 The direction and position given to the centre line
of the railway track on the ground is called track
alignment.
It includes
 Horizontal alignment such as straight path, its
width, deviation and horizontal curves.
 Vertical alignment such as changes in gradients
and vertical curves.
2GRK, Asst. Professor, SPEC
An ideal alignment should fulfil the following
requirements:
1. Purpose of the track: The alignment should satisfy
the basic purposes of track such as
a) Transportation services: Railways carry the
passenger traffic and goods traffic, local as
well as through.
b) Political and strategic: It is essential to
construct a line to connect two points for
defensive purposes.
3GRK, Asst. Professor, SPEC
c) Linking of centers: A railway line should
construct through the important places.
d) To open up new track: It may be necessary to
align new tracks for the land, whose
resources are not yet tapped.
e) Shortening existing track: When the existing
track is uneconomical, a new track may be
aligned to shorten the existing track which
would prove to be economical.
4GRK, Asst. Professor, SPEC
2. Feasibility: The proposed track should met all
the technical requirements and general planning
of the country.
3. Economy: The initial construction cost,
maintenance cost and operational cost should be
minimum.
4. Safety: The aligned track give safety to track
operations, passenger traffic and goods traffic.
5. Aesthetic aspects: The alignment should be
aesthetically and good give pleasant railway
journey.
5GRK, Asst. Professor, SPEC
The following factors should be considered while design of a
new track:
1. Obligatory or controlling points: The points which governs
the alignment are:
a) Points through which a track must pass: It is desirable that
a track alignment should pass from places of social,
commercial, political and defensive importance.
b) Points through which a track should not pass: The track
should not pass through the following points
i) It is better to avoid river crossing because it requires
major bridge constructions. It is a uneconomical.
ii) it is necessary to avoid high hill passes and saddles.
iii) the alignment should be avoided through the tunnels.
6GRK, Asst. Professor, SPEC
2. Traffic:
 It is essential to satisfy position, nature and amount
of traffic.
 The alignment should pass through the greatest
population.
3. Gauge selection: If the gauge width is increases the
initial cost is more but also increases load carrying
capacity and speed of the trains.
4. Geometric standards: The efficiency of the
alignment depends upon varying conditions of
gradients, speed, loading conditions.
7GRK, Asst. Professor, SPEC
5. Topography of the country: If the heavy gradients are
unavoidable then the cost alignment can be reduced by
different techniques.
6. Economic considerations: The alignment should be
economical.
 The best alignment is one which should gives maximum
annual return(r)
r =[Gross revenue – Annual running expenses ] /
Investment
r = [R- E] / I
7. Other considerations: The miscellaneous factors such as
soil conditions, drainage conditions etc.
8GRK, Asst. Professor, SPEC
In order to have a proper and satisfactory new route,
various surveys are carried out:
1) Traffic survey
2) Reconnaissance Survey
3) Preliminary Survey
4) Location Survey
9GRK, Asst. Professor, SPEC
This consists of collection of the information regarding the
following:
 The general character of the country and the extent of
cultivation.
 Information regarding the local industries and religious
festivals.
 The general condition as regards prosperity of people in the
locality and density of population and its distribution;
 The probable amount of traffic to be served by new railway
line.
 The probable new traffic lines to be opened up to join large
centres of trade.
10GRK, Asst. Professor, SPEC
 Nature and volume of exports and their destination;
 The amount of imports and centres of their
distribution.
 Possibilities of development of industries as a result
of the new railway line.
 Visiting all trade centres and consultation with
prominent citizens and local authorities regarding the
most suitable route for the railway.
 Standard of construction required for carrying the
probable traffic.
 Study of the existing means of transport.
11GRK, Asst. Professor, SPEC
This consists of collection of information regarding the
following:
 Physical features of the country.
 The surface formation of the ground.
 Nature of soil and its classification.
 Streams and rivers of the immediate vicinity, especially
those which are likely to cross the proposed railway line.
 Positions of hills and lakes.
 Samples of water from wells, rivers, etc. so as to ascertain
weather the water is suitable for use in locomotive or not.
 Availability of materials and labour for use during
construction.
12GRK, Asst. Professor, SPEC
Object of preliminary survey:
 To conduct the survey work along the alternative
routes found out by reconnaissance survey and;
 To determine with greater accuracy the cost of the
railway line along these alternative routes.
Importance of preliminary survey:
 It decides the final route and recommends only one
particular route in preference to other alternative
routes;
 Thus, should be carried out with great precision as on
it depends the alignment of the final route.
13GRK, Asst. Professor, SPEC
Object of location survey:
 To carry out the detailed survey along the route which
has been found and fixed as the most economical route
from the data of the preliminary survey.
 It establishes the centre-line of the actual track to be
laid.
 As soon as the location survey is completed, the
construction work is started.
14GRK, Asst. Professor, SPEC
Work of location survey: It is carried out in two stages:
1. Paper location
2. Field location
1. Paper location:
The final route selected is put up on paper and details
such as gradient, curves, contours, etc. are worked out.
 All the working drawings are prepared, even of minor
structures such as signal cabins.
