SlideShare ist ein Scribd-Unternehmen logo
1 von 17
COMPUTER AIDED QUALITY
METROLOGY & QUALITY ASSURANCE
QUALITY
We can define quality as:
 A degree of excellence
 Conformance to requirement
 Totality of characteristics which act to satisfy need
 Fitness for Use and Purpose
 Freedom from defects
 Delighting customers
QUALITY CONTROL
Quality control is a system of
 Inspection
 Analysis
 Action applied
OBJECTIVES OF QUALITY CONTROL
Objectives of Quality control are:
 Establish desired quality standards
 Discover flow of variation in raw material and manufacturing process
 Evaluate methods and process of functioning
 Suggest improvement
 Determine the extent of quality deviation
 Analyse in detail the causes of such deviations
 Undertake steps which are helpful in achieving the desired quality
WHAT IS COMPUTER AIDED QUALITY
CONTROL?
The use of computers for quality control the product is called as the
Computer aided quality control or CAQC.
DIFFERENCE BETWEEN QC & CAQC
Quality Control Computer Aided Quality Control
1. Major parts of quality control are
inspection and testing
2. Operations are traditionally
performed manually with the help
of gages, measuring devices and
testing apparatus.
1. Major parts of CAQC are computer
aided inspection (CAI) and
computer aided testing (CAT)
2. Operations are digitally performed
on computers
BLOCK DIAGRAM OF COMPUTER AIDED QUALITY CONTROL (CAQC)
COMPUTER AIDED INSPECTION (CAI)
It is use of computer based software tools that assist quality engineers,
machinists and inspectors in manufacturing product components
Its primary purpose is to create a faster production process and
components with more precise dimensions and material consistency.
COMPUTER AIDED INSPECTION (CAI)
Computer aided inspection (CAI) is a software tool that makes it
Possible to inspect physical models using computer aided design
(CAD) programs.
COMPUTER AIDED TESTING (CAT)
The applications of computer to control either analogue or digital test
Techniques in order to evaluate the quality of components and products.
Computer aided testing is used to check that the component parts,
Subassemblies, and full systems are within specified tolerance and
Also perform up to specifications.
COMPUTER AIDED TESTING (CAT)
Performance to specification may require that unit or system operates
Under stressful conditions that would not be encountered in normal use.
The parameters (test criteria) for computer-aided testing are often
derived from computer aided design and computer aided
manufacturing systems.
ADVANTAGES OF COMPUTER AIDED
QUALITY CONTROL
1. 100% Testing and Inspection
 In traditional manual process the testing and inspection is done by
sampling process out of hundred and thousands of products and parts
manufactured by the part company since it is not feasible to check
each and every product.
 With CAI and CAT hundred percent inspection and testing can be
accomplished without much difficulty.
ADVANTAGES OF COMPUTER AIDED
QUALITY CONTROL
2. Inspection integrated with manufacturing process:
 No separate department is necessarily made for inspection.
 In CAQC the inspection process is integrated with the
manufacturing process and it is located along thee production line.
 This helps in reducing the overall time required for manufacturing
the process.
ADVANTAGES OF COMPUTER AIDED
QUALITY CONTROL
3. Use of Non-Contact Sensor:
 In CAQC non-contact sensors are used for the inspection purpose
and they inspect the product without coming in contact with the product.
 Sensors can check the product very quickly in the fraction of seconds.
 In future, the robots would be used to carry-out the inspection
process thus further automating and speeding the process.
ADVANTAGES OF COMPUTER AIDED
QUALITY CONTROL
4. Computerized Feedback control system:
 The data collected by non-contact sensor is sent as the feedback to
the computerized control system.
 These systems would carry out the analysis of the data including
statistical trend analysis.
 This helps in identifying the problem going on in the manufacturing
line and find appropriate solution to it.
ADVANTAGES OF COMPUTER AIDED
QUALITY CONTROL
5. Computer Aided Quality Control (CAQC) and
CAD/CAM Integration:
 All the applications of CAQC can be integrated with CAM/CAD
to make the whole process of designing and manufacturing controlled
by the computers converted into fully automated process.
THANK YOU
2017ME516@STUDENT.UET.EDU.PK

Weitere ähnliche Inhalte

Was ist angesagt?

