PRODUCTION
SCHEDULING
Unit-4
PRODUCTION CONTROL
LOADING AND SCHEDULING
LOADING
• Once the route has been established, the work required can
be loaded against the selected machine or workstation.
• The total time required to perform the operation is computed
by multiplying the unit operation times given on the standard
process sheet by the number of parts to be processed.
• This total time is then added to the work already planned for
the workstation.
• This is the function of loading, and it results in a tabulated list
or chart showing the planned utilization of the machines or
workstations in the plant
SCHEDULING
• Scheduling is the last of the planning functions.
• It determines when an operation is to be performed, or when
work is to be completed; the difference lies in the detail of the
scheduling procedure.
• In a centralized control situation - where all process planning,
loading, and scheduling for the plant are done in a central
office- the details of the schedule may specify the starting and
finishing time for an operation.
• On the other hand, the central schedule may simply give a
completion time for the work in a given department.
MASTER SCHEDULING
SCHEDULING -BENEFITS
• Inventory reduction,
• Process change-over reduction
• leveling
• Reduced scheduling effort
• Increased production efficiency
• Labor load leveling
• Accurate delivery date quotes
• Real time information
GANTT CHART
•A Gantt chart is a type of bar chart, developed by Henry Gantt,
that illustrates a project schedule.
• Gantt charts illustrate the start
and finish dates of the terminal elements and summary elements
of a project. Terminal elements and summary elements comprise
the work breakdown structure of the project.
•Some Gantt charts also show the dependency (i.e., precedence network)
relationships between activities.
Production Control
• Perpetual loading
– Tabulation of the time necessary to finish unfulfilled orders and
determine how long it will take to finish this work.
Perpetual loading
LINE OF BALANCE
• Find a feasible defined replacement for all undefined
(‘ANY’) ergonomic constraints on workstations, i.e. one
compatible with the ergonomic constraints and
precedence constraints defined on operations, as well as
zoning constraints and possible drifting operations
• Solve the within-workstation scheduling problem on all
workstations, for all products being assembled on the line
• Assign the operations to workstations to achieve the best
average balance, while keeping the peak times at a
manageable level.
Linear Scheduling Method
• Linear Scheduling Method (LSM) is a graphical scheduling method
focusing on continuous resource utilization in repetitive activities. It is
believed that it originally adopted the idea of Line-Of-Balance method.
• The main advantages of LSM over Critical Path Method (CPM) is its
underlying idea of keeping resources continuously at work. In other
words, it schedules activities in such a way that:
1. resource utilization is maximized;
2. interruption in on-going process is minimized, including hiring-and-
firing; and
3. the effect of the learning curve phenomenon is minimized
BATCH PRODUCTION SCHEDULING
• Batch production scheduling is the practice of planning and
scheduling of batch manufacturing processes.
• Although, scheduling may apply to traditionally continuous
processes, such as refining, it is especially important for batch
processes such as those for pharmaceutical active ingredients,
biotechnology processes and many specialty chemical
processes.
• Batch production scheduling shares some concepts and
techniques with finite capacity scheduling which has been
applied to many manufacturing problems.
• The specific issues of scheduling batch manufacturing
processes have generated considerable industrial and
academic interest
MRP
KANBAN
DISPATCHING
• Authorizing the start of an operation on the shop
floor is the function of dispatching.
• This function may be centralized or decentralized.
• The departmental dispatcher would authorize the
start of each of the machine operations – the
dispatch actions are based on the foreman’s routing
and scheduling of the work through his department.
This is decentralized dispatching.
PROGRESS REPORTING AND EXPEDITING
• The manufacturing activity of a plant is said to be “in
control” when the actual performance is within the
objectives of the planned performance.
• When jobs are started and completed on schedule,
there should be very little, if any, concern about the
meeting of commitments.
• Optimum operation of the plant, however, is attained
only if the original plan has been carefully prepared
to utilize the manufacturing facilities fully and
effectively.
Mfg. lead time
Mfg. lead time

Weitere ähnliche Inhalte

Was ist angesagt?

Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and controlkarthi keyan
 
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROLMohanumar S
 
Ppc unit-4-production scheduling
Ppc   unit-4-production schedulingPpc   unit-4-production scheduling
Ppc unit-4-production schedulingkarthi keyan
 
PRODUCTION PLANNING AND CONTROL-Unit 5
PRODUCTION PLANNING AND CONTROL-Unit 5PRODUCTION PLANNING AND CONTROL-Unit 5
PRODUCTION PLANNING AND CONTROL-Unit 5prakash0712
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work studykarthi keyan
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION) TAMILMECHKIT
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGSathishkumarM89
 
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROLMohanumar S
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process PlanningPraveenManickam2
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.PraveenManickam2
 

Was ist angesagt? (15)

Unit 1
Unit 1Unit 1
Unit 1
 
Unit 5
Unit 5Unit 5
Unit 5
 
Unit 3
Unit 3Unit 3
Unit 3
 
Ppc unit-1-production planning and control
Ppc   unit-1-production planning and controlPpc   unit-1-production planning and control
Ppc unit-1-production planning and control
 
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 4-IE6605 & PRODUCTION PLANNING AND CONTROL
 
Ppc unit-4-production scheduling
Ppc   unit-4-production schedulingPpc   unit-4-production scheduling
Ppc unit-4-production scheduling
 
production scheduling
production schedulingproduction scheduling
production scheduling
 
PRODUCTION PLANNING AND CONTROL-Unit 5
PRODUCTION PLANNING AND CONTROL-Unit 5PRODUCTION PLANNING AND CONTROL-Unit 5
PRODUCTION PLANNING AND CONTROL-Unit 5
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)  PPCE  unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
PPCE unit 3 (ME8793 – PROCESS PLANNING AND COST ESTIMATION)
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNING
 
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROLUnit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
Unit 3-IE6605 & PRODUCTION PLANNING AND CONTROL
 
Production Planning and Process Planning
Production Planning and Process PlanningProduction Planning and Process Planning
Production Planning and Process Planning
 
PPCE Unit 5
PPCE Unit   5PPCE Unit   5
PPCE Unit 5
 
Introduction to Production Planning and control.
Introduction to Production Planning and control.Introduction to Production Planning and control.
Introduction to Production Planning and control.
 

Ähnlich wie Production Scheduling Methods for Maximum Efficiency

Production planning and control
Production planning and controlProduction planning and control
Production planning and controlLaxmikant Deshmukh
 
scheduling in operations Management PPT O and M
scheduling in operations Management PPT O and Mscheduling in operations Management PPT O and M
scheduling in operations Management PPT O and MProfessionalDeeksha
 
Operation scheduling
Operation schedulingOperation scheduling
Operation schedulingsai precious
 
Scheduling Topic of Production and Operations
Scheduling Topic of Production and OperationsScheduling Topic of Production and Operations
Scheduling Topic of Production and OperationsProfessionalDeeksha
 
Unit 7 production scheduling
Unit 7 production scheduling Unit 7 production scheduling
Unit 7 production scheduling RASHMIPANWAR10
 
Presentation on scheduling
Presentation on schedulingPresentation on scheduling
Presentation on schedulingGunjan Lal
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptxArpanKumar79
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencingAkanksha Gupta
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations SchedulingAshish Jain
 
Production management
Production managementProduction management
Production managementPurnesh Aloni
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPratikDalvi17
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planningVenu Yadav
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2samjune
 
Functions of production planning and control
Functions of production planning and controlFunctions of production planning and control
Functions of production planning and controlVignesh Jayakumar
 

Ähnlich wie Production Scheduling Methods for Maximum Efficiency (20)

UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
scheduling in operations Management PPT O and M
scheduling in operations Management PPT O and Mscheduling in operations Management PPT O and M
scheduling in operations Management PPT O and M
 
Operation scheduling
Operation schedulingOperation scheduling
Operation scheduling
 
Scheduling Topic of Production and Operations
Scheduling Topic of Production and OperationsScheduling Topic of Production and Operations
Scheduling Topic of Production and Operations
 
Unit 7 production scheduling
Unit 7 production scheduling Unit 7 production scheduling
Unit 7 production scheduling
 
Presentation on scheduling
Presentation on schedulingPresentation on scheduling
Presentation on scheduling
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptx
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Operations Scheduling
Operations SchedulingOperations Scheduling
Operations Scheduling
 
Production management
Production managementProduction management
Production management
 
Unit 3 Manufacturing system design
Unit   3 Manufacturing system designUnit   3 Manufacturing system design
Unit 3 Manufacturing system design
 
MMS PRESENTAION.pptx
MMS PRESENTAION.pptxMMS PRESENTAION.pptx
MMS PRESENTAION.pptx
 