 After the paper location is over, the field work is started
and the centre-line of the track is fixed.
15GRK, Asst. Professor, SPEC
 The field location transfers paper location on the ground;
 It gives all the requirements of the construction engineer
such as benchmarks, levels, measurements, etc.
 The centre-line pegs are driven at every 300 metres
along the centre-line of the track.
 Every change of direction, the beginning and end of the
curve and also the intersecting points are clearly marked.
 In addition to the fixing up of the centre-line of the track,
the centre-lines of bridges, culverts, tunnels, station
buildings, signal cabins, etc. should also be fixed.
16GRK, Asst. Professor, SPEC
 The amount of slope in longitudinal direction of railway
track is called gradient or grade.
 Gradients are provided to negotiate the rise or fall in the
level of the railway track.
 Rising gradient rises the track in the direction of movement,
whereas, falling gradient cause the track to go down in the
direction of movement.
 A gradient is represented by the distance travelled for a rise
or fall of one unit.
 It is written as; 1 in ‘X’ or 1 in ‘n’ or as percent
17GRK, Asst. Professor, SPEC
•A gradient is normally represented by the distance
travelled for a rise or fall of one unit.
•Sometimes the gradient is indicated as per cent rise
or fall.
•For example, if there is a rise of 1 m in 400 m, the
gradient is 1 in 400 or 0.25%,
18GRK, Asst. Professor, SPEC
Gradients are provided to meet the following
objectives:
 To reach various stations at different elevations
 To follow the natural contours of the ground to
the extent possible
 To reduce the cost of earthwork.
19GRK, Asst. Professor, SPEC
The need for proper geometric design of a track arises
because of the following considerations :
 To ensure the smooth and safe running of trains.
 To achieve maximum speeds.
 To carry heavy axle loads.
 To avoid accidents and derailments due to a
defective permanent way.
 To ensure that the track requires least maintenance.
 For good aesthetics.
20GRK, Asst. Professor, SPEC
 Ruling gradient
 Pusher or helper gradient
 Momentum gradient
 Gradients in station yards
21GRK, Asst. Professor, SPEC
 This is the design gradient basically, because it
is determined on the basis of the performance
of the locomotive and at the same time, it tries
to look at the total amount of load which that
locomotive can take up along with it, while
negotiating any gradient without any loss or
major loss in the speed of the movement.
22GRK, Asst. Professor, SPEC
23GRK, Asst. Professor, SPEC
 It is a maximum gradient (steepest gradient), which
may be permitted on the section of the track.
 It is determined by maximum load that a locomotive
can haul with maximum permissible speed.
 Extra pull required by locomotive on gradient with ‘θ ’
inclination. P = WSinθ =W * gradient
 For Ex:-
Weight of train (W)=500 tonnes
Gradient = 1 in 100
Extra power (P) = 5 tonnes
Ruling gradient
24GRK, Asst. Professor, SPEC
 In Plane area = 1 in 150 to 1 in 250
 In hilly area = 1 in 100 to 1in 150
 Once a ruling gradient is specified for a section, then
all other gradients provided in that section should be
flatter than the ruling gradients (after making due to
compensation for curvature)
25GRK, Asst. Professor, SPEC
 When the gradient of the ensuing section is so steep as
to necessitate the use of an extra engine for pushing the
train, it is known as a pusher or helper gradient.
 Examples of pusher gradients are the Budni -Barkhera
section of Central Railways and the Darjeeling
Himalayan Railway section.
26GRK, Asst. Professor, SPEC
27GRK, Asst. Professor, SPEC
 Momentum gradient steeper than ruling gradient that is
overcome by momentum gathered while having a run in
plane or on falling gradient in valleys.
 Use additional kinetic energy received during run on a
section.
 No obstruction like signals are provided on section with
these gradients(means the train should not be stopped at
that territory).
28GRK, Asst. Professor, SPEC
29GRK, Asst. Professor, SPEC
 For example, in valleys, a falling gradient is
usually followed by rising gradient acquires
sufficient momentum.
 This momentum gives additional kinetic
energy to the moving train which would
enable the train to overcome a steeper rising
gradient than the ruling gradient for a certain
length of the track.
 This rising gradient is called momentum
gradient and this gradient is steeper than ruling
gradient.
30GRK, Asst. Professor, SPEC
31GRK, Asst. Professor, SPEC
The gradients in station yards are quite flat due to the
following reasons:
 To prevent standing vehicles from rolling and moving away
from the yard due to the combined effect of gravity and
strong winds.
 To reduce the additional resistive forces required to start a
locomotive to the extent possible.
 It may be mentioned here that generally, yards are not
levelled completely and certain flat gradients are provided
in order to ensure good drainage.
 The maximum gradient prescribed in station yards on
Indian Railways is 1 in 400, while the recommended
gradient is 1 in 1000.
32GRK, Asst. Professor, SPEC
33GRK, Asst. Professor, SPEC
 Curves provide extra resistance to the movement of
trains. As a result, gradients are compensated to the
following extent on curves:
 On BG tracks, 0.04% per degree of the curve or 70/R,
whichever is minimum.
 On MG tracks, 0.03% per degree of curve or 52.5/R,
whichever is minimum.
 On NG tracks, 0.02% per degree of curve or 35/R,
whichever is minimum where R is the radius of the
curve in metres.
 The gradient of a curved portion of the section should
be flatter than the ruling gradient because of the extra
resistance offered by the curve.
34GRK, Asst. Professor, SPEC
1. Find the steepest gradient on a 2° curve for a
BG line with a ruling gradient of 1 in 200.
Solution
(i) Ruling gradient = 1 in 200 = 0.5%
(ii) Compensation for a 2° curve = 0.04 × 2 = 0.08%
(iii) Compensated gradient = 0.5 – 0.08 = 0.42% = 1
in 238
