SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
OPEX in CPG
Manufacturing
A BearingPoint Accelerator
BearingPoint’s operational excellence approach in CPG Manufacturing
primarily aims to reduce costs in production and to support clients in
their transformation journey. Our operational excellence approach
contributes to the creation of a culture of continuous improvements in
factories.
Contents
Market Drivers
Our Approach
Client Benefits
References
Contact
OPEX in CPG Manufacturing | A BearingPoint Accelerator
OPEX in CPG Manufacturing | A BearingPoint Accelerator
In today’s globalized market, manufacturing companies in the consumer packaged goods (CPG) industry experience
increased competitiveness and price pressure, which force them to focus on cost cutting initiatives in production and
the supply chain set-up.
Market Drivers
• Due to the competitive landscape,
CPG companies are required to focus on
continuous efficiency improvements in order
to minimize their cost base
• In order to stay profitable and reach EBIT
targets, factories need to utilize their full
capacity when it comes to machinery,
input material, and personnel
• In the CPG industry, acquisitions and
volume consolidations are necessary
in order to stay competitive
• However, due to a large degree of
uncertainty it is more of a norm than an
exception that companies miscalculate
expected impact and the effects of these
events, why it is important to secure the
variables that are possible to control –
such as production capabilities
• Customers demand a greater variety of
products while simultaneously altering
trends give rise to fluctuations in volumes
• This requires factories to manage volume
variety and adapt both machinery and
processes to enable efficient delivery of
small batches
Profitability Need for flexibilityUncertainty
OPEX in CPG Manufacturing | A BearingPoint Accelerator
Our approach centers around the BearingPoint Operational Excellence framework, which covers the three main
dimensions: core operations, management control systems, and culture.
While planning and maintenance are
crucial enablers for efficient production,
it is within the production elements where
the main part of the financial potential lies
The Core operations analysis seeks to improve
production related activities focusing on labor
productivity, machine OEE and yield, while
securing optimized production & workforce
planning and increasing the proactive focus
in the maintenance department
Core operations
Ensure an efficient flow of information
and an optimized organizational structure
for quick actions and improvement work
Analysis of the organizational structure including
span of control, roles and responsibilities as well as
performance management and meeting structure
Management control systems
The cultural dimension aims to improve the
organizational mindset and behavior to support
the continuous improvement capabilities
In this dimension, we’re looking at leadership
capabilities, corporate structures and competence
development, as well as environment, health and
safety (EHS) culture
Culture
Management control systems
Culture
Production
M
aintenanc
e
Planning
OPEX in CPG Manufacturing | A BearingPoint Accelerator
Improvement actions are developed in close collaboration with the client within each of the dimensions, and lays the
foundation for the improvement work.
• Set the project
foundation: establish
the business case,
define the project
mandate and
stakeholders
• Solution design of the core operation elements
• Planning process analysis to minimize planning
related costs with maximum flexibility
• Maintenance work order processes analysis
• Development of
implementation plans
• Detailed estimations of
potential Investments
• Secure and plan
resources
• Quick wins
• Implementation
activities conducted
• Define follow-up
metrics
• Fine tune and standardize
new ways of working
• Follow-up up on defined
metrics to secure sustainable
improvements
• Pre-analysis: data
gathering, management
interviews and
employee survey
• Analysis preparation:
set up war room,
establish hypothesis
and plan analysis
activities
• Established baseline
• Initial hypothesis &
analysis activity plan
Core operations
Mobilize
1-2 weeks
Analyze & Design
4-5 weeks
Plan
1-2 weeks
Implement
~ 20 weeks
Follow-up
12 weeks
• Design of organizational setup, effective
meeting structures and control system
• Secure metrics and
plan organizational
change
• Preparations for a
new meeting structure
• Implement org.
change and control
system
• Daily coaching in
meeting execution
• Follow-up on overall reporting
and meeting adherence
Management Control Systems
• Design future ways of working for leadership
and structure enabling as well as favoring CI
culture
• Improvement areas with calculated savings
• Future state design supporting CI and
operational excellence targets in all areas
• Plan activities for an
improved CI culture
• Tactical implementation
plans for each work
stream
• Management
coaching in CI
and safety culture
• Sustainable OPEX
design in place
• Quick wins realized
• Secure continuous
improvement culture
• Goal fulfillment through
implementation follow-up
Culture
Deliverables
> > > >
OPEX in CPG Manufacturing | A BearingPoint Accelerator
Our approach not only improves profitability and production agility, but also enhances the organization, its leadership
and the control systems to enable a continuous improvement culture.
Culture
Even though the easy-to-measure and direct effects, such as increased profitability, stability and flexibility are some very
pleasant results to be expected from an operational excellence project, the cultural improvement should be considered as
one of the major benefits. Expect an organization with positivism and pride in what they do while your EHS KPIs improve.
Expect an organization ready for continuous improvement delivering on the YoY savings target for the coming decade.
• From previous experience BearingPoint
estimates an average reduction in
conversion cost ranging between 10-15%
• Also, an EBIT improvement of around
5-10% is to be expected
• Reduced variability in production efficiency
gives more accurate capacity estimations
and thus reduces planning complexity and
provides less risk when consolidating volumes
• Efficient planning and optimized
changeover routines allow for increased
product complexity without losing valuable
production time or building up stock
Improved Profitability Increased FlexibilityStability and Predictability
OPEX in CPG Manufacturing | A BearingPoint Accelerator
Leading global food & beverage company
The client initiated a comprehensive program with an ambitious
cost-out target addressing several factories. BearingPoint was
engaged as a partner where several operational excellence projects
within food & beverage, home & personal care, and confectionery and
snacks was conducted.
BearingPoint helped the client to reduce conversion costs in the
production of goods by standardizing processes to optimize the use of
the workforce, maximizing machine utilization, and building
capabilities that drive continuous improvement. BearingPoint
supported the initiatives with its hands-on approach and analytical
and functional experience.
Leading dairy producer
The client was challenged by decreasing milk consumption volumes,
increased international competition and high cost-levels. BearingPoint
was chosen to do a full analysis followed by implementation at one of
the dairies. The project included an overall redesign and improvement
of the organization and processes within production, maintenance,
management systems and planning.
References
OPEX in CPG Manufacturing | A BearingPoint Accelerator
Contact
Peter Brente
Partner
BearingPoint Sweden
peter.brente@bearingpoint.com
Linda Helsing
Manager
BearingPoint Sweden
linda.helsing@bearingpoint.com
About BearingPoint
BearingPoint is an independent management and technology consultancy with European
roots and a global reach. The company operates in three units: Consulting, Solutions and
Ventures. Consulting covers the advisory business; Solutions provides the tools for successful
digital transformation, regulatory technology and advanced analytics; Ventures drives the
financing and development of start-ups. BearingPoint’s clients include many of the world’s
leading companies and organizations. The firm has a global consulting network with more
than 10,000 people and supports clients in over 75 countries, engaging with them to
achieve measurable and sustainable success.
For more information, please visit:
Homepage: www.bearingpoint.com
LinkedIn: www.linkedin.com/company/bearingpoint
Twitter: @BearingPoint
© 2019 BearingPoint. All rights reserved

