Breakeven point
LO4b
EGN 3203 Engineering Economics
LEARNING OUTCOMES
1. Breakeven point – one parameter
2. Breakeven point – two alternatives
3. Payback period analysis
© 2012 by McGraw-Hill All Rights Reserved13-2
Breakeven Point
The parameter (or variable) can be an amount of
revenue, cost, supply, demand, etc. for one project or
between two alternatives
 One project - Breakeven point is identified as QBE. Determined
using linear or non-linear math relations for revenue and cost
 Between two alternatives - Determine one of the parameters
P, A, F, i, or n with others constant
Solution is by one of three methods:
Direct solution of relations
Trial and error
Spreadsheet functions or tools (Goal Seek or
Solver)
© 2012 by McGraw-Hill All Rights Reserved13-3
Value of a parameter that makes two elements equal
Cost-Revenue Model ― One Project
© 2012 by McGraw-Hill All Rights Reserved
13-4
Quantity, Q — An amount of the variable in
question, e.g., units/year, hours/month
Breakeven value is QBE
Fixed cost, FC — Costs not directly dependent on the variable, e.g.,
buildings, fixed overhead, insurance, minimum workforce cost
Variable cost, VC — Costs that change with parameters such as
production level and workforce size. These are labor, material
and marketing costs. Variable cost per unit is v
Total cost, TC — Sum of fixed and variable costs, TC = FC + VC
Revenue, R — Amount is
dependent on quantity sold
Revenue per unit is r
Profit, P — Amount of
revenue remaining after costs
P = R – TC = R – (FC+VC)
Breakeven Analysis
• There are different shapes of a
revenue relation - identified as R .
• A linear revenue relation is
commonly assumed, but a nonlinear
relation is often more realistic.
• It can model an increasing per unit
revenue with larger volumes - curve
1
• or a decreasing per unit revenue that
usually prevails at higher quantities
© 2012 by McGraw-Hill All Rights
Reserved
5
Breakeven for linear R and TC
© 2012 by McGraw-Hill All Rights Reserved13-5
Set R = TC and solve for Q = QBE
R = TC
rQ = FC + vQ
FC
r – v
When variable cost, v, is lowered, QBE
decreases (moves to left)
QBE =
• The breakeven graph is an important management tool.
• Often used in decision making.
• if the variable cost VC per unit is reduced, then the TC line has a smaller slope and the
breakeven point will decrease.
• This is an advantage because the smaller the value of QBE, the greater the profit for a
given amount of revenue.
Example: One Project Breakeven Point
Solution: Find QBE and compare to 15,000; calculate Profit
QBE = 75,000 / (8.00-2.50) = 13,636 units/month
Production level is above breakeven Profit
Profit = R – (FC + VC)
= rQ – (FC + vQ) = (r-v)Q – FC
= (8.00 – 2.50)(15,000) – 75,000
= $ 7500/month
© 2012 by McGraw-Hill All Rights Reserved13-6
A plant produces 15,000 units/month. Find breakeven level if FC =
$75,000 /month, revenue is $8/unit and variable cost is $2.50/unit.
Determine expected monthly profit or loss.
© 2012 by McGraw-Hill All Rights
Reserved
8
Example: One Project Breakeven Point
© 2012 by McGraw-Hill All Rights
Reserved
9
Example: One Project Breakeven Point
© 2012 by McGraw-Hill All Rights
Reserved
10
Example: One Project Breakeven Point
Breakeven Between Two Alternatives
To determine value of common variable between 2 alternatives, do the following:
1. Define the common variable
2. Develop equivalence PW, AW or FW relations as function of common variable for
each alternative
3. Equate the relations; solve for variable. This is breakeven value
4. Selection of the alternative is different depending upon two facts:
– the parameter value relative to the breakeven point.
– slope of the variable cost curve
© 2012 by McGraw-Hill All Rights Reserved13-7
Selection of alternative is based on
anticipated value of common variable:
 Value BELOW breakeven;
select higher variable cost (larger
slope)
 Value ABOVE breakeven;
select lower variable cost (less
slope)
Example: Two Alternative Breakeven Analysis
Perform a make/buy analysis where the
common variable is X, the number of units
produced each year. AW relations are:
AWmake = -18,000(A/P,15%,6)
