             We deliver successful projects through Project Controls solutions and Collaborative solutions.



Project Controls Solutions                                                       To Support Companies

                                                                                 The right project controls make projects run smoothly. ORCAS provides
ORCAS improves the control of complex projects, programs, and
                                                                                 valuable services that leverage our field-based knowledge and areas of
operations by performing key functions:
                                                                                 expertise. Since all of our projects are complex with critical time-to-market
                                                                                 demands, we work closely with clients from day one to ensure the right,
  ◊                                    ◊
      Project Planning                      Resource Analysis
                                                                                 customized plan is securely in place. Then, we coordinate project controls
  ◊                                    ◊
      CPM Scheduling                        Risk Management
                                                                                 solutions across all key departments so that everyone throughout the
  ◊                                    ◊
      Contracts Management                  Earned-value Analysis
  ◊                                    ◊                                         enterprise is quot;on the same page.quot;
      Cost Control                          Issues Management
  ◊                                    ◊
      Productivity Analysis                 Claims Analysis/Mitigation
  ◊                                    ◊
      Change Management                     Document Control                     For Critical Projects
                                                                                 All our projects and programs share a common theme: ORCAS excels on
                                                                                 large, complex projects where time-to-market pressures are intense and risk is
Collaborative Solutions                                                          high. Although the industries may vary, the project profile remains the same:

The establishment and implementation of systems and proper
                                                                                                Complex and Critical
                                                                                            ◊
technological support tools are critical components of successful project
                                                                                                Significant $ Value
                                                                                            ◊
management. ORCAS designs, configures and implements project
                                                                                                Time to Market Pressure
                                                                                            ◊
management software specifically suited to your needs; some are simple
                                                                                                High Risk
and some are complex. The most effective system optimizes the                               ◊
processes, the people, and the technology. ORCAS believes in finding the
right tools to fit your specific needs. They utilize a incremental roll-out of
technology to address critical needs, minimize impact of change, and
grows with the team.
Why does ORCAS exist?
How Does ORCAS Do It?
People                                                                               Real Project Benefits
                                                                                     With ORCAS on your team, you can improve all planning, execution, and
ORCAS brings only the right people to support you. We augment your
                                                                                     evaluation phases of your project. You will have more clarity and
existing team with qualified experts to focus on specific project areas and fill
                                                                                     confidence in the management decisions you make. And you will obtain
specialized skill sets, or we deliver a complete project controls team. Over
                                                                                     many more benefits using ORCAS as a resource on your next project.
the years, ORCAS has worked with a full circle of project team contributors,
including designers, contractors, construction managers and turnkey system
providers. Who better to have on your team than someone who fully
understands every side of the game?

                                                                                            Optimum Cost Control
                                                                                        ◊
Technology Tool Box                                                                         Early Identification of Problems
                                                                                        ◊

                                                                                            Reduced Risk of Claims and Disputes
                                                                                        ◊
                              ORCAS incorporates only the most appropriate
                                                                                            Proactive Issue Resolution
                                                                                        ◊
                              technological tools and systems in developing
                                                                                            Improved Communication
                                                                                        ◊
                              successful project controls management solutions,
                                                                                            Reduced Change Orders
                              from the best software for your particular needs          ◊
                              to unique hosting and delivery options.                       Improved Project Analysis and Forecasts
                                                                                        ◊

                                                                                            Improved Decision Making Capabilities
                                                                                        ◊

                                                                                            Effective and Efficient Use of Project Resources
                                                                                        ◊
Objectivity
                                                                                            Third Party Objectivity and Assessment
                                                                                        ◊
ORCAS brings third-party objectivity to every project. Company owners,
                                                                                            Enterprise-wide Standards and Solutions
                                                                                        ◊
presidents and CEOs are increasingly mandating high levels of accountability
                                                                                            Improved Project Delivery
                                                                                        ◊
and objectivity on their projects. With the introduction of the Sarbanes-Oxley
Act, and an increase in corporate initiatives to improve project visibility, there
is even more pressure to create and enact stringent quot;checks-and-balancesquot;
systems. Whether reviewing contractor plans, analyzing productivity, or
bringing enterprise-wide visibility to organizations, ORCAS delivers critical
experience and insight.
Why does ORCAS exist?
                                                                                                                                          Project Success Creates Business Success
A “Pretty Picture” Never Built a Project
Real project control is more than hanging a Gantt Chart on your                                                                           With the increasing pressure for successful projects, owners have asked
manager’s wall. Effective control is about planning, risk management,                                                                     ORCAS to standardize their project management processes, procedures,
realistic resource planning, and profit optimization. It is a continuous                                                                  and systems across the enterprise. ORCAS clients now have an
process that starts with the bid and ends when the jobsite trailers leave                                                                 integrated system to control, optimize, and collaborate on all projects in
the site.                                                                                                                                 the enterprise.


                    600
                                                                                                                Contractor 6
                                                                                                                 Seismic




                                                                                                                                          Optimize the Project Team
                    500

                                                                                                                 Cleanroom
                                                                                                                Contractor 5


                                                                                                                               Resource
                    400
   Num ber of Men




                                                                                                                                          Do you want your project manager working the details of a two-week
                                                                                                                 Process
                                                                                                                Contractor 4
                    300



                                                                                                                               Analysis   look-ahead schedule or focusing on large-scale opportunities and risks?
                                                                                                                 Electrical
                                                                                                                Contractor 3
                    200




                                                                                                                                          On fast-track projects, ORCAS can add just the right resource to your
                    100
                                                                                                                 Mech, Dry
                                                                                                                Contractor 2




                                                                                                                                          team so you can focus on the big picture.
                     0
                          Nov   Dec 7 Dec   Dec   Dec Jan 4    Jan   Jan    Jan   Feb 1 Feb 8 Feb   Feb Mar 1    Mech, Wet
                                                                                                                Contractor 1
                           30          14    21    28           11    18     25                15   22
                                                              Week Ending




Trust Goes a Long Way
Industry leaders trust ORCAS with their confidential cost, resource,
                                                                                                                                                                                              Schedule
profitability, and risk information. We take the confidence they place in
us very seriously. It is through this high level of trust that ORCAS thrives                                                                                                                  Analysis
and is able to work with a variety of companies.
                                                                                                                                                                                              and

