ROADS
Water Bound Macadam
Amardeep Singh
2
CATEGORY OF ROADS
• NATIONAL HIGHWAYS – Main highways of India connecting major ports, foreign
highways, capitals of large states. Total length in India 58112 kms
• STATE HIGHWAYS – Alternate roads of state, connecting National Highways and cities
within the state. Total length 137119 kms
• DISTRICT ROADS – Important roads of state serving areas of production and markets.
Total length 470000 kms
• OTHER DISTRICT ROADS – Roads serving rural areas for production and outlet to market
• VILLAGE ROADS – Roads connecting villages. Total length of ODR and VR in India
2650000 kms
– Total length of all type of roads in India is 3315231 kms.
3
TYPICAL ROAD CROSS SECTION
4
GEOMETRIC DESIGN
• Elements of design:
– Sight distance
• The length of road ahead visible to drivers
– Stopping sight distance
– Passing sight distance
– Horizontal alignment
• Super elevation (e=V2/127R)
where, V is velocity (kph) of vehicle and R is radius (mtr) of curve
Super elevation commonly not more than 12 % of the width of road
• Minimum radius
– Vertical alignment
– Pavement design
– Intersection and crossing design
5
Pavement Thickness Design
• Determined by IRC : 37 , two parameters are required –
MSA and CBR
Design Traffic in CVPD (A)
A = P(1 + r ) x
P = No. of commercial vehicles per day (CVPD) as per last count
X = No. of years between last count & the year of completion(Yrs.)
Design traffic in Million Standard Axles (MSA) (N)
N = [ 365 x A x [( 1+r ) n - 1] x F x D] / r
A = Design Traffic in CVPD.
r = annual growth rate of commercial vehicles
n = design life in years
F = vehicle damage factor
D = lane distribution factor
– California Bearing Ratio (CBR) of underlying soil of road
Soaked CBR value ( after 96 hours of submerged in water )
Average traffic of 7 days is computed and only Buses, Trucks and other heavy vehicles
came under commercial vehicles category.
6
Calculation of MSA
Traffic data provided by client
Car/Van/
A rick. Bus Truck
Mcycle/
scooter
Animal
driven Cycle
Others
(Heavy)
3473 334 2726 2467 773 1740 927
Commercial Vehicles per day(Trucks+ Buses + Others heavy) = 3987
Conversion into PCU’s
1 3 3 0.5 6 0.5 3
3473 1002 8178 1233.5 4638 870 2781
Total PCU = 22176
PCU = Passenger Car Unit, it is a conversion factor as per IRC
to convert each vehicle to equivalent to Car. It is required to
determine the width of the road as per designed traffic.
7
Calculation of MSA
CALULATION OF M.S.A. (IRC:37-2001)
Sr. No.
Abservat
ion
Descripti
on Value
1 P
No. of commercial vehs as per last
count 3987
2 x No. of years between last count & the year of completion(Yrs.) 1
3 CARRIAGE WAY LANES 2
4 A Design Traffic in CVPD. A + P(1 +r )^ x 4286
5 r ANNUAL GROWTH RATE OF COMMERCIAL VEHICLES 0.075
6 n DESIGN LIFE IN YEARS 5
5 F VEHICLE DAMAGE FACTOR 4.5
AS PER TABLE NO 5.1 OF IRC
7 D LANE DISTRIBUTION FACTOR 0.75
8 N DESIGN TRAFFIC IN Million Standard Axles 30.67
N = [ 365 x A x [( 1+r ) n - 1] x F x D] / r (Say) 31
After the calculations of MSA
and values of soaked CBR are
known, with reference of
IRC:37-2001 the pavement
thickness is determined.
8
Calculation of MSA
At MSA 30 and soaked CBR
value assumed 5% , with
reference of IRC:37-2001 the
pavement thickness is as per
table.
Total Pavement Thickness : 710 mm
BC : 40 mm
DBM : 120 mm
Base : 250 mm
Sub-Base : 300 mm
9
Carriage Lane widths as per IRC
• Single lane -- 3.75 m
• Two lane, no kerbs -- 7.0 m
• Two lane, raised kerbs -- 7.5 m
• Intermediate carriage way -- 5.5 m
• Multi lane -- 3.5 m x no of lanes
10
Construction of Road - WBM works
• Water bound macadam is most commonly used practice in road
construction in India. It was developed by a Scottish Engineer John
Loudon McAdam.
• The road layer consists of clean crushed aggregates, mechanically
interlocked by rolling and bound together with screenings, filler
material and water laid on a well compacted base course, is called
water bound macadam (W.B.M.). Generally all operations of W.B.M.
is done manually by skilled labor.
• Water Bound Macadam comes under Base / Sub Base Category
• There are commonly three types of aggregate sizes/ Gradings
G1 – 90 to 45 mm
G2 – 63 to 45 mm
G3 – 53 to 22.4 mm
11
Construction of Road - WBM works
Materials
• Coarse aggregates : Coarse aggregates shall be either crushed or broken stone, crushed
slag, over burnt brick aggregates or any other naturally occurring aggregates such as kankar
and laterite of suitable quality. Not less than 90 percent by weight of the gravel/shingle pieces
retained on 4.75 mm sieve shall have at least two fractured faces.
• Screenings : Screenings to fill voids in the coarse aggregate shall generally consist of the
same material (13.2 mm or 11.2 mm crushed stone chips) as the coarse aggregate. However,
where permitted, predominantly non-plastic material such as moorum or gravel (other than
rounded river borne material) may be used for this purpose provided liquid limit and plasticity
index of such material are below 20 and 6 respectively and fraction passing 75 micron sieve
does not exceed 10 percent.
• Binding material : Binding material to be used for water bound macadam as a filler material
meant for preventing raveling shall comprise of a suitable material having a Plasticity Index
(PI) value of less than 6 as determined in accordance with IS:2720 (Part-5).