+2,000(A/F,15%,6) – 0.4X
AWbuy = -1.5X
Solution: Equate AW relations, solve for X
-1.5X = -4528 - 0.4X
X = 4116 per year
© 2012 by McGraw-Hill All Rights Reserved13-8
X, 1000 units per year
Breakeven
value of X
1 2 3 4 5
AWbuy
AWmake
If anticipated production > 4116,
select make alternative (lower variable cost)
AW, 1000
$/year
8
7
6
5
4
3
2
1
0
Breakeven Analysis Using Goal Seek Tool
Spreadsheet tool Goal Seek finds breakeven value for the
common variable between two alternatives
© 2012 by McGraw-Hill All Rights Reserved13-9
Problem: Two machines (1 and 2) have following estimates.
a) Use spreadsheet and AW analysis to select one at MARR = 10%.
b) Use Goal Seek to find the breakeven first cost.
Machine 1 2
P, $ -80,000 -110,000
NCF, $/year 25,000
22,000
S, $ 2,000
3,000
n, years 4 6
Solution: a) Select machine A with AWA = $193
Breakeven Analysis Using Goal Seek Tool
Solution: b) Goal Seek finds a first-cost breakeven of $96,669 to
make machine B economically equivalent to A
© 2012 by McGraw-Hill All Rights Reserved13-10
Spreadsheet after Goal Seek is applied
Changing cell
Target cell
Payback Period Analysis
Caution: Payback period analysis is a good initial screening
tool, rather than the primary method to justify a project or
select an alternative (Discussed later)
© 2012 by McGraw-Hill All Rights Reserved13-11
Payback period: Estimated amount of time (np) for cash inflows to recover an
initial investment (P) plus a stated return of return (i%)
Types of payback analysis: No-return and discounted payback
1. No-return payback means rate of return is ZERO (i = 0%)
2. Discounted payback considers time value of money (i > 0%)
Payback Period Computation
© 2012 by McGraw-Hill All Rights Reserved13-12
Formula to determine payback period (np)
varies with type of analysis.
NCF = Net Cash Flow per period t
Eqn. 1
Eqn. 2
Eqn. 3
Eqn. 4
Points to Remember About Payback Analysis
• No-return payback neglects time value of money, so no
return is expected for the investment made
• No cash flows after the payback period are considered in the
analysis. Return may be higher if these cash flows are
expected to be positive.
• Approach of payback analysis is different from PW, AW, ROR
and B/C analysis. A different alternative may be selected
using payback.
• Rely on payback as a supplemental tool; use PW or AW at the
MARR for a reliable decision
• Discounted payback (i > 0%) gives a good sense of the risk
involved
© 2012 by McGraw-Hill All Rights Reserved13-13
Example: Payback Analysis
System 1 System 2
First cost, $ 12,000 8,000
NCF, $ per year 3,000 1,000 (year 1-5)
3,000 (year 6-14)
Maximum life, years 7 14
Problem: Use (a) no-return payback, (b) discounted payback at
15%, and (c) PW analysis at 15% to select a system. Comment
on the results.
Solution: (a) Use Eqns. 1 and 2
np1= 12,000 / 3,000 = 4 years
np2= -8,000 + 5(1,000) + 1(3,000) = 6 years
Select system 1
© 2012 by McGraw-Hill All Rights Reserved13-14
Example: Payback Analysis (continued)
System 1 System 2
First cost, $ 12,000 8,000
NCF, $ per year 3,000 1,000 (year 1-5)
3,000 (year 6-14)
Maximum life, years 7 14
Solution: (b) Use Eqns. 3 and 4
System 1: 0 = -12,000 + 3,000(P/A,15%,np1)
np1 = 6.6 years
System 2: 0 = -8,000 + 1,000(P/A,15%,5)
+ 3,000(P/A,15%,np2 - 5)(P/F,15%,5)
np1 = 9.5 years
Select system 1
(c) Find PW over LCM of 14 years
PW1 = $663
PW2 = $2470
Select system 2
Comment: PW method considers cash flows after payback period.
Selection changes from system 1 to 2 © 2012 by McGraw-Hill All Rights Reserved13-15
Summary of Important Points
© 2012 by McGraw-Hill All Rights Reserved13-16
Breakeven amount is a point of indifference to
accept or reject a project
One project breakeven: accept if quantity is > QBE
Two alternative breakeven: if level > breakeven,
select lower variable cost alternative (smaller slope)
Payback estimates time to recover investment.
Return can be i = 0% or i > 0%
Use payback as supplemental to PW or other analyses,
because np neglects cash flows after payback,
and if i = 0%, it neglects time value of money
Payback is useful to sense the economic risk in a project