                                                                                                                                                                                              Turnaround Plan
Our Path of Successes
                                                                                Project Control Pays: $560 Million
The $2 Million Report
                                                                                At one of the leading semiconductor manufacturers, ORCAS implemented
ORCAS was recently commissioned to create a one-page report depicting
                                                                                an enterprise-based project management system. A great deal was at
the basic relationship between construction, commissioning and validation
                                                                                stake for this this project and company; if they weren’t successful their
for a scaled-up biotechnology project. According to the Executive Vice
                                                                                operations could move oversees. They did not only deliver their first tool
President, this report alone was worth the $2 million budgeted for the
                                                                                ramp on-time, they were EARLY! Due to the tools ORCAS implemented,
entire project controls initiative. Next step: to present the report to the
                                                                                the team successfully delivered the project 8 weeks early. Since each
Board of Directors.
                                                                                day of production is worth $10 Million in revenue, this equates to $560
Secretary’s Project Management Awarded
                                                                                Million. Project Control does pay!
The Terascale Simulation Facility (TSF) project won the Secretary's Project
                                                                                Facility of the Year Award
Management Award of Achievement. This large construction project
provided power and space to accommodate two simultaneous 100-                   The new Genentech facility (NIMO) in Oceanside, CA received this
teraOPs-class computer systems operations. TSF became the home for              prestigious award sponsored by ISPE, INTERPHEX and Pharmaceutical
next-generation supercomputers. ORCAS represented Lawrence                      Processing magazine. The Facility of the Year Awards (FOYA) competition
Livermore National Laboratory in scheduling and project controls. Our           recognizes state-of-the-art pharmaceutical manufacturing projects that
team also supported the Lab’s project controls team in achieving EVMS           utilize new and innovative technologies to enhance the delivery of a
Certification.                                                                  quality project, as well as reduce the cost of producing high quality
                                                                                medicines. The NIMO project team quot;delivered the base project on time
World’s Largest Laser Facility                                                  and under budget.quot; ORCAS managed the master construction schedule for
                                                                                this successful project.
The National Ignition Facility (NIF) is a 192-beam laser facility the size of
                                                                                Constructech Vision Award
a sports stadium. The system is so powerful it produces 1000 times the
electrical generating power of the United States. ORCAS supported a
                                                                                ORCAS received the Vision Award as a technology enabler to MannKind
variety of companies to control and manage the complex schedule on this
                                                                                Corporation for their successful capital project in the Industrial / Mfg.
$3.4 billion project, including contractors representing the disciplines of
                                                                                category. ORCAS supported MannKind Corporation by implementing an
process-piping, beam path and steel installation, electrical and general
                                                                                enterprise-based project management solution based on Primavera as
construction.
                                                                                well as performing project controls for their successful $250M+ Project.
Ongoing Projects
ExxonMobil                                                 Valero                                                    FMI
Torrance, CA                                               Benecia, CA                                               Phoenix, AZ
ORCAS provides support in the creation and                 Our team supports the $1 Billion Program at this site,    The Tenke Fungurume Mine Project in Africa entails the
administration of a detailed schedule for the              which comprises of several small projects. ORCAS is       development, construction and operation of a copper/
construction of the world’s largest Electrostatic          primarily responsible for scheduling one of the           cobalt mine. This is a significant size project, estimated at
precipitator built. This impressive project consisted on   specific projects.                                        $1Billion.
the construction of 2 modular ESP units measuring a                                                                  Orcas performed an assessment on the schedule to
total of 175 ft long x 85 feet wide and 135 feet tall.     In addition, ORCAS offers technical support to the        determine if there were any areas of opportunity for
                                                           scheduling team and manager for data exchange             improvement. Our assessment and recommendations
ORCAS assists Jacobs Engineering in the development        and integration, schedule structure.                      covered the following:
of “what-if” scenarios to reduce the projected                                                                       ♦ Schedule Structure and Architecture
completion date of the project, as well as make
                                                                                                                     ♦   Schedule Processes and Procedures
recommendations to bring it back into the required
                                                           Renewable Energy Corp. (REC)                              ♦
schedule by ExxonMobil.                                                                                                  Schedule Components
                                                           Moses Lake, WA
                                                                                                                     ♦   Schedule Reporting
The development of critical paths and a fully              The REC Moses Lake facility produces solar-grade
integrated schedule allowed the companies to               polysilicon for use in solar panels and devices. 20%
analyze different approaches to complete the               to 25% of the solar cells in the world are produced       Amgen
project.                                                   by REC’ polysilicon. The new facility in Moses Lake is    Fremont, CA
                                                           estimated at $600 Million.
                                                                                                                     Amgen is performing two significant shutdowns. We are
ORCAS also assisted in the development of the              Orcas provides project controls services to support the
                                                                                                                     supporting two specialty contractors, Therma and Kinetics,
Turnaround portion of the project to be able to            construction effort. The services we provide include
                                                                                                                     to schedule and monitor all process system, piping, and
connect the ESP to the FCC in a duration of 28 days        the following:
                                                                                                                     HVAC work activities.
and be able to start the unit on time.                     ♦ Cost Control
                                                           ♦   Productivity Management                               Our team works closely with Fluor to ensure these high
Conoco-Philips                                                                                                       exposure scopes are successful and the shutdown plans
                                                           ♦   Document Control
Rodeo, CA                                                                                                            meet the business needs of Amgen.
                                                           Wyeth
The capital project is a $300M Hydrogen Plant for
Conoco-Philips. Air Liquide is the turnkey provider        Collegeville, PA                                          Bayer
and is contracting all the construction work. Air Liq-                                                               Berkeley, CA
                                                           ORCAS is implementing a portfolio-based scheduling
uide is the largest supplier of gas in the world.
                                                           system for this owner As part of Enterprise Solutions,    ORCAS supports the owner on developing the integrated
ORCAS has supported this organization for more than
                                                           our team is delivering the following as part of this      project schedule for this multi-year program. The team
10 years in providing project controls services.
                                                           implementation:                                           works closely with each department of this organization
                                                           ♦ Design                                                  as well as the external general contractor, service
ORCAS supports Air Liquide on several aspects of
                                                                                                                     organizations, and consultants.
                                                           ♦
project controls; ORCAS represents Air Liquide on the          Implement
integrated schedule, some cost, and project admini-
                                                           ♦   Train                                                 In addition, ORCAS is working with Bayer to evaluate the
stration support as it relates to document control, RFI
                                                                                                                     benefits of implementing a “Collaborative Scheduling
                                                           ♦
management, and general project support.                       Roll-out
                                                                                                                     Solution.” This system will increase the visibility of all
                                                           Portfolio Schedule Systems are used to successfully       project team members, provide one focal point for the
                                                                                                                     schedule, and empower non schedulers to participate in
                                                           manage multiple projects across different project
                                                                                                                     the schedule process.
                                                           portfolios.
Past Projects
                                                                                                                             Lawrence Livermore National Lab
MannKind Corporation                                          BioMarin
                                                                                                                             NIF Project, Livermore, CA
Danbury, CT                                                   Novato, CA
                                                                                                                             ORCAS provided project controls services for the
Mannkind is a biopharmaceutical company focused on            BioMarin is executing several key projects during their
                                                                                                                             National Ignition Facility (NIF) Project. NIF is the
the discovery, development and commercialization of           shutdown. These projects require detailed planning
                                                                                                                             largest laser in the world. This 192-beam laser
therapeutic products for diseases such as diabetes            and scheduling to coordinate the activities of all
                                                                                                                             facility is the size of a sports stadium and the system
and cancer.                                                   trades.
                                                                                                                             is so powerful it produces 1000 times the electrical
Orcas provides both project controls solutions and            Orcas directly supports the construction manager for
                                                                                                                             generating power of the United States.
project management enterprise solutions to this               this critical project. The scopes covered in this
                                                                                                                             Our services directly supported the process-piping
dynamic company. Our team has implemented a                   shutdown schedule include architectural, process,
                                                                                                                             contractor, beampath and steel installation contractor,
Primavera-based scheduling solution as well as                electrical, instrumentation & control, and mechanical.
                                                                                                                             electrical contractor, and the general contractor for
project cost management system.
                                                                                                                             several phases of the NIF Project. ORCAS provided
The “real” integrated schedule ties together all
                                                                                                                             the following services for this dynamic project:
departments, from procurement to construction &
                                                                                                                             ♦ Schedule Development
facilities, to regulatory. Our team also supports the
                                                              NOVO Nordisk Delivery Technologies
hands-on scheduling role to support the project team,                                                                        ♦   Schedule Progress and Updates
                                                              Hayward, CA
as well as providing estimating and general project
                                                                                                                             ♦   Resource Analysis
management support.                                           NNDT is a world leader in diabetes care. Orcas is
                                                              providing their critical inhaled insulin (IS) project with     ♦   Invoice Management
                                                              turnkey project controls solutions. Our Team provides
                                                                                                                             ♦   Change Proposals
                                                              the following services to help keep this project on
Air Liquide America                                           schedule and on budget:                                        ♦   Project Management Coordination
                                                              ♦ Planning and Schedule Management
Rodeo, CA                                                                                                                    ♦   Cost Control Coordination
                                                              ♦
Air Liquide is the largest supplier of gas in the world.          Cost Control
ORCAS has supported this organization for more than
                                                              ♦   Document Control
10 years in providing project controls services.
                                                                                                                             Skyworks Solutions
                                                              ♦   Project Management System Deployment
                                                                                                                             Newbury Park, CA
The current project is a $300M Hydrogen Plant. Air
                                                              ♦   Project Administration
Liquide is the turnkey provider and is contracting all                                                                       Skyworks is an industry leader in radio solutions and
the construction work. ORCAS represents Air Liquide                                                                          precision analog semiconductors servicing a diversified
on the integrated schedule, some cost, and project                                                                           set of mobile communications customers.
                                                              Texas Instruments
administration support as it relates to document con-                                                                        Orcas was asked to return to this facility and support
trol, RFI management, and general project support.            New Fab Project, Richardson, TX                                their critical project: 4” to 6” Conversion Project. Our
                                                                                                                             role is to support the three major phases, 1. Process
                                                              ORCAS provides master scheduling, cost support, change
                                                                                                                             Development, 2. Process Qualification, and 3. Facility
                                                              management, and document control services to support
Lucile Packard Children’s Hospital                                                                                           Conversion. Our team will manage the overall master
                                                              the construction of all bulk gas, specialty gas, and
                                                                                                                             schedule, which encompasses all department activities to
Systems Implementation Project, Palo Alto, CA                 chemical distribution systems for this multi-year $3 Billion
                                                                                                                             ensure the entire project team is on the same page.
                                                              Project.
ORCAS provides technical services for a major hospital
                                                                                                                             Skyworks has also requested assistance in project
                                                              Our services provide all facets of systems engineering.
system implementation. This multi-year project includes all
                                                                                                                             management to facilitate the success of the process
infrastructure upgrades, software, and hardware.
                                                                                                                             development and process qualification phases.
ORCAS is providing all facets of systems engineering.
Past Projects
                                                         Lawrence Livermore National Lab                            NEC Electronics
Amgen                                                    TSF Project, Livermore, CA                                 Various Projects, Roseville, CA
Global LIMS Project, Boulder, CO                         The Terascale Simulation Facility (TSF) is being           ORCAS has supported the NEC facility since 1991. The
                                                         constructed to provide power and space to                  original charter was to assist the construction management
ORCAS provides consulting services to the Information
                                                         accommodate two simultaneous 100-teraOPs-class             team with installing more than 1,000 pieces of
Technology Project Team. We support the project
                                                         computer systems' operations. TSF will become the          manufacturing equipment. We provided the scheduling
with the following services:
                                                         home for next-generation supercomputers.                   and progressing support, managed issues tracking
                                                         Our services directly support the LLNL Management          systems, and developed budgets for the seven main
                                                         Team, and include the following:                           subcontractors.
                                                         ♦ Conduct Constructability Reviews                         Our services have extended to directly benefit the owner.