For Binding material crusher dust, fly ash may also be used because of its non plastic nature if
approved by client.
12
Construction of Road - WBM works
Laying of Aggregates Dry Rolling
Spreading of screenings Water sprinkling and compaction
13
Construction of Road - WBM works
• Construction Operations
1. Preparation of base : The surface of the sub-grade to receive the
water bound macadam course shall be prepared to the specified grade and camber
and cleaned of dust, dirt and other extraneous material.
2. Spreading coarse aggregates : The coarse aggregates shall be spread
uniformly and evenly upon the prepared sub-grade/sub-base in the required
quantities from the stockpiles. The thickness of each compacted layer is not more
than 100 mm for Grading 1 and 75 mm for Grading 2 and 3.
Generally in road works loose thickness of layer is provided 1.33 times to the
desired compacted thickness.
Wooden blocks of desired loose thickness of layer can be used to maintain level.
Wherever possible, approved mechanical devise such as Grader can be used to
spread the aggregates uniformly so as to minimize the need for manual rectification
afterwards. For spreading of aggregates use of JCB of directly by dumper should be restricted.
14
Construction of Road - WBM works
3. Rolling: Immediately following the spreading of the coarse aggregate,
Dry rolling shall be started with three wheeled power rollers of 80 to 100 kN
capacity or tandem or vibratory rollers of 80 to 100 kN static weight.
Rolling shall begin from the edges gradually progressing towards the centre.
First the edges shall be compacted then roller move inward parallel to the centre
line of the road, in successive passes uniformly lapping preceding tracks by at least one half
width at a speed of 10 km/hr.
4. Rolling shall be discontinued when the aggregates are partially
compacted with sufficient void space in them to permit application of screenings.
5. During Dry rolling, slight sprinkling of water may be done, if necessary.
Material which gets crushed excessively during compaction or becomes segregated
shall be removed and replaced with suitable aggregates.
15
Construction of Road - WBM works
6. Application of screenings: After the coarse aggregate has been Dry
rolled, Screenings to completely fill the voids and shall be applied gradually over
the surface. Dry rolling shall be done while the screenings are being spread so that
vibrations of the roller cause them to settle into the voids of the coarse aggregate.
The screenings shall not be dumped in piles but be spread uniformly in successive
thin layers either by the spreading motions of hand shovels or by mechanical spreaders, or
directly from tipper with suitable grit spreading arrangement.
7. Sprinkling of water and grouting: After the screenings have been
applied, the surface shall be copiously sprinkled with water, swept and rolled. Hand
brooms shall be used to sweep the wet screenings into voids and to distribute them
evenly.
16
Construction of Road - WBM works
8. Application of binding material: After the application of screenings
the binding material shall be applied successively in two or more thin layers at a
slow and uniform rate.
After each application, the surface shall be copiously sprinkled with
water, the resulting slurry swept in with hand brooms, or mechanical brooms to fill
the voids properly, and rolled during which water shall be applied to the wheels of
the rollers if necessary to wash down the binding material sticking to them.
These operations shall continue until the resulting slurry after filling of voids, forms
a wave ahead of the wheels of the moving roller.
9. Setting and drying: After the final compaction of water bound
macadam course, the pavement shall be allowed to dry overnight. Next morning
hungry spots shall be filled with screenings or binding material as directed, lightly
sprinkled with water if necessary and rolled. No traffic shall be allowed on the road
until the macadam has set.
The compacted water bound macadam course should be allowed to completely dry
and set before the next pavement course is laid over it.
The water bound macadam work shall not be carried out when the atmospheric
temperature is less than 100C in the shade.
17
Grading Requirements Of Aggregates
18
Quantities of Aggregates and screenings -
10m2 area
19
Quantities of Binding material -10m2 area
• The quantity of binding material required for 75 mm compacted
thickness of water bound macadam will be 0.06-0.09 m3/10m2 and
• 0.08-0.10m3/10m2 for 100 mm compacted thickness.
20
DRAINAGE of WATER
• DRAINAGE is VERY! VERY! VERY! IMPORTANT, both in relation to road pavement
construction and maintenance.
• Good drainage will help to keep the water table (and strength) of the road
pavement in equilibrium.
• Rain water should be drained out through camber provided and should not
collect over the wearing surface in any case.
• Water below the road pavement must be kept low and not be allowed to rise up
into the construction layers
• The road pavement must be constructed so that it will drain in the event of a
failure of the integrity of the surfacing layers, i.e. if water is able to enter the
road pavement there must be a path for it to exit.
21
DRAINAGE SYSTEMS FAILURE
22