Weitere ähnliche Inhalte

Was ist angesagt?

Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work studyrahulmeshram14
 
CONSISTENT AND LUMPED MASS MATRICES IN DYNAMICS AND THEIR IMPACT ON FINITE EL...
CONSISTENT AND LUMPED MASS MATRICES IN DYNAMICS AND THEIR IMPACT ON FINITE EL...CONSISTENT AND LUMPED MASS MATRICES IN DYNAMICS AND THEIR IMPACT ON FINITE EL...
CONSISTENT AND LUMPED MASS MATRICES IN DYNAMICS AND THEIR IMPACT ON FINITE EL...IAEME Publication
 
Introduction to Engineering Economics Unit I MG6863
Introduction to Engineering Economics  Unit I MG6863Introduction to Engineering Economics  Unit I MG6863
Introduction to Engineering Economics Unit I MG6863Balamurugan Subburaj
 
travel chart for plant layout
travel chart for plant layouttravel chart for plant layout
travel chart for plant layoutYash Patel
 
Industrial Engineering Concepts
Industrial Engineering ConceptsIndustrial Engineering Concepts
Industrial Engineering Conceptsvengefulwind
 
Methods of Production : Job, Batch & Mass Productiion
Methods of Production : Job, Batch & Mass ProductiionMethods of Production : Job, Batch & Mass Productiion
Methods of Production : Job, Batch & Mass ProductiionHarinadh Karimikonda
 
Presentation aggregate planning
Presentation aggregate planningPresentation aggregate planning
Presentation aggregate planningLauraRLR
 
Introduction to value engineering and value analysis
Introduction to value engineering and value analysisIntroduction to value engineering and value analysis
Introduction to value engineering and value analysisPrathamesh Kadam
 
PRODUCTION SYSTEMS
PRODUCTION SYSTEMSPRODUCTION SYSTEMS
PRODUCTION SYSTEMSNaeem Akram
 
Engineering economics and cost analysis
Engineering economics and cost analysisEngineering economics and cost analysis
Engineering economics and cost analysissriamrish
 
Industrial engineering and management
Industrial engineering and managementIndustrial engineering and management
Industrial engineering and managementShaikh Zubair
 
Engineering Economics and Cost Estimation
Engineering Economics and Cost EstimationEngineering Economics and Cost Estimation
Engineering Economics and Cost EstimationManikandan G.K
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)Abu Bashar
 
Material handling leturer
Material handling leturerMaterial handling leturer
Material handling leturerrkjain90
 
Engineering economic importance & application
Engineering economic importance & applicationEngineering economic importance & application
Engineering economic importance & applicationabdus sobhan
 
Industrial engineering unit 2 new
Industrial engineering unit 2 newIndustrial engineering unit 2 new
Industrial engineering unit 2 newmohsinmmm
 

Was ist angesagt? (20)

Lecture 2 process charts work study
Lecture 2 process charts work studyLecture 2 process charts work study
Lecture 2 process charts work study
 
CONSISTENT AND LUMPED MASS MATRICES IN DYNAMICS AND THEIR IMPACT ON FINITE EL...
CONSISTENT AND LUMPED MASS MATRICES IN DYNAMICS AND THEIR IMPACT ON FINITE EL...CONSISTENT AND LUMPED MASS MATRICES IN DYNAMICS AND THEIR IMPACT ON FINITE EL...
CONSISTENT AND LUMPED MASS MATRICES IN DYNAMICS AND THEIR IMPACT ON FINITE EL...
 
Introduction to Engineering Economics Unit I MG6863
Introduction to Engineering Economics  Unit I MG6863Introduction to Engineering Economics  Unit I MG6863
Introduction to Engineering Economics Unit I MG6863
 
travel chart for plant layout
travel chart for plant layouttravel chart for plant layout
travel chart for plant layout
 
Industrial Engineering Concepts
Industrial Engineering ConceptsIndustrial Engineering Concepts
Industrial Engineering Concepts
 
Methods of Production : Job, Batch & Mass Productiion
Methods of Production : Job, Batch & Mass ProductiionMethods of Production : Job, Batch & Mass Productiion
Methods of Production : Job, Batch & Mass Productiion
 
Lecture 1 Material Handling Equipment (Introduction to Material handling equi...
Lecture 1 Material Handling Equipment (Introduction to Material handling equi...Lecture 1 Material Handling Equipment (Introduction to Material handling equi...
Lecture 1 Material Handling Equipment (Introduction to Material handling equi...
 
Presentation aggregate planning
Presentation aggregate planningPresentation aggregate planning
Presentation aggregate planning
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
Introduction to value engineering and value analysis
Introduction to value engineering and value analysisIntroduction to value engineering and value analysis
Introduction to value engineering and value analysis
 
PRODUCTION SYSTEMS
PRODUCTION SYSTEMSPRODUCTION SYSTEMS
PRODUCTION SYSTEMS
 
Value Engineering
Value EngineeringValue Engineering
Value Engineering
 
Engineering economics and cost analysis
Engineering economics and cost analysisEngineering economics and cost analysis
Engineering economics and cost analysis
 
Industrial engineering and management
Industrial engineering and managementIndustrial engineering and management
Industrial engineering and management
 
Engineering Economics and Cost Estimation
Engineering Economics and Cost EstimationEngineering Economics and Cost Estimation
Engineering Economics and Cost Estimation
 
Production planning & control(ppc)
Production planning & control(ppc)Production planning & control(ppc)
Production planning & control(ppc)
 