Computer numerical control (CNC)
Computer numerical control (CNC)Computer numerical control (CNC)
Computer numerical control (CNC)Sudip Phuyal
 
CNC machining
CNC machiningCNC machining
CNC machiningnitigga92
 
Unit 5 -1-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 5 -1-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 5 -1-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 5 -1-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURINGMohanumar S
 
Coordinate Measuring Machine (CMM)
Coordinate Measuring  Machine (CMM)Coordinate Measuring  Machine (CMM)
Coordinate Measuring Machine (CMM)RajabhauMatePatil1
 
Numerical control machines
Numerical control machines Numerical control machines
Numerical control machines jntuhcej
 
CAD AND CAM PPT.pptx
CAD AND CAM PPT.pptxCAD AND CAM PPT.pptx
CAD AND CAM PPT.pptxjntuhcej
 
6 CHAPTER SIX - COMPUTER AIDED INSPECTION.ppt
6 CHAPTER SIX - COMPUTER AIDED INSPECTION.ppt6 CHAPTER SIX - COMPUTER AIDED INSPECTION.ppt
6 CHAPTER SIX - COMPUTER AIDED INSPECTION.pptfahamkhan7
 
Cnc, dnc & adaptive control
Cnc, dnc & adaptive controlCnc, dnc & adaptive control
Cnc, dnc & adaptive controlparabajinkya0070
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Nitin Patil
 
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)mathanArumugam
 
12 cnc & part programming
12 cnc & part programming12 cnc & part programming
12 cnc & part programmingM Siva Kumar
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)Victor Al
 
Unit V CNC Machining
Unit V CNC MachiningUnit V CNC Machining
Unit V CNC Machininglaxtwinsme
 

Was ist angesagt? (20)

Computer numerical control (CNC)
Computer numerical control (CNC)Computer numerical control (CNC)
Computer numerical control (CNC)
 
CNC machining
CNC machiningCNC machining
CNC machining
 
Lecture 3 Computer - Aided Manufacturing (CAM)
Lecture 3 Computer - Aided Manufacturing (CAM)Lecture 3 Computer - Aided Manufacturing (CAM)
Lecture 3 Computer - Aided Manufacturing (CAM)
 
Unit 5 -1-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 5 -1-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 5 -1-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 5 -1-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
 
Coordinate Measuring Machine (CMM)
Coordinate Measuring  Machine (CMM)Coordinate Measuring  Machine (CMM)
Coordinate Measuring Machine (CMM)
 
Numerical control machines
Numerical control machines Numerical control machines
Numerical control machines
 
CAD AND CAM PPT.pptx
CAD AND CAM PPT.pptxCAD AND CAM PPT.pptx
CAD AND CAM PPT.pptx
 
DNC SYSTEMS
DNC SYSTEMSDNC SYSTEMS
DNC SYSTEMS
 
6 CHAPTER SIX - COMPUTER AIDED INSPECTION.ppt
6 CHAPTER SIX - COMPUTER AIDED INSPECTION.ppt6 CHAPTER SIX - COMPUTER AIDED INSPECTION.ppt
6 CHAPTER SIX - COMPUTER AIDED INSPECTION.ppt
 
Cnc control systems
Cnc control systemsCnc control systems
Cnc control systems
 
Cnc, dnc & adaptive control
Cnc, dnc & adaptive controlCnc, dnc & adaptive control
Cnc, dnc & adaptive control
 
CNC machining centers
CNC machining centersCNC machining centers
CNC machining centers
 
Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).Flexible manufacturing system(FMS).
Flexible manufacturing system(FMS).
 
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
Flexible manufacturing system (fms) and automated guided vehicle system (agvs)
 
Numeric control
Numeric controlNumeric control
Numeric control
 
12 cnc & part programming
12 cnc & part programming12 cnc & part programming
12 cnc & part programming
 
CAD/CAM/CIM (Lecture 1 CAD)
CAD/CAM/CIM  (Lecture 1 CAD)CAD/CAM/CIM  (Lecture 1 CAD)
CAD/CAM/CIM (Lecture 1 CAD)
 
COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)COMPUTER AIDED PROCESS PLANNING (CAPP)
COMPUTER AIDED PROCESS PLANNING (CAPP)
 
