Andhra Pradesh has recently published new solar policy which focuses majorly on local solar manufacturing unit, solar park & associated incentives. It also introduces Feed-In Tariff (FiTs) for small scale projects (upto 5MW).
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
Andhra Pradesh (AP) Solar Policy Highlights_07.02.2019
1. Andhra Pradesh Solar Policy 2018
Sl.No Clause Interpretation
1 Policy AP Solar Power Policy 2018
2 Effective Date 3rd
January 2019
3
Target
Sale to Discom
Solar Park
Solar Pump Set
Overall target of 5000 MW from solar power project by 2023
2000 MW of solar power shall be procured by Discom in next 5 year
4000 MW of initial target for Solar Park
50,000 solar powered pump sets will be operational in the state in next 5 year with subsidy
4 Objectives
Solar park in the state with full infrastructure
solar powered agricultural pump sets
promote local manufacturing
5 Operative Period Effective from the date of issuance till period of 5 years
6
Eligibility for Incentives or
Benefits
The Project(s) developed during Operative Period of this Policy for 10 years from the
date of commissioning.
7
Nodal Agency
Responsibilities
New and Renewable
Energy Development
Corporation of A.P. Ltd
(NREDCAP)
obtaining revenue land
facilitate power evacuation and/ or Open Access
facilitate water allocation
Facilitate & coordinate in obtaining necessary clearances, approvals, grants and subsidies.
Gensol Engineering Pvt. Ltd
Solar Policy Review 2019: Andhra Pradesh
2. 8
Incentives for Solar
Manufacturing from
Government
Govt. lands shall prioritize for solar parks on long term lease basis
Exemption from electricity duty for a period of ten (10) years
Provision for single desk statuary clearances will be provided
9
Transmission & Wheeling
Charges
Exempted, only for connectivity to the nearest Central Transmission Utility (CTU) for inter-
state
10
Energy Banking &
Accounting
Banking of 100% of energy will be permitted during all 12 months of the year, based on the
feasibility and prior approval of APTRANSCO / APDISCOMs.
Banking charges will be adjusted in kind at 5% of the energy delivered at the point of
drawl.
The unutilized banked energy shall be considered as deemed purchase by Discom at 50% of
the Average Pooled Power Purchase Cost as determined by the APERC for the applicable
year.
The payment for the deemed purchase of un-utilized banked energy shall be capped to 10%
of the total banked energy during the applicable year.
However, for Solar Wind hybrid Projects utilized power shall be procured at 75% of the
Average Pooled Power Purchase Cost for the applicable year.
11
Grid Connectivity &
Evacuation
The Eligible Developer shall bear the entire cost of construction of power evacuation
facilities from the project upto the interconnection point and/or upto APTransco / Discom(s)
substation
12 Supervision Charges
Exempted from paying the Supervision charges to APTransco/Discom(s) only in case of
transmission of power from State Transmission Utility (STU) to Central transmission utility
(CTU)
13
Deemed Public Private
Partnership (PPP)
Deemed PPP status will be provided for solar projects under category Sale of power to AP
Discom(s)
3. 14 Land
Deemed Non-Agricultural (NA) status for the land where Solar Power Projects will be
accorded, on payment of applicable statutory fees
Responsibility of the project developer to acquire the land required for the project
NREDCAP will pay the land cost as decided to the revenue authorities @ 10% of the
market value for a period of 10 years.
NREDCAP will collect the lease rentals for 25 years period @10% of the value of land with
10% increase in every 5 years block period
15 Must Run Status Injection from power from solar projects
16
Renewable Power
Purchase Obligation (RPO)
The Obligated Entities as per the RPPO Regulations of APERC, are eligible for adjusting
the power generated from rooftop projects towards their obligation to meet RPPO provided
necessary metering is arranged for measuring the solar power as per the regulations.
Further, the RPPO is not defined for the ground mounted project towards obligated entities
17 Administrative Approval
Eligible Developers has to pay following fee along with application:
-INR 1000 upto 5kWp
-INR 5000 for 5kWp -100kWp
-INR 10000 for 100kWp- 1000kWp
-INR 25000/MW above 1000kWp
- INR 25/kW for assistance required SNA for clearances (exempted for solar parks)
18 Pollution Clearance Exempted
19 Scheduling & Forecasting
Applicable as per APERC (Commission Forecasting, Scheduling and Deviation Settlement
of Solar and Wind Generation) Regulation, 2017.
20
Project Completion
Timeline
-
21 Security Deposit -