Project Charter
Project Title:
Improve the Planning & Scheduling Process to Achieve OTIF Requirements for Key Account A, B, C at Plant
123
Expected Customer BenefitsImproved On-Time-In-Full customer delivery contributes to the goal to position Company as the "supplier of
choice" to our customers. Higher customer service level also adds value to the integrated supply chain (ISC) of
the main customers.
Business Case:
Plant 123 received complains from key accounts on the order delivery performance. Improving customer service
level will enhance the customer loyalty, and generate more revenue in the future.
Opportunity Statement: There are disconnections in the order-to-cash process that caused delivery delays to the customer. This project
will use SCOR methodology and Lean tools to identify the Gaps that caused the disconnections and take
actions to bridge the gaps. Specifically in Plant 123, the project will review both the front end
planning/scheduling processes and follow through on the shop floor execution, to improve the scheduling
adherence and OTIF. Meanwhile, the excessive inventory for production orders that are not required in the short
term will be reduced and the shortage of production orders that might cause poor customer service level will be
minimized. The capacity utilization will be more effective as the priority will be given to the production orders
that are really needed. The direct savings will come from right-sizing the WIP & capacity utilization based on
customer demands.
Scope:
The scope of this project is the material part numbers for the four customers. The process starts from receiving
customer orders/forecasts and ends with customer receiving the products.
Metrics METRICS BASELINE CURRENT GOAL UNITS
External
OTIF
Key Acct A: 95%;
Key Acct B: 90%;
Key Acct A: 95%;
Key Acct B: 90%;
Key Acct A: 98%;
Key Acct B: 95%;
PRIMARY METRIC
Internal
OTIF
Key Acct A: 43.8%;
Key Acct B: 77.7%;
Key Acct A: 74.8%;
Key Acct B: 78.3%;
Key Acct A: 90%;
Key Acct B: 90%;
SECONDARY
METRIC
Scheduling
Adherence
SECONDARY
METRIC
4
Project Methodology
X1 Production Order Planning Process
 Demand and Supply Evaluation for New Production Order Creation
 Quality/Engineering Review for the Production Order Release
X2 Production Scheduling & Implementation
X3 Throughput/Capacity/Productivity of the Constraint Work Centers
X4 Raw Material ATP
5
Sub-Projects Portfolio
Y: OTIF = F(X1, X2, X3, X4)
6
Production Order Planning Process
Demand and Supply Evaluation for New Production Order Creation
– Business Issue:
• Current process for production order requirement calculation (MRP process) is not well defined, especially
for the Min/Max products. We need to have a systematic and scientific way to evaluate the production order
situation (both shortage and over production), and cut new production orders for shortages only.
– Measure/Analyze/Improve:
• Before: Production order for production shortage: 55%; After: over 85%
– Progress:
• Open production order analysis T1
• Develop production order planning process for Min/Max materials T2
• ABC based production order planning process for MRP parameters setting in SAP T3
Quality/Engineering Review for the Production Order Release
– Business Issue:
• Current capacity for quality review is 10 product part numbers/day, and there are over 1000 product part
numbers in the “review list”. We need to increase the quality review capacity and make sure the list for
review is prioritized according to the most current requirements.
– Measure/Analysis/Improve:
• Before: Quality review for production orders: 8 orders/day; After: 15 orders/day
– Progress:
• Re-prioritize the list of materials for quality review T1
• Establish the inter-departmental procedure on quality review process T2
• Current wait time for Quality/Engineering review is 11 days T3
• To have a Kaizen event to reduce the wait time into 2-3 days T4
X1: Production Order
Planning Process
7
X1: Production Order
Planning Process
Plant Min/Max Delivery Performance to Key Acct B
8
X1: Production Order
Planning Process
Plant Min/Max Delivery Performance to Key Acct A
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
75.00%
80.00%
85.00%
90.00%
95.00%
100.00%
OTIF Above 80% Max
OTIF Trendline Above 80% Max Trendline
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
90.00%
91.00%
92.00%
93.00%
94.00%
95.00%
96.00%
97.00%
98.00%
99.00%
100.00%
OTIF Above 80% Max