Cost indexes
Cost indexesCost indexes
Cost indexes
 
Material handling leturer
Material handling leturerMaterial handling leturer
Material handling leturer
 
Engineering economic importance & application
Engineering economic importance & applicationEngineering economic importance & application
Engineering economic importance & application
 
Industrial engineering unit 2 new
Industrial engineering unit 2 newIndustrial engineering unit 2 new
Industrial engineering unit 2 new
 

Andere mochten auch

Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitationBich Lien Pham
 
Recruitment, training, compensation
Recruitment, training, compensationRecruitment, training, compensation
Recruitment, training, compensationAvinash Singh
 
Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysisBich Lien Pham
 
10 causes of project failure.
10 causes of project failure.10 causes of project failure.
10 causes of project failure.Muhammad Abbas
 
Managing The Sales Force - By Dr. Karpagam Director – Academics, ISBR Busines...
Managing The Sales Force - By Dr. Karpagam Director – Academics, ISBR Busines...Managing The Sales Force - By Dr. Karpagam Director – Academics, ISBR Busines...
Managing The Sales Force - By Dr. Karpagam Director – Academics, ISBR Busines...ISBR Business School
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoidMarianna Semenova
 
Marginal costing & breakeven analysis
Marginal costing & breakeven analysisMarginal costing & breakeven analysis
Marginal costing & breakeven analysisFaltu Focat
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful ProjectsTrevor Roberts
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/FailurePeter Salmon
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Failjpstewar
 
Code of discipline
Code of discipline Code of discipline
Code of discipline swatip81
 
Breakeven Analysis (Introduction)
Breakeven Analysis (Introduction)Breakeven Analysis (Introduction)
Breakeven Analysis (Introduction)tutor2u
 
BREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSISBREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSISAsrar Mohd
 
Direct marketing ppt
Direct marketing pptDirect marketing ppt
Direct marketing pptswatifariya
 

Andere mochten auch (20)

Chapter 12 independent projects & budget limitation
Chapter 12   independent projects & budget limitationChapter 12   independent projects & budget limitation
Chapter 12 independent projects & budget limitation
 
Recruitment, training, compensation
Recruitment, training, compensationRecruitment, training, compensation
Recruitment, training, compensation
 
Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysis
 
10 causes of project failure.
10 causes of project failure.10 causes of project failure.
10 causes of project failure.
 
Payback Analysis
Payback AnalysisPayback Analysis
Payback Analysis
 
Managing The Sales Force - By Dr. Karpagam Director – Academics, ISBR Busines...
Managing The Sales Force - By Dr. Karpagam Director – Academics, ISBR Busines...Managing The Sales Force - By Dr. Karpagam Director – Academics, ISBR Busines...
Managing The Sales Force - By Dr. Karpagam Director – Academics, ISBR Busines...
 
10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid10 reasons why projects fail or common mistakes to avoid
10 reasons why projects fail or common mistakes to avoid
 
Marginal costing & breakeven analysis
Marginal costing & breakeven analysisMarginal costing & breakeven analysis
Marginal costing & breakeven analysis
 
Factors for Successful Projects
Factors for Successful ProjectsFactors for Successful Projects
Factors for Successful Projects
 
Project Success/Failure
Project Success/FailureProject Success/Failure
Project Success/Failure
 
Top Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects FailTop Ten Reasons Why Projects Fail
Top Ten Reasons Why Projects Fail
 
Code of discipline
Code of discipline Code of discipline
Code of discipline
 
Direct marketing
Direct  marketingDirect  marketing
Direct marketing
 
Breakeven Analysis (Introduction)
Breakeven Analysis (Introduction)Breakeven Analysis (Introduction)
Breakeven Analysis (Introduction)
 
Direct Marketing
Direct MarketingDirect Marketing
Direct Marketing
 
BREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSISBREAK-EVEN ANALYSIS
BREAK-EVEN ANALYSIS
 
Discipline Ppt
Discipline PptDiscipline Ppt
Discipline Ppt
 
Break Even Analysis
Break Even AnalysisBreak Even Analysis
Break Even Analysis
 
Direct marketing ppt
Direct marketing pptDirect marketing ppt
Direct marketing ppt
 
Tools of direct marketing
Tools of direct marketingTools of direct marketing
Tools of direct marketing
 

Ähnlich wie Lo4b (nabil) breakeven analysis

Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysisBich Lien Pham
 
lanen_5e_ch05_student.ppt
lanen_5e_ch05_student.pptlanen_5e_ch05_student.ppt
lanen_5e_ch05_student.pptSURAJITDASBAURI
 
Chapter 5 present worth analysis -with examples
Chapter 5   present worth analysis -with examplesChapter 5   present worth analysis -with examples
Chapter 5 present worth analysis -with examplesAbdulaziz AlSuwaidi
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysisBich Lien Pham
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysisBich Lien Pham
 
