Potential Induced Degradation -
Potential Induced Degradation (PID) occurs when the module’s voltage potential
and leakage current drive ion mobility within the module between the
semiconductor material and other elements of the module (e.g. glass, mount and
frame), thus causing the module’s power output capacity to degrade. The ion
mobility accelerates with humidity, temperature and voltage potential.
To bring down the effect caused by PID, manufacturers need to improve the
insulation of EVA and refractive index of silicon nitride layer of solar cell. Some
suppliers ignore PID-free demand of solar cell, and partially pursue module’s high
efficiency.
Snail Trail -
Snail Trail is caused by solar cell grid discolour and till now the mechanism is still
unknown. Main reason is that moisture transmits through the back sheet, EVA
and solar cell, and reacts with silver on cell grid and EVA. Choosing the back
sheet with low moisture transmission could prevent Snail Trail.
Also, the back sheet will turn yellow if the front EVA lets UV transmit. We should
strictly control light transmission in EVA selection.
Long Time Damp Heat -
Solar panel power output will degrade after long-time damp heat (DH). After DH,
heat spots might appear in the corresponding position of cell back-electrode in
short-circuit condition, which can even cause 70% power degradation.
Manufacturers ignore the importance of back electrode, to lower cost at the
expense of using little silver. In current IEC standard, module power degradation
must be less than 10% after module is subjected to long time damp heat of 1000
Hours.
	
  

Weitere ähnliche Inhalte

Was ist angesagt?

Session 02 solar energy technologies
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologiesChirag Jain
 
BIPV in Apartment Buildings - Denmark
BIPV in Apartment Buildings - DenmarkBIPV in Apartment Buildings - Denmark
BIPV in Apartment Buildings - DenmarkAndrea Isidori
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overviewChirag Jain
 
Session 04 solar pv modules
Session 04   solar pv modulesSession 04   solar pv modules
Session 04 solar pv modulesChirag Jain
 
Session 06 balance of system components
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system componentsChirag Jain
 
iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iplon
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M IssuesNageswar Rao
 
IRJET- Power Quality Assessment of Photovoltaic System
IRJET- Power Quality Assessment of Photovoltaic SystemIRJET- Power Quality Assessment of Photovoltaic System
IRJET- Power Quality Assessment of Photovoltaic SystemIRJET Journal
 
Outdoor testing, analysis and performance predictions of PV technologies [PV ...
Outdoor testing, analysis and performance predictions of PV technologies [PV ...Outdoor testing, analysis and performance predictions of PV technologies [PV ...
Outdoor testing, analysis and performance predictions of PV technologies [PV ...Smithers Apex
 
Session 03 solar pv rooftop technology overview
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overviewChirag Jain
 
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...sdchrosis
 
Modeling PV Module Power Degradation to Evaluate Performance Warranty Risks
Modeling PV Module Power Degradation to Evaluate Performance Warranty RisksModeling PV Module Power Degradation to Evaluate Performance Warranty Risks
Modeling PV Module Power Degradation to Evaluate Performance Warranty RisksKenneth J. Sauer
 
Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan N...
Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan N...Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan N...
Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan N...RESolve Energy Consultants
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Ashish Verma
 
IRJET- Comparative Study of Maximum Power Point Techniques
IRJET- Comparative Study of Maximum Power Point TechniquesIRJET- Comparative Study of Maximum Power Point Techniques
IRJET- Comparative Study of Maximum Power Point TechniquesIRJET Journal
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterAshish Verma
 

Was ist angesagt? (20)

Session 02 solar energy technologies
Session 02   solar energy technologiesSession 02   solar energy technologies
Session 02 solar energy technologies
 
BIPV in Apartment Buildings - Denmark
BIPV in Apartment Buildings - DenmarkBIPV in Apartment Buildings - Denmark
BIPV in Apartment Buildings - Denmark
 
Session 08 design & safety overview
Session 08   design & safety overviewSession 08   design & safety overview
Session 08 design & safety overview
 