Delivery Performance for Min/Max
(Represents customers measure):
# of Materials Above or Equal Min
# of Materials in MinMax Scope
9
Production Order Scheduling & Implementation
– Business Issue:
• Shop floor has no visibility beyond the current “hot orders”. Even if there is capacity left after all the “hot
orders” for the day are completed. We need a master schedule to prioritize production orders.
– Measure/Analyze/Improve:
• The Excel Macro that helps us to prioritize the production orders and create production schedule has been
reviewed and rewrote. 2010 Q4
• 7 Day finite schedule was produced and pilot run 2010 Q4
• Color code production orders to set priorities categorically, but not specify the exact sequence. Daily
production order sequence is made on the shop floor. 2011 Q1
– Discussion:
• The best level of granularity of shop floor scheduling
• The routing/duration discussion for SAP master data (post Aug 1st)
X2 Production Order Scheduling
Finite Schedule (Form)
by ProdOrd by Day/Shift
Radom
Schedule
“Hot List”
Schedule
Categorical Schedule
by Priority Level
7 Day Schedule but Allow
Daily Re-sequence
10
X2 Production Order Scheduling
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
Plant 123 Scheduling Adherence
11
Increase the Capacity/Productivity/Throughput of the Constraint Work Centers
– Business Issue:
• The overall production rate of plant123 is determined by the pace of the slowest work center(s). We need to
improve the productivity/throughput of the constraint work center(s) to complete the past due orders, to
increase customer inventory to Max, and to prepare for future demands.
– Measure/Analyze/Improve:
• Bottleneck Identification: Pickle & Hot Press
• Throughput Improvement
– Progress:
• Productivity of pickle work center improved by 22.8% 2010 Q4
• Over production cycle time reduced by 50% 2011 Q2
X3: Throughput/Capacity/Productivity
of the Constraints
12
X3: Throughput/Capacity/Productivity
of the Constraints
-40
-20
0
20
40
60
80
100
120
Avg Days Late vs Sch Inferred Actual LT
3 per. Mov. Avg. (Avg Days Late vs Sch) 3 per. Mov. Avg. (Inferred Actual LT)
Actual Lead Time/Lateness of ProdOrd Completion
New Average
In-house Prod
Time:
56days.
13
Ensure Raw Material ATP
– Business Issue:
• The current process to evaluate the raw material requirement is not based on a systematic analysis of the
demand and supply situation of the raw material inventory. On top of that, focus on reduce the inventory
level slowed the reaction to the current demand on raw materials. We need to establish a process to
evaluate the raw material requirement in a more systematic and scientific way
– Progress:
• First round of Raw Material supply and demand analysis 2010 Q4
• First batch of purchase orders of Raw Materials that below the critical level of inventory 2010 Q4
• Establish procedure for raw material requirement review process 2011 Q2
– Discussion:
• Use SAP to drive raw material replenishment
X4: Raw Material ATP
14
X4: Raw Material ATP
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Apr May Jun 7/12 7/18 7/25
2008 2008 2008 2008 2009 2009 2009 2009 2010 2010 2010 2010 2011 2011 2011 2011 2011 2011 2011
FG 396 443 426 443 374 522 467 910 1,843 2,204 2,312 2612 3083 3189 3401 3976 4069 3950
WIP 3,993 3,005 2,918 2,529 2,227 1,915 1,718 1,435 2,422 2,373 2658 3164 3735 3514 2792 2579 2404 2345
RM 5,825 5,646 5,024 4,786 4,676 4,088 4,142 3,505 3,430 3,442 3,143 5324 6079 5776 6230 5843 6031 6005
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
RM WIP FG
INVENTORY
15
Solution Matrix Review: Are the Xs’
Correctly Identified & Addressed?
0.00%
20.00%
40.00%
60.00%
80.00%
90.00%
92.00%
94.00%
96.00%
98.00%
100.00%
Min/Max Delivery Performance to Key Acct
0.00%
20.00%
40.00%
60.00%
Scheduling Adherence
-50
0
50
100
150
Avg Days Late vs Sch
Actual Lead Time/Lateness of ProdOrd Completion
Phase 1Phase 2Phase 3
Planning (X1) ↑ ↓ ↑
Scheduling (X2) - ↑ ↑
Throughput (X3) - - ↑
Raw Mat (X4) ↑ ↑ ↑
OTIF ↑ ↓ ↑
Phase Summary
Phase I Phase II
Team SCM, CI, Site Mgmt Include IT
Tools
SCOR Level3 Lean, 6
Sigma, TOC
Add VSM, SCOR Level
4 (with Info Flow)
Design
High Level Review for
Disconnections; Good
Priority of Xs
A more Thourough
Review for
Disconnections
Measure
Corp Metric + Cust
Metric
SAP Generated Metric
& Rpt
Analyze
/Improve
Excel/Access Based
Tools Plus System
Solution
System Based
Solution
Control SAP MRP
SAP Rpt on Plant &
Cus Inv
17

