Dave Hallquist
Vermont Electric Cooperative
Why Do AMR?
 Billing and Meter Reading Benefits
 Reduce Meter Read Costs
 Reduce Error
 Eliminate Entry Liability
 Eliminate Member Complaints about
Meter Readers
 Improve Billing Flexibility
 Improve Financial Predictability
 Reduce HR issues
Other AMR Benefits
Carefully select the technology, there is more to AMR
than reading meters.
Rates
 Rate Setting has been more of an art
than a science
 AMR allows detailed analysis of peak
demands – critical to setting rate
structures by class
 Reduces the tension between residential
commercial and industrial
As Vermont Public Interest Research
Group has charged “The poor residential
ratepayers are subsidizing big business!”
System Planning
 System load studies often use gross
assumptions (i.e. – 1.1kw/home). This can
result in substantial errors as VEC has
found certain substation residential home
loads are significantly higher, while others
are significantly lower
 Unusual spot load growth have caught
utilities by surprise
 R-T AMR provides the local data to
significantly improve the accuracy of
system planning
Load Control
 Many systems provide optional load
control packages
 R-T AMR enables verification of load
control
 R-T AMR enables significant flexibility
in load control
 By using a greater number of shorter off
times, member satisfaction with load
control programs is markedly improved
Phase Balancing
 Phase loading is typically done once
in a lifetime on many systems
 Retro versus pro-active
 AMR shows what phase each meter is
on
 Results:
 Better system balancing
 Improved transformer efficiency
 Greater safety for line personnel
Voltage Profiles
 R-T AMR allows flexibility in time
buckets for analyzing member issues
 Accurate voltage analysis' can identify
connectivity issues
 Improved member satisfaction
(implicit versus explicit needs)
 Identify voltage sag issues
 I-D neutral problems early to prevent
member equipment failure (burn out
resulting from excessive voltage)
Voltage Profile
Voltage Profile
Load Profile
 R-T AMR allows flexibility in time
periods for profiles
 Good for managing high bill
complaints
 Commercial and Industrials can use
system to reduce peak demand
charges
Load Profile
Transformer Sizing
 AMR transformer studies reveal sizing
issues
 Prevents transformer failures due to
members’ lack of planning
 Correct transformer sizing reduces
line loss cost
 Elimination of electric heat left many
transformers oversized
Load Profile for Transformer
Hourly Profile Data
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.001
3
5
7
9
1
1
1
3
1
5
1
7
1
9
2
1
2
3
Hour
KVA
19-Jan
18-Jan
17-Jan
16-Jan
Distribution Automation
 R-T AMR infrastructure can often be
used for SCADA
 Many companies have interfaces for
SCADA equipment
 AMR communications is lower cost
than dedicated (fiber, copper, radio)
Outage Restoration
 R-T AMR is a very powerful tool when
combined with an Outage Management
System (OMS) and Interactive Voice
Response (IVR) system
 Predictive feature of OMS eliminates need
for ticket sorting
 IVR reduces call volume by 80% with
significant improvements in member
satisfaction
 Combined with Map Presentation program
(Mapview, Arcview) provides dispatch with
visual outage tracking
 Eliminates need to call member to verify
outage has been restored
Connect and Disconnect
 R-T AMR allows for “soft” disconnect
without additional infrastructure
 Great for move in / move out
 Disconnect devices available for many
product platforms
 Devices are plug-in; underneath the
meter
 Allows for disconnect from the office
Load Control
Device Mounted to
control a Water Heater
and an Air-Conditioner
at a Florida Power and
Light (FPL) Customer’s
Home
Load Control
at Florida Power
and Light (FPL)
Lake Region Electric Cooperative
Pelican Rapids, Minnesota (the red star)
 25000 members
 7c/kwh residential rate
 Mainly coal
 80 mw non-coincidental
peak (peaks in winter –
slightly larger than
summer peak)
 10% peak shaving using
disconnects switches –
a load shedding
strategy - not a load
shifting strategy
 65mw coincidental
peak
 7000 peak disconnect
switches (primarily for
hot water heaters)
 70% penetration on existing water heater users (10k total)
 Water heater credit – straight credit – $4/mo./40gal heater - $8/mo./80gal heater
 An off-peak incentive rate exists – 40% savings off-peak – on-peak rate same as
residential – few residential takers – mainly storage heat
Billing
 Significantly improves billing
predictability
 Eliminates ties to read schedules that
are based on meter routes
 Reduces outstanding receivables by
reducing billing lead-time
 Virtually eliminates mis-reads and
requisite member revisits
 Allows for industrials/commercials to
close monthly books earlier
Time of Use (TOU) Billing
 R-T AMR simplifies TOU reading and
billing process
 Allows for multiple TOU rates
 Load shifting a good strategy for
reduction of system coincident peaks
thus reducing power supply cost
 Allows for tailored incentive programs
 Many utilities have reduced system
peak by 10%
Customer Service
 No longer tell member to “check the
meter”
 Find out about outage before member calls
 No need to call member to verify
restoration
 With IVR and OMS, member can get
outage status anytime
 Turn Customer Service Reps into usage
experts through usage profile
 Make the moving process easy for your
members
 Minimize the ‘hand-offs’ to improve the
member experience
Potential R-T AMR Savings
VEC ROI Analysis
VEC’s Choice
 DCSI TWACS for all but the largest
users
 Electro-Industries Nexus for Large
users (>500kw) and substations
 Why TWACS?
 DCSI had significant experience and a
variety of options
 Very good references
 Outage Monitoring and Reporting
 Ability to ‘ping’ on demand
 Integrates with many CIS and Billing
Systems including NISC
 Why Nexus?
 Built-in web server
 Dual ports for maximum security
 On-demand usage, billing, history
 Transient Recording
 Record up to 512 Samples per Cycle Peak
 Voltage Surge and Sag Recording
 EN 50160 Flicker Analysis
 Interharmonic Recording
 Fault Recording and Analysis
 Harmonic Analysis to 255th Order
 DNP 3.0 and Modbus capability
VEC’s Choice (con’t)
What Worked
 Organization was committed
 Four years of discussion created a high level of desire
from everyone
 Board of Directors was involved in these long-ranging
discussions
 Detailed project planning
 Microsoft project used to identify every action item
 Weekly status/action meetings for six months prior to
commissioning
 Project Manager and CFO co-own project
 Operations really wanted AMR
 TWACS a great product - Commissioning was
highly successful and exceeded all expectations
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt
Automatic Meter Reading.ppt