Cim ppt
Cim pptCim ppt
Cim ppt
 
Unit V CNC Machining
Unit V CNC MachiningUnit V CNC Machining
Unit V CNC Machining
 

Ähnlich wie Computer Aided Quality

Auditing In Computer Environment Presentation
Auditing In Computer Environment PresentationAuditing In Computer Environment Presentation
Auditing In Computer Environment PresentationEMAC Consulting Group
 
Computerized system validation (CSV) as a requirement for good manufacturing ...
Computerized system validation (CSV) as a requirement for good manufacturing ...Computerized system validation (CSV) as a requirement for good manufacturing ...
Computerized system validation (CSV) as a requirement for good manufacturing ...Ahmed Hasham
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master planPrinka Choudhary
 
Medical OEMs can achieve commercial mfg efficiency
Medical OEMs can achieve commercial mfg efficiencyMedical OEMs can achieve commercial mfg efficiency
Medical OEMs can achieve commercial mfg efficiencysmclacken
 
Risk assessment for computer system validation
Risk assessment for computer system validationRisk assessment for computer system validation
Risk assessment for computer system validationBangaluru
 
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROsWebinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROsStatistics & Data Corporation
 
Ctrl vision - Incoming Quality Control
Ctrl vision - Incoming Quality ControlCtrl vision - Incoming Quality Control
Ctrl vision - Incoming Quality ControlInfodream
 
Automating Common Criteria
Automating Common Criteria Automating Common Criteria
Automating Common Criteria Javier Tallón
 
Incorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanIncorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanInstitute of Validation Technology
 
inspection , test and measurement
inspection , test and measurementinspection , test and measurement
inspection , test and measurementtanvikumbhar
 
Types of Process control system
Types of Process control systemTypes of Process control system
Types of Process control systemArul Kumar
 
validationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfvalidationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfAkashChaudhary749568
 
Computerized system validation_final
Computerized system validation_finalComputerized system validation_final
Computerized system validation_finalDuy Tan Geek
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assuranceEr. Nancy
 

Ähnlich wie Computer Aided Quality (20)

Auditing In Computer Environment Presentation
Auditing In Computer Environment PresentationAuditing In Computer Environment Presentation
Auditing In Computer Environment Presentation
 
Unit 1 cim
Unit 1 cimUnit 1 cim
Unit 1 cim
 
Computerized system validation (CSV) as a requirement for good manufacturing ...
Computerized system validation (CSV) as a requirement for good manufacturing ...Computerized system validation (CSV) as a requirement for good manufacturing ...
Computerized system validation (CSV) as a requirement for good manufacturing ...
 
Validation and calibration of master plan
Validation and calibration of master planValidation and calibration of master plan
Validation and calibration of master plan
 
Medical OEMs can achieve commercial mfg efficiency
Medical OEMs can achieve commercial mfg efficiencyMedical OEMs can achieve commercial mfg efficiency
Medical OEMs can achieve commercial mfg efficiency
 
Risk assessment for computer system validation
Risk assessment for computer system validationRisk assessment for computer system validation
Risk assessment for computer system validation
 
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROsWebinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
Webinar: How to Ace Your SaaS-based EDC System Validation for Sponsors and CROs
 
Ctrl vision - Incoming Quality Control
Ctrl vision - Incoming Quality ControlCtrl vision - Incoming Quality Control
Ctrl vision - Incoming Quality Control
 
Validation
ValidationValidation
Validation
 
Automating Common Criteria
Automating Common Criteria Automating Common Criteria
Automating Common Criteria
 
Process validation
Process validationProcess validation
Process validation
 
Incorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation PlanIncorporate CPV and Continual Improvement into your Validation Plan
Incorporate CPV and Continual Improvement into your Validation Plan
 
inspection , test and measurement
inspection , test and measurementinspection , test and measurement
inspection , test and measurement
 
A010510109
A010510109A010510109
A010510109
 
Types of Process control system
Types of Process control systemTypes of Process control system
Types of Process control system
 
validationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfvalidationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdf
 
Computerized system validation_final
Computerized system validation_finalComputerized system validation_final
Computerized system validation_final
 
Software quality assurance
Software quality assuranceSoftware quality assurance
Software quality assurance
 