                                                                                                                    Over the years we have supported several departments
                                                         ♦   Coordinate Project Master Schedule                     including Equipment Engineering, Facilities, Line
                                                         ♦                                                          Maintenance, Manufacturing Engineering, Production,
                                                             Develop Earned-value Cost Reporting
Infineon Technologies
                                                                                                                    Process Engineering, and Line Maintenance. Services for
Richmond, VA                                             ♦   Provide Monthly Progress Assessments                   the owner have included:
ORCAS is supporting the Owner to self-manage their       ♦                                                          ♦ 300mm Facility Design Support
                                                             Provide Claims Avoidance Review and Analysis
$1 Billion dollar project. The project includes a base
                                                         ♦                                                          ♦
                                                             Assist with Change Order Review and Analysis               Equipment Layout Management
building portion to finish out the construction of all
mechanical, electrical, and architectural systems. It    ♦                                                          ♦
                                                             Prepare Monthly Reports to DOE                             Usage Analysis of Facility Utilities
also includes the tool hookup portion to install all
                                                         ♦                                                          ♦
                                                             Coordinate Activation and Commissioning Issues             Equipment Performance Analysis
manufacturing process equipment.
Our team developed the project management                                                                           ♦   Production Scheduling and Analysis
processes and procedures, implemented enterprise-
                                                         Stanford Hospital and Clinics                              ♦   Manufacturing Engineering Support
wide project tools, and support in all aspects of
                                                         Various Projects, Palo Alto, CA
project control. Specifically, we are providing the                                                                 ♦   Materials Requirements Planning (MRP) System
following services to this fast-track manufacturing      ORCAS supports a variety of key information
                                                                                                                    ♦   Project Controls Support Services
project:                                                 technology projects at Stanford. These projects range
♦ Process and Procedure Development                      from security to wireless implementations.
                                                         Utilizing our expertise in project controls, the team is
♦   Planning and Scheduling                                                                                         Aviron
                                                         successfully delivering the following projects: General
                                                                                                                    Philadelphia, PA
♦                                                        Computer Infrastructure Remediation, HIPAA Security
    Enterprise-wide Project System
                                                         Improvements, Wireless Network Design through              ORCAS developed a Cost Control System for
♦   Training and Support
                                                         Implementation, IT Change Management Project.              Aviron’s Engineering Corporate Services
♦   Integrated Project Scheduling                                                                                   Department. This system improves control via
                                                                                                                    establishing standards, implementing procedures,
♦   Cost Control and Reporting
                                                                                                                    and providing a database tool for managing cost
♦ Change Management                                                                                                 information.
                                                                                                                    The system includes invoice management, project
With the enterprise-wide project systems and
                                                                                                                    progressing, standardized Requests for Information,
integrated schedules, this owner has gained an
                                                                                                                    forecasting methods, and management reporting.
unprecedented level of project control and visibility.
These tools enable them to be proactive and correct
problems early in order to keep the project on-track.
Past Projects
Wyeth BioPharma                                                 TriQuint Semiconductor                                       ST Microelectronics
St. Louis, MO                                                   Hillsborough, OR                                             Phoenix, AZ
                                                                ORCAS assisted TriQuint to develop a standardized Cost       ORCAS provided support to two major players on the
This is state-of-the-art biopharmaceutical manufacturing
facility is poised to make a significant contribution towards   Control System. This system provides standard methods        project; the process piping contractor and turnkey
the treatment of hemophilia A. The advanced 115,000             and procedures in the following areas:                       bulk gas supplier.
square foot biopharmaceutical campus is undergoing a
                                                                ♦ Request for Proposal to Contractors                        The team developed and progressed schedules, as
significant expansion. ORCAS supported the Construction
                                                                                                                             well as managed project issues for the equipment
                                                                ♦
Manager with planning, scheduling review, analysis, and             Contractor Price Evaluation                              installation project. The Master Project Schedule inte-
development.
                                                                ♦                                                            grated the activities of project so issues were identi-
                                                                    Contractor Selection
                                                                                                                             fied and resolved early.
Specifically, our team prepared a critical shut-down
                                                                ♦   Contractor Invoice Review
schedule for the facility, facilitated the compilation of
                                                                ♦
executive reports, reviewed and analyzed construction                                                                        Lawrence Livermore National Lab
                                                                    Cost Analysis and Forecast
schedules and assisted training of new project management
                                                                                                                             NIF Project, Livermore, CA
personnel.
                                                                With the first phase of system design completed, the next    ORCAS provided project controls services for the
                                                                phase will expand into a fully integrated database           National Ignition Facility (NIF) Project. NIF is the
Baxter Hyland                                                   system which shares information with TriQuint’s              largest laser in the world. This 192-beam laser
Glendale, CA                                                    established purchasing and financial systems.                facility is the size of a sports stadium and the system
                                                                                                                             is so powerful it produces 1000 times the electrical
ORCAS developed the plans for the process piping
                                                                                                                             generating power of the United States.
work on this Blood Fractionation Project. The team
                                                                                                                             Our services directly supported the process-piping
assisted the contractor with the following:
                                                                Schering-Plough                                              contractor, beampath and steel installation contractor,
♦ Schedule Development
                                                                Mexico City                                                  electrical contractor, and the general contractor for
♦    Progressing and Analysis                                                                                                several phases of the NIF Project. ORCAS provided
                                                                Orcas developed the baseline schedule for the process-
                                                                                                                             the following services for this dynamic project:
♦                                                               piping contractor on the purified water system “green
     Claims Avoidance
                                                                                                                             ♦ Schedule Development
                                                                field” project. This schedule was used for resource plan-
                                                                ning and management.
                                                                                                                             ♦   Schedule Progress and Updates
                                                                                                                             ♦   Resource Analysis
Leading Edge Semiconductor Company
                                                                                                                             ♦   Invoice Management
                                                                National Semiconductor
Boise, ID
                                                                Portland, ME                                                 ♦   Change Proposals
ORCAS supported Air Liquide America on the Base Build
                                                                Orcas developed the base-line fit-up and hook-up sched-      ♦
scope of work at a new Photo Mask Facility by providing                                                                          Project Management Coordination
                                                                ules for the process piping contractor at Building 18. All
the following services:
                                                                                                                             ♦   Cost Control Coordination
                                                                schedules were fully resource and cost loaded. Progress
♦    Scheduling Services
                                                                reports were developed on a weekly basis to provide          Digital Equipment Corporation (DEC)
♦    Issues Management                                          status to the general contractor regarding materials, fab-
                                                                                                                             Hudson, MA
                                                                rication, installation, and testing.
♦    Cost Control and Change Management
                                                                                                                             Orcas supported the mechanical contractor on their
                                                                We also implemented our Labor Tracking System to track
♦    Project Reporting and Customer Feedback                                                                                 equipment installation project for FAB 6. Our primary
                                                                all labor costs associated with tool hook-up. Payroll and
                                                                                                                             role was to develop and progress schedules, in addi-
     Surveys                                                    billing were automatically generated as a result of the on
                                                                                                                             tion to tracking project issues.
                                                                -site labor tracking system.
♦    Final Project Compilation Report                                                                                        We also set-up systems to automate the extraction of
                                                                                                                             facility requirements from the design drawings for use
                                                                                                                             in facilities planning and management. The design
                                                                                                                             group requested our assistance in this effort.
Past Projects
                                                         Lawrence Livermore National Lab                         WhiteOak Semiconductor
Amgen                                                    Bldg. 155 Seismic Upgrade, Livermore, CA                Richmond, VA
Helix Project, Seattle, WA                               ORCAS provides claims analysis services to the          ORCAS developed the baseline schedules for several
                                                         University of California for the Seismic Upgrade        base building sub-projects including the Fab, IWT, Cub,
ORCAS provides project analysis services to a
                                                         Project of Building 155, a two story building housing   Glegg Systems, Slurry, and Specialty Gases.
mechanical contractor on the Helix Project, a $650
                                                         chemical research laboratories and offices. Seismic     We customized our Labor Tracking and Material Tracking
million research and development campus on Elliot
                                                         strengthening of Building 155 will occur on both the    Systems to effectively monitor these base construction
Bay in Seattle, WA. The analysis effort focuses on
                                                         exterior and interior of the building. The structural   projects.
reviewing the schedule plans, documenting the key
                                                         scope of work includes all work required to upgrade     To improve document control, we developed a system to
issues and delays, and representing how each of the
                                                         the performance of the building in a PC-2 basic         track project drawings. All project issues and RFI’s were
delays impacts the contractor’s schedule performance.
                                                         earthquake.                                             entered, managed, and reported using our Issues
Various types of delay impacts are reviewed,
                                                         Our services directly support the LLNL Management       Tracking System.
including design changes, constructability issues, and
                                                         Team, and include the following:
owner directed changes. The delay impacts are
                                                         ♦ Detailed Reviews of Project                           LSI Logic
analyzed to quantify the resulting effects and
inefficiencies in design, detailing, and field                                                                   Greshem, OR
                                                         ♦   Assessment of Delay Claims made by Contractor
                                                                                                                 ORCAS developed system and service databases to
                                                         ♦   Development of the “True” Critical Path Schedule
                                                                                                                 identify scope, resources, and linear footage for the
                                                         ♦   Recommendation to Disapprove/Approve                process piping systems.
Conexant                                                                                                         We generated a schedule template to be utilized for
                                                             Contractor’s Claims
Newport Beach, CA                                                                                                scheduling each of the services in addition to performing
                                                                                                                 resource analysis for the design efforts of the process
ORCAS has supported Conexant on tool hook-up
                                                                                                                 piping contractor.
                                                         TriQuint Semiconductor
projects since 1995. Our services over the years have
                                                         Richardson, TX
expanded to include a variety of facilities-related
projects, including seismic, emergency generator                                                                 Lawrence Livermore National Lab
                                                         ORCAS managed all project controls for Air Liquide
upgrades, and other major system and building            America on Phase 1 of the Oregon Tool Set. ORCAS        Bldg. 151 Seismic Upgrade, Livermore, CA
modifications.                                           contributed in all phases of the project to assist in
                                                                                                                 ORCAS provides project controls services for the Seismic
Our team supports the owner with a variety of            planning, control, and close-out. The following ser-
                                                                                                                 Upgrade of Building 151, a two story building housing
services, including the following.                       vices were provided:
                                                                                                                 research laboratories and offices. Seismic strengthening
♦ Project Website                                        ♦ Request for Proposal Preparation                      of Building 151 will occur on both the exterior and
♦   Schedule Development and Management                                                                          interior of the building. The structural scope of work
                                                         ♦   Contractor Bid Evaluation
                                                                                                                 includes all work required to upgrade the performance of
♦   Issues Tracking                                      ♦   Invoice Management                                  the building in a PC-2 basic earthquake.
♦   Project Reporting                                    ♦                                                       Our services directly support the LLNL Management
                                                             Issues Management
                                                                                                                 Team, and include the following:
♦   Develop and Maintain Project Databases               ♦   Change Order Management
                                                                                                                 ♦ Schedule Progress and Updates
♦   Developed Document and Drawing System                ♦   Schedule Management
                                                                                                                 ♦   Resource Analysis
♦ Customer Satisfaction Surveys and Analysis             ♦   Cost Analysis and Forecasts
                                                                                                                 ♦   Claims Avoidance
ORCAS also supported the process-piping contractor       ♦   Executive Project Summaries
in managing schedules, tracking labor and materials,
                                                         ♦   Protocol Specification Development
and project issues.
                                                         ♦   Final Report and Analysis
Other things to know about us ...
Professional Certifications
                                                                                        How to find us?
ORCAS team members maintain certifications in project management organizations,
                                                                                        Our office is the job-site. The projects take us to
cost management, and leading project technology. We are committed to the
                                                                                        locations throughout the United States. For information
advancement and use of project controls to make projects more successful.
                                                                                        about our project sites, contact us.


