with sufficiently strong hand railings during the execution of the job. Scaffold/Platform to be used by more than two persons has to be approved by Site Engineer and the concerned Safety Organization, jointly.  The Contractor shall ensure the use of scaffolding at Construction Site by his personnel working at height, fabricated as per standard drawing for scaffolding.  If the scaffolding as per the standard drawing is not found suitable at site, the Contractor shall make necessary modifications to strengthen the same,  For any Civil Engineenng job, the Contractor will provide adequate support before casting or any superstructure and provide approach, scaffolding etc., in such a manner
  • 10. Page 10 of 13 Page 10 of 13 that it is safe easy for movement of men. women and materials.  The Contractor shall make his own arrangement for the area lighting/spot lightingat Fabrication Yard. The Employer will provide power source at one point only near to the Fabrication Yard.  The Employer will provide area lighting at erection site only. The Contractor shall make his own arrangement for spot lighting. The source of power supply at the nearest possible point will be shown by Engineer at site. HOUSE KEEPING  The Contractor shall ensure good house keeping in his working area, fabricating yard as well as at erection site. The safe approach to the working place must be ensured. Place for keeping raw materials, finished materials semifinished materials should be clearly marked with proper identification. Machine component shall be kept properly under shed  The Contractor shall keep the scrap materials at one place duly barricaded and shall remove the same regularly form the work place.  The Contractor shall stack properly the fabricated or any other items likely to be erected very shortly at erection site, in such a way that the materials do not cause congestion at site or create unsafe condition for free safe approach Barrication  The Contractor shall ensure barrication of the unsafe area, which can lead to accident to any unknown person working in that area. In order to remove unsafe condition and prevent accident, the unsafe area such as trench/pit/foundation, any type of opening made or left in any floor of the building etc must be barricaded.  The hand railings shall be immediately provided in all the floors, stairs, etc before proceeding for thuther erection/dismantling.  Removal of muck from road sides, shall be done as soon as possible.  The Contractor shall be responsible for removing all unwanted materials/scaffolds from work site.  The Contractor shall issue written as well as oral instructions from time to time, in
  • 11. Page 11 of 13 Page 11 of 13 addition to the precautions, measures spelt out above so as to ensure that the workers adhere to safety norms specifically needed for the particular job during the execution of work.  The Contractor shall ensure that compressed air is not used for removing dust from one's clothes. Compressed air shall not be blown against anyone as it may injure or even kill him/her.  The Contractor shall provide, maintain and arrange for periodical checking of adequate numbers of fire extinguishers of appropriate type and other facilities (e g. sand buckets, asbestos covering etc) in fire prone areas.  The Contractor shall provide clearly demarcated access and exits at work site to take care in case of outbreak of fire or any other eventuality.  The Contractor shall ensure that smoking or keeping naked light near gas lines, valves and any other equipment connected with the gas distribution system and handling of all inflammable material is not done as it is strictly prohibited.  The Contractor shall ensure that no one takes rest/shelter below any dumped slag boulder or any other pit/excavation, near any stock of materials, electrical installations and gas lines, etc.  The Contractor shall ensure availability of first aid box at the working sites.
  • 12. Page 12 of 13 Page 12 of 13 HEIGHT PASS SN…… Date …… This is to Certify that the undermentioned person has been permitted to work at height. 1) Name : ____________________ 2) Father s Name : _____________ 3) Designation : _______________ 4) Age :____ Yrs. 5) Validity upto Date From………….. to …………………… ……………….. ………………………….. Signature/Left Thumb Impression of Worker Signature-of Authorized of. Executive of safety Engg. Department Name & Seal PHOTO
  • 13. Page 13 of 13 Page 13 of 13 CHECKLIST OF REQUIREMENTS/PRECAUTIONS FOR WORKING AT HEIGHT 1) Name of Department executing the job : ……………… 2) Name of departmental representative(s): …………. …………………………….. 3) Name(s) of contractor's supervisor : ……….. ……………… 4) Name of Contractor: …………. 5) location of work : _.............. 6) Brief description of work : ……………… 7) No. of persons deployed for the job………….. 8) Names of persons deployed to do the job at height: 9) No. of persons issued height passes 10) All persons have been imparted training for working at height by Safety Engineering department : Yes/No. 11) Head of Operation Deptt. has been informed of this job: Yes/No. 12) Shut downs of following operating equipment have been obtained EOT Crane Yes / No Belt Coveyor Yes / No Gas Line Yes / No Bus Bar Yes / No ………….. Yes / No ….. ……….. Yes / No …………… Yes / No