Weitere ähnliche Inhalte

Was ist angesagt?

Black Belt Project Storyboard Template Example
Black Belt Project Storyboard Template ExampleBlack Belt Project Storyboard Template Example
Black Belt Project Storyboard Template ExampleGoLeanSixSigma.com
 
Warehousing management
Warehousing managementWarehousing management
Warehousing managementMani Kandan K
 
Inventory Management Project
Inventory Management ProjectInventory Management Project
Inventory Management ProjectMOHD ARISH
 
Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Thomas Tanel
 
Inventory Cycle Count Best Practices
Inventory Cycle Count Best PracticesInventory Cycle Count Best Practices
Inventory Cycle Count Best PracticesAndy Eastes
 
Inventory management
Inventory managementInventory management
Inventory managementrajeev227
 
Warehousing management final copy
Warehousing management final copyWarehousing management final copy
Warehousing management final copyAdityaPitale
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planningAnila Vanguri
 
Vendor Managed Inventory (VMI)
Vendor Managed Inventory (VMI)Vendor Managed Inventory (VMI)
Vendor Managed Inventory (VMI)Anand Subramaniam
 
efficiency in supply chain & ware hosing
 efficiency in supply chain & ware hosing efficiency in supply chain & ware hosing
efficiency in supply chain & ware hosingRahul kalyani
 
Vendor Managed Inventory
Vendor Managed InventoryVendor Managed Inventory
Vendor Managed Inventoryloganath85
 
Saving Time and Money in Warehouse Operations (MFSA Annual Conference)
Saving Time and Money in Warehouse Operations (MFSA Annual Conference)Saving Time and Money in Warehouse Operations (MFSA Annual Conference)
Saving Time and Money in Warehouse Operations (MFSA Annual Conference)interlinkONE
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesTKMG, Inc.
 
Managing warehouse operations. How to manage and run warehouse operations by ...
Managing warehouse operations. How to manage and run warehouse operations by ...Managing warehouse operations. How to manage and run warehouse operations by ...
Managing warehouse operations. How to manage and run warehouse operations by ...Omar Youssef
 
Inventory optimization
Inventory optimizationInventory optimization
Inventory optimizationGenpact Ltd
 
Inventory Management Presentation
Inventory Management  Presentation Inventory Management  Presentation
Inventory Management Presentation KattareeyaPrompreing
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortGoLeanSixSigma.com
 
Supply Chain Inventory And Logistics PowerPoint Presentation Slides
Supply Chain Inventory And Logistics PowerPoint Presentation Slides Supply Chain Inventory And Logistics PowerPoint Presentation Slides
Supply Chain Inventory And Logistics PowerPoint Presentation Slides SlideTeam
 

Was ist angesagt? (20)

Black Belt Project Storyboard Template Example
Black Belt Project Storyboard Template ExampleBlack Belt Project Storyboard Template Example
Black Belt Project Storyboard Template Example
 
Warehousing management
Warehousing managementWarehousing management
Warehousing management
 
Inventory Management Project
Inventory Management ProjectInventory Management Project
Inventory Management Project
 
Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management
 
Inventory Cycle Count Best Practices
Inventory Cycle Count Best PracticesInventory Cycle Count Best Practices
Inventory Cycle Count Best Practices
 
Inventory management
Inventory managementInventory management
Inventory management
 
Best practises of inventory optimization
Best practises of inventory optimizationBest practises of inventory optimization
Best practises of inventory optimization
 