Industry Associations                                                                   On the telephone
ORCAS is actively involved in the industries associations we support. We are proud
                                                                                        Bert Rangel, Project Development
participants of ISPE and SEMI organizations. Our team contributes to association
                                                                                        800.422.6722 x133
events, seminars, and training programs.
                                                                                        brangel@orcasnetwork.com


Certified DBE and SWBE
                                                                                        On the world wide web
At the request of our government clients, ORCAS obtained certifications to formalize    www.orcasnetwork.com
our status as a woman-owned business. ORCAS is certified with the U.S. Small
Business Administration as an 8(a) DBE business. We are also certified with the State
of California as a SWBE.
                                                                                        Via email
                                                                                        Questions or Requests:
                                                                                        info@orcasnetwork.com



                                                                                        By postal service
                                                                                        ORCAS Project Controls
                                                                                        11048 Coast Highway One
                                                                                        P.O. Box 133
                                                                                        Jenner, CA 95450-0133

Weitere ähnliche Inhalte

Was ist angesagt?

Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions SA
 
TariqKAMIL Résumé
TariqKAMIL RésuméTariqKAMIL Résumé
TariqKAMIL RésuméTariq Faisal
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions SA
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions SA
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions SA
 
Roadmap for Techno-functional Team
Roadmap for Techno-functional TeamRoadmap for Techno-functional Team
Roadmap for Techno-functional Teamthelastzodiac
 
Richard Halprin-CV
Richard Halprin-CVRichard Halprin-CV
Richard Halprin-CVRich Halprin
 
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...IEEEP Karachi
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions SA
 
Macrosolutions Consulting Service: Communication, Management and Recovery Pla...
Macrosolutions Consulting Service: Communication, Management and Recovery Pla...Macrosolutions Consulting Service: Communication, Management and Recovery Pla...
Macrosolutions Consulting Service: Communication, Management and Recovery Pla...Macrosolutions SA
 
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions SA
 
Tynan Group Qualifications
Tynan Group QualificationsTynan Group Qualifications
Tynan Group Qualificationsmegnbarnes
 
Primavera Project Management
Primavera Project ManagementPrimavera Project Management
Primavera Project ManagementTotalSoft
 
Intelligent Transport Systems
Intelligent Transport SystemsIntelligent Transport Systems
Intelligent Transport Systemswazy1972
 
Redrock Communications
Redrock CommunicationsRedrock Communications
Redrock Communicationswebbersgolf
 
Ziyad CV
Ziyad CVZiyad CV
Ziyad CVzzsz77
 

Was ist angesagt? (20)

Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
 
TariqKAMIL Résumé
TariqKAMIL RésuméTariqKAMIL Résumé
TariqKAMIL Résumé
 
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and DiagnosisMacrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
Macrosolutions Consulting Service: Project Maturity Assessment and Diagnosis
 
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
Macrosolutions Consulting Service: Support and Consulting for Specific Projec...
 