Weitere ähnliche Inhalte

Was ist angesagt?

Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 SupriyaPal10
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement designRohit Ranjan
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavementpjainrahul
 
Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )mohit kumar panchal
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenanceSatyapal Singh
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and SuperelevationMir Zafarullah
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highwayPratikShinde113
 
Road Construction
Road ConstructionRoad Construction
Road ConstructionDanish Mohd
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavementsHARITSEHRAWAT
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEsrinivas cnu
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress Ankit Sarkar
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 

Was ist angesagt? (20)

Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37
 
ppt on pavement design
ppt on pavement designppt on pavement design
ppt on pavement design
 
Rigid pavement
Rigid pavementRigid pavement
Rigid pavement
 
Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )Highway notes (planning, alignment, & geometric design )
Highway notes (planning, alignment, & geometric design )
 
Low cost road
Low cost roadLow cost road
Low cost road
 
Pavement failures and maintenance
Pavement failures and maintenancePavement failures and maintenance
Pavement failures and maintenance
 
Transition curve and Superelevation
Transition curve and SuperelevationTransition curve and Superelevation
Transition curve and Superelevation
 
Vacuum dewatering
Vacuum dewateringVacuum dewatering
Vacuum dewatering
 
Pavement Deterioration
Pavement DeteriorationPavement Deterioration
Pavement Deterioration
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highway
 
Road Construction
Road ConstructionRoad Construction
Road Construction
 
Flexible and-rigid-pavements
Flexible and-rigid-pavementsFlexible and-rigid-pavements
Flexible and-rigid-pavements
 