Operations management
Operations managementOperations management
Operations management
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Scheduling
SchedulingScheduling
Scheduling
 
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdfPRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
PRODUCTION AND OPERATIONS MANAGEMENT (304) SEM3 NOV2021.pdf
 
Computer integrated production planning
Computer integrated production planningComputer integrated production planning
Computer integrated production planning
 
Manish 13 mrp2
Manish 13 mrp2Manish 13 mrp2
Manish 13 mrp2
 
Functions of production planning and control
Functions of production planning and controlFunctions of production planning and control
Functions of production planning and control
 

Mehr von Aravind Ra

PPCE UNIT- 4.pptx
PPCE UNIT- 4.pptxPPCE UNIT- 4.pptx
PPCE UNIT- 4.pptxAravind Ra
 
PPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxPPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxAravind Ra
 
PPCE UNIT- 2.pptx
PPCE UNIT- 2.pptxPPCE UNIT- 2.pptx
PPCE UNIT- 2.pptxAravind Ra
 
UNIT-4 GEAR BOX.ppt
UNIT-4 GEAR BOX.pptUNIT-4 GEAR BOX.ppt
UNIT-4 GEAR BOX.pptAravind Ra
 
unit_iii_bevel_gear.ppt
unit_iii_bevel_gear.pptunit_iii_bevel_gear.ppt
unit_iii_bevel_gear.pptAravind Ra
 
UNIT-2 DTS.pptx
UNIT-2 DTS.pptxUNIT-2 DTS.pptx
UNIT-2 DTS.pptxAravind Ra
 
UNIT-I DTS.pptx
UNIT-I DTS.pptxUNIT-I DTS.pptx
UNIT-I DTS.pptxAravind Ra
 
Unit 2 planning
Unit 2 planningUnit 2 planning
Unit 2 planningAravind Ra
 
Unit 1 overview of management
Unit 1 overview of managementUnit 1 overview of management
Unit 1 overview of managementAravind Ra
 
Unit 5---bearings
Unit 5---bearingsUnit 5---bearings
Unit 5---bearingsAravind Ra
 
Unit 4---springs
Unit 4---springsUnit 4---springs
Unit 4---springsAravind Ra
 
Unit 3---knuckle joint--
Unit   3---knuckle joint--Unit   3---knuckle joint--
Unit 3---knuckle joint--Aravind Ra
 

Mehr von Aravind Ra (20)

UNIT- 5.pptx
UNIT- 5.pptxUNIT- 5.pptx
UNIT- 5.pptx
 
PPCE UNIT- 4.pptx
PPCE UNIT- 4.pptxPPCE UNIT- 4.pptx
PPCE UNIT- 4.pptx
 
PPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxPPCE UNIT- 3.pptx
PPCE UNIT- 3.pptx
 
PPCE UNIT- 2.pptx
PPCE UNIT- 2.pptxPPCE UNIT- 2.pptx
PPCE UNIT- 2.pptx
 
UNIT- 1.pptx
UNIT- 1.pptxUNIT- 1.pptx
UNIT- 1.pptx
 
clutch.ppt
clutch.pptclutch.ppt
clutch.ppt
 
UNIT-4 GEAR BOX.ppt
UNIT-4 GEAR BOX.pptUNIT-4 GEAR BOX.ppt
UNIT-4 GEAR BOX.ppt
 
unit_iii_bevel_gear.ppt
unit_iii_bevel_gear.pptunit_iii_bevel_gear.ppt
unit_iii_bevel_gear.ppt
 
UNIT-2 DTS.pptx
UNIT-2 DTS.pptxUNIT-2 DTS.pptx
UNIT-2 DTS.pptx
 
UNIT-I DTS.pptx
UNIT-I DTS.pptxUNIT-I DTS.pptx
UNIT-I DTS.pptx
 
UNIT-V FMM
UNIT-V FMMUNIT-V FMM
UNIT-V FMM
 
UNIT-IV FMM
UNIT-IV FMMUNIT-IV FMM
UNIT-IV FMM
 
UNIT-III FMM
UNIT-III FMMUNIT-III FMM
UNIT-III FMM
 
UNIT-II FMM
UNIT-II FMMUNIT-II FMM
UNIT-II FMM
 
UNIT-I FMM
UNIT-I FMMUNIT-I FMM
UNIT-I FMM
 
Unit 2 planning
Unit 2 planningUnit 2 planning
Unit 2 planning
 
Unit 1 overview of management
Unit 1 overview of managementUnit 1 overview of management
Unit 1 overview of management
 