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...Macrosolutions Consulting Service: Resources and Investment Optimization thro...
Macrosolutions Consulting Service: Resources and Investment Optimization thro...
 
Vadivelan_Resume
Vadivelan_ResumeVadivelan_Resume
Vadivelan_Resume
 
Kerry_Sheehan_15
Kerry_Sheehan_15Kerry_Sheehan_15
Kerry_Sheehan_15
 
Roadmap for Techno-functional Team
Roadmap for Techno-functional TeamRoadmap for Techno-functional Team
Roadmap for Techno-functional Team
 
Richard Halprin-CV
Richard Halprin-CVRichard Halprin-CV
Richard Halprin-CV
 
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
Strategic Advancement in Turbulent Environment thru Organizational Project Ma...
 
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project ManagementMacrosolutions Consulting Service: Coaching and Mentoring in Project Management
Macrosolutions Consulting Service: Coaching and Mentoring in Project Management
 
Macrosolutions Consulting Service: Communication, Management and Recovery Pla...
Macrosolutions Consulting Service: Communication, Management and Recovery Pla...Macrosolutions Consulting Service: Communication, Management and Recovery Pla...
Macrosolutions Consulting Service: Communication, Management and Recovery Pla...
 
Biju 2008 Pmi Whitepaper
Biju 2008 Pmi WhitepaperBiju 2008 Pmi Whitepaper
Biju 2008 Pmi Whitepaper
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...Macrosolutions Consulting Service: Projects accelerated planning through the ...
Macrosolutions Consulting Service: Projects accelerated planning through the ...
 
Tynan Group Qualifications
Tynan Group QualificationsTynan Group Qualifications
Tynan Group Qualifications
 
Primavera Project Management
Primavera Project ManagementPrimavera Project Management
Primavera Project Management
 
Intelligent Transport Systems
Intelligent Transport SystemsIntelligent Transport Systems
Intelligent Transport Systems
 
Redrock Communications
Redrock CommunicationsRedrock Communications
Redrock Communications
 
Ziyad CV
Ziyad CVZiyad CV
Ziyad CV
 

Ähnlich wie ORCAS Introduction

Primavera.PLAN_AND _EXCUTE EASILY_ 070808
Primavera.PLAN_AND _EXCUTE EASILY_ 070808Primavera.PLAN_AND _EXCUTE EASILY_ 070808
Primavera.PLAN_AND _EXCUTE EASILY_ 070808Alla Buzynarska
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordablyp6academy
 
SaM Brochure
SaM BrochureSaM Brochure
SaM BrochurealesiaSh
 
SaM Brochure
SaM BrochureSaM Brochure
SaM BrochurealesiaSh
 
Application & Convergence
Application & ConvergenceApplication & Convergence
Application & Convergencefmalaing
 
Real Estate Solutions Services
Real Estate Solutions ServicesReal Estate Solutions Services
Real Estate Solutions ServicesManeer
 
Debra Lewis Kugler Resume March 2009
Debra Lewis Kugler Resume March 2009Debra Lewis Kugler Resume March 2009
Debra Lewis Kugler Resume March 2009drlk698
 
Xanadu Company Profile
Xanadu Company ProfileXanadu Company Profile
Xanadu Company Profilearnab74
 
Maconomy Management It Consulting Brochure
Maconomy Management It Consulting BrochureMaconomy Management It Consulting Brochure
Maconomy Management It Consulting Brochurejanbultinck
 
DELTEK Maconomy IT Consulting Brochure
DELTEK Maconomy IT Consulting BrochureDELTEK Maconomy IT Consulting Brochure
DELTEK Maconomy IT Consulting BrochureJan Bultinck
 
Jrd Project Management Services
Jrd Project Management ServicesJrd Project Management Services
Jrd Project Management Servicestiglesias
 
ePartners Overview
ePartners OverviewePartners Overview
ePartners Overviewjstango71
 
McKesson Accelerated Services
McKesson Accelerated ServicesMcKesson Accelerated Services
McKesson Accelerated ServicesMangeserve
 
Mission Critical Enterprise Solutions
Mission  Critical Enterprise SolutionsMission  Critical Enterprise Solutions
Mission Critical Enterprise SolutionsRazorbackbob
 
Project Management Solutions
Project Management SolutionsProject Management Solutions
Project Management SolutionsRCM Technologies
 

Ähnlich wie ORCAS Introduction (20)

Siemens plm-key ox-industrial-design-cs-z5
Siemens plm-key ox-industrial-design-cs-z5Siemens plm-key ox-industrial-design-cs-z5
Siemens plm-key ox-industrial-design-cs-z5
 
Primavera.PLAN_AND _EXCUTE EASILY_ 070808
Primavera.PLAN_AND _EXCUTE EASILY_ 070808Primavera.PLAN_AND _EXCUTE EASILY_ 070808
Primavera.PLAN_AND _EXCUTE EASILY_ 070808
 
Plan and Execute the Right Projects— Easily and Affordably
Plan and Execute the Right Projects—  Easily and AffordablyPlan and Execute the Right Projects—  Easily and Affordably
Plan and Execute the Right Projects— Easily and Affordably
 
SaM Brochure
SaM BrochureSaM Brochure
SaM Brochure
 
SaM Brochure
SaM BrochureSaM Brochure
SaM Brochure
 
Application & Convergence
Application & ConvergenceApplication & Convergence
Application & Convergence
 
Epm 2010
Epm 2010Epm 2010
Epm 2010
 
Real Estate Solutions Services
Real Estate Solutions ServicesReal Estate Solutions Services
Real Estate Solutions Services
 
Debra Lewis Kugler Resume March 2009
Debra Lewis Kugler Resume March 2009Debra Lewis Kugler Resume March 2009
Debra Lewis Kugler Resume March 2009
 
Xanadu Company Profile
Xanadu Company ProfileXanadu Company Profile
Xanadu Company Profile
 
Engineering Risk Audit
Engineering Risk AuditEngineering Risk Audit
Engineering Risk Audit
 
Maconomy Management It Consulting Brochure
Maconomy Management It Consulting BrochureMaconomy Management It Consulting Brochure
Maconomy Management It Consulting Brochure
 
DELTEK Maconomy IT Consulting Brochure
DELTEK Maconomy IT Consulting BrochureDELTEK Maconomy IT Consulting Brochure
DELTEK Maconomy IT Consulting Brochure
 
Jrd Project Management Services
Jrd Project Management ServicesJrd Project Management Services
Jrd Project Management Services
 
TenXLabs Brochure
TenXLabs BrochureTenXLabs Brochure
TenXLabs Brochure
 
ePartners Overview
ePartners OverviewePartners Overview
ePartners Overview
 
McKesson Accelerated Services
McKesson Accelerated ServicesMcKesson Accelerated Services
McKesson Accelerated Services
 
Mission Critical Enterprise Solutions
Mission  Critical Enterprise SolutionsMission  Critical Enterprise Solutions
Mission Critical Enterprise Solutions
 
Project Management Solutions
Project Management SolutionsProject Management Solutions
Project Management Solutions
 
RamanaShankar 2 -2015
RamanaShankar 2 -2015RamanaShankar 2 -2015
RamanaShankar 2 -2015
 

Kürzlich hochgeladen

Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skillskristinalimarenko7
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdffillmonipdc
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 

Kürzlich hochgeladen (18)

Motivational theories an leadership skills
Motivational theories an leadership skillsMotivational theories an leadership skills
Motivational theories an leadership skills
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
Management and managerial skills training manual.pdf
Management and managerial skills training manual.pdfManagement and managerial skills training manual.pdf
Management and managerial skills training manual.pdf
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 