FN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.pptFN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.ppthass6
 
Ch5 pw analysis_part1_rev4
Ch5 pw analysis_part1_rev4Ch5 pw analysis_part1_rev4
Ch5 pw analysis_part1_rev4Nour Dagher
 
Systematic Economic Analysis Technique for analysis
Systematic Economic Analysis Technique for analysisSystematic Economic Analysis Technique for analysis
Systematic Economic Analysis Technique for analysisNaganna Chetty
 
8 150316005531-conversion-gate01
8 150316005531-conversion-gate018 150316005531-conversion-gate01
8 150316005531-conversion-gate01abidiqbal55
 
8. Rate of return analysis
8. Rate of return analysis8. Rate of return analysis
8. Rate of return analysisMohsin Siddique
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingpremarhea
 
3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf18010YeashRahman
 

Ähnlich wie Lo4b (nabil) breakeven analysis (20)

Chapter 13 breakeven analysis
Chapter 13   breakeven analysisChapter 13   breakeven analysis
Chapter 13 breakeven analysis
 
Lo4b(arif)
Lo4b(arif)Lo4b(arif)
Lo4b(arif)
 
lanen_5e_ch05_student.ppt
lanen_5e_ch05_student.pptlanen_5e_ch05_student.ppt
lanen_5e_ch05_student.ppt
 
Chapter 5 present worth analysis -with examples
Chapter 5   present worth analysis -with examplesChapter 5   present worth analysis -with examples
Chapter 5 present worth analysis -with examples
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysis
 
Chapter 5 present worth analysis
Chapter 5   present worth analysisChapter 5   present worth analysis
Chapter 5 present worth analysis
 
FN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.pptFN6033-CORP FIN-LECTURE 5A.ppt
FN6033-CORP FIN-LECTURE 5A.ppt
 
Lecture blank - 8-9
Lecture  blank - 8-9Lecture  blank - 8-9
Lecture blank - 8-9
 
Nce603 mod unit3
Nce603 mod unit3Nce603 mod unit3
Nce603 mod unit3
 
Lo4a(arif)
Lo4a(arif)Lo4a(arif)
Lo4a(arif)
 
Ch5 pw analysis_part1_rev4
Ch5 pw analysis_part1_rev4Ch5 pw analysis_part1_rev4
Ch5 pw analysis_part1_rev4
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
Systematic Economic Analysis Technique for analysis
Systematic Economic Analysis Technique for analysisSystematic Economic Analysis Technique for analysis
Systematic Economic Analysis Technique for analysis
 
Evaluation
EvaluationEvaluation
Evaluation
 
Cap budget [autosaved]
Cap budget [autosaved]Cap budget [autosaved]
Cap budget [autosaved]
 
Engineering Economy
Engineering EconomyEngineering Economy
Engineering Economy
 
8 150316005531-conversion-gate01
8 150316005531-conversion-gate018 150316005531-conversion-gate01
8 150316005531-conversion-gate01
 
8. Rate of return analysis
8. Rate of return analysis8. Rate of return analysis
8. Rate of return analysis
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf3.-Benefit-Cost-Analysis.pdf
3.-Benefit-Cost-Analysis.pdf
 

Mehr von Abdulaziz AlSuwaidi

Case study questions Engineering Economics
Case study questions Engineering EconomicsCase study questions Engineering Economics
Case study questions Engineering EconomicsAbdulaziz AlSuwaidi
 
Lo #5 manufacturing technology (jan 2016)
Lo #5 manufacturing technology (jan  2016)Lo #5 manufacturing technology (jan  2016)
Lo #5 manufacturing technology (jan 2016)Abdulaziz AlSuwaidi
 
Lo4a benefit cost analysis (nabil)
Lo4a benefit  cost analysis (nabil)Lo4a benefit  cost analysis (nabil)
Lo4a benefit cost analysis (nabil)Abdulaziz AlSuwaidi
 
Lo #4 manufacturing technology (jan 2016)
Lo #4 manufacturing technology (jan  2016)Lo #4 manufacturing technology (jan  2016)
Lo #4 manufacturing technology (jan 2016)Abdulaziz AlSuwaidi
 
Chapter 6&7 annual worth analysis & ror lo3b
Chapter 6&7  annual worth analysis & ror   lo3bChapter 6&7  annual worth analysis & ror   lo3b
Chapter 6&7 annual worth analysis & ror lo3bAbdulaziz AlSuwaidi
 
Lo# 3c(common) manufacturing technology part 3
Lo# 3c(common) manufacturing technology part 3Lo# 3c(common) manufacturing technology part 3
Lo# 3c(common) manufacturing technology part 3Abdulaziz AlSuwaidi
 