Unit 5---bearings
Unit 5---bearingsUnit 5---bearings
Unit 5---bearings
 
Unit 4---springs
Unit 4---springsUnit 4---springs
Unit 4---springs
 
Unit 3---knuckle joint--
Unit   3---knuckle joint--Unit   3---knuckle joint--
Unit 3---knuckle joint--
 

Kürzlich hochgeladen

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 

Kürzlich hochgeladen (20)

Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 

Production Scheduling Methods for Maximum Efficiency

  • 4. LOADING • Once the route has been established, the work required can be loaded against the selected machine or workstation. • The total time required to perform the operation is computed by multiplying the unit operation times given on the standard process sheet by the number of parts to be processed. • This total time is then added to the work already planned for the workstation. • This is the function of loading, and it results in a tabulated list or chart showing the planned utilization of the machines or workstations in the plant
  • 5. SCHEDULING • Scheduling is the last of the planning functions. • It determines when an operation is to be performed, or when work is to be completed; the difference lies in the detail of the scheduling procedure. • In a centralized control situation - where all process planning, loading, and scheduling for the plant are done in a central office- the details of the schedule may specify the starting and finishing time for an operation. • On the other hand, the central schedule may simply give a completion time for the work in a given department.
  • 7. SCHEDULING -BENEFITS • Inventory reduction, • Process change-over reduction • leveling • Reduced scheduling effort • Increased production efficiency • Labor load leveling • Accurate delivery date quotes • Real time information
  • 8. GANTT CHART •A Gantt chart is a type of bar chart, developed by Henry Gantt, that illustrates a project schedule. • Gantt charts illustrate the start and finish dates of the terminal elements and summary elements of a project. Terminal elements and summary elements comprise the work breakdown structure of the project. •Some Gantt charts also show the dependency (i.e., precedence network) relationships between activities.
  • 9. Production Control • Perpetual loading – Tabulation of the time necessary to finish unfulfilled orders and determine how long it will take to finish this work. Perpetual loading
  • 10. LINE OF BALANCE • Find a feasible defined replacement for all undefined (‘ANY’) ergonomic constraints on workstations, i.e. one compatible with the ergonomic constraints and precedence constraints defined on operations, as well as zoning constraints and possible drifting operations • Solve the within-workstation scheduling problem on all workstations, for all products being assembled on the line • Assign the operations to workstations to achieve the best average balance, while keeping the peak times at a manageable level.
  • 11. Linear Scheduling Method • Linear Scheduling Method (LSM) is a graphical scheduling method focusing on continuous resource utilization in repetitive activities. It is believed that it originally adopted the idea of Line-Of-Balance method. • The main advantages of LSM over Critical Path Method (CPM) is its underlying idea of keeping resources continuously at work. In other words, it schedules activities in such a way that: 1. resource utilization is maximized; 2. interruption in on-going process is minimized, including hiring-and- firing; and 3. the effect of the learning curve phenomenon is minimized
  • 12. BATCH PRODUCTION SCHEDULING • Batch production scheduling is the practice of planning and scheduling of batch manufacturing processes. • Although, scheduling may apply to traditionally continuous processes, such as refining, it is especially important for batch processes such as those for pharmaceutical active ingredients, biotechnology processes and many specialty chemical processes. • Batch production scheduling shares some concepts and techniques with finite capacity scheduling which has been applied to many manufacturing problems. • The specific issues of scheduling batch manufacturing processes have generated considerable industrial and academic interest
  • 13. MRP
  • 15. DISPATCHING • Authorizing the start of an operation on the shop floor is the function of dispatching. • This function may be centralized or decentralized. • The departmental dispatcher would authorize the start of each of the machine operations – the dispatch actions are based on the foreman’s routing and scheduling of the work through his department. This is decentralized dispatching.
  • 16. PROGRESS REPORTING AND EXPEDITING • The manufacturing activity of a plant is said to be “in control” when the actual performance is within the objectives of the planned performance. • When jobs are started and completed on schedule, there should be very little, if any, concern about the meeting of commitments. • Optimum operation of the plant, however, is attained only if the original plan has been carefully prepared to utilize the manufacturing facilities fully and effectively.