The steepest gradient on the curved track is 1
in 238.
35GRK, Asst. Professor, SPEC
 Curves are introduced on a railway track to
bypass obstacles, to provide longer and easily
traversed gradients, and to pass a railway line
through obligatory or desirable locations.
 Horizontal curves are provided when a
change in the direction of the track is
required and Vertical curves are provided at
points where two gradients meet or where a
gradient meets level ground.
 Curve is defined either by radius or its degree
36GRK, Asst. Professor, SPEC
 The maximum permissible degree of a curve on a
track depends on various factors such as gauge,
wheel base of the vehicle, maximum permissible
super elevation, and other such allied factors.
The maximum degree or the minimum radius of
the curve permitted on Indian Railways for
various gauges is given in Fig 5.
 Figure No.:5 Maximum Degree of a Curve
 (Source:
dl4a.org/uploads/pdf/EbookRailwayEngineering.
pdf)
37GRK, Asst. Professor, SPEC
38GRK, Asst. Professor, SPEC
 Super elevation or cant (Ca) is the difference in
height between the outer and the inner rail on
a curve.
 It is provided by gradually lifting the outer rail
above the level of the inner rail.
 The inner rail is taken as the reference rail and
is normally maintained at its original level.
 The inner rail is also known as the gradient
rail.
39GRK, Asst. Professor, SPEC
The main functions of super elevation are the
following :
 To ensure a better distribution of load on both
rails.
 To reduce the wear and tear of the rails and
rolling stock.
 To neutralize the effect of lateral forces.
 To provide comfort to passengers.
40GRK, Asst. Professor, SPEC
 A vehicle has a tendency to travel in a straight direction,
which is tangential to the curve, even when it moves on a
circular curve. As a result, the vehicle is subjected to a
constant radial acceleration:
Radial acceleration (g)= V2 /R
Where, V = velocity (metres per second) and
R = Radius of curve (metres).
 This radial acceleration produces a centrifugal force
which acts in a radial direction away from the centre.
41GRK, Asst. Professor, SPEC
The value of the centrifugal force is given by the formula
Force = mass × acceleration
F = m × (V2 /R)
= (W/g) × (V2 /R)
Where,F = Centrifugal force (tonnes),
W = Weight of the vehicle (tonnes),
V = Speed (metre/sec),
g = Acceleration due to gravity (metre/sec2 ), and
R = Radius of the curve (metres).
 To counteract the effect of the centrifugal force, the outer rail of the
curve is elevated with respect to the inner rail by an amount equal to
the super elevation.
 A state of equilibrium is reached when both the wheels exert equal
pressure on the rails and the super elevation is enough to bring the
resultant of the centrifugal force and the force exerted by the weight of
the vehicle at right angles to the plane of the top surface of the rails.
 In this state of equilibrium, the difference in the heights of the outer
and inner rails of the curve known as equilibrium super elevation.
42GRK, Asst. Professor, SPEC
43GRK, Asst. Professor, SPEC
 6.4 Formula for Superelevation
 The θ is the angle that the inclined plane
makes with the horizontal line, then
44GRK, Asst. Professor, SPEC
45GRK, Asst. Professor, SPEC
 where ,
 e = Superelevation,
 G= Gauge,
 V = Velocity,
 g = Acceleration due to gravity, and
 R = Radius of the curve.
 6.5 Thumb Rules for Calculating Superelevation
in the Field
 A field engineer can adopt the following thumb
rules for determining the superelevation of any
curve
46GRK, Asst. Professor, SPEC
 A field engineer can adopt the following thumb
rules for determining the superelevation of any
curve
 Super elevation for BG in cm
 For MG tracks
 Super elevation = three-fifths of the above
formula
 The equilibrium speed is used in this formula
47GRK, Asst. Professor, SPEC
 6.6 Types of Cant
 The cant are further divided on the bases of
speed:
 Equilibrium cant
 Cant deficiency ( Cd )
 Cant excess ( Ce )
 6.6.1 Equilibrium cant
 Value of super elevation derived from the
equation using equilibrium speed
48GRK, Asst. Professor, SPEC
 6.6.2 Cant deficiency ( Cd )
 Cant deficiency (Cd) occurs when a train
travels around a curve at a speed higher than
the equilibrium speed. It is the difference
between the theoretical cant required for
such high speeds and the actual cant
provided. Maximum permissible Cd : 7.6cm
(BG), 5.1cm (MG), 3.8cm (NG).
49GRK, Asst. Professor, SPEC
 6.6.3 Cant excess ( Ce )
 Cant excess (Ce) occurs when a train travels
around a curve at a speed lower than the
equilibrium speed. It is the difference
between the actual cant provided and the
theoretical cant required for such a low
speed.
50GRK, Asst. Professor, SPEC
 7.1 Widening of Gauge on Curve
 When vehicle moves onto a curve, the flange of the
outside wheel of the leading axle continues to travel
in a straight line till it rubs against the rail. Due to the
coning of wheels ,the outside wheel travels a longer
distance compared to the inner wheel. In an effort to
make up for the difference in the distance travelled
by the outer wheel and the inner wheel, the inside
wheels slip backward and the outer wheels skid
forward.
 The widening of the gauge on a curve has, in fact,
tends to decrease the wear and tear on both the
wheel and the track
51GRK, Asst. Professor, SPEC
 The widening of the gauge on curves can be
calculated using the formula
 Extra width on curves
 w = 13(B+L)2/R
 Where,
 B is the wheel base of the vehicle in metres,
 R is the radius of the curve in metres,
 L =0.02(h2 + Dh)1/2 is the lap of the flange in
metres,
 h is the depth of flange below top of the
rail(cm),
 D is the diameter of the wheel of the vehicle
(cm).
52GRK, Asst. Professor, SPEC
53GRK, Asst. Professor, SPEC
GRK, Asst. Professor, SPEC 54
GRK, Asst. Professor, SPEC 55
GRK, Asst. Professor, SPEC 56
GRK, Asst. Professor, SPEC 57
GRK, Asst. Professor, SPEC 58
GRK, Asst. Professor, SPEC 59
GRK, Asst. Professor, SPEC 60
GRK, Asst. Professor, SPEC 61
GRK, Asst. Professor, SPEC 62