Lo #3b (common)manufacturing technology (jan 2016) part 2
Lo #3b (common)manufacturing technology (jan  2016)   part 2Lo #3b (common)manufacturing technology (jan  2016)   part 2
Lo #3b (common)manufacturing technology (jan 2016) part 2Abdulaziz AlSuwaidi
 
Lo# 3a(2033 common) manufacturing technology PART 1
Lo# 3a(2033 common) manufacturing technology PART 1Lo# 3a(2033 common) manufacturing technology PART 1
Lo# 3a(2033 common) manufacturing technology PART 1Abdulaziz AlSuwaidi
 
Lo #2 manufacturing process primary secondary part 1
Lo #2 manufacturing process   primary  secondary part 1 Lo #2 manufacturing process   primary  secondary part 1
Lo #2 manufacturing process primary secondary part 1 Abdulaziz AlSuwaidi
 
Lo #1 design factors in manufacturing processes (sept 2015)
Lo #1 design factors in manufacturing processes (sept  2015)Lo #1 design factors in manufacturing processes (sept  2015)
Lo #1 design factors in manufacturing processes (sept 2015)Abdulaziz AlSuwaidi
 
Lo # 1 manufacturing process selection design part 1
Lo # 1 manufacturing process selection design part 1Lo # 1 manufacturing process selection design part 1
Lo # 1 manufacturing process selection design part 1Abdulaziz AlSuwaidi
 
Chapter 6&7 annual worth analysis & ror lo3b
Chapter 6&7  annual worth analysis & ror   lo3bChapter 6&7  annual worth analysis & ror   lo3b
Chapter 6&7 annual worth analysis & ror lo3bAbdulaziz AlSuwaidi
 

Mehr von Abdulaziz AlSuwaidi (17)

Case study questions Engineering Economics
Case study questions Engineering EconomicsCase study questions Engineering Economics
Case study questions Engineering Economics
 
Lo #5 manufacturing technology (jan 2016)
Lo #5 manufacturing technology (jan  2016)Lo #5 manufacturing technology (jan  2016)
Lo #5 manufacturing technology (jan 2016)
 
Lo4a benefit cost analysis (nabil)
Lo4a benefit  cost analysis (nabil)Lo4a benefit  cost analysis (nabil)
Lo4a benefit cost analysis (nabil)
 
Lo #4 manufacturing technology (jan 2016)
Lo #4 manufacturing technology (jan  2016)Lo #4 manufacturing technology (jan  2016)
Lo #4 manufacturing technology (jan 2016)
 
Chapter 6&7 annual worth analysis & ror lo3b
Chapter 6&7  annual worth analysis & ror   lo3bChapter 6&7  annual worth analysis & ror   lo3b
Chapter 6&7 annual worth analysis & ror lo3b
 
2. ethical theories part 2 (1)
2.  ethical theories part 2 (1)2.  ethical theories part 2 (1)
2. ethical theories part 2 (1)
 
1. ethical theories part 1
1. ethical theories part 11. ethical theories part 1
1. ethical theories part 1
 
Lo# 3c(common) manufacturing technology part 3
Lo# 3c(common) manufacturing technology part 3Lo# 3c(common) manufacturing technology part 3
Lo# 3c(common) manufacturing technology part 3
 
Lo #3b (common)manufacturing technology (jan 2016) part 2
Lo #3b (common)manufacturing technology (jan  2016)   part 2Lo #3b (common)manufacturing technology (jan  2016)   part 2
Lo #3b (common)manufacturing technology (jan 2016) part 2
 
Lo# 3a(2033 common) manufacturing technology PART 1
Lo# 3a(2033 common) manufacturing technology PART 1Lo# 3a(2033 common) manufacturing technology PART 1
Lo# 3a(2033 common) manufacturing technology PART 1
 
lo 2 handout 1 (2) PART 2
 lo 2 handout 1 (2) PART 2 lo 2 handout 1 (2) PART 2
lo 2 handout 1 (2) PART 2
 
Lo #2 manufacturing process primary secondary part 1
Lo #2 manufacturing process   primary  secondary part 1 Lo #2 manufacturing process   primary  secondary part 1
Lo #2 manufacturing process primary secondary part 1
 
Lo #1 design factors in manufacturing processes (sept 2015)
Lo #1 design factors in manufacturing processes (sept  2015)Lo #1 design factors in manufacturing processes (sept  2015)
Lo #1 design factors in manufacturing processes (sept 2015)
 
Lo # 1 manufacturing process selection design part 1
Lo # 1 manufacturing process selection design part 1Lo # 1 manufacturing process selection design part 1
Lo # 1 manufacturing process selection design part 1
 