Weitere ähnliche Inhalte

Ähnlich wie Automatic Meter Reading.ppt

AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSE
AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSEAUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSE
AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSEBitan Das
 
Wind turbine condition monitoring sqi rev
Wind turbine condition monitoring sqi revWind turbine condition monitoring sqi rev
Wind turbine condition monitoring sqi revSpectra Quest Inc
 
AMR & EMS- Automated Meter Reading and Energy Management System
AMR & EMS- Automated Meter Reading and Energy Management SystemAMR & EMS- Automated Meter Reading and Energy Management System
AMR & EMS- Automated Meter Reading and Energy Management SystemSushant Kumar Sinha
 
3 p strategy sems 10-v4
3 p strategy  sems 10-v43 p strategy  sems 10-v4
3 p strategy sems 10-v4guestec6b92bb
 
IT in power,Smart Grid,OMS & DMS
IT in power,Smart Grid,OMS & DMSIT in power,Smart Grid,OMS & DMS
IT in power,Smart Grid,OMS & DMSChanmeet Singh
 
Aia tata power_26112010 r1
Aia tata power_26112010 r1Aia tata power_26112010 r1
Aia tata power_26112010 r1Ajinkya Dalvi
 
Smart metering-system
Smart metering-systemSmart metering-system
Smart metering-systemNIT MEGHALAYA
 
Baker Charlie
Baker CharlieBaker Charlie
Baker CharlieCarl Ford
 
15ee81 module1[www.vtuloop.com].pdf
15ee81 module1[www.vtuloop.com].pdf15ee81 module1[www.vtuloop.com].pdf
15ee81 module1[www.vtuloop.com].pdfJoshKwedjartey1
 
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...Amazon Web Services
 
Automatic meter reading
Automatic meter readingAutomatic meter reading
Automatic meter readingSajan Sahu
 
TRANSFORMER HEALTH MONITORING SYSTEM
TRANSFORMER HEALTH MONITORING SYSTEMTRANSFORMER HEALTH MONITORING SYSTEM
TRANSFORMER HEALTH MONITORING SYSTEMIRJET Journal
 
Wind Turbine programme
Wind Turbine programmeWind Turbine programme
Wind Turbine programmeMinka Grdesic
 
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA Ajesh Jacob
 

Ähnlich wie Automatic Meter Reading.ppt (20)

AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSE
AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSEAUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSE
AUTOMATIC ENERGY METER READING SYSTEM FOR BILLING PURPOSE
 
Wind turbine condition monitoring sqi rev
Wind turbine condition monitoring sqi revWind turbine condition monitoring sqi rev
Wind turbine condition monitoring sqi rev
 