Weitere ähnliche Inhalte

Was ist angesagt?

Business Operational Excellence Strategy PowerPoint Presentation Slides
Business Operational Excellence Strategy PowerPoint Presentation Slides Business Operational Excellence Strategy PowerPoint Presentation Slides
Business Operational Excellence Strategy PowerPoint Presentation Slides SlideTeam
 
Business Process Re-engineering BPR
Business Process Re-engineering BPRBusiness Process Re-engineering BPR
Business Process Re-engineering BPRadcom2015
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...TKMG, Inc.
 
Establishing a Business Process Management Center of Excellence - Impact 2012
Establishing a Business Process Management Center of Excellence  - Impact 2012Establishing a Business Process Management Center of Excellence  - Impact 2012
Establishing a Business Process Management Center of Excellence - Impact 2012Prolifics
 
M. Kaminskas ir A. K. Remeikienė. LEAN projektas: sėkmės istorijos, iššūkiai ...
M. Kaminskas ir A. K. Remeikienė. LEAN projektas: sėkmės istorijos, iššūkiai ...M. Kaminskas ir A. K. Remeikienė. LEAN projektas: sėkmės istorijos, iššūkiai ...
M. Kaminskas ir A. K. Remeikienė. LEAN projektas: sėkmės istorijos, iššūkiai ...Agile Lietuva
 
BPM Center of Excellence
BPM Center of ExcellenceBPM Center of Excellence
BPM Center of ExcellenceSandy Kemsley
 