Lo 2 b factors
Lo 2 b   factorsLo 2 b   factors
Lo 2 b factors
 
Lo 2 a key terminologies
Lo 2 a   key terminologiesLo 2 a   key terminologies
Lo 2 a key terminologies
 
Chapter 6&7 annual worth analysis & ror lo3b
Chapter 6&7  annual worth analysis & ror   lo3bChapter 6&7  annual worth analysis & ror   lo3b
Chapter 6&7 annual worth analysis & ror lo3b
 

Kürzlich hochgeladen

Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stageAbc194748
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...Health
 

Kürzlich hochgeladen (20)

Air Compressor reciprocating single stage
Air Compressor reciprocating single stageAir Compressor reciprocating single stage
Air Compressor reciprocating single stage
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
+97470301568>> buy weed in qatar,buy thc oil qatar,buy weed and vape oil in d...
 

Lo4b (nabil) breakeven analysis

  • 1. Breakeven point LO4b EGN 3203 Engineering Economics
  • 2. LEARNING OUTCOMES 1. Breakeven point – one parameter 2. Breakeven point – two alternatives 3. Payback period analysis © 2012 by McGraw-Hill All Rights Reserved13-2
  • 3. Breakeven Point The parameter (or variable) can be an amount of revenue, cost, supply, demand, etc. for one project or between two alternatives  One project - Breakeven point is identified as QBE. Determined using linear or non-linear math relations for revenue and cost  Between two alternatives - Determine one of the parameters P, A, F, i, or n with others constant Solution is by one of three methods: Direct solution of relations Trial and error Spreadsheet functions or tools (Goal Seek or Solver) © 2012 by McGraw-Hill All Rights Reserved13-3 Value of a parameter that makes two elements equal
  • 4. Cost-Revenue Model ― One Project © 2012 by McGraw-Hill All Rights Reserved 13-4 Quantity, Q — An amount of the variable in question, e.g., units/year, hours/month Breakeven value is QBE Fixed cost, FC — Costs not directly dependent on the variable, e.g., buildings, fixed overhead, insurance, minimum workforce cost Variable cost, VC — Costs that change with parameters such as production level and workforce size. These are labor, material and marketing costs. Variable cost per unit is v Total cost, TC — Sum of fixed and variable costs, TC = FC + VC Revenue, R — Amount is dependent on quantity sold Revenue per unit is r Profit, P — Amount of revenue remaining after costs P = R – TC = R – (FC+VC)
  • 5. Breakeven Analysis • There are different shapes of a revenue relation - identified as R . • A linear revenue relation is commonly assumed, but a nonlinear relation is often more realistic. • It can model an increasing per unit revenue with larger volumes - curve 1 • or a decreasing per unit revenue that usually prevails at higher quantities © 2012 by McGraw-Hill All Rights Reserved 5
  • 6. Breakeven for linear R and TC © 2012 by McGraw-Hill All Rights Reserved13-5 Set R = TC and solve for Q = QBE R = TC rQ = FC + vQ FC r – v When variable cost, v, is lowered, QBE decreases (moves to left) QBE = • The breakeven graph is an important management tool. • Often used in decision making. • if the variable cost VC per unit is reduced, then the TC line has a smaller slope and the breakeven point will decrease. • This is an advantage because the smaller the value of QBE, the greater the profit for a given amount of revenue.
  • 7. Example: One Project Breakeven Point Solution: Find QBE and compare to 15,000; calculate Profit QBE = 75,000 / (8.00-2.50) = 13,636 units/month Production level is above breakeven Profit Profit = R – (FC + VC) = rQ – (FC + vQ) = (r-v)Q – FC = (8.00 – 2.50)(15,000) – 75,000 = $ 7500/month © 2012 by McGraw-Hill All Rights Reserved13-6 A plant produces 15,000 units/month. Find breakeven level if FC = $75,000 /month, revenue is $8/unit and variable cost is $2.50/unit. Determine expected monthly profit or loss.
  • 8. © 2012 by McGraw-Hill All Rights Reserved 8 Example: One Project Breakeven Point
  • 9. © 2012 by McGraw-Hill All Rights Reserved 9 Example: One Project Breakeven Point
  • 10. © 2012 by McGraw-Hill All Rights Reserved 10 Example: One Project Breakeven Point
  • 11. Breakeven Between Two Alternatives To determine value of common variable between 2 alternatives, do the following: 1. Define the common variable 2. Develop equivalence PW, AW or FW relations as function of common variable for each alternative 3. Equate the relations; solve for variable. This is breakeven value 4. Selection of the alternative is different depending upon two facts: – the parameter value relative to the breakeven point. – slope of the variable cost curve © 2012 by McGraw-Hill All Rights Reserved13-7 Selection of alternative is based on anticipated value of common variable:  Value BELOW breakeven; select higher variable cost (larger slope)  Value ABOVE breakeven; select lower variable cost (less slope)