AMR & EMS- Automated Meter Reading and Energy Management System
AMR & EMS- Automated Meter Reading and Energy Management SystemAMR & EMS- Automated Meter Reading and Energy Management System
AMR & EMS- Automated Meter Reading and Energy Management System
 
OPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim WebinarOPAL-RT ePHASORsim Webinar
OPAL-RT ePHASORsim Webinar
 
3 p strategy sems 10-v4
3 p strategy  sems 10-v43 p strategy  sems 10-v4
3 p strategy sems 10-v4
 
IT in power,Smart Grid,OMS & DMS
IT in power,Smart Grid,OMS & DMSIT in power,Smart Grid,OMS & DMS
IT in power,Smart Grid,OMS & DMS
 
Aia tata power_26112010 r1
Aia tata power_26112010 r1Aia tata power_26112010 r1
Aia tata power_26112010 r1
 
Smart metering-system
Smart metering-systemSmart metering-system
Smart metering-system
 
Baker Charlie
Baker CharlieBaker Charlie
Baker Charlie
 
Green power for the futuree
Green power for the futureeGreen power for the futuree
Green power for the futuree
 
Delta ia pq-apf2000_c_en_20160118
Delta ia pq-apf2000_c_en_20160118Delta ia pq-apf2000_c_en_20160118
Delta ia pq-apf2000_c_en_20160118
 
Ever Green Dc
Ever Green DcEver Green Dc
Ever Green Dc
 
axisCONSERVE4.0
axisCONSERVE4.0axisCONSERVE4.0
axisCONSERVE4.0
 
15ee81 module1[www.vtuloop.com].pdf
15ee81 module1[www.vtuloop.com].pdf15ee81 module1[www.vtuloop.com].pdf
15ee81 module1[www.vtuloop.com].pdf
 
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
Intelligent Production: Deploying IoT and cloud-based machine learning to opt...
 
Automatic meter reading
Automatic meter readingAutomatic meter reading
Automatic meter reading
 
TRANSFORMER HEALTH MONITORING SYSTEM
TRANSFORMER HEALTH MONITORING SYSTEMTRANSFORMER HEALTH MONITORING SYSTEM
TRANSFORMER HEALTH MONITORING SYSTEM
 
Amr
AmrAmr
Amr
 
Wind Turbine programme
Wind Turbine programmeWind Turbine programme
Wind Turbine programme
 
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
AUTOMATIC VOLTAGE CONTROL OF TRANSFORMER USING MICROCONTROLLER AND SCADA
 

Kürzlich hochgeladen

BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 

Kürzlich hochgeladen (20)

BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 

Automatic Meter Reading.ppt

  • 1. Automatic Meter Reading Selecting the Technology BPL? IR? Internet? RS232? RJ11? MasterMeter? RF? FireFly? SpreadSprectrum? SilverSpring? Nexus? Dave Hallquist Vermont Electric Cooperative
  • 2. Why Do AMR?  Billing and Meter Reading Benefits  Reduce Meter Read Costs  Reduce Error  Eliminate Entry Liability  Eliminate Member Complaints about Meter Readers  Improve Billing Flexibility  Improve Financial Predictability  Reduce HR issues
  • 3. Other AMR Benefits Carefully select the technology, there is more to AMR than reading meters.
  • 4. Rates  Rate Setting has been more of an art than a science  AMR allows detailed analysis of peak demands – critical to setting rate structures by class  Reduces the tension between residential commercial and industrial As Vermont Public Interest Research Group has charged “The poor residential ratepayers are subsidizing big business!”
  • 5. System Planning  System load studies often use gross assumptions (i.e. – 1.1kw/home). This can result in substantial errors as VEC has found certain substation residential home loads are significantly higher, while others are significantly lower  Unusual spot load growth have caught utilities by surprise  R-T AMR provides the local data to significantly improve the accuracy of system planning
  • 6. Load Control  Many systems provide optional load control packages  R-T AMR enables verification of load control  R-T AMR enables significant flexibility in load control  By using a greater number of shorter off times, member satisfaction with load control programs is markedly improved
  • 7. Phase Balancing  Phase loading is typically done once in a lifetime on many systems  Retro versus pro-active  AMR shows what phase each meter is on  Results:  Better system balancing  Improved transformer efficiency  Greater safety for line personnel
  • 8. Voltage Profiles  R-T AMR allows flexibility in time buckets for analyzing member issues  Accurate voltage analysis' can identify connectivity issues  Improved member satisfaction (implicit versus explicit needs)  Identify voltage sag issues  I-D neutral problems early to prevent member equipment failure (burn out resulting from excessive voltage)
  • 11. Load Profile  R-T AMR allows flexibility in time periods for profiles  Good for managing high bill complaints  Commercial and Industrials can use system to reduce peak demand charges
  • 13.
  • 14. Transformer Sizing  AMR transformer studies reveal sizing issues  Prevents transformer failures due to members’ lack of planning  Correct transformer sizing reduces line loss cost  Elimination of electric heat left many transformers oversized
  • 15. Load Profile for Transformer Hourly Profile Data 0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.001 3 5 7 9 1 1 1 3 1 5 1 7 1 9 2 1 2 3 Hour KVA 19-Jan 18-Jan 17-Jan 16-Jan
  • 16. Distribution Automation  R-T AMR infrastructure can often be used for SCADA  Many companies have interfaces for SCADA equipment  AMR communications is lower cost than dedicated (fiber, copper, radio)
  • 17. Outage Restoration  R-T AMR is a very powerful tool when combined with an Outage Management System (OMS) and Interactive Voice Response (IVR) system  Predictive feature of OMS eliminates need for ticket sorting  IVR reduces call volume by 80% with significant improvements in member satisfaction  Combined with Map Presentation program (Mapview, Arcview) provides dispatch with visual outage tracking  Eliminates need to call member to verify outage has been restored
  • 18. Connect and Disconnect  R-T AMR allows for “soft” disconnect without additional infrastructure  Great for move in / move out  Disconnect devices available for many product platforms  Devices are plug-in; underneath the meter  Allows for disconnect from the office
  • 19. Load Control Device Mounted to control a Water Heater and an Air-Conditioner at a Florida Power and Light (FPL) Customer’s Home Load Control at Florida Power and Light (FPL)
  • 20. Lake Region Electric Cooperative Pelican Rapids, Minnesota (the red star)  25000 members  7c/kwh residential rate  Mainly coal  80 mw non-coincidental peak (peaks in winter – slightly larger than summer peak)  10% peak shaving using disconnects switches – a load shedding strategy - not a load shifting strategy  65mw coincidental peak  7000 peak disconnect switches (primarily for hot water heaters)  70% penetration on existing water heater users (10k total)  Water heater credit – straight credit – $4/mo./40gal heater - $8/mo./80gal heater  An off-peak incentive rate exists – 40% savings off-peak – on-peak rate same as residential – few residential takers – mainly storage heat
  • 21. Billing  Significantly improves billing predictability  Eliminates ties to read schedules that are based on meter routes  Reduces outstanding receivables by reducing billing lead-time  Virtually eliminates mis-reads and requisite member revisits  Allows for industrials/commercials to close monthly books earlier
  • 22. Time of Use (TOU) Billing  R-T AMR simplifies TOU reading and billing process  Allows for multiple TOU rates  Load shifting a good strategy for reduction of system coincident peaks thus reducing power supply cost  Allows for tailored incentive programs  Many utilities have reduced system peak by 10%
  • 23. Customer Service  No longer tell member to “check the meter”  Find out about outage before member calls  No need to call member to verify restoration  With IVR and OMS, member can get outage status anytime  Turn Customer Service Reps into usage experts through usage profile  Make the moving process easy for your members  Minimize the ‘hand-offs’ to improve the member experience
  • 24. Potential R-T AMR Savings
  • 26. VEC’s Choice  DCSI TWACS for all but the largest users  Electro-Industries Nexus for Large users (>500kw) and substations  Why TWACS?  DCSI had significant experience and a variety of options  Very good references  Outage Monitoring and Reporting  Ability to ‘ping’ on demand  Integrates with many CIS and Billing Systems including NISC
  • 27.  Why Nexus?  Built-in web server  Dual ports for maximum security  On-demand usage, billing, history  Transient Recording  Record up to 512 Samples per Cycle Peak  Voltage Surge and Sag Recording  EN 50160 Flicker Analysis  Interharmonic Recording  Fault Recording and Analysis  Harmonic Analysis to 255th Order  DNP 3.0 and Modbus capability VEC’s Choice (con’t)
  • 28. What Worked  Organization was committed  Four years of discussion created a high level of desire from everyone  Board of Directors was involved in these long-ranging discussions  Detailed project planning  Microsoft project used to identify every action item  Weekly status/action meetings for six months prior to commissioning  Project Manager and CFO co-own project  Operations really wanted AMR  TWACS a great product - Commissioning was highly successful and exceeded all expectations