Session 04 solar pv modules
Session 04   solar pv modulesSession 04   solar pv modules
Session 04 solar pv modules
 
Session 06 balance of system components
Session 06   balance of system componentsSession 06   balance of system components
Session 06 balance of system components
 
iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011iPLON presentation at Intersolar Mumbai 15 Dec 2011
iPLON presentation at Intersolar Mumbai 15 Dec 2011
 
2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues2. Solar Power Plant- O&M Issues
2. Solar Power Plant- O&M Issues
 
Maximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSECMaximum Energy Case Studies - EUPVSEC
Maximum Energy Case Studies - EUPVSEC
 
IRJET- Power Quality Assessment of Photovoltaic System
IRJET- Power Quality Assessment of Photovoltaic SystemIRJET- Power Quality Assessment of Photovoltaic System
IRJET- Power Quality Assessment of Photovoltaic System
 
CUF vs PR
CUF vs PRCUF vs PR
CUF vs PR
 
Outdoor testing, analysis and performance predictions of PV technologies [PV ...
Outdoor testing, analysis and performance predictions of PV technologies [PV ...Outdoor testing, analysis and performance predictions of PV technologies [PV ...
Outdoor testing, analysis and performance predictions of PV technologies [PV ...
 
Session 03 solar pv rooftop technology overview
Session 03   solar pv rooftop technology overviewSession 03   solar pv rooftop technology overview
Session 03 solar pv rooftop technology overview
 
Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013Solar O&M Presentation Intersolar 2013
Solar O&M Presentation Intersolar 2013
 
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
REACH Solar Consultants - Presentation at Intersolar India 2013 | Learnings f...
 
Modeling PV Module Power Degradation to Evaluate Performance Warranty Risks
Modeling PV Module Power Degradation to Evaluate Performance Warranty RisksModeling PV Module Power Degradation to Evaluate Performance Warranty Risks
Modeling PV Module Power Degradation to Evaluate Performance Warranty Risks
 
Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan N...
Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan N...Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan N...
Policy & Regulatory Enablers for off-grid solar PV growth in India-Madhavan N...
 
Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...Performance paramter and suggestion to optizing the performnce of grid connec...
Performance paramter and suggestion to optizing the performnce of grid connec...
 
IRJET- Comparative Study of Maximum Power Point Techniques
IRJET- Comparative Study of Maximum Power Point TechniquesIRJET- Comparative Study of Maximum Power Point Techniques
IRJET- Comparative Study of Maximum Power Point Techniques
 
performance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverterperformance optimization of Solar pv plant through Micro inverter
performance optimization of Solar pv plant through Micro inverter
 
Solar PV DC Concepts
Solar PV DC ConceptsSolar PV DC Concepts
Solar PV DC Concepts
 

Andere mochten auch

Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsGensol Engineering Limited
 
Transmission Loss Calculation on 33 / 66 / 132 KV Lines for Solar Power Plant
Transmission Loss Calculation on 33 / 66 / 132 KV  Lines for Solar Power PlantTransmission Loss Calculation on 33 / 66 / 132 KV  Lines for Solar Power Plant
Transmission Loss Calculation on 33 / 66 / 132 KV Lines for Solar Power PlantGensol Engineering Limited
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentationAnjali Khandelwal
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Gensol Engineering Limited
 
Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)Gensol Engineering Limited
 

Andere mochten auch (9)

Optimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar ProjectsOptimisation of Balance of System (BOS) for Solar Projects
Optimisation of Balance of System (BOS) for Solar Projects
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Transmission Loss Calculation on 33 / 66 / 132 KV Lines for Solar Power Plant
Transmission Loss Calculation on 33 / 66 / 132 KV  Lines for Solar Power PlantTransmission Loss Calculation on 33 / 66 / 132 KV  Lines for Solar Power Plant
Transmission Loss Calculation on 33 / 66 / 132 KV Lines for Solar Power Plant
 
Solar mango corporate presentation
Solar mango   corporate presentationSolar mango   corporate presentation
Solar mango corporate presentation
 
Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects Engineering Drawings required for Solar Projects
Engineering Drawings required for Solar Projects
 
MS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation ScheduleMS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation Schedule
 
Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)Solar Cell & Module Supplier - India (01.02.17)
Solar Cell & Module Supplier - India (01.02.17)
 
Phases of Construction - Solar Project
Phases of Construction - Solar ProjectPhases of Construction - Solar Project
Phases of Construction - Solar Project
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 

Ähnlich wie 3 Common Solar Module Quality Issues to Understand & Act On

Introductionto Solar
Introductionto SolarIntroductionto Solar
Introductionto Solarsanjoysanyal
 
Introductionto Solar
Introductionto SolarIntroductionto Solar
Introductionto Solarsanjoysanyal
 
Solar panels
Solar panelsSolar panels
Solar panelsJoel Koh
 
“Transparent Solar Cells: Future of Electricity”
“Transparent Solar Cells: Future of Electricity”“Transparent Solar Cells: Future of Electricity”
“Transparent Solar Cells: Future of Electricity”Hasan Mahadi Riaz
 
seminar report on solar cell
seminar report on solar cellseminar report on solar cell
seminar report on solar cellASHOK KHOJA
 
Industrial training report presentation on SOLAR CELL
Industrial training report presentation on SOLAR CELLIndustrial training report presentation on SOLAR CELL
Industrial training report presentation on SOLAR CELL1408081208
 
Solar pv cells
Solar pv cellsSolar pv cells
Solar pv cellssayantika6
 
Solar pv cells
Solar pv cellsSolar pv cells
Solar pv cellssayantika6
 
CEI_SolarMaterials_Middle.pptx
CEI_SolarMaterials_Middle.pptxCEI_SolarMaterials_Middle.pptx
CEI_SolarMaterials_Middle.pptxranjith395723
 
infrared-plastic-solar-cell-tamilyoungsterscom-2nd-ppt.pdf
infrared-plastic-solar-cell-tamilyoungsterscom-2nd-ppt.pdfinfrared-plastic-solar-cell-tamilyoungsterscom-2nd-ppt.pdf
infrared-plastic-solar-cell-tamilyoungsterscom-2nd-ppt.pdfAjmalKunjumon
 
Infrared plastic solar cell- tamilyoungsters.com -2nd PPT
Infrared plastic solar cell- tamilyoungsters.com -2nd PPTInfrared plastic solar cell- tamilyoungsters.com -2nd PPT
Infrared plastic solar cell- tamilyoungsters.com -2nd PPTtamilyoungsters .com
 

Ähnlich wie 3 Common Solar Module Quality Issues to Understand & Act On (20)

Introductionto Solar
Introductionto SolarIntroductionto Solar
Introductionto Solar
 
Introductionto Solar
Introductionto SolarIntroductionto Solar
Introductionto Solar
 
Solar panels
Solar panelsSolar panels
Solar panels
 
Solar panels
Solar panelsSolar panels
Solar panels
 
“Transparent Solar Cells: Future of Electricity”
“Transparent Solar Cells: Future of Electricity”“Transparent Solar Cells: Future of Electricity”
“Transparent Solar Cells: Future of Electricity”
 
Microcrack chapter
Microcrack chapterMicrocrack chapter
Microcrack chapter
 
Physical chem
Physical chemPhysical chem
Physical chem
 
Photovoltaic.pptx
Photovoltaic.pptxPhotovoltaic.pptx
Photovoltaic.pptx
 
seminar report on solar cell
seminar report on solar cellseminar report on solar cell
seminar report on solar cell
 
Solar cell
Solar cell Solar cell
Solar cell
 
Solar PV Module Technologies
Solar PV Module TechnologiesSolar PV Module Technologies
Solar PV Module Technologies
 
Solar Companies
Solar CompaniesSolar Companies
Solar Companies
 
Industrial training report presentation on SOLAR CELL
Industrial training report presentation on SOLAR CELLIndustrial training report presentation on SOLAR CELL
Industrial training report presentation on SOLAR CELL
 