  • 12. Example: Two Alternative Breakeven Analysis Perform a make/buy analysis where the common variable is X, the number of units produced each year. AW relations are: AWmake = -18,000(A/P,15%,6) +2,000(A/F,15%,6) – 0.4X AWbuy = -1.5X Solution: Equate AW relations, solve for X -1.5X = -4528 - 0.4X X = 4116 per year © 2012 by McGraw-Hill All Rights Reserved13-8 X, 1000 units per year Breakeven value of X 1 2 3 4 5 AWbuy AWmake If anticipated production > 4116, select make alternative (lower variable cost) AW, 1000 $/year 8 7 6 5 4 3 2 1 0
  • 13. Breakeven Analysis Using Goal Seek Tool Spreadsheet tool Goal Seek finds breakeven value for the common variable between two alternatives © 2012 by McGraw-Hill All Rights Reserved13-9 Problem: Two machines (1 and 2) have following estimates. a) Use spreadsheet and AW analysis to select one at MARR = 10%. b) Use Goal Seek to find the breakeven first cost. Machine 1 2 P, $ -80,000 -110,000 NCF, $/year 25,000 22,000 S, $ 2,000 3,000 n, years 4 6 Solution: a) Select machine A with AWA = $193
  • 14. Breakeven Analysis Using Goal Seek Tool Solution: b) Goal Seek finds a first-cost breakeven of $96,669 to make machine B economically equivalent to A © 2012 by McGraw-Hill All Rights Reserved13-10 Spreadsheet after Goal Seek is applied Changing cell Target cell
  • 15. Payback Period Analysis Caution: Payback period analysis is a good initial screening tool, rather than the primary method to justify a project or select an alternative (Discussed later) © 2012 by McGraw-Hill All Rights Reserved13-11 Payback period: Estimated amount of time (np) for cash inflows to recover an initial investment (P) plus a stated return of return (i%) Types of payback analysis: No-return and discounted payback 1. No-return payback means rate of return is ZERO (i = 0%) 2. Discounted payback considers time value of money (i > 0%)
  • 16. Payback Period Computation © 2012 by McGraw-Hill All Rights Reserved13-12 Formula to determine payback period (np) varies with type of analysis. NCF = Net Cash Flow per period t Eqn. 1 Eqn. 2 Eqn. 3 Eqn. 4
  • 17. Points to Remember About Payback Analysis • No-return payback neglects time value of money, so no return is expected for the investment made • No cash flows after the payback period are considered in the analysis. Return may be higher if these cash flows are expected to be positive. • Approach of payback analysis is different from PW, AW, ROR and B/C analysis. A different alternative may be selected using payback. • Rely on payback as a supplemental tool; use PW or AW at the MARR for a reliable decision • Discounted payback (i > 0%) gives a good sense of the risk involved © 2012 by McGraw-Hill All Rights Reserved13-13
  • 18. Example: Payback Analysis System 1 System 2 First cost, $ 12,000 8,000 NCF, $ per year 3,000 1,000 (year 1-5) 3,000 (year 6-14) Maximum life, years 7 14 Problem: Use (a) no-return payback, (b) discounted payback at 15%, and (c) PW analysis at 15% to select a system. Comment on the results. Solution: (a) Use Eqns. 1 and 2 np1= 12,000 / 3,000 = 4 years np2= -8,000 + 5(1,000) + 1(3,000) = 6 years Select system 1 © 2012 by McGraw-Hill All Rights Reserved13-14
  • 19. Example: Payback Analysis (continued) System 1 System 2 First cost, $ 12,000 8,000 NCF, $ per year 3,000 1,000 (year 1-5) 3,000 (year 6-14) Maximum life, years 7 14 Solution: (b) Use Eqns. 3 and 4 System 1: 0 = -12,000 + 3,000(P/A,15%,np1) np1 = 6.6 years System 2: 0 = -8,000 + 1,000(P/A,15%,5) + 3,000(P/A,15%,np2 - 5)(P/F,15%,5) np1 = 9.5 years Select system 1 (c) Find PW over LCM of 14 years PW1 = $663 PW2 = $2470 Select system 2 Comment: PW method considers cash flows after payback period. Selection changes from system 1 to 2 © 2012 by McGraw-Hill All Rights Reserved13-15
  • 20. Summary of Important Points © 2012 by McGraw-Hill All Rights Reserved13-16 Breakeven amount is a point of indifference to accept or reject a project One project breakeven: accept if quantity is > QBE Two alternative breakeven: if level > breakeven, select lower variable cost alternative (smaller slope) Payback estimates time to recover investment. Return can be i = 0% or i > 0% Use payback as supplemental to PW or other analyses, because np neglects cash flows after payback, and if i = 0%, it neglects time value of money Payback is useful to sense the economic risk in a project