Warehousing management final copy
Warehousing management final copyWarehousing management final copy
Warehousing management final copy
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planning
 
Vendor Managed Inventory (VMI)
Vendor Managed Inventory (VMI)Vendor Managed Inventory (VMI)
Vendor Managed Inventory (VMI)
 
efficiency in supply chain & ware hosing
 efficiency in supply chain & ware hosing efficiency in supply chain & ware hosing
efficiency in supply chain & ware hosing
 
Vendor Managed Inventory
Vendor Managed InventoryVendor Managed Inventory
Vendor Managed Inventory
 
Saving Time and Money in Warehouse Operations (MFSA Annual Conference)
Saving Time and Money in Warehouse Operations (MFSA Annual Conference)Saving Time and Money in Warehouse Operations (MFSA Annual Conference)
Saving Time and Money in Warehouse Operations (MFSA Annual Conference)
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Managing warehouse operations. How to manage and run warehouse operations by ...
Managing warehouse operations. How to manage and run warehouse operations by ...Managing warehouse operations. How to manage and run warehouse operations by ...
Managing warehouse operations. How to manage and run warehouse operations by ...
 
Inventory optimization
Inventory optimizationInventory optimization
Inventory optimization
 
Inventory Management Presentation
Inventory Management  Presentation Inventory Management  Presentation
Inventory Management Presentation
 
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma EffortHow A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
 
Just in time
Just in timeJust in time
Just in time
 
Supply Chain Inventory And Logistics PowerPoint Presentation Slides
Supply Chain Inventory And Logistics PowerPoint Presentation Slides Supply Chain Inventory And Logistics PowerPoint Presentation Slides
Supply Chain Inventory And Logistics PowerPoint Presentation Slides
 

Andere mochten auch

Leadership Development in Manufacturing - World Trade Group Presentation 2012
Leadership Development in Manufacturing - World Trade Group Presentation 2012Leadership Development in Manufacturing - World Trade Group Presentation 2012
Leadership Development in Manufacturing - World Trade Group Presentation 2012Pablo Cussatti
 
Manufacturing Recap
Manufacturing RecapManufacturing Recap
Manufacturing RecapMark Huguet
 
AVATA Webinar: Upgrading ASCP - The New Face of ASCP is Here! www.avata.com
AVATA Webinar:  Upgrading ASCP - The New Face of ASCP is Here! www.avata.comAVATA Webinar:  Upgrading ASCP - The New Face of ASCP is Here! www.avata.com
AVATA Webinar: Upgrading ASCP - The New Face of ASCP is Here! www.avata.comAVATA
 
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer ValueBeyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer ValueCognizant
 
The Perfect Order Dashboard
The Perfect Order DashboardThe Perfect Order Dashboard
The Perfect Order Dashboardvaleriepreston
 
Paint Manufacturing Industry Waste Minimization
Paint Manufacturing Industry Waste MinimizationPaint Manufacturing Industry Waste Minimization
Paint Manufacturing Industry Waste MinimizationShahzad Khan
 
Regulatory Reporting Dashboard
Regulatory Reporting DashboardRegulatory Reporting Dashboard
Regulatory Reporting Dashboardaccenture
 

Andere mochten auch (8)

Leadership Development in Manufacturing - World Trade Group Presentation 2012
Leadership Development in Manufacturing - World Trade Group Presentation 2012Leadership Development in Manufacturing - World Trade Group Presentation 2012
Leadership Development in Manufacturing - World Trade Group Presentation 2012
 
Manufacturing Recap
Manufacturing RecapManufacturing Recap
Manufacturing Recap
 
AVATA Webinar: Upgrading ASCP - The New Face of ASCP is Here! www.avata.com
AVATA Webinar:  Upgrading ASCP - The New Face of ASCP is Here! www.avata.comAVATA Webinar:  Upgrading ASCP - The New Face of ASCP is Here! www.avata.com
AVATA Webinar: Upgrading ASCP - The New Face of ASCP is Here! www.avata.com
 
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer ValueBeyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
Beyond the 'Perfect Order' Index: Obtaining a True Measure of Customer Value
 
The Perfect Order Dashboard
The Perfect Order DashboardThe Perfect Order Dashboard
The Perfect Order Dashboard
 