Solar pv cells
Solar pv cellsSolar pv cells
Solar pv cells
 
Solar pv cells
Solar pv cellsSolar pv cells
Solar pv cells
 
CEI_SolarMaterials_Middle.pptx
CEI_SolarMaterials_Middle.pptxCEI_SolarMaterials_Middle.pptx
CEI_SolarMaterials_Middle.pptx
 
Solar Energy
Solar EnergySolar Energy
Solar Energy
 
Solar Technology Basics
Solar Technology BasicsSolar Technology Basics
Solar Technology Basics
 
infrared-plastic-solar-cell-tamilyoungsterscom-2nd-ppt.pdf
infrared-plastic-solar-cell-tamilyoungsterscom-2nd-ppt.pdfinfrared-plastic-solar-cell-tamilyoungsterscom-2nd-ppt.pdf
infrared-plastic-solar-cell-tamilyoungsterscom-2nd-ppt.pdf
 
Infrared plastic solar cell- tamilyoungsters.com -2nd PPT
Infrared plastic solar cell- tamilyoungsters.com -2nd PPTInfrared plastic solar cell- tamilyoungsters.com -2nd PPT
Infrared plastic solar cell- tamilyoungsters.com -2nd PPT
 

Mehr von Gensol Engineering Limited

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Gensol Engineering Limited
 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Gensol Engineering Limited
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Gensol Engineering Limited
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Gensol Engineering Limited
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Gensol Engineering Limited
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Gensol Engineering Limited
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019Gensol Engineering Limited
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Gensol Engineering Limited
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Gensol Engineering Limited
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Gensol Engineering Limited
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Gensol Engineering Limited
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Gensol Engineering Limited
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Gensol Engineering Limited
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Gensol Engineering Limited
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Gensol Engineering Limited
 

Mehr von Gensol Engineering Limited (20)

Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
 
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
 
Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019Gensol Engineering Limited - Investor Deck_26.09.2019
Gensol Engineering Limited - Investor Deck_26.09.2019
 
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19Electric Vehicles - Tax Benefits & Incentives_20.09.19
Electric Vehicles - Tax Benefits & Incentives_20.09.19
 
Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019Phases of Construction & Erection for Wind Power Project_03 09 2019
Phases of Construction & Erection for Wind Power Project_03 09 2019
 
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019List of Solar PV Tenders Floated in India - 11.03.2019
List of Solar PV Tenders Floated in India - 11.03.2019
 
List of successful bidders 11.03.2019
List of successful bidders 11.03.2019List of successful bidders 11.03.2019
List of successful bidders 11.03.2019
 
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
 
Module Price Trend Analysis
Module Price Trend AnalysisModule Price Trend Analysis
Module Price Trend Analysis
 
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System Emerging Opportunities - Wind Solar Hybrid System
Emerging Opportunities - Wind Solar Hybrid System
 
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
 
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
 
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
 
Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18Technical Risks in Solar PV Projects 18.03.18
Technical Risks in Solar PV Projects 18.03.18
 

Kürzlich hochgeladen

Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate ProfessorThyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate Professormuralinath2
 
Genome sequencing,shotgun sequencing.pptx
Genome sequencing,shotgun sequencing.pptxGenome sequencing,shotgun sequencing.pptx
Genome sequencing,shotgun sequencing.pptxSilpa
 
300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptx300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptxryanrooker
 
Reboulia: features, anatomy, morphology etc.
Reboulia: features, anatomy, morphology etc.Reboulia: features, anatomy, morphology etc.
Reboulia: features, anatomy, morphology etc.Silpa
 
Cyanide resistant respiration pathway.pptx
Cyanide resistant respiration pathway.pptxCyanide resistant respiration pathway.pptx
Cyanide resistant respiration pathway.pptxSilpa
 
Role of AI in seed science Predictive modelling and Beyond.pptx
Role of AI in seed science  Predictive modelling and  Beyond.pptxRole of AI in seed science  Predictive modelling and  Beyond.pptx
Role of AI in seed science Predictive modelling and Beyond.pptxArvind Kumar
 