13 Measuring Sc Performance
13 Measuring Sc Performance13 Measuring Sc Performance
13 Measuring Sc Performancepirama2000
 
Retail Industry Enterprise Architecture Review
Retail Industry Enterprise Architecture ReviewRetail Industry Enterprise Architecture Review
Retail Industry Enterprise Architecture ReviewLakshmana Kattula
 
Scor Model Convergence With Lean & Six Sigma
Scor Model Convergence With Lean & Six SigmaScor Model Convergence With Lean & Six Sigma
Scor Model Convergence With Lean & Six SigmaOssama Ismail
 
Business Focused IT Strategy
Business Focused IT StrategyBusiness Focused IT Strategy
Business Focused IT Strategymuhammadsjameel
 
Mine Your Simulation Model: Automated Discovery of Business Process Simulatio...
Mine Your Simulation Model: Automated Discovery of Business Process Simulatio...Mine Your Simulation Model: Automated Discovery of Business Process Simulatio...
Mine Your Simulation Model: Automated Discovery of Business Process Simulatio...Marlon Dumas
 
Case Study on Driving Procure to Pay (Purchase to Pay) Quick Wins
Case Study on Driving Procure to Pay (Purchase to Pay) Quick WinsCase Study on Driving Procure to Pay (Purchase to Pay) Quick Wins
Case Study on Driving Procure to Pay (Purchase to Pay) Quick WinsChazey Partners
 
Metrics & KPIs. Tips To Setup Your Measurement Initiative Right.
Metrics & KPIs. Tips To Setup Your Measurement Initiative Right.Metrics & KPIs. Tips To Setup Your Measurement Initiative Right.
Metrics & KPIs. Tips To Setup Your Measurement Initiative Right.Michael Tarnowski
 
Solution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachSolution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachJulen Mohanty
 
Sales & Operations Planning Process
Sales & Operations Planning ProcessSales & Operations Planning Process
Sales & Operations Planning ProcessHarshal Badgujar
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringDAVIS THOMAS
 

Was ist angesagt? (20)

Business Operational Excellence Strategy PowerPoint Presentation Slides
Business Operational Excellence Strategy PowerPoint Presentation Slides Business Operational Excellence Strategy PowerPoint Presentation Slides
Business Operational Excellence Strategy PowerPoint Presentation Slides
 
Business Process Re-engineering BPR
Business Process Re-engineering BPRBusiness Process Re-engineering BPR
Business Process Re-engineering BPR
 
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
Value Stream Transformation: Achieving Excellence through Leadership Alignmen...
 
Establishing a Business Process Management Center of Excellence - Impact 2012
Establishing a Business Process Management Center of Excellence  - Impact 2012Establishing a Business Process Management Center of Excellence  - Impact 2012
Establishing a Business Process Management Center of Excellence - Impact 2012
 
M. Kaminskas ir A. K. Remeikienė. LEAN projektas: sėkmės istorijos, iššūkiai ...
M. Kaminskas ir A. K. Remeikienė. LEAN projektas: sėkmės istorijos, iššūkiai ...M. Kaminskas ir A. K. Remeikienė. LEAN projektas: sėkmės istorijos, iššūkiai ...
M. Kaminskas ir A. K. Remeikienė. LEAN projektas: sėkmės istorijos, iššūkiai ...
 
Innovation Driven Procurement
Innovation Driven ProcurementInnovation Driven Procurement
Innovation Driven Procurement
 
BPM Center of Excellence
BPM Center of ExcellenceBPM Center of Excellence
BPM Center of Excellence
 
13 Measuring Sc Performance
13 Measuring Sc Performance13 Measuring Sc Performance
13 Measuring Sc Performance
 
Retail Industry Enterprise Architecture Review
Retail Industry Enterprise Architecture ReviewRetail Industry Enterprise Architecture Review
Retail Industry Enterprise Architecture Review
 
Lean principles
Lean principlesLean principles
Lean principles
 
Scor Model Convergence With Lean & Six Sigma
Scor Model Convergence With Lean & Six SigmaScor Model Convergence With Lean & Six Sigma
Scor Model Convergence With Lean & Six Sigma
 
Business Focused IT Strategy
Business Focused IT StrategyBusiness Focused IT Strategy
Business Focused IT Strategy
 
Mine Your Simulation Model: Automated Discovery of Business Process Simulatio...
Mine Your Simulation Model: Automated Discovery of Business Process Simulatio...Mine Your Simulation Model: Automated Discovery of Business Process Simulatio...
Mine Your Simulation Model: Automated Discovery of Business Process Simulatio...
 