Rigid pavements
Rigid pavements Rigid pavements
Rigid pavements
 
Irc 37-2018
Irc 37-2018Irc 37-2018
Irc 37-2018
 
Bearings in bridges
Bearings in bridgesBearings in bridges
Bearings in bridges
 
BALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGEBALANCED CANTILEVER BRIDGE
BALANCED CANTILEVER BRIDGE
 
Unit 2
Unit 2Unit 2
Unit 2
 
Rigid pavement distress
Rigid pavement distress Rigid pavement distress
Rigid pavement distress
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Types of pavements
Types of pavementsTypes of pavements
Types of pavements
 

Ähnlich wie Roads design as per IRC 37

Road bridge & railway construction pdf
Road bridge & railway construction pdfRoad bridge & railway construction pdf
Road bridge & railway construction pdfSaqib Imran
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD hitendra pendam
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemeakram akhtar
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD hitendra pendam
 
Industrial training abhi edited.pdf
Industrial training abhi edited.pdfIndustrial training abhi edited.pdf
Industrial training abhi edited.pdfAbhi858562
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)alamrintu
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)Anil Gupta
 
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptx
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptxSubgrade, ETB and Asphalt Site Organisation construction procedure-2.pptx
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptxEricNikorido1
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfDanielWisman1
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptxWajehUlHassan
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADGLA University
 

Ähnlich wie Roads design as per IRC 37 (20)

Road bridge & railway construction pdf
Road bridge & railway construction pdfRoad bridge & railway construction pdf
Road bridge & railway construction pdf
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
 
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage systemwidening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage system
 
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
ESTIMATE THE CONSTRUCTION PROCEDURE OF WATER-BOUND MACADAM ROAD
 
Industrial training abhi edited.pdf
Industrial training abhi edited.pdfIndustrial training abhi edited.pdf
Industrial training abhi edited.pdf
 
Roads & bridges
Roads & bridgesRoads & bridges
Roads & bridges
 
Highway construction and equipments
Highway construction and equipmentsHighway construction and equipments
Highway construction and equipments
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)RIGID PAVEMENT -ANIL GUPTA (P.W.D)
RIGID PAVEMENT -ANIL GUPTA (P.W.D)
 
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptx
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptxSubgrade, ETB and Asphalt Site Organisation construction procedure-2.pptx
Subgrade, ETB and Asphalt Site Organisation construction procedure-2.pptx
 
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdfROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
ROAD CONSTRUCTION (FLEXIBLE & RIGID) - SLIDES.pdf
 
123 VIKASH.pptx
123 VIKASH.pptx123 VIKASH.pptx
123 VIKASH.pptx
 
Transportation Pavement.pptx
Transportation Pavement.pptxTransportation Pavement.pptx
Transportation Pavement.pptx
 
Road of construction
Road of construction Road of construction
Road of construction
 
Presentation sayed
Presentation sayedPresentation sayed
Presentation sayed
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
Anshuman.pptx
Anshuman.pptxAnshuman.pptx
Anshuman.pptx
 
Vgguj.pptx
Vgguj.pptxVgguj.pptx
Vgguj.pptx
 
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWDSUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 

Mehr von Amardeep Singh

Concrete m ix design m 15 with bottom ash
Concrete m ix design m 15 with bottom ashConcrete m ix design m 15 with bottom ash
Concrete m ix design m 15 with bottom ashAmardeep Singh
 
Sand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam constructionSand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam constructionAmardeep Singh
 
Standard Penetration Test for soils
Standard Penetration Test for soilsStandard Penetration Test for soils
Standard Penetration Test for soilsAmardeep Singh
 
Sand chimney in embankment of dam
Sand chimney in embankment of damSand chimney in embankment of dam
Sand chimney in embankment of damAmardeep Singh
 
Reinforcement welding in civil engineering
Reinforcement welding in civil engineeringReinforcement welding in civil engineering
Reinforcement welding in civil engineeringAmardeep Singh
 
Triaxial shear test of soils
Triaxial shear test of soilsTriaxial shear test of soils
Triaxial shear test of soilsAmardeep Singh
 