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsBiogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsSérgio Sacani
 
Cyathodium bryophyte: morphology, anatomy, reproduction etc.
Cyathodium bryophyte: morphology, anatomy, reproduction etc.Cyathodium bryophyte: morphology, anatomy, reproduction etc.
Cyathodium bryophyte: morphology, anatomy, reproduction etc.Silpa
 
Use of mutants in understanding seedling development.pptx
Use of mutants in understanding seedling development.pptxUse of mutants in understanding seedling development.pptx
Use of mutants in understanding seedling development.pptxRenuJangid3
 
Selaginella: features, morphology ,anatomy and reproduction.
Selaginella: features, morphology ,anatomy and reproduction.Selaginella: features, morphology ,anatomy and reproduction.
Selaginella: features, morphology ,anatomy and reproduction.Silpa
 
module for grade 9 for distance learning
module for grade 9 for distance learningmodule for grade 9 for distance learning
module for grade 9 for distance learninglevieagacer
 
Genetics and epigenetics of ADHD and comorbid conditions
Genetics and epigenetics of ADHD and comorbid conditionsGenetics and epigenetics of ADHD and comorbid conditions
Genetics and epigenetics of ADHD and comorbid conditionsbassianu17
 
The Mariana Trench remarkable geological features on Earth.pptx
The Mariana Trench remarkable geological features on Earth.pptxThe Mariana Trench remarkable geological features on Earth.pptx
The Mariana Trench remarkable geological features on Earth.pptxseri bangash
 
GBSN - Microbiology (Unit 3)Defense Mechanism of the body
GBSN - Microbiology (Unit 3)Defense Mechanism of the body GBSN - Microbiology (Unit 3)Defense Mechanism of the body
GBSN - Microbiology (Unit 3)Defense Mechanism of the body Areesha Ahmad
 
Dr. E. Muralinath_ Blood indices_clinical aspects
Dr. E. Muralinath_ Blood indices_clinical  aspectsDr. E. Muralinath_ Blood indices_clinical  aspects
Dr. E. Muralinath_ Blood indices_clinical aspectsmuralinath2
 
Digital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptxDigital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptxMohamedFarag457087
 
CYTOGENETIC MAP................ ppt.pptx
CYTOGENETIC MAP................ ppt.pptxCYTOGENETIC MAP................ ppt.pptx
CYTOGENETIC MAP................ ppt.pptxSilpa
 
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...Monika Rani
 
Zoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfZoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfSumit Kumar yadav
 
Atp synthase , Atp synthase complex 1 to 4.
Atp synthase , Atp synthase complex 1 to 4.Atp synthase , Atp synthase complex 1 to 4.
Atp synthase , Atp synthase complex 1 to 4.Silpa
 

Kürzlich hochgeladen (20)

Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate ProfessorThyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
 
Genome sequencing,shotgun sequencing.pptx
Genome sequencing,shotgun sequencing.pptxGenome sequencing,shotgun sequencing.pptx
Genome sequencing,shotgun sequencing.pptx
 
300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptx300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptx
 
Reboulia: features, anatomy, morphology etc.
Reboulia: features, anatomy, morphology etc.Reboulia: features, anatomy, morphology etc.
Reboulia: features, anatomy, morphology etc.
 
Cyanide resistant respiration pathway.pptx
Cyanide resistant respiration pathway.pptxCyanide resistant respiration pathway.pptx
Cyanide resistant respiration pathway.pptx
 
Role of AI in seed science Predictive modelling and Beyond.pptx
Role of AI in seed science  Predictive modelling and  Beyond.pptxRole of AI in seed science  Predictive modelling and  Beyond.pptx
Role of AI in seed science Predictive modelling and Beyond.pptx
 
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsBiogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
 
Cyathodium bryophyte: morphology, anatomy, reproduction etc.
Cyathodium bryophyte: morphology, anatomy, reproduction etc.Cyathodium bryophyte: morphology, anatomy, reproduction etc.
Cyathodium bryophyte: morphology, anatomy, reproduction etc.
 