Case Study on Driving Procure to Pay (Purchase to Pay) Quick Wins
Case Study on Driving Procure to Pay (Purchase to Pay) Quick WinsCase Study on Driving Procure to Pay (Purchase to Pay) Quick Wins
Case Study on Driving Procure to Pay (Purchase to Pay) Quick Wins
 
Metrics & KPIs. Tips To Setup Your Measurement Initiative Right.
Metrics & KPIs. Tips To Setup Your Measurement Initiative Right.Metrics & KPIs. Tips To Setup Your Measurement Initiative Right.
Metrics & KPIs. Tips To Setup Your Measurement Initiative Right.
 
Solution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachSolution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical Approach
 
Benchmarking ver01
Benchmarking ver01Benchmarking ver01
Benchmarking ver01
 
Heizer 09
Heizer 09Heizer 09
Heizer 09
 
Sales & Operations Planning Process
Sales & Operations Planning ProcessSales & Operations Planning Process
Sales & Operations Planning Process
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 

Ähnlich wie Opex in Manufacturing

Hall MR12CD Wednesday 09h15 - Sello Mosai
Hall MR12CD Wednesday 09h15 - Sello MosaiHall MR12CD Wednesday 09h15 - Sello Mosai
Hall MR12CD Wednesday 09h15 - Sello Mosai7391456
 
Business Process Excellence: Building Out Business Process Capabilities
Business Process Excellence: Building Out Business Process CapabilitiesBusiness Process Excellence: Building Out Business Process Capabilities
Business Process Excellence: Building Out Business Process CapabilitiesCentric Consulting
 
Lakshya corporate prz
Lakshya corporate przLakshya corporate prz
Lakshya corporate przpradeep sale
 
Planning and Forecasting in Oil & Gas
Planning and Forecasting in Oil & GasPlanning and Forecasting in Oil & Gas
Planning and Forecasting in Oil & GasBearingPoint
 
Enterprise benefit planning
Enterprise benefit planningEnterprise benefit planning
Enterprise benefit planningAndy Parkins
 
Professional Profile Chuck Marks 032515
Professional Profile Chuck Marks 032515Professional Profile Chuck Marks 032515
Professional Profile Chuck Marks 032515Chuck Marks
 
John Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceJohn Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceAlan LeBihan
 
PwC Vietnam - Building advantaged operations - EN
PwC Vietnam - Building advantaged operations - ENPwC Vietnam - Building advantaged operations - EN
PwC Vietnam - Building advantaged operations - ENArnout Berkenbosch
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIAAditi Walia
 
Unlock Success with Essential KPIs for Global Capability Centers (GCCs)!
Unlock Success with Essential KPIs for Global Capability Centers (GCCs)!Unlock Success with Essential KPIs for Global Capability Centers (GCCs)!
Unlock Success with Essential KPIs for Global Capability Centers (GCCs)!Polestar Solutions
 
anuragsaxena_Profile
anuragsaxena_Profileanuragsaxena_Profile
anuragsaxena_ProfileAnurag Saxena
 
Nuclear Promise: Reducing Cost While Improving Performance
Nuclear Promise: Reducing Cost While Improving PerformanceNuclear Promise: Reducing Cost While Improving Performance
Nuclear Promise: Reducing Cost While Improving PerformanceBooz Allen Hamilton
 

Ähnlich wie Opex in Manufacturing (20)

Business Process Reengineering (BPR)
Business Process Reengineering (BPR)Business Process Reengineering (BPR)
Business Process Reengineering (BPR)
 
Resume of saptarshi bhattacharjee
Resume of saptarshi bhattacharjeeResume of saptarshi bhattacharjee
Resume of saptarshi bhattacharjee
 
Hall MR12CD Wednesday 09h15 - Sello Mosai
Hall MR12CD Wednesday 09h15 - Sello MosaiHall MR12CD Wednesday 09h15 - Sello Mosai
Hall MR12CD Wednesday 09h15 - Sello Mosai
 
IntegrtdAppro-GlblSuppChnTrans-Final-v2a
IntegrtdAppro-GlblSuppChnTrans-Final-v2aIntegrtdAppro-GlblSuppChnTrans-Final-v2a
IntegrtdAppro-GlblSuppChnTrans-Final-v2a
 