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Station and Yards in Indian Railway
Station and Yards in Indian RailwayStation and Yards in Indian Railway
Station and Yards in Indian Railway
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
turnouts in railways
 turnouts in railways turnouts in railways
turnouts in railways
 
2.railway track gauge
2.railway track gauge2.railway track gauge
2.railway track gauge
 
PERMANANT WAY
PERMANANT WAYPERMANANT WAY
PERMANANT WAY
 
Railway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevationRailway Engineering-Curves and superelevation
Railway Engineering-Curves and superelevation
 
Sleepers and Ballast
Sleepers and Ballast Sleepers and Ballast
Sleepers and Ballast
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway Engineering - Geometric design of track
Railway Engineering - Geometric design of trackRailway Engineering - Geometric design of track
Railway Engineering - Geometric design of track
 
Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)Introduction to railway engineering (T.E 2)
Introduction to railway engineering (T.E 2)
 
Geometric design of track
Geometric design of trackGeometric design of track
Geometric design of track
 
Creep of Rails.pdf
Creep of Rails.pdfCreep of Rails.pdf
Creep of Rails.pdf
 
Geometric design of railway track
Geometric design of railway  trackGeometric design of railway  track
Geometric design of railway track
 
Presentation on railway construction and maintenance
Presentation on railway construction and maintenancePresentation on railway construction and maintenance
Presentation on railway construction and maintenance
 
Bridge survey
Bridge surveyBridge survey
Bridge survey
 
Railway Engineering- Basic Introduction
Railway Engineering- Basic IntroductionRailway Engineering- Basic Introduction
Railway Engineering- Basic Introduction
 
1.railway intro and rails
1.railway intro and rails1.railway intro and rails
1.railway intro and rails
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 

Ähnlich wie Railway engineering part2

Transportation engineering 2
Transportation engineering   2Transportation engineering   2
Transportation engineering 2
R VIJAYAKUMAR
 

Ähnlich wie Railway engineering part2 (20)

Design Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway AlignmentDesign Methodology for Feasible Railway Alignment
Design Methodology for Feasible Railway Alignment
 
Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)Indian Railways Surveying (RECT, PECT and FLS)
Indian Railways Surveying (RECT, PECT and FLS)
 
4.engineering surveys
4.engineering surveys4.engineering surveys
4.engineering surveys
 
Transportation engineering 2
Transportation engineering   2Transportation engineering   2
Transportation engineering 2
 
Railway.pdf
Railway.pdfRailway.pdf
Railway.pdf
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineering
 