ORCAS Introduction

  • 1. O U R Q UA L I F I C AT I O N P RO F I L E P ROJECT, P ROGRAM, ENTERPRISE SOLUTIONS AND www.orcasnetwork.com
  • 2. What we do ... We deliver successful projects through Project Controls solutions and Collaborative solutions. Project Controls Solutions To Support Companies The right project controls make projects run smoothly. ORCAS provides ORCAS improves the control of complex projects, programs, and valuable services that leverage our field-based knowledge and areas of operations by performing key functions: expertise. Since all of our projects are complex with critical time-to-market demands, we work closely with clients from day one to ensure the right, ◊ ◊ Project Planning Resource Analysis customized plan is securely in place. Then, we coordinate project controls ◊ ◊ CPM Scheduling Risk Management solutions across all key departments so that everyone throughout the ◊ ◊ Contracts Management Earned-value Analysis ◊ ◊ enterprise is quot;on the same page.quot; Cost Control Issues Management ◊ ◊ Productivity Analysis Claims Analysis/Mitigation ◊ ◊ Change Management Document Control For Critical Projects All our projects and programs share a common theme: ORCAS excels on large, complex projects where time-to-market pressures are intense and risk is Collaborative Solutions high. Although the industries may vary, the project profile remains the same: The establishment and implementation of systems and proper Complex and Critical ◊ technological support tools are critical components of successful project Significant $ Value ◊ management. ORCAS designs, configures and implements project Time to Market Pressure ◊ management software specifically suited to your needs; some are simple High Risk and some are complex. The most effective system optimizes the ◊ processes, the people, and the technology. ORCAS believes in finding the right tools to fit your specific needs. They utilize a incremental roll-out of technology to address critical needs, minimize impact of change, and grows with the team.
  • 3. Why does ORCAS exist? How Does ORCAS Do It? People Real Project Benefits With ORCAS on your team, you can improve all planning, execution, and ORCAS brings only the right people to support you. We augment your evaluation phases of your project. You will have more clarity and existing team with qualified experts to focus on specific project areas and fill confidence in the management decisions you make. And you will obtain specialized skill sets, or we deliver a complete project controls team. Over many more benefits using ORCAS as a resource on your next project. the years, ORCAS has worked with a full circle of project team contributors, including designers, contractors, construction managers and turnkey system providers. Who better to have on your team than someone who fully understands every side of the game? Optimum Cost Control ◊ Technology Tool Box Early Identification of Problems ◊ Reduced Risk of Claims and Disputes ◊ ORCAS incorporates only the most appropriate Proactive Issue Resolution ◊ technological tools and systems in developing Improved Communication ◊ successful project controls management solutions, Reduced Change Orders from the best software for your particular needs ◊ to unique hosting and delivery options. Improved Project Analysis and Forecasts ◊ Improved Decision Making Capabilities ◊ Effective and Efficient Use of Project Resources ◊ Objectivity Third Party Objectivity and Assessment ◊ ORCAS brings third-party objectivity to every project. Company owners, Enterprise-wide Standards and Solutions ◊ presidents and CEOs are increasingly mandating high levels of accountability Improved Project Delivery ◊ and objectivity on their projects. With the introduction of the Sarbanes-Oxley Act, and an increase in corporate initiatives to improve project visibility, there is even more pressure to create and enact stringent quot;checks-and-balancesquot; systems. Whether reviewing contractor plans, analyzing productivity, or bringing enterprise-wide visibility to organizations, ORCAS delivers critical experience and insight.
  • 4. Why does ORCAS exist? Project Success Creates Business Success A “Pretty Picture” Never Built a Project Real project control is more than hanging a Gantt Chart on your With the increasing pressure for successful projects, owners have asked manager’s wall. Effective control is about planning, risk management, ORCAS to standardize their project management processes, procedures, realistic resource planning, and profit optimization. It is a continuous and systems across the enterprise. ORCAS clients now have an process that starts with the bid and ends when the jobsite trailers leave integrated system to control, optimize, and collaborate on all projects in the site. the enterprise. 600 Contractor 6 Seismic Optimize the Project Team 500 Cleanroom Contractor 5 Resource 400 Num ber of Men Do you want your project manager working the details of a two-week Process Contractor 4 300 Analysis look-ahead schedule or focusing on large-scale opportunities and risks? Electrical Contractor 3 200 On fast-track projects, ORCAS can add just the right resource to your 100 Mech, Dry Contractor 2 team so you can focus on the big picture. 0 Nov Dec 7 Dec Dec Dec Jan 4 Jan Jan Jan Feb 1 Feb 8 Feb Feb Mar 1 Mech, Wet Contractor 1 30 14 21 28 11 18 25 15 22 Week Ending Trust Goes a Long Way Industry leaders trust ORCAS with their confidential cost, resource, Schedule profitability, and risk information. We take the confidence they place in us very seriously. It is through this high level of trust that ORCAS thrives Analysis and is able to work with a variety of companies. and Turnaround Plan
  • 5. Our Path of Successes Project Control Pays: $560 Million The $2 Million Report At one of the leading semiconductor manufacturers, ORCAS implemented ORCAS was recently commissioned to create a one-page report depicting an enterprise-based project management system. A great deal was at the basic relationship between construction, commissioning and validation stake for this this project and company; if they weren’t successful their for a scaled-up biotechnology project. According to the Executive Vice operations could move oversees. They did not only deliver their first tool President, this report alone was worth the $2 million budgeted for the ramp on-time, they were EARLY! Due to the tools ORCAS implemented, entire project controls initiative. Next step: to present the report to the the team successfully delivered the project 8 weeks early. Since each Board of Directors. day of production is worth $10 Million in revenue, this equates to $560 Secretary’s Project Management Awarded Million. Project Control does pay! The Terascale Simulation Facility (TSF) project won the Secretary's Project Facility of the Year Award Management Award of Achievement. This large construction project provided power and space to accommodate two simultaneous 100- The new Genentech facility (NIMO) in Oceanside, CA received this teraOPs-class computer systems operations. TSF became the home for prestigious award sponsored by ISPE, INTERPHEX and Pharmaceutical next-generation supercomputers. ORCAS represented Lawrence Processing magazine. The Facility of the Year Awards (FOYA) competition Livermore National Laboratory in scheduling and project controls. Our recognizes state-of-the-art pharmaceutical manufacturing projects that team also supported the Lab’s project controls team in achieving EVMS utilize new and innovative technologies to enhance the delivery of a Certification. quality project, as well as reduce the cost of producing high quality medicines. The NIMO project team quot;delivered the base project on time World’s Largest Laser Facility and under budget.quot; ORCAS managed the master construction schedule for this successful project. The National Ignition Facility (NIF) is a 192-beam laser facility the size of Constructech Vision Award a sports stadium. The system is so powerful it produces 1000 times the electrical generating power of the United States. ORCAS supported a ORCAS received the Vision Award as a technology enabler to MannKind variety of companies to control and manage the complex schedule on this Corporation for their successful capital project in the Industrial / Mfg. $3.4 billion project, including contractors representing the disciplines of category. ORCAS supported MannKind Corporation by implementing an process-piping, beam path and steel installation, electrical and general enterprise-based project management solution based on Primavera as construction. well as performing project controls for their successful $250M+ Project.