Business Process Excellence: Building Out Business Process Capabilities
Business Process Excellence: Building Out Business Process CapabilitiesBusiness Process Excellence: Building Out Business Process Capabilities
Business Process Excellence: Building Out Business Process Capabilities
 
Lakshya corporate prz
Lakshya corporate przLakshya corporate prz
Lakshya corporate prz
 
Planning and Forecasting in Oil & Gas
Planning and Forecasting in Oil & GasPlanning and Forecasting in Oil & Gas
Planning and Forecasting in Oil & Gas
 
Enterprise benefit planning
Enterprise benefit planningEnterprise benefit planning
Enterprise benefit planning
 
Professional Profile Chuck Marks 032515
Professional Profile Chuck Marks 032515Professional Profile Chuck Marks 032515
Professional Profile Chuck Marks 032515
 
John Alan LeBihan Success and Experience
John Alan LeBihan Success and ExperienceJohn Alan LeBihan Success and Experience
John Alan LeBihan Success and Experience
 
PwC Vietnam - Building advantaged operations - EN
PwC Vietnam - Building advantaged operations - ENPwC Vietnam - Building advantaged operations - EN
PwC Vietnam - Building advantaged operations - EN
 
Ikea 2
Ikea 2Ikea 2
Ikea 2
 
Business Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIABusiness Process Re-Engineering by ADITI WALIA
Business Process Re-Engineering by ADITI WALIA
 
RMV1
RMV1RMV1
RMV1
 
Rajesh P
Rajesh PRajesh P
Rajesh P
 
Unlock Success with Essential KPIs for Global Capability Centers (GCCs)!
Unlock Success with Essential KPIs for Global Capability Centers (GCCs)!Unlock Success with Essential KPIs for Global Capability Centers (GCCs)!
Unlock Success with Essential KPIs for Global Capability Centers (GCCs)!
 
anuragsaxena_Profile
anuragsaxena_Profileanuragsaxena_Profile
anuragsaxena_Profile
 
ARVINDER_SINGH
ARVINDER_SINGHARVINDER_SINGH
ARVINDER_SINGH
 
GVK- Resume
GVK- ResumeGVK- Resume
GVK- Resume
 
Nuclear Promise: Reducing Cost While Improving Performance
Nuclear Promise: Reducing Cost While Improving PerformanceNuclear Promise: Reducing Cost While Improving Performance
Nuclear Promise: Reducing Cost While Improving Performance
 

Mehr von BearingPoint

Transformation Model for leveraging ARTIFICIAL INTELLIGENCE
Transformation Model for leveraging ARTIFICIAL INTELLIGENCETransformation Model for leveraging ARTIFICIAL INTELLIGENCE
Transformation Model for leveraging ARTIFICIAL INTELLIGENCEBearingPoint
 
Business and Data in motion
Business and Data in motionBusiness and Data in motion
Business and Data in motionBearingPoint
 
SAM Software Asset Management
SAM Software Asset ManagementSAM Software Asset Management
SAM Software Asset ManagementBearingPoint
 
360° B2B Sales Management
360° B2B Sales Management360° B2B Sales Management
360° B2B Sales ManagementBearingPoint
 
Connectivity for IoT
Connectivity for IoTConnectivity for IoT
Connectivity for IoTBearingPoint
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive MaintenanceBearingPoint
 
Service goes digital
Service goes digitalService goes digital
Service goes digitalBearingPoint
 
IT Financial Management
IT Financial ManagementIT Financial Management
IT Financial ManagementBearingPoint
 
Investment Accounting in the Cloud
Investment Accounting in the CloudInvestment Accounting in the Cloud
Investment Accounting in the CloudBearingPoint
 
Investment Data Warehouse
Investment Data WarehouseInvestment Data Warehouse
Investment Data WarehouseBearingPoint
 
CPQ - Configure, Price and Quoting Excellence
CPQ - Configure, Price and Quoting ExcellenceCPQ - Configure, Price and Quoting Excellence
CPQ - Configure, Price and Quoting ExcellenceBearingPoint
 

Mehr von BearingPoint (20)

Transformation Model for leveraging ARTIFICIAL INTELLIGENCE
Transformation Model for leveraging ARTIFICIAL INTELLIGENCETransformation Model for leveraging ARTIFICIAL INTELLIGENCE
Transformation Model for leveraging ARTIFICIAL INTELLIGENCE
 