Paint Manufacturing Industry Waste Minimization
Paint Manufacturing Industry Waste MinimizationPaint Manufacturing Industry Waste Minimization
Paint Manufacturing Industry Waste Minimization
 
Financial management 3
Financial management 3Financial management 3
Financial management 3
 
Regulatory Reporting Dashboard
Regulatory Reporting DashboardRegulatory Reporting Dashboard
Regulatory Reporting Dashboard
 

Ähnlich wie Improving OTIF for Key Accounts at Plant 123

Final presentation
Final presentationFinal presentation
Final presentationAmogh Hajare
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015Worksoft
 
Growing your business with BPM
Growing your business with BPMGrowing your business with BPM
Growing your business with BPMinnovelocity
 
Avery Denisson case study (1).pptx
Avery Denisson case study (1).pptxAvery Denisson case study (1).pptx
Avery Denisson case study (1).pptxKajalJoshi40
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Copperberg
 
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...TKMG, Inc.
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control BookLearn With GeekAlign
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Pramod Patil
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationWorksoft
 
MGMT 6103 - Control Phase- CMCC
MGMT 6103 - Control Phase- CMCCMGMT 6103 - Control Phase- CMCC
MGMT 6103 - Control Phase- CMCCLeonard Burch
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de BurgtTEST Huddle
 
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest Northern Ireland
 
Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...LT COLONEL VIKRAM BAKSHI ( RETD)
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivitydrdej19
 

Ähnlich wie Improving OTIF for Key Accounts at Plant 123 (20)

Final presentation
Final presentationFinal presentation
Final presentation
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
 
Growing your business with BPM
Growing your business with BPMGrowing your business with BPM
Growing your business with BPM
 
Renni Consultancy - Introduction
Renni Consultancy - IntroductionRenni Consultancy - Introduction
Renni Consultancy - Introduction
 
Avery Denisson case study (1).pptx
Avery Denisson case study (1).pptxAvery Denisson case study (1).pptx
Avery Denisson case study (1).pptx
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013
 
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
Value Stream Mapping: Beyond the Mechanics - Part 3 (Executing the Transforma...
 
Production Planning & Control Book
Production Planning & Control BookProduction Planning & Control Book
Production Planning & Control Book
 
Qms & iatf presentation1
Qms & iatf presentation1Qms & iatf presentation1
Qms & iatf presentation1
 
Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.Implementation of Business Process Reengineering in Thermax Ltd.
Implementation of Business Process Reengineering in Thermax Ltd.
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with Automation
 
MGMT 6103 - Control Phase- CMCC
MGMT 6103 - Control Phase- CMCCMGMT 6103 - Control Phase- CMCC
MGMT 6103 - Control Phase- CMCC
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt'How To Apply Lean Test Management' by Bob van de Burgt
'How To Apply Lean Test Management' by Bob van de Burgt
 
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journeyInvest NI Lean Conference 2016 | Case Study: AES | Our lean journey
Invest NI Lean Conference 2016 | Case Study: AES | Our lean journey
 
Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
Value Stream Mapping in the Office
Value Stream Mapping in the Office Value Stream Mapping in the Office
Value Stream Mapping in the Office
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivity
 
001 a strategy for productivity
001 a strategy for productivity001 a strategy for productivity
001 a strategy for productivity
 