  • 6. Ongoing Projects ExxonMobil Valero FMI Torrance, CA Benecia, CA Phoenix, AZ ORCAS provides support in the creation and Our team supports the $1 Billion Program at this site, The Tenke Fungurume Mine Project in Africa entails the administration of a detailed schedule for the which comprises of several small projects. ORCAS is development, construction and operation of a copper/ construction of the world’s largest Electrostatic primarily responsible for scheduling one of the cobalt mine. This is a significant size project, estimated at precipitator built. This impressive project consisted on specific projects. $1Billion. the construction of 2 modular ESP units measuring a Orcas performed an assessment on the schedule to total of 175 ft long x 85 feet wide and 135 feet tall. In addition, ORCAS offers technical support to the determine if there were any areas of opportunity for scheduling team and manager for data exchange improvement. Our assessment and recommendations ORCAS assists Jacobs Engineering in the development and integration, schedule structure. covered the following: of “what-if” scenarios to reduce the projected ♦ Schedule Structure and Architecture completion date of the project, as well as make ♦ Schedule Processes and Procedures recommendations to bring it back into the required Renewable Energy Corp. (REC) ♦ schedule by ExxonMobil. Schedule Components Moses Lake, WA ♦ Schedule Reporting The development of critical paths and a fully The REC Moses Lake facility produces solar-grade integrated schedule allowed the companies to polysilicon for use in solar panels and devices. 20% analyze different approaches to complete the to 25% of the solar cells in the world are produced Amgen project. by REC’ polysilicon. The new facility in Moses Lake is Fremont, CA estimated at $600 Million. Amgen is performing two significant shutdowns. We are ORCAS also assisted in the development of the Orcas provides project controls services to support the supporting two specialty contractors, Therma and Kinetics, Turnaround portion of the project to be able to construction effort. The services we provide include to schedule and monitor all process system, piping, and connect the ESP to the FCC in a duration of 28 days the following: HVAC work activities. and be able to start the unit on time. ♦ Cost Control ♦ Productivity Management Our team works closely with Fluor to ensure these high Conoco-Philips exposure scopes are successful and the shutdown plans ♦ Document Control Rodeo, CA meet the business needs of Amgen. Wyeth The capital project is a $300M Hydrogen Plant for Conoco-Philips. Air Liquide is the turnkey provider Collegeville, PA Bayer and is contracting all the construction work. Air Liq- Berkeley, CA ORCAS is implementing a portfolio-based scheduling uide is the largest supplier of gas in the world. system for this owner As part of Enterprise Solutions, ORCAS supports the owner on developing the integrated ORCAS has supported this organization for more than our team is delivering the following as part of this project schedule for this multi-year program. The team 10 years in providing project controls services. implementation: works closely with each department of this organization ♦ Design as well as the external general contractor, service ORCAS supports Air Liquide on several aspects of organizations, and consultants. ♦ project controls; ORCAS represents Air Liquide on the Implement integrated schedule, some cost, and project admini- ♦ Train In addition, ORCAS is working with Bayer to evaluate the stration support as it relates to document control, RFI benefits of implementing a “Collaborative Scheduling ♦ management, and general project support. Roll-out Solution.” This system will increase the visibility of all Portfolio Schedule Systems are used to successfully project team members, provide one focal point for the schedule, and empower non schedulers to participate in manage multiple projects across different project the schedule process. portfolios.
  • 7. Past Projects Lawrence Livermore National Lab MannKind Corporation BioMarin NIF Project, Livermore, CA Danbury, CT Novato, CA ORCAS provided project controls services for the Mannkind is a biopharmaceutical company focused on BioMarin is executing several key projects during their National Ignition Facility (NIF) Project. NIF is the the discovery, development and commercialization of shutdown. These projects require detailed planning largest laser in the world. This 192-beam laser therapeutic products for diseases such as diabetes and scheduling to coordinate the activities of all facility is the size of a sports stadium and the system and cancer. trades. is so powerful it produces 1000 times the electrical Orcas provides both project controls solutions and Orcas directly supports the construction manager for generating power of the United States. project management enterprise solutions to this this critical project. The scopes covered in this Our services directly supported the process-piping dynamic company. Our team has implemented a shutdown schedule include architectural, process, contractor, beampath and steel installation contractor, Primavera-based scheduling solution as well as electrical, instrumentation & control, and mechanical. electrical contractor, and the general contractor for project cost management system. several phases of the NIF Project. ORCAS provided The “real” integrated schedule ties together all the following services for this dynamic project: departments, from procurement to construction & ♦ Schedule Development facilities, to regulatory. Our team also supports the NOVO Nordisk Delivery Technologies hands-on scheduling role to support the project team, ♦ Schedule Progress and Updates Hayward, CA as well as providing estimating and general project ♦ Resource Analysis management support. NNDT is a world leader in diabetes care. Orcas is providing their critical inhaled insulin (IS) project with ♦ Invoice Management turnkey project controls solutions. Our Team provides ♦ Change Proposals the following services to help keep this project on Air Liquide America schedule and on budget: ♦ Project Management Coordination ♦ Planning and Schedule Management Rodeo, CA ♦ Cost Control Coordination ♦ Air Liquide is the largest supplier of gas in the world. Cost Control ORCAS has supported this organization for more than ♦ Document Control 10 years in providing project controls services. Skyworks Solutions ♦ Project Management System Deployment Newbury Park, CA The current project is a $300M Hydrogen Plant. Air ♦ Project Administration Liquide is the turnkey provider and is contracting all Skyworks is an industry leader in radio solutions and the construction work. ORCAS represents Air Liquide precision analog semiconductors servicing a diversified on the integrated schedule, some cost, and project set of mobile communications customers. Texas Instruments administration support as it relates to document con- Orcas was asked to return to this facility and support trol, RFI management, and general project support. New Fab Project, Richardson, TX their critical project: 4” to 6” Conversion Project. Our role is to support the three major phases, 1. Process ORCAS provides master scheduling, cost support, change Development, 2. Process Qualification, and 3. Facility management, and document control services to support Lucile Packard Children’s Hospital Conversion. Our team will manage the overall master the construction of all bulk gas, specialty gas, and schedule, which encompasses all department activities to Systems Implementation Project, Palo Alto, CA chemical distribution systems for this multi-year $3 Billion ensure the entire project team is on the same page. Project. ORCAS provides technical services for a major hospital Skyworks has also requested assistance in project Our services provide all facets of systems engineering. system implementation. This multi-year project includes all management to facilitate the success of the process infrastructure upgrades, software, and hardware. development and process qualification phases. ORCAS is providing all facets of systems engineering.
  • 8. Past Projects Lawrence Livermore National Lab NEC Electronics Amgen TSF Project, Livermore, CA Various Projects, Roseville, CA Global LIMS Project, Boulder, CO The Terascale Simulation Facility (TSF) is being ORCAS has supported the NEC facility since 1991. The constructed to provide power and space to original charter was to assist the construction management ORCAS provides consulting services to the Information accommodate two simultaneous 100-teraOPs-class team with installing more than 1,000 pieces of Technology Project Team. We support the project computer systems' operations. TSF will become the manufacturing equipment. We provided the scheduling with the following services: home for next-generation supercomputers. and progressing support, managed issues tracking Our services directly support the LLNL Management systems, and developed budgets for the seven main Team, and include the following: subcontractors. ♦ Conduct Constructability Reviews Our services have extended to directly benefit the owner. Over the years we have supported several departments ♦ Coordinate Project Master Schedule including Equipment Engineering, Facilities, Line ♦ Maintenance, Manufacturing Engineering, Production, Develop Earned-value Cost Reporting Infineon Technologies Process Engineering, and Line Maintenance. Services for Richmond, VA ♦ Provide Monthly Progress Assessments the owner have included: ORCAS is supporting the Owner to self-manage their ♦ ♦ 300mm Facility Design Support Provide Claims Avoidance Review and Analysis $1 Billion dollar project. The project includes a base ♦ ♦ Assist with Change Order Review and Analysis Equipment Layout Management building portion to finish out the construction of all mechanical, electrical, and architectural systems. It ♦ ♦ Prepare Monthly Reports to DOE Usage Analysis of Facility Utilities also includes the tool hookup portion to install all ♦ ♦ Coordinate Activation and Commissioning Issues Equipment Performance Analysis manufacturing process equipment. Our team developed the project management ♦ Production Scheduling and Analysis processes and procedures, implemented enterprise- Stanford Hospital and Clinics ♦ Manufacturing Engineering Support wide project tools, and support in all aspects of Various Projects, Palo Alto, CA project control. Specifically, we are providing the ♦ Materials Requirements Planning (MRP) System following services to this fast-track manufacturing ORCAS supports a variety of key information ♦ Project Controls Support Services project: technology projects at Stanford. These projects range ♦ Process and Procedure Development from security to wireless implementations. Utilizing our expertise in project controls, the team is ♦ Planning and Scheduling Aviron successfully delivering the following projects: General Philadelphia, PA ♦ Computer Infrastructure Remediation, HIPAA Security Enterprise-wide Project System Improvements, Wireless Network Design through ORCAS developed a Cost Control System for ♦ Training and Support Implementation, IT Change Management Project. Aviron’s Engineering Corporate Services ♦ Integrated Project Scheduling Department. This system improves control via establishing standards, implementing procedures, ♦ Cost Control and Reporting and providing a database tool for managing cost ♦ Change Management information. The system includes invoice management, project With the enterprise-wide project systems and progressing, standardized Requests for Information, integrated schedules, this owner has gained an forecasting methods, and management reporting. unprecedented level of project control and visibility. These tools enable them to be proactive and correct problems early in order to keep the project on-track.