Use of mutants in understanding seedling development.pptx
Use of mutants in understanding seedling development.pptxUse of mutants in understanding seedling development.pptx
Use of mutants in understanding seedling development.pptx
 
Selaginella: features, morphology ,anatomy and reproduction.
Selaginella: features, morphology ,anatomy and reproduction.Selaginella: features, morphology ,anatomy and reproduction.
Selaginella: features, morphology ,anatomy and reproduction.
 
module for grade 9 for distance learning
module for grade 9 for distance learningmodule for grade 9 for distance learning
module for grade 9 for distance learning
 
Genetics and epigenetics of ADHD and comorbid conditions
Genetics and epigenetics of ADHD and comorbid conditionsGenetics and epigenetics of ADHD and comorbid conditions
Genetics and epigenetics of ADHD and comorbid conditions
 
The Mariana Trench remarkable geological features on Earth.pptx
The Mariana Trench remarkable geological features on Earth.pptxThe Mariana Trench remarkable geological features on Earth.pptx
The Mariana Trench remarkable geological features on Earth.pptx
 
GBSN - Microbiology (Unit 3)Defense Mechanism of the body
GBSN - Microbiology (Unit 3)Defense Mechanism of the body GBSN - Microbiology (Unit 3)Defense Mechanism of the body
GBSN - Microbiology (Unit 3)Defense Mechanism of the body
 
Dr. E. Muralinath_ Blood indices_clinical aspects
Dr. E. Muralinath_ Blood indices_clinical  aspectsDr. E. Muralinath_ Blood indices_clinical  aspects
Dr. E. Muralinath_ Blood indices_clinical aspects
 
Digital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptxDigital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptx
 
CYTOGENETIC MAP................ ppt.pptx
CYTOGENETIC MAP................ ppt.pptxCYTOGENETIC MAP................ ppt.pptx
CYTOGENETIC MAP................ ppt.pptx
 
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS  ESCORT SERVICE In Bhiwan...
Bhiwandi Bhiwandi ❤CALL GIRL 7870993772 ❤CALL GIRLS ESCORT SERVICE In Bhiwan...
 
Zoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfZoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdf
 
Atp synthase , Atp synthase complex 1 to 4.
Atp synthase , Atp synthase complex 1 to 4.Atp synthase , Atp synthase complex 1 to 4.
Atp synthase , Atp synthase complex 1 to 4.
 

3 Common Solar Module Quality Issues to Understand & Act On

  • 1.       3  Common  Solar  Module  Quality  Issues  to  Understand  &   Act  On     Potential Induced Degradation - Potential Induced Degradation (PID) occurs when the module’s voltage potential and leakage current drive ion mobility within the module between the semiconductor material and other elements of the module (e.g. glass, mount and frame), thus causing the module’s power output capacity to degrade. The ion mobility accelerates with humidity, temperature and voltage potential. To bring down the effect caused by PID, manufacturers need to improve the insulation of EVA and refractive index of silicon nitride layer of solar cell. Some suppliers ignore PID-free demand of solar cell, and partially pursue module’s high efficiency. Snail Trail - Snail Trail is caused by solar cell grid discolour and till now the mechanism is still unknown. Main reason is that moisture transmits through the back sheet, EVA and solar cell, and reacts with silver on cell grid and EVA. Choosing the back sheet with low moisture transmission could prevent Snail Trail. Also, the back sheet will turn yellow if the front EVA lets UV transmit. We should strictly control light transmission in EVA selection. Long Time Damp Heat - Solar panel power output will degrade after long-time damp heat (DH). After DH, heat spots might appear in the corresponding position of cell back-electrode in short-circuit condition, which can even cause 70% power degradation. Manufacturers ignore the importance of back electrode, to lower cost at the expense of using little silver. In current IEC standard, module power degradation must be less than 10% after module is subjected to long time damp heat of 1000 Hours.