Improving OTIF for Key Accounts at Plant 123

  • 1. Andrew Si Email: Andrew.sile@gmail.com 1 Note: 1. All rights reserved. This presentation or any portion of it may not be reproduced or used in any manner without the express written permission of the author. 2. The author has made every effort to remove the company specific information. If you notice any company specific or any type of sensitive information in the document, please advise the author.
  • 2. 2
  • 3. 3 Project Charter Project Title: Improve the Planning & Scheduling Process to Achieve OTIF Requirements for Key Account A, B, C at Plant 123 Expected Customer BenefitsImproved On-Time-In-Full customer delivery contributes to the goal to position Company as the "supplier of choice" to our customers. Higher customer service level also adds value to the integrated supply chain (ISC) of the main customers. Business Case: Plant 123 received complains from key accounts on the order delivery performance. Improving customer service level will enhance the customer loyalty, and generate more revenue in the future. Opportunity Statement: There are disconnections in the order-to-cash process that caused delivery delays to the customer. This project will use SCOR methodology and Lean tools to identify the Gaps that caused the disconnections and take actions to bridge the gaps. Specifically in Plant 123, the project will review both the front end planning/scheduling processes and follow through on the shop floor execution, to improve the scheduling adherence and OTIF. Meanwhile, the excessive inventory for production orders that are not required in the short term will be reduced and the shortage of production orders that might cause poor customer service level will be minimized. The capacity utilization will be more effective as the priority will be given to the production orders that are really needed. The direct savings will come from right-sizing the WIP & capacity utilization based on customer demands. Scope: The scope of this project is the material part numbers for the four customers. The process starts from receiving customer orders/forecasts and ends with customer receiving the products. Metrics METRICS BASELINE CURRENT GOAL UNITS External OTIF Key Acct A: 95%; Key Acct B: 90%; Key Acct A: 95%; Key Acct B: 90%; Key Acct A: 98%; Key Acct B: 95%; PRIMARY METRIC Internal OTIF Key Acct A: 43.8%; Key Acct B: 77.7%; Key Acct A: 74.8%; Key Acct B: 78.3%; Key Acct A: 90%; Key Acct B: 90%; SECONDARY METRIC Scheduling Adherence SECONDARY METRIC
  • 5. X1 Production Order Planning Process  Demand and Supply Evaluation for New Production Order Creation  Quality/Engineering Review for the Production Order Release X2 Production Scheduling & Implementation X3 Throughput/Capacity/Productivity of the Constraint Work Centers X4 Raw Material ATP 5 Sub-Projects Portfolio Y: OTIF = F(X1, X2, X3, X4)
  • 6. 6 Production Order Planning Process Demand and Supply Evaluation for New Production Order Creation – Business Issue: • Current process for production order requirement calculation (MRP process) is not well defined, especially for the Min/Max products. We need to have a systematic and scientific way to evaluate the production order situation (both shortage and over production), and cut new production orders for shortages only. – Measure/Analyze/Improve: • Before: Production order for production shortage: 55%; After: over 85% – Progress: • Open production order analysis T1 • Develop production order planning process for Min/Max materials T2 • ABC based production order planning process for MRP parameters setting in SAP T3 Quality/Engineering Review for the Production Order Release – Business Issue: • Current capacity for quality review is 10 product part numbers/day, and there are over 1000 product part numbers in the “review list”. We need to increase the quality review capacity and make sure the list for review is prioritized according to the most current requirements. – Measure/Analysis/Improve: • Before: Quality review for production orders: 8 orders/day; After: 15 orders/day – Progress: • Re-prioritize the list of materials for quality review T1 • Establish the inter-departmental procedure on quality review process T2 • Current wait time for Quality/Engineering review is 11 days T3 • To have a Kaizen event to reduce the wait time into 2-3 days T4 X1: Production Order Planning Process