Validation
ValidationValidation
Validation
 
Testability
TestabilityTestability
Testability
 

Mehr von AliRaza1767

Solar Ponds.pptx
Solar Ponds.pptxSolar Ponds.pptx
Solar Ponds.pptxAliRaza1767
 
Hydrogen Alternative Fuels.pptx
Hydrogen Alternative Fuels.pptxHydrogen Alternative Fuels.pptx
Hydrogen Alternative Fuels.pptxAliRaza1767
 
Three new models for evaluation of standard involute spur gear | Mesh Analysis
Three new models for evaluation of standard involute spur gear | Mesh Analysis Three new models for evaluation of standard involute spur gear | Mesh Analysis
Three new models for evaluation of standard involute spur gear | Mesh Analysis AliRaza1767
 
Six sigma, spc , lean
Six sigma, spc , leanSix sigma, spc , lean
Six sigma, spc , leanAliRaza1767
 
Shaper & planer machines
Shaper & planer machinesShaper & planer machines
Shaper & planer machinesAliRaza1767
 
Normal distribtion curve
Normal distribtion curveNormal distribtion curve
Normal distribtion curveAliRaza1767
 
Quality assurance errors
Quality assurance errorsQuality assurance errors
Quality assurance errorsAliRaza1767
 
Grinding machine
Grinding machineGrinding machine
Grinding machineAliRaza1767
 
Drilling, boring reaming operation on lathe
Drilling, boring reaming operation on latheDrilling, boring reaming operation on lathe
Drilling, boring reaming operation on latheAliRaza1767
 
Broaching machine
Broaching machineBroaching machine
Broaching machineAliRaza1767
 
Abrsive products
Abrsive productsAbrsive products
Abrsive productsAliRaza1767
 
Milling machine.pptx
Milling machine.pptxMilling machine.pptx
Milling machine.pptxAliRaza1767
 
Building construction layout
Building construction layoutBuilding construction layout
Building construction layoutAliRaza1767
 
Funny speech by ali raza
Funny speech by ali razaFunny speech by ali raza
Funny speech by ali razaAliRaza1767
 
Rock and the Rock Cycle
Rock and the Rock CycleRock and the Rock Cycle
Rock and the Rock CycleAliRaza1767
 

Mehr von AliRaza1767 (18)

Solar Ponds.pptx
Solar Ponds.pptxSolar Ponds.pptx
Solar Ponds.pptx
 
Hydrogen Alternative Fuels.pptx
Hydrogen Alternative Fuels.pptxHydrogen Alternative Fuels.pptx
Hydrogen Alternative Fuels.pptx
 
Three new models for evaluation of standard involute spur gear | Mesh Analysis
Three new models for evaluation of standard involute spur gear | Mesh Analysis Three new models for evaluation of standard involute spur gear | Mesh Analysis
Three new models for evaluation of standard involute spur gear | Mesh Analysis
 
Slotter machine
Slotter machineSlotter machine
Slotter machine
 
Six sigma, spc , lean
Six sigma, spc , leanSix sigma, spc , lean
Six sigma, spc , lean
 
Shaper & planer machines
Shaper & planer machinesShaper & planer machines
Shaper & planer machines
 
Normal distribtion curve
Normal distribtion curveNormal distribtion curve
Normal distribtion curve
 
Quality assurance errors
Quality assurance errorsQuality assurance errors
Quality assurance errors
 
Grinding machine
Grinding machineGrinding machine
Grinding machine
 
Drilling, boring reaming operation on lathe
Drilling, boring reaming operation on latheDrilling, boring reaming operation on lathe
Drilling, boring reaming operation on lathe
 
Broaching machine
Broaching machineBroaching machine
Broaching machine
 
Abrsive products
Abrsive productsAbrsive products
Abrsive products
 
Milling machine
Milling machineMilling machine
Milling machine
 
Milling machine.pptx
Milling machine.pptxMilling machine.pptx
Milling machine.pptx
 
Building construction layout
Building construction layoutBuilding construction layout
Building construction layout
 
Funny speech by ali raza
Funny speech by ali razaFunny speech by ali raza
Funny speech by ali raza
 
Rock and the Rock Cycle
Rock and the Rock CycleRock and the Rock Cycle
Rock and the Rock Cycle
 