Geological investigations for highways
Geological investigations for highwaysGeological investigations for highways
Geological investigations for highways
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Metro system routing studies.pptx
Metro system routing studies.pptxMetro system routing studies.pptx
Metro system routing studies.pptx
 
Mumbai-Nagpur.pdf
Mumbai-Nagpur.pdfMumbai-Nagpur.pdf
Mumbai-Nagpur.pdf
 
Introduction, alignment & surveys
Introduction, alignment & surveysIntroduction, alignment & surveys
Introduction, alignment & surveys
 
Alignment of railway tracks
Alignment of railway tracksAlignment of railway tracks
Alignment of railway tracks
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
Unit 5
Unit 5Unit 5
Unit 5
 
Bridge
BridgeBridge
Bridge
 
Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...Analysis of stability of rock column between cut & cover Metro Station and NA...
Analysis of stability of rock column between cut & cover Metro Station and NA...
 
ALEEM MALIK
ALEEM MALIKALEEM MALIK
ALEEM MALIK
 
Chapter 1 Introduction to road
Chapter 1 Introduction to roadChapter 1 Introduction to road
Chapter 1 Introduction to road
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
Chapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaaChapter 2 highway route surveys and locationaa
Chapter 2 highway route surveys and locationaa
 

Mehr von GARRE RAVI KUMAR

Mehr von GARRE RAVI KUMAR (20)

Eia for railway project
Eia for railway projectEia for railway project
Eia for railway project
 
Railway engineering part3
Railway engineering part3Railway engineering part3
Railway engineering part3
 
Railway engineering part1
Railway engineering part1Railway engineering part1
Railway engineering part1
 
Introduction to particulate matter
Introduction to particulate matterIntroduction to particulate matter
Introduction to particulate matter
 
Air pollution introduction
Air pollution introductionAir pollution introduction
Air pollution introduction
 
Kinetics and thermodynamics of air pollutants
Kinetics and thermodynamics of air pollutantsKinetics and thermodynamics of air pollutants
Kinetics and thermodynamics of air pollutants
 
Monitoring of Particulate matter
Monitoring of Particulate matterMonitoring of Particulate matter
Monitoring of Particulate matter
 
Monitoring of gaseous pollutants
Monitoring of gaseous pollutantsMonitoring of gaseous pollutants
Monitoring of gaseous pollutants
 
Methods to control s ox emissions
Methods to control s ox emissionsMethods to control s ox emissions
Methods to control s ox emissions
 
Urban heat islands
Urban heat islandsUrban heat islands
Urban heat islands
 
Ozone layer depletion
Ozone layer depletionOzone layer depletion
Ozone layer depletion
 
Greenhouse effect and global warming
Greenhouse effect and global warmingGreenhouse effect and global warming
Greenhouse effect and global warming
 
Effects of air pollutants on plants
Effects of air pollutants on plantsEffects of air pollutants on plants
Effects of air pollutants on plants
 
Effects of air pollutants on materials
Effects of air pollutants on materialsEffects of air pollutants on materials
Effects of air pollutants on materials
 
Effects of air pollutants on human
Effects of air pollutants on humanEffects of air pollutants on human
Effects of air pollutants on human
 
Acid rains
Acid rainsAcid rains
Acid rains
 
Episoeds of air pollution
Episoeds of air pollutionEpisoeds of air pollution
Episoeds of air pollution
 
General methods to control gaseous pollutants
General methods to control gaseous pollutantsGeneral methods to control gaseous pollutants
General methods to control gaseous pollutants
 
Methods to control n ox emissions
Methods to control n ox emissionsMethods to control n ox emissions
Methods to control n ox emissions
 
Equipment to control particulates part 2
Equipment to control particulates part 2Equipment to control particulates part 2
Equipment to control particulates part 2
 

Kürzlich hochgeladen

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Kürzlich hochgeladen (20)