Bearing capacity of rocky strata
Bearing capacity of rocky strata Bearing capacity of rocky strata
Bearing capacity of rocky strata Amardeep Singh
 
Pre and post concreting checks
Pre and post concreting checksPre and post concreting checks
Pre and post concreting checksAmardeep Singh
 
Min max dosage of admixture
Min max dosage of admixtureMin max dosage of admixture
Min max dosage of admixtureAmardeep Singh
 
Design mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability methodDesign mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability methodAmardeep Singh
 

Mehr von Amardeep Singh (11)

Concrete m ix design m 15 with bottom ash
Concrete m ix design m 15 with bottom ashConcrete m ix design m 15 with bottom ash
Concrete m ix design m 15 with bottom ash
 
Bearings in Bridges
Bearings in BridgesBearings in Bridges
Bearings in Bridges
 
Sand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam constructionSand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam construction
 
Standard Penetration Test for soils
Standard Penetration Test for soilsStandard Penetration Test for soils
Standard Penetration Test for soils
 
Sand chimney in embankment of dam
Sand chimney in embankment of damSand chimney in embankment of dam
Sand chimney in embankment of dam
 
Reinforcement welding in civil engineering
Reinforcement welding in civil engineeringReinforcement welding in civil engineering
Reinforcement welding in civil engineering
 
Triaxial shear test of soils
Triaxial shear test of soilsTriaxial shear test of soils
Triaxial shear test of soils
 
Bearing capacity of rocky strata
Bearing capacity of rocky strata Bearing capacity of rocky strata
Bearing capacity of rocky strata
 
Pre and post concreting checks
Pre and post concreting checksPre and post concreting checks
Pre and post concreting checks
 
Min max dosage of admixture
Min max dosage of admixtureMin max dosage of admixture
Min max dosage of admixture
 
Design mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability methodDesign mix method of bitumenous materials by Marshall stability method
Design mix method of bitumenous materials by Marshall stability method
 

Kürzlich hochgeladen

Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Kürzlich hochgeladen (20)

Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

Roads design as per IRC 37

  • 2. 2 CATEGORY OF ROADS • NATIONAL HIGHWAYS – Main highways of India connecting major ports, foreign highways, capitals of large states. Total length in India 58112 kms • STATE HIGHWAYS – Alternate roads of state, connecting National Highways and cities within the state. Total length 137119 kms • DISTRICT ROADS – Important roads of state serving areas of production and markets. Total length 470000 kms • OTHER DISTRICT ROADS – Roads serving rural areas for production and outlet to market • VILLAGE ROADS – Roads connecting villages. Total length of ODR and VR in India 2650000 kms – Total length of all type of roads in India is 3315231 kms.
  • 4. 4 GEOMETRIC DESIGN • Elements of design: – Sight distance • The length of road ahead visible to drivers – Stopping sight distance – Passing sight distance – Horizontal alignment • Super elevation (e=V2/127R) where, V is velocity (kph) of vehicle and R is radius (mtr) of curve Super elevation commonly not more than 12 % of the width of road • Minimum radius – Vertical alignment – Pavement design – Intersection and crossing design
  • 5. 5 Pavement Thickness Design • Determined by IRC : 37 , two parameters are required – MSA and CBR Design Traffic in CVPD (A) A = P(1 + r ) x P = No. of commercial vehicles per day (CVPD) as per last count X = No. of years between last count & the year of completion(Yrs.) Design traffic in Million Standard Axles (MSA) (N) N = [ 365 x A x [( 1+r ) n - 1] x F x D] / r A = Design Traffic in CVPD. r = annual growth rate of commercial vehicles n = design life in years F = vehicle damage factor D = lane distribution factor – California Bearing Ratio (CBR) of underlying soil of road Soaked CBR value ( after 96 hours of submerged in water ) Average traffic of 7 days is computed and only Buses, Trucks and other heavy vehicles came under commercial vehicles category.
  • 6. 6 Calculation of MSA Traffic data provided by client Car/Van/ A rick. Bus Truck Mcycle/ scooter Animal driven Cycle Others (Heavy) 3473 334 2726 2467 773 1740 927 Commercial Vehicles per day(Trucks+ Buses + Others heavy) = 3987 Conversion into PCU’s 1 3 3 0.5 6 0.5 3 3473 1002 8178 1233.5 4638 870 2781 Total PCU = 22176 PCU = Passenger Car Unit, it is a conversion factor as per IRC to convert each vehicle to equivalent to Car. It is required to determine the width of the road as per designed traffic.
  • 7. 7 Calculation of MSA CALULATION OF M.S.A. (IRC:37-2001) Sr. No. Abservat ion Descripti on Value 1 P No. of commercial vehs as per last count 3987 2 x No. of years between last count & the year of completion(Yrs.) 1 3 CARRIAGE WAY LANES 2 4 A Design Traffic in CVPD. A + P(1 +r )^ x 4286 5 r ANNUAL GROWTH RATE OF COMMERCIAL VEHICLES 0.075 6 n DESIGN LIFE IN YEARS 5 5 F VEHICLE DAMAGE FACTOR 4.5 AS PER TABLE NO 5.1 OF IRC 7 D LANE DISTRIBUTION FACTOR 0.75 8 N DESIGN TRAFFIC IN Million Standard Axles 30.67 N = [ 365 x A x [( 1+r ) n - 1] x F x D] / r (Say) 31 After the calculations of MSA and values of soaked CBR are known, with reference of IRC:37-2001 the pavement thickness is determined.
  • 8. 8 Calculation of MSA At MSA 30 and soaked CBR value assumed 5% , with reference of IRC:37-2001 the pavement thickness is as per table. Total Pavement Thickness : 710 mm BC : 40 mm DBM : 120 mm Base : 250 mm Sub-Base : 300 mm
  • 9. 9 Carriage Lane widths as per IRC • Single lane -- 3.75 m • Two lane, no kerbs -- 7.0 m • Two lane, raised kerbs -- 7.5 m • Intermediate carriage way -- 5.5 m • Multi lane -- 3.5 m x no of lanes
  • 10. 10 Construction of Road - WBM works • Water bound macadam is most commonly used practice in road construction in India. It was developed by a Scottish Engineer John Loudon McAdam. • The road layer consists of clean crushed aggregates, mechanically interlocked by rolling and bound together with screenings, filler material and water laid on a well compacted base course, is called water bound macadam (W.B.M.). Generally all operations of W.B.M. is done manually by skilled labor. • Water Bound Macadam comes under Base / Sub Base Category • There are commonly three types of aggregate sizes/ Gradings G1 – 90 to 45 mm G2 – 63 to 45 mm G3 – 53 to 22.4 mm
  • 11. 11 Construction of Road - WBM works Materials • Coarse aggregates : Coarse aggregates shall be either crushed or broken stone, crushed slag, over burnt brick aggregates or any other naturally occurring aggregates such as kankar and laterite of suitable quality. Not less than 90 percent by weight of the gravel/shingle pieces retained on 4.75 mm sieve shall have at least two fractured faces. • Screenings : Screenings to fill voids in the coarse aggregate shall generally consist of the same material (13.2 mm or 11.2 mm crushed stone chips) as the coarse aggregate. However, where permitted, predominantly non-plastic material such as moorum or gravel (other than rounded river borne material) may be used for this purpose provided liquid limit and plasticity index of such material are below 20 and 6 respectively and fraction passing 75 micron sieve does not exceed 10 percent. • Binding material : Binding material to be used for water bound macadam as a filler material meant for preventing raveling shall comprise of a suitable material having a Plasticity Index (PI) value of less than 6 as determined in accordance with IS:2720 (Part-5). For Binding material crusher dust, fly ash may also be used because of its non plastic nature if approved by client.