FCC structure
FCC structureFCC structure
FCC structure
 

Kürzlich hochgeladen

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 

Kürzlich hochgeladen (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 

Computer Aided Quality

  • 1. COMPUTER AIDED QUALITY METROLOGY & QUALITY ASSURANCE
  • 2. QUALITY We can define quality as:  A degree of excellence  Conformance to requirement  Totality of characteristics which act to satisfy need  Fitness for Use and Purpose  Freedom from defects  Delighting customers
  • 3. QUALITY CONTROL Quality control is a system of  Inspection  Analysis  Action applied
  • 4. OBJECTIVES OF QUALITY CONTROL Objectives of Quality control are:  Establish desired quality standards  Discover flow of variation in raw material and manufacturing process  Evaluate methods and process of functioning  Suggest improvement  Determine the extent of quality deviation  Analyse in detail the causes of such deviations  Undertake steps which are helpful in achieving the desired quality
  • 5. WHAT IS COMPUTER AIDED QUALITY CONTROL? The use of computers for quality control the product is called as the Computer aided quality control or CAQC.
  • 6. DIFFERENCE BETWEEN QC & CAQC Quality Control Computer Aided Quality Control 1. Major parts of quality control are inspection and testing 2. Operations are traditionally performed manually with the help of gages, measuring devices and testing apparatus. 1. Major parts of CAQC are computer aided inspection (CAI) and computer aided testing (CAT) 2. Operations are digitally performed on computers
  • 7. BLOCK DIAGRAM OF COMPUTER AIDED QUALITY CONTROL (CAQC)
  • 8. COMPUTER AIDED INSPECTION (CAI) It is use of computer based software tools that assist quality engineers, machinists and inspectors in manufacturing product components Its primary purpose is to create a faster production process and components with more precise dimensions and material consistency.
  • 9. COMPUTER AIDED INSPECTION (CAI) Computer aided inspection (CAI) is a software tool that makes it Possible to inspect physical models using computer aided design (CAD) programs.
  • 10. COMPUTER AIDED TESTING (CAT) The applications of computer to control either analogue or digital test Techniques in order to evaluate the quality of components and products. Computer aided testing is used to check that the component parts, Subassemblies, and full systems are within specified tolerance and Also perform up to specifications.
  • 11. COMPUTER AIDED TESTING (CAT) Performance to specification may require that unit or system operates Under stressful conditions that would not be encountered in normal use. The parameters (test criteria) for computer-aided testing are often derived from computer aided design and computer aided manufacturing systems.
  • 12. ADVANTAGES OF COMPUTER AIDED QUALITY CONTROL 1. 100% Testing and Inspection  In traditional manual process the testing and inspection is done by sampling process out of hundred and thousands of products and parts manufactured by the part company since it is not feasible to check each and every product.  With CAI and CAT hundred percent inspection and testing can be accomplished without much difficulty.
  • 13. ADVANTAGES OF COMPUTER AIDED QUALITY CONTROL 2. Inspection integrated with manufacturing process:  No separate department is necessarily made for inspection.  In CAQC the inspection process is integrated with the manufacturing process and it is located along thee production line.  This helps in reducing the overall time required for manufacturing the process.
  • 14. ADVANTAGES OF COMPUTER AIDED QUALITY CONTROL 3. Use of Non-Contact Sensor:  In CAQC non-contact sensors are used for the inspection purpose and they inspect the product without coming in contact with the product.  Sensors can check the product very quickly in the fraction of seconds.  In future, the robots would be used to carry-out the inspection process thus further automating and speeding the process.
  • 15. ADVANTAGES OF COMPUTER AIDED QUALITY CONTROL 4. Computerized Feedback control system:  The data collected by non-contact sensor is sent as the feedback to the computerized control system.  These systems would carry out the analysis of the data including statistical trend analysis.  This helps in identifying the problem going on in the manufacturing line and find appropriate solution to it.
  • 16. ADVANTAGES OF COMPUTER AIDED QUALITY CONTROL 5. Computer Aided Quality Control (CAQC) and CAD/CAM Integration:  All the applications of CAQC can be integrated with CAM/CAD to make the whole process of designing and manufacturing controlled by the computers converted into fully automated process.