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

Railway engineering part2

  • 1.
  • 2.  The direction and position given to the centre line of the railway track on the ground is called track alignment. It includes  Horizontal alignment such as straight path, its width, deviation and horizontal curves.  Vertical alignment such as changes in gradients and vertical curves. 2GRK, Asst. Professor, SPEC
  • 3. An ideal alignment should fulfil the following requirements: 1. Purpose of the track: The alignment should satisfy the basic purposes of track such as a) Transportation services: Railways carry the passenger traffic and goods traffic, local as well as through. b) Political and strategic: It is essential to construct a line to connect two points for defensive purposes. 3GRK, Asst. Professor, SPEC
  • 4. c) Linking of centers: A railway line should construct through the important places. d) To open up new track: It may be necessary to align new tracks for the land, whose resources are not yet tapped. e) Shortening existing track: When the existing track is uneconomical, a new track may be aligned to shorten the existing track which would prove to be economical. 4GRK, Asst. Professor, SPEC
  • 5. 2. Feasibility: The proposed track should met all the technical requirements and general planning of the country. 3. Economy: The initial construction cost, maintenance cost and operational cost should be minimum. 4. Safety: The aligned track give safety to track operations, passenger traffic and goods traffic. 5. Aesthetic aspects: The alignment should be aesthetically and good give pleasant railway journey. 5GRK, Asst. Professor, SPEC
  • 6. The following factors should be considered while design of a new track: 1. Obligatory or controlling points: The points which governs the alignment are: a) Points through which a track must pass: It is desirable that a track alignment should pass from places of social, commercial, political and defensive importance. b) Points through which a track should not pass: The track should not pass through the following points i) It is better to avoid river crossing because it requires major bridge constructions. It is a uneconomical. ii) it is necessary to avoid high hill passes and saddles. iii) the alignment should be avoided through the tunnels. 6GRK, Asst. Professor, SPEC
  • 7. 2. Traffic:  It is essential to satisfy position, nature and amount of traffic.  The alignment should pass through the greatest population. 3. Gauge selection: If the gauge width is increases the initial cost is more but also increases load carrying capacity and speed of the trains. 4. Geometric standards: The efficiency of the alignment depends upon varying conditions of gradients, speed, loading conditions. 7GRK, Asst. Professor, SPEC
  • 8. 5. Topography of the country: If the heavy gradients are unavoidable then the cost alignment can be reduced by different techniques. 6. Economic considerations: The alignment should be economical.  The best alignment is one which should gives maximum annual return(r) r =[Gross revenue – Annual running expenses ] / Investment r = [R- E] / I 7. Other considerations: The miscellaneous factors such as soil conditions, drainage conditions etc. 8GRK, Asst. Professor, SPEC
  • 9. In order to have a proper and satisfactory new route, various surveys are carried out: 1) Traffic survey 2) Reconnaissance Survey 3) Preliminary Survey 4) Location Survey 9GRK, Asst. Professor, SPEC
  • 10. This consists of collection of the information regarding the following:  The general character of the country and the extent of cultivation.  Information regarding the local industries and religious festivals.  The general condition as regards prosperity of people in the locality and density of population and its distribution;  The probable amount of traffic to be served by new railway line.  The probable new traffic lines to be opened up to join large centres of trade. 10GRK, Asst. Professor, SPEC
  • 11.  Nature and volume of exports and their destination;  The amount of imports and centres of their distribution.  Possibilities of development of industries as a result of the new railway line.  Visiting all trade centres and consultation with prominent citizens and local authorities regarding the most suitable route for the railway.  Standard of construction required for carrying the probable traffic.  Study of the existing means of transport. 11GRK, Asst. Professor, SPEC
  • 12. This consists of collection of information regarding the following:  Physical features of the country.  The surface formation of the ground.  Nature of soil and its classification.  Streams and rivers of the immediate vicinity, especially those which are likely to cross the proposed railway line.  Positions of hills and lakes.  Samples of water from wells, rivers, etc. so as to ascertain weather the water is suitable for use in locomotive or not.  Availability of materials and labour for use during construction. 12GRK, Asst. Professor, SPEC
  • 13. Object of preliminary survey:  To conduct the survey work along the alternative routes found out by reconnaissance survey and;  To determine with greater accuracy the cost of the railway line along these alternative routes. Importance of preliminary survey:  It decides the final route and recommends only one particular route in preference to other alternative routes;  Thus, should be carried out with great precision as on it depends the alignment of the final route. 13GRK, Asst. Professor, SPEC
  • 14. Object of location survey:  To carry out the detailed survey along the route which has been found and fixed as the most economical route from the data of the preliminary survey.  It establishes the centre-line of the actual track to be laid.  As soon as the location survey is completed, the construction work is started. 14GRK, Asst. Professor, SPEC