  • 8. Plant Min/Max Delivery Performance to Key Acct B 8 X1: Production Order Planning Process Plant Min/Max Delivery Performance to Key Acct A 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 75.00% 80.00% 85.00% 90.00% 95.00% 100.00% OTIF Above 80% Max OTIF Trendline Above 80% Max Trendline 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 90.00% 91.00% 92.00% 93.00% 94.00% 95.00% 96.00% 97.00% 98.00% 99.00% 100.00% OTIF Above 80% Max Delivery Performance for Min/Max (Represents customers measure): # of Materials Above or Equal Min # of Materials in MinMax Scope
  • 9. 9 Production Order Scheduling & Implementation – Business Issue: • Shop floor has no visibility beyond the current “hot orders”. Even if there is capacity left after all the “hot orders” for the day are completed. We need a master schedule to prioritize production orders. – Measure/Analyze/Improve: • The Excel Macro that helps us to prioritize the production orders and create production schedule has been reviewed and rewrote. 2010 Q4 • 7 Day finite schedule was produced and pilot run 2010 Q4 • Color code production orders to set priorities categorically, but not specify the exact sequence. Daily production order sequence is made on the shop floor. 2011 Q1 – Discussion: • The best level of granularity of shop floor scheduling • The routing/duration discussion for SAP master data (post Aug 1st) X2 Production Order Scheduling Finite Schedule (Form) by ProdOrd by Day/Shift Radom Schedule “Hot List” Schedule Categorical Schedule by Priority Level 7 Day Schedule but Allow Daily Re-sequence
  • 10. 10 X2 Production Order Scheduling 0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% Plant 123 Scheduling Adherence
  • 11. 11 Increase the Capacity/Productivity/Throughput of the Constraint Work Centers – Business Issue: • The overall production rate of plant123 is determined by the pace of the slowest work center(s). We need to improve the productivity/throughput of the constraint work center(s) to complete the past due orders, to increase customer inventory to Max, and to prepare for future demands. – Measure/Analyze/Improve: • Bottleneck Identification: Pickle & Hot Press • Throughput Improvement – Progress: • Productivity of pickle work center improved by 22.8% 2010 Q4 • Over production cycle time reduced by 50% 2011 Q2 X3: Throughput/Capacity/Productivity of the Constraints
  • 12. 12 X3: Throughput/Capacity/Productivity of the Constraints -40 -20 0 20 40 60 80 100 120 Avg Days Late vs Sch Inferred Actual LT 3 per. Mov. Avg. (Avg Days Late vs Sch) 3 per. Mov. Avg. (Inferred Actual LT) Actual Lead Time/Lateness of ProdOrd Completion New Average In-house Prod Time: 56days.
  • 13. 13 Ensure Raw Material ATP – Business Issue: • The current process to evaluate the raw material requirement is not based on a systematic analysis of the demand and supply situation of the raw material inventory. On top of that, focus on reduce the inventory level slowed the reaction to the current demand on raw materials. We need to establish a process to evaluate the raw material requirement in a more systematic and scientific way – Progress: • First round of Raw Material supply and demand analysis 2010 Q4 • First batch of purchase orders of Raw Materials that below the critical level of inventory 2010 Q4 • Establish procedure for raw material requirement review process 2011 Q2 – Discussion: • Use SAP to drive raw material replenishment X4: Raw Material ATP
  • 14. 14 X4: Raw Material ATP Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Apr May Jun 7/12 7/18 7/25 2008 2008 2008 2008 2009 2009 2009 2009 2010 2010 2010 2010 2011 2011 2011 2011 2011 2011 2011 FG 396 443 426 443 374 522 467 910 1,843 2,204 2,312 2612 3083 3189 3401 3976 4069 3950 WIP 3,993 3,005 2,918 2,529 2,227 1,915 1,718 1,435 2,422 2,373 2658 3164 3735 3514 2792 2579 2404 2345 RM 5,825 5,646 5,024 4,786 4,676 4,088 4,142 3,505 3,430 3,442 3,143 5324 6079 5776 6230 5843 6031 6005 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 RM WIP FG INVENTORY
  • 15. 15 Solution Matrix Review: Are the Xs’ Correctly Identified & Addressed? 0.00% 20.00% 40.00% 60.00% 80.00% 90.00% 92.00% 94.00% 96.00% 98.00% 100.00% Min/Max Delivery Performance to Key Acct 0.00% 20.00% 40.00% 60.00% Scheduling Adherence -50 0 50 100 150 Avg Days Late vs Sch Actual Lead Time/Lateness of ProdOrd Completion Phase 1Phase 2Phase 3 Planning (X1) ↑ ↓ ↑ Scheduling (X2) - ↑ ↑ Throughput (X3) - - ↑ Raw Mat (X4) ↑ ↑ ↑ OTIF ↑ ↓ ↑
  • 16. Phase Summary Phase I Phase II Team SCM, CI, Site Mgmt Include IT Tools SCOR Level3 Lean, 6 Sigma, TOC Add VSM, SCOR Level 4 (with Info Flow) Design High Level Review for Disconnections; Good Priority of Xs A more Thourough Review for Disconnections Measure Corp Metric + Cust Metric SAP Generated Metric & Rpt Analyze /Improve Excel/Access Based Tools Plus System Solution System Based Solution Control SAP MRP SAP Rpt on Plant & Cus Inv
  • 17. 17