Business and Data in motion
Business and Data in motionBusiness and Data in motion
Business and Data in motion
 
Visual Analytics
Visual AnalyticsVisual Analytics
Visual Analytics
 
SAM Software Asset Management
SAM Software Asset ManagementSAM Software Asset Management
SAM Software Asset Management
 
360° B2B Sales Management
360° B2B Sales Management360° B2B Sales Management
360° B2B Sales Management
 
Factory Navigator
Factory NavigatorFactory Navigator
Factory Navigator
 
Connectivity for IoT
Connectivity for IoTConnectivity for IoT
Connectivity for IoT
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
Lab Optimizer
Lab OptimizerLab Optimizer
Lab Optimizer
 
Service goes digital
Service goes digitalService goes digital
Service goes digital
 
Digital Workspace
Digital WorkspaceDigital Workspace
Digital Workspace
 
Payment Factory
Payment FactoryPayment Factory
Payment Factory
 
IT Financial Management
IT Financial ManagementIT Financial Management
IT Financial Management
 
Cloud Navigator
Cloud NavigatorCloud Navigator
Cloud Navigator
 
Investment Accounting in the Cloud
Investment Accounting in the CloudInvestment Accounting in the Cloud
Investment Accounting in the Cloud
 
LogCOST
LogCOSTLogCOST
LogCOST
 
Investment Data Warehouse
Investment Data WarehouseInvestment Data Warehouse
Investment Data Warehouse
 
Universal Consor
Universal ConsorUniversal Consor
Universal Consor
 
CPQ - Configure, Price and Quoting Excellence
CPQ - Configure, Price and Quoting ExcellenceCPQ - Configure, Price and Quoting Excellence
CPQ - Configure, Price and Quoting Excellence
 
Lean - ERP
Lean - ERPLean - ERP
Lean - ERP
 

Kürzlich hochgeladen

Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 

Kürzlich hochgeladen (20)

Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 

Opex in Manufacturing

  • 1. OPEX in CPG Manufacturing A BearingPoint Accelerator BearingPoint’s operational excellence approach in CPG Manufacturing primarily aims to reduce costs in production and to support clients in their transformation journey. Our operational excellence approach contributes to the creation of a culture of continuous improvements in factories.
  • 2. Contents Market Drivers Our Approach Client Benefits References Contact OPEX in CPG Manufacturing | A BearingPoint Accelerator
  • 3. OPEX in CPG Manufacturing | A BearingPoint Accelerator In today’s globalized market, manufacturing companies in the consumer packaged goods (CPG) industry experience increased competitiveness and price pressure, which force them to focus on cost cutting initiatives in production and the supply chain set-up. Market Drivers • Due to the competitive landscape, CPG companies are required to focus on continuous efficiency improvements in order to minimize their cost base • In order to stay profitable and reach EBIT targets, factories need to utilize their full capacity when it comes to machinery, input material, and personnel • In the CPG industry, acquisitions and volume consolidations are necessary in order to stay competitive • However, due to a large degree of uncertainty it is more of a norm than an exception that companies miscalculate expected impact and the effects of these events, why it is important to secure the variables that are possible to control – such as production capabilities • Customers demand a greater variety of products while simultaneously altering trends give rise to fluctuations in volumes • This requires factories to manage volume variety and adapt both machinery and processes to enable efficient delivery of small batches Profitability Need for flexibilityUncertainty
  • 4. OPEX in CPG Manufacturing | A BearingPoint Accelerator Our approach centers around the BearingPoint Operational Excellence framework, which covers the three main dimensions: core operations, management control systems, and culture. While planning and maintenance are crucial enablers for efficient production, it is within the production elements where the main part of the financial potential lies The Core operations analysis seeks to improve production related activities focusing on labor productivity, machine OEE and yield, while securing optimized production & workforce planning and increasing the proactive focus in the maintenance department Core operations Ensure an efficient flow of information and an optimized organizational structure for quick actions and improvement work Analysis of the organizational structure including span of control, roles and responsibilities as well as performance management and meeting structure Management control systems The cultural dimension aims to improve the organizational mindset and behavior to support the continuous improvement capabilities In this dimension, we’re looking at leadership capabilities, corporate structures and competence development, as well as environment, health and safety (EHS) culture Culture Management control systems Culture Production M aintenanc e Planning
  • 5. OPEX in CPG Manufacturing | A BearingPoint Accelerator Improvement actions are developed in close collaboration with the client within each of the dimensions, and lays the foundation for the improvement work. • Set the project foundation: establish the business case, define the project mandate and stakeholders • Solution design of the core operation elements • Planning process analysis to minimize planning related costs with maximum flexibility • Maintenance work order processes analysis • Development of implementation plans • Detailed estimations of potential Investments • Secure and plan resources • Quick wins • Implementation activities conducted • Define follow-up metrics • Fine tune and standardize new ways of working • Follow-up up on defined metrics to secure sustainable improvements • Pre-analysis: data gathering, management interviews and employee survey • Analysis preparation: set up war room, establish hypothesis and plan analysis activities • Established baseline • Initial hypothesis & analysis activity plan Core operations Mobilize 1-2 weeks Analyze & Design 4-5 weeks Plan 1-2 weeks Implement ~ 20 weeks Follow-up 12 weeks • Design of organizational setup, effective meeting structures and control system • Secure metrics and plan organizational change • Preparations for a new meeting structure • Implement org. change and control system • Daily coaching in meeting execution • Follow-up on overall reporting and meeting adherence Management Control Systems • Design future ways of working for leadership and structure enabling as well as favoring CI culture • Improvement areas with calculated savings • Future state design supporting CI and operational excellence targets in all areas • Plan activities for an improved CI culture • Tactical implementation plans for each work stream • Management coaching in CI and safety culture • Sustainable OPEX design in place • Quick wins realized • Secure continuous improvement culture • Goal fulfillment through implementation follow-up Culture Deliverables > > > >
  • 6. OPEX in CPG Manufacturing | A BearingPoint Accelerator Our approach not only improves profitability and production agility, but also enhances the organization, its leadership and the control systems to enable a continuous improvement culture. Culture Even though the easy-to-measure and direct effects, such as increased profitability, stability and flexibility are some very pleasant results to be expected from an operational excellence project, the cultural improvement should be considered as one of the major benefits. Expect an organization with positivism and pride in what they do while your EHS KPIs improve. Expect an organization ready for continuous improvement delivering on the YoY savings target for the coming decade. • From previous experience BearingPoint estimates an average reduction in conversion cost ranging between 10-15% • Also, an EBIT improvement of around 5-10% is to be expected • Reduced variability in production efficiency gives more accurate capacity estimations and thus reduces planning complexity and provides less risk when consolidating volumes • Efficient planning and optimized changeover routines allow for increased product complexity without losing valuable production time or building up stock Improved Profitability Increased FlexibilityStability and Predictability
  • 7. OPEX in CPG Manufacturing | A BearingPoint Accelerator Leading global food & beverage company The client initiated a comprehensive program with an ambitious cost-out target addressing several factories. BearingPoint was engaged as a partner where several operational excellence projects within food & beverage, home & personal care, and confectionery and snacks was conducted. BearingPoint helped the client to reduce conversion costs in the production of goods by standardizing processes to optimize the use of the workforce, maximizing machine utilization, and building capabilities that drive continuous improvement. BearingPoint supported the initiatives with its hands-on approach and analytical and functional experience. Leading dairy producer The client was challenged by decreasing milk consumption volumes, increased international competition and high cost-levels. BearingPoint was chosen to do a full analysis followed by implementation at one of the dairies. The project included an overall redesign and improvement of the organization and processes within production, maintenance, management systems and planning. References
  • 8. OPEX in CPG Manufacturing | A BearingPoint Accelerator Contact Peter Brente Partner BearingPoint Sweden peter.brente@bearingpoint.com Linda Helsing Manager BearingPoint Sweden linda.helsing@bearingpoint.com About BearingPoint BearingPoint is an independent management and technology consultancy with European roots and a global reach. The company operates in three units: Consulting, Solutions and Ventures. Consulting covers the advisory business; Solutions provides the tools for successful digital transformation, regulatory technology and advanced analytics; Ventures drives the financing and development of start-ups. BearingPoint’s clients include many of the world’s leading companies and organizations. The firm has a global consulting network with more than 10,000 people and supports clients in over 75 countries, engaging with them to achieve measurable and sustainable success. For more information, please visit: Homepage: www.bearingpoint.com LinkedIn: www.linkedin.com/company/bearingpoint Twitter: @BearingPoint © 2019 BearingPoint. All rights reserved