  • 15. Work of location survey: It is carried out in two stages: 1. Paper location 2. Field location 1. Paper location: The final route selected is put up on paper and details such as gradient, curves, contours, etc. are worked out.  All the working drawings are prepared, even of minor structures such as signal cabins.  After the paper location is over, the field work is started and the centre-line of the track is fixed. 15GRK, Asst. Professor, SPEC
  • 16.  The field location transfers paper location on the ground;  It gives all the requirements of the construction engineer such as benchmarks, levels, measurements, etc.  The centre-line pegs are driven at every 300 metres along the centre-line of the track.  Every change of direction, the beginning and end of the curve and also the intersecting points are clearly marked.  In addition to the fixing up of the centre-line of the track, the centre-lines of bridges, culverts, tunnels, station buildings, signal cabins, etc. should also be fixed. 16GRK, Asst. Professor, SPEC
  • 17.  The amount of slope in longitudinal direction of railway track is called gradient or grade.  Gradients are provided to negotiate the rise or fall in the level of the railway track.  Rising gradient rises the track in the direction of movement, whereas, falling gradient cause the track to go down in the direction of movement.  A gradient is represented by the distance travelled for a rise or fall of one unit.  It is written as; 1 in ‘X’ or 1 in ‘n’ or as percent 17GRK, Asst. Professor, SPEC
  • 18. •A gradient is normally represented by the distance travelled for a rise or fall of one unit. •Sometimes the gradient is indicated as per cent rise or fall. •For example, if there is a rise of 1 m in 400 m, the gradient is 1 in 400 or 0.25%, 18GRK, Asst. Professor, SPEC
  • 19. Gradients are provided to meet the following objectives:  To reach various stations at different elevations  To follow the natural contours of the ground to the extent possible  To reduce the cost of earthwork. 19GRK, Asst. Professor, SPEC
  • 20. The need for proper geometric design of a track arises because of the following considerations :  To ensure the smooth and safe running of trains.  To achieve maximum speeds.  To carry heavy axle loads.  To avoid accidents and derailments due to a defective permanent way.  To ensure that the track requires least maintenance.  For good aesthetics. 20GRK, Asst. Professor, SPEC
  • 21.  Ruling gradient  Pusher or helper gradient  Momentum gradient  Gradients in station yards 21GRK, Asst. Professor, SPEC
  • 22.  This is the design gradient basically, because it is determined on the basis of the performance of the locomotive and at the same time, it tries to look at the total amount of load which that locomotive can take up along with it, while negotiating any gradient without any loss or major loss in the speed of the movement. 22GRK, Asst. Professor, SPEC
  • 24.  It is a maximum gradient (steepest gradient), which may be permitted on the section of the track.  It is determined by maximum load that a locomotive can haul with maximum permissible speed.  Extra pull required by locomotive on gradient with ‘θ ’ inclination. P = WSinθ =W * gradient  For Ex:- Weight of train (W)=500 tonnes Gradient = 1 in 100 Extra power (P) = 5 tonnes Ruling gradient 24GRK, Asst. Professor, SPEC
  • 25.  In Plane area = 1 in 150 to 1 in 250  In hilly area = 1 in 100 to 1in 150  Once a ruling gradient is specified for a section, then all other gradients provided in that section should be flatter than the ruling gradients (after making due to compensation for curvature) 25GRK, Asst. Professor, SPEC
  • 26.  When the gradient of the ensuing section is so steep as to necessitate the use of an extra engine for pushing the train, it is known as a pusher or helper gradient.  Examples of pusher gradients are the Budni -Barkhera section of Central Railways and the Darjeeling Himalayan Railway section. 26GRK, Asst. Professor, SPEC
  • 28.  Momentum gradient steeper than ruling gradient that is overcome by momentum gathered while having a run in plane or on falling gradient in valleys.  Use additional kinetic energy received during run on a section.  No obstruction like signals are provided on section with these gradients(means the train should not be stopped at that territory). 28GRK, Asst. Professor, SPEC
  • 30.  For example, in valleys, a falling gradient is usually followed by rising gradient acquires sufficient momentum.  This momentum gives additional kinetic energy to the moving train which would enable the train to overcome a steeper rising gradient than the ruling gradient for a certain length of the track.  This rising gradient is called momentum gradient and this gradient is steeper than ruling gradient. 30GRK, Asst. Professor, SPEC
  • 32. The gradients in station yards are quite flat due to the following reasons:  To prevent standing vehicles from rolling and moving away from the yard due to the combined effect of gravity and strong winds.  To reduce the additional resistive forces required to start a locomotive to the extent possible.  It may be mentioned here that generally, yards are not levelled completely and certain flat gradients are provided in order to ensure good drainage.  The maximum gradient prescribed in station yards on Indian Railways is 1 in 400, while the recommended gradient is 1 in 1000. 32GRK, Asst. Professor, SPEC
  • 34.  Curves provide extra resistance to the movement of trains. As a result, gradients are compensated to the following extent on curves:  On BG tracks, 0.04% per degree of the curve or 70/R, whichever is minimum.  On MG tracks, 0.03% per degree of curve or 52.5/R, whichever is minimum.  On NG tracks, 0.02% per degree of curve or 35/R, whichever is minimum where R is the radius of the curve in metres.  The gradient of a curved portion of the section should be flatter than the ruling gradient because of the extra resistance offered by the curve. 34GRK, Asst. Professor, SPEC