  • 12. 12 Construction of Road - WBM works Laying of Aggregates Dry Rolling Spreading of screenings Water sprinkling and compaction
  • 13. 13 Construction of Road - WBM works • Construction Operations 1. Preparation of base : The surface of the sub-grade to receive the water bound macadam course shall be prepared to the specified grade and camber and cleaned of dust, dirt and other extraneous material. 2. Spreading coarse aggregates : The coarse aggregates shall be spread uniformly and evenly upon the prepared sub-grade/sub-base in the required quantities from the stockpiles. The thickness of each compacted layer is not more than 100 mm for Grading 1 and 75 mm for Grading 2 and 3. Generally in road works loose thickness of layer is provided 1.33 times to the desired compacted thickness. Wooden blocks of desired loose thickness of layer can be used to maintain level. Wherever possible, approved mechanical devise such as Grader can be used to spread the aggregates uniformly so as to minimize the need for manual rectification afterwards. For spreading of aggregates use of JCB of directly by dumper should be restricted.
  • 14. 14 Construction of Road - WBM works 3. Rolling: Immediately following the spreading of the coarse aggregate, Dry rolling shall be started with three wheeled power rollers of 80 to 100 kN capacity or tandem or vibratory rollers of 80 to 100 kN static weight. Rolling shall begin from the edges gradually progressing towards the centre. First the edges shall be compacted then roller move inward parallel to the centre line of the road, in successive passes uniformly lapping preceding tracks by at least one half width at a speed of 10 km/hr. 4. Rolling shall be discontinued when the aggregates are partially compacted with sufficient void space in them to permit application of screenings. 5. During Dry rolling, slight sprinkling of water may be done, if necessary. Material which gets crushed excessively during compaction or becomes segregated shall be removed and replaced with suitable aggregates.
  • 15. 15 Construction of Road - WBM works 6. Application of screenings: After the coarse aggregate has been Dry rolled, Screenings to completely fill the voids and shall be applied gradually over the surface. Dry rolling shall be done while the screenings are being spread so that vibrations of the roller cause them to settle into the voids of the coarse aggregate. The screenings shall not be dumped in piles but be spread uniformly in successive thin layers either by the spreading motions of hand shovels or by mechanical spreaders, or directly from tipper with suitable grit spreading arrangement. 7. Sprinkling of water and grouting: After the screenings have been applied, the surface shall be copiously sprinkled with water, swept and rolled. Hand brooms shall be used to sweep the wet screenings into voids and to distribute them evenly.
  • 16. 16 Construction of Road - WBM works 8. Application of binding material: After the application of screenings the binding material shall be applied successively in two or more thin layers at a slow and uniform rate. After each application, the surface shall be copiously sprinkled with water, the resulting slurry swept in with hand brooms, or mechanical brooms to fill the voids properly, and rolled during which water shall be applied to the wheels of the rollers if necessary to wash down the binding material sticking to them. These operations shall continue until the resulting slurry after filling of voids, forms a wave ahead of the wheels of the moving roller. 9. Setting and drying: After the final compaction of water bound macadam course, the pavement shall be allowed to dry overnight. Next morning hungry spots shall be filled with screenings or binding material as directed, lightly sprinkled with water if necessary and rolled. No traffic shall be allowed on the road until the macadam has set. The compacted water bound macadam course should be allowed to completely dry and set before the next pavement course is laid over it. The water bound macadam work shall not be carried out when the atmospheric temperature is less than 100C in the shade.
  • 18. 18 Quantities of Aggregates and screenings - 10m2 area
  • 19. 19 Quantities of Binding material -10m2 area • The quantity of binding material required for 75 mm compacted thickness of water bound macadam will be 0.06-0.09 m3/10m2 and • 0.08-0.10m3/10m2 for 100 mm compacted thickness.
  • 20. 20 DRAINAGE of WATER • DRAINAGE is VERY! VERY! VERY! IMPORTANT, both in relation to road pavement construction and maintenance. • Good drainage will help to keep the water table (and strength) of the road pavement in equilibrium. • Rain water should be drained out through camber provided and should not collect over the wearing surface in any case. • Water below the road pavement must be kept low and not be allowed to rise up into the construction layers • The road pavement must be constructed so that it will drain in the event of a failure of the integrity of the surfacing layers, i.e. if water is able to enter the road pavement there must be a path for it to exit.
  • 22. 22