  • 9. Past Projects Wyeth BioPharma TriQuint Semiconductor ST Microelectronics St. Louis, MO Hillsborough, OR Phoenix, AZ ORCAS assisted TriQuint to develop a standardized Cost ORCAS provided support to two major players on the This is state-of-the-art biopharmaceutical manufacturing facility is poised to make a significant contribution towards Control System. This system provides standard methods project; the process piping contractor and turnkey the treatment of hemophilia A. The advanced 115,000 and procedures in the following areas: bulk gas supplier. square foot biopharmaceutical campus is undergoing a ♦ Request for Proposal to Contractors The team developed and progressed schedules, as significant expansion. ORCAS supported the Construction well as managed project issues for the equipment ♦ Manager with planning, scheduling review, analysis, and Contractor Price Evaluation installation project. The Master Project Schedule inte- development. ♦ grated the activities of project so issues were identi- Contractor Selection fied and resolved early. Specifically, our team prepared a critical shut-down ♦ Contractor Invoice Review schedule for the facility, facilitated the compilation of ♦ executive reports, reviewed and analyzed construction Lawrence Livermore National Lab Cost Analysis and Forecast schedules and assisted training of new project management NIF Project, Livermore, CA personnel. With the first phase of system design completed, the next ORCAS provided project controls services for the phase will expand into a fully integrated database National Ignition Facility (NIF) Project. NIF is the Baxter Hyland system which shares information with TriQuint’s largest laser in the world. This 192-beam laser Glendale, CA established purchasing and financial systems. facility is the size of a sports stadium and the system is so powerful it produces 1000 times the electrical ORCAS developed the plans for the process piping generating power of the United States. work on this Blood Fractionation Project. The team Our services directly supported the process-piping assisted the contractor with the following: Schering-Plough contractor, beampath and steel installation contractor, ♦ Schedule Development Mexico City electrical contractor, and the general contractor for ♦ Progressing and Analysis several phases of the NIF Project. ORCAS provided Orcas developed the baseline schedule for the process- the following services for this dynamic project: ♦ piping contractor on the purified water system “green Claims Avoidance ♦ Schedule Development field” project. This schedule was used for resource plan- ning and management. ♦ Schedule Progress and Updates ♦ Resource Analysis Leading Edge Semiconductor Company ♦ Invoice Management National Semiconductor Boise, ID Portland, ME ♦ Change Proposals ORCAS supported Air Liquide America on the Base Build Orcas developed the base-line fit-up and hook-up sched- ♦ scope of work at a new Photo Mask Facility by providing Project Management Coordination ules for the process piping contractor at Building 18. All the following services: ♦ Cost Control Coordination schedules were fully resource and cost loaded. Progress ♦ Scheduling Services reports were developed on a weekly basis to provide Digital Equipment Corporation (DEC) ♦ Issues Management status to the general contractor regarding materials, fab- Hudson, MA rication, installation, and testing. ♦ Cost Control and Change Management Orcas supported the mechanical contractor on their We also implemented our Labor Tracking System to track ♦ Project Reporting and Customer Feedback equipment installation project for FAB 6. Our primary all labor costs associated with tool hook-up. Payroll and role was to develop and progress schedules, in addi- Surveys billing were automatically generated as a result of the on tion to tracking project issues. -site labor tracking system. ♦ Final Project Compilation Report We also set-up systems to automate the extraction of facility requirements from the design drawings for use in facilities planning and management. The design group requested our assistance in this effort.
  • 10. Past Projects Lawrence Livermore National Lab WhiteOak Semiconductor Amgen Bldg. 155 Seismic Upgrade, Livermore, CA Richmond, VA Helix Project, Seattle, WA ORCAS provides claims analysis services to the ORCAS developed the baseline schedules for several University of California for the Seismic Upgrade base building sub-projects including the Fab, IWT, Cub, ORCAS provides project analysis services to a Project of Building 155, a two story building housing Glegg Systems, Slurry, and Specialty Gases. mechanical contractor on the Helix Project, a $650 chemical research laboratories and offices. Seismic We customized our Labor Tracking and Material Tracking million research and development campus on Elliot strengthening of Building 155 will occur on both the Systems to effectively monitor these base construction Bay in Seattle, WA. The analysis effort focuses on exterior and interior of the building. The structural projects. reviewing the schedule plans, documenting the key scope of work includes all work required to upgrade To improve document control, we developed a system to issues and delays, and representing how each of the the performance of the building in a PC-2 basic track project drawings. All project issues and RFI’s were delays impacts the contractor’s schedule performance. earthquake. entered, managed, and reported using our Issues Various types of delay impacts are reviewed, Our services directly support the LLNL Management Tracking System. including design changes, constructability issues, and Team, and include the following: owner directed changes. The delay impacts are ♦ Detailed Reviews of Project LSI Logic analyzed to quantify the resulting effects and inefficiencies in design, detailing, and field Greshem, OR ♦ Assessment of Delay Claims made by Contractor ORCAS developed system and service databases to ♦ Development of the “True” Critical Path Schedule identify scope, resources, and linear footage for the ♦ Recommendation to Disapprove/Approve process piping systems. Conexant We generated a schedule template to be utilized for Contractor’s Claims Newport Beach, CA scheduling each of the services in addition to performing resource analysis for the design efforts of the process ORCAS has supported Conexant on tool hook-up piping contractor. TriQuint Semiconductor projects since 1995. Our services over the years have Richardson, TX expanded to include a variety of facilities-related projects, including seismic, emergency generator Lawrence Livermore National Lab ORCAS managed all project controls for Air Liquide upgrades, and other major system and building America on Phase 1 of the Oregon Tool Set. ORCAS Bldg. 151 Seismic Upgrade, Livermore, CA modifications. contributed in all phases of the project to assist in ORCAS provides project controls services for the Seismic Our team supports the owner with a variety of planning, control, and close-out. The following ser- Upgrade of Building 151, a two story building housing services, including the following. vices were provided: research laboratories and offices. Seismic strengthening ♦ Project Website ♦ Request for Proposal Preparation of Building 151 will occur on both the exterior and ♦ Schedule Development and Management interior of the building. The structural scope of work ♦ Contractor Bid Evaluation includes all work required to upgrade the performance of ♦ Issues Tracking ♦ Invoice Management the building in a PC-2 basic earthquake. ♦ Project Reporting ♦ Our services directly support the LLNL Management Issues Management Team, and include the following: ♦ Develop and Maintain Project Databases ♦ Change Order Management ♦ Schedule Progress and Updates ♦ Developed Document and Drawing System ♦ Schedule Management ♦ Resource Analysis ♦ Customer Satisfaction Surveys and Analysis ♦ Cost Analysis and Forecasts ♦ Claims Avoidance ORCAS also supported the process-piping contractor ♦ Executive Project Summaries in managing schedules, tracking labor and materials, ♦ Protocol Specification Development and project issues. ♦ Final Report and Analysis
  • 11. Other things to know about us ... Professional Certifications How to find us? ORCAS team members maintain certifications in project management organizations, Our office is the job-site. The projects take us to cost management, and leading project technology. We are committed to the locations throughout the United States. For information advancement and use of project controls to make projects more successful. about our project sites, contact us. Industry Associations On the telephone ORCAS is actively involved in the industries associations we support. We are proud Bert Rangel, Project Development participants of ISPE and SEMI organizations. Our team contributes to association 800.422.6722 x133 events, seminars, and training programs. brangel@orcasnetwork.com Certified DBE and SWBE On the world wide web At the request of our government clients, ORCAS obtained certifications to formalize www.orcasnetwork.com our status as a woman-owned business. ORCAS is certified with the U.S. Small Business Administration as an 8(a) DBE business. We are also certified with the State of California as a SWBE. Via email Questions or Requests: info@orcasnetwork.com By postal service ORCAS Project Controls 11048 Coast Highway One P.O. Box 133 Jenner, CA 95450-0133