  • 35. 1. Find the steepest gradient on a 2° curve for a BG line with a ruling gradient of 1 in 200. Solution (i) Ruling gradient = 1 in 200 = 0.5% (ii) Compensation for a 2° curve = 0.04 × 2 = 0.08% (iii) Compensated gradient = 0.5 – 0.08 = 0.42% = 1 in 238 The steepest gradient on the curved track is 1 in 238. 35GRK, Asst. Professor, SPEC
  • 36.  Curves are introduced on a railway track to bypass obstacles, to provide longer and easily traversed gradients, and to pass a railway line through obligatory or desirable locations.  Horizontal curves are provided when a change in the direction of the track is required and Vertical curves are provided at points where two gradients meet or where a gradient meets level ground.  Curve is defined either by radius or its degree 36GRK, Asst. Professor, SPEC
  • 37.  The maximum permissible degree of a curve on a track depends on various factors such as gauge, wheel base of the vehicle, maximum permissible super elevation, and other such allied factors. The maximum degree or the minimum radius of the curve permitted on Indian Railways for various gauges is given in Fig 5.  Figure No.:5 Maximum Degree of a Curve  (Source: dl4a.org/uploads/pdf/EbookRailwayEngineering. pdf) 37GRK, Asst. Professor, SPEC
  • 39.  Super elevation or cant (Ca) is the difference in height between the outer and the inner rail on a curve.  It is provided by gradually lifting the outer rail above the level of the inner rail.  The inner rail is taken as the reference rail and is normally maintained at its original level.  The inner rail is also known as the gradient rail. 39GRK, Asst. Professor, SPEC
  • 40. The main functions of super elevation are the following :  To ensure a better distribution of load on both rails.  To reduce the wear and tear of the rails and rolling stock.  To neutralize the effect of lateral forces.  To provide comfort to passengers. 40GRK, Asst. Professor, SPEC
  • 41.  A vehicle has a tendency to travel in a straight direction, which is tangential to the curve, even when it moves on a circular curve. As a result, the vehicle is subjected to a constant radial acceleration: Radial acceleration (g)= V2 /R Where, V = velocity (metres per second) and R = Radius of curve (metres).  This radial acceleration produces a centrifugal force which acts in a radial direction away from the centre. 41GRK, Asst. Professor, SPEC
  • 42. The value of the centrifugal force is given by the formula Force = mass × acceleration F = m × (V2 /R) = (W/g) × (V2 /R) Where,F = Centrifugal force (tonnes), W = Weight of the vehicle (tonnes), V = Speed (metre/sec), g = Acceleration due to gravity (metre/sec2 ), and R = Radius of the curve (metres).  To counteract the effect of the centrifugal force, the outer rail of the curve is elevated with respect to the inner rail by an amount equal to the super elevation.  A state of equilibrium is reached when both the wheels exert equal pressure on the rails and the super elevation is enough to bring the resultant of the centrifugal force and the force exerted by the weight of the vehicle at right angles to the plane of the top surface of the rails.  In this state of equilibrium, the difference in the heights of the outer and inner rails of the curve known as equilibrium super elevation. 42GRK, Asst. Professor, SPEC
  • 44.  6.4 Formula for Superelevation  The θ is the angle that the inclined plane makes with the horizontal line, then 44GRK, Asst. Professor, SPEC
  • 46.  where ,  e = Superelevation,  G= Gauge,  V = Velocity,  g = Acceleration due to gravity, and  R = Radius of the curve.  6.5 Thumb Rules for Calculating Superelevation in the Field  A field engineer can adopt the following thumb rules for determining the superelevation of any curve 46GRK, Asst. Professor, SPEC
  • 47.  A field engineer can adopt the following thumb rules for determining the superelevation of any curve  Super elevation for BG in cm  For MG tracks  Super elevation = three-fifths of the above formula  The equilibrium speed is used in this formula 47GRK, Asst. Professor, SPEC
  • 48.  6.6 Types of Cant  The cant are further divided on the bases of speed:  Equilibrium cant  Cant deficiency ( Cd )  Cant excess ( Ce )  6.6.1 Equilibrium cant  Value of super elevation derived from the equation using equilibrium speed 48GRK, Asst. Professor, SPEC
  • 49.  6.6.2 Cant deficiency ( Cd )  Cant deficiency (Cd) occurs when a train travels around a curve at a speed higher than the equilibrium speed. It is the difference between the theoretical cant required for such high speeds and the actual cant provided. Maximum permissible Cd : 7.6cm (BG), 5.1cm (MG), 3.8cm (NG). 49GRK, Asst. Professor, SPEC
  • 50.  6.6.3 Cant excess ( Ce )  Cant excess (Ce) occurs when a train travels around a curve at a speed lower than the equilibrium speed. It is the difference between the actual cant provided and the theoretical cant required for such a low speed. 50GRK, Asst. Professor, SPEC
  • 51.  7.1 Widening of Gauge on Curve  When vehicle moves onto a curve, the flange of the outside wheel of the leading axle continues to travel in a straight line till it rubs against the rail. Due to the coning of wheels ,the outside wheel travels a longer distance compared to the inner wheel. In an effort to make up for the difference in the distance travelled by the outer wheel and the inner wheel, the inside wheels slip backward and the outer wheels skid forward.  The widening of the gauge on a curve has, in fact, tends to decrease the wear and tear on both the wheel and the track 51GRK, Asst. Professor, SPEC
  • 52.  The widening of the gauge on curves can be calculated using the formula  Extra width on curves  w = 13(B+L)2/R  Where,  B is the wheel base of the vehicle in metres,  R is the radius of the curve in metres,  L =0.02(h2 + Dh)1/2 is the lap of the flange in metres,  h is the depth of flange below top of the rail(cm),  D is the diameter of the wheel of the vehicle (cm). 52GRK, Asst. Professor, SPEC