SlideShare ist ein Scribd-Unternehmen logo
1 von 18
Downloaden Sie, um offline zu lesen
Innovative Control and
Optimization of Fired Heaters
               9-1229




           Mark Brewer
           Radu Iscovici
Agenda

Introductions (Presenter, Rompetrol, Emerson Team)
Control Objectives & APC Scope
Control Design, Implementation & Commissioning
Business Results
Summary
Presenter
 Radu Iscovici
 Head, Process Control Department at Rompetrol Refining
 SA, Romania
 In charge of:
     profit increase through advanced regulatory controls
     and advanced process control and optimization
     techniques
     safe and secure plant operation through safety
     instrumented systems implementation;
     data collection, transfer and processing into valuable
     information for management through implementation
     of IT industrial systems
Presenter
 Mark Brewer
 Senior Consultant
 Emerson Process Management, Strategic Services
 Group, UK
 Advanced Control and Optimization Specialist
Project Execution
 Project Team
    Emerson
       Emerson Romania
       Strategic Services (UK)
       AAT (US)
    Rompetrol
       Rompetrol DCS Engineer and Control Engineer
       embedded as part of the execution team
       This strategy ensures greater understanding of the
       installed system thus developing on-site champions of the
       APC technology
       Any DCS configuration work carried out by Rompetrol
       personnel
Rompetrol – An Overview

 A leader in the regional oil industry
 Rompetrol is a multinational company with activities
 in 13 countries
 Strong operational base in the Black Sea and
 Mediterranean Sea region
 The number and the complex nature of the projects
 executed at a global level have turned Rompetrol
 over time into the best known international brand
 originating in Romania.
 Co. Size: 9,000 Employees
 Industry: Oil & Energy
 Website: http://www.rompetrol.com
Constanta Refinery – A brief history

 Built in the 1980’s by Petromidia, a Romanian
 national owned company
 Now owned by Rompetrol
 Largest Romanian refinery (100,000 bbl/day)
 Recently modernized with Emerson’s DeltaV DCS
 Continuous drive to improve operational efficiency
 through exploitation of new DCS functionality and
 smart field instrumentation
Emerson Process Management

 Strategic Services Group
 UK Based (Middlesbrough)
 Support for Europe. Middle East &
 Africa
 Consultancy in advanced control
 and optimization
 Process experts with 10 to 30
 years experience (ex operating
 companies)
 Experienced project managers
 Process-specific technical solutions
 (oil & gas, refining, chemicals,
 utilities)
CDU Plant
                                                             Gas




                                                             Naphtha

                                                                                      To Vacuum System
                                               Steam



                                                             Kerosene
                                               Steam



                                                             Lt Diesel
                                               Steam


                                                                                                  LVGO
                                                             Diesel
                                               Steam




                                                             AGO
                                                                                                  HVGO




                                     Atmospheric
                             Steam
                                     Tower
Crude Feed                                                               Steam


                                                                                                Residue


             Fired Heaters
                                                   Fired Heater              Vacuum
                                                                             Tower
Introduction
 2 fired Heaters in parallel
 Each fired heater has 2 process passes
 Control Objectives
  – Good temperature control in outlet
  – Good total flow control
  – Optimization (minimise excess air)
 Disturbances
  – Feed inlet temperature and flow changes
  – Fuel quality changes
 Interactions
 Constraint Avoidance
Solution: PredictPro® / SmartProcess®
    Heater
Control total feed to target with allocation for up to 4
passes
Control outlet temperature to the desired target
Adjust inlet air and draft dampers to minimize excess
air
Combustion control including fuel/ air cross limiting
Stabilize heater against changes in fuel gas and feed
temperature
Operate within all heater constraints




                              PredictPro
     CV                                         MV (Manipulated
     (Control                                   Variables)
                       :                    :
     Variables)
                       :                    :

     LV
     (Limit
     Variables)        :
                       :
     DV
     (Disturbance      :
     Variables)
Potential Problem

 One heater has no automatic air flow control but we
 need to minimise the excess air.
 Soultion:
  – Use process flow rate to change heat demand, which in turn
    changes the fuel requirement allowing us to push the excess
    air ratio to the optimum position.
  – The second heater (which does have a variable speed drive
    on its air fan), can then be used to control the total flow to
    the downstream process.
Control Design
                                                                                         Control Variables
                   CO2   O2                                                              Manipulated Variables
                                                                                         Constraint Variables
               F                                  T                                      Disturbance Variables




               F              P          T        dT



    T                                                                                               F
                                                             CO2   O2

               Air                           P

                                             F          F                                    T
                                                                                                                 Hot
                                  Fuel
Cold                                                                                                             Process
                                  Gas
Process                                      CV                                                                  Feed
Feed
                                                        F                P     T        dT



                                                         s
                                                                                   P
          Note: Fixed air
          Flow (manual                                                             F
                                                       Air
          adjustment in field)                                          Fuel       CV
                                                                        Gas
User Interface
Business Results

Annual Fuel Saving of                                            Baseline Period         APC Period
                                                                 1/7/07 to 30/09/08   12/03/09 to 27/3/09
$100,000                Average Stack Oxygen                          5.13%                 4.41%
                        Average Efficiency (from US DoE table)        79.31%               79.65%
Heaters require less    Typical fuel usage                         2200 Nm3/h          2190.34 Nm3/h


manual actions
                        Typical fuel Saving                                              9.66 Nm3/h
                        Fuel Price                                                       0.25 $/Nm3
                        Saving                                                             2.37 $/h
Heaters can manage                                                                      $21,000/year

load changes                                                     Baseline Period         APC Period
automatically                                                    1/7/07 to 30/09/08   12/03/09 to 27/3/09
                        Average Stack Oxygen                          5.83%                 3.81%
Heaters can now be      Average Efficiency (from US DoE table)        76.05%               77.39%
                        Typical fuel usage                         2200 Nm3/h          2161.99 Nm3/h
used to control         Typical fuel Saving                                              38.01 Nm3/h

Atmospheric column      Fuel Price
                        Saving
                                                                                         0.25 $/Nm3
                                                                                           9.34 $/h

in closed loop mode.                                                                    $82,000/year
Summary

 PredictPro to optimize heaters
 Oxygen control without air flow
 control!
 Saving $100,000 per year
Question Time

Thank you for your attention!


 Questions & Feedback
Where To Get More Information
Other, Related Sessions
– Inferential Analyses Enhances Benefits of PredictPro Controllers in
  Crude Fractionation (9-1231)
– Dynamic Simulation of Fractionation Columns in PredictPro (9-1232)
– PredictPro Delivers Results at Rompetrol’s Constanta Refinery Crude
  Fractionation Unit (9-1228)


More Information Available From:
                                                                     Paul Dima

                                                                     Emerson Process Management
                                                                     Gara Herastrau 2-4, 5th Floor
                                  Mark Brewer                        020334 Bucharest
                                                                     ROMANIA
                                  Emerson Process Management
                                  Eggleston Court, Startforth Road   Tel +40 21 206 25 00
                                  Middlesbrough                      Fax: +40 21 206 25 20
                                  TS2 1PT                            paul.dima@emerson.com
                                  UK

                                  T 44 1642 773024
                                  mark.brewer@emerson.com

Weitere ähnliche Inhalte

Was ist angesagt?

Flownex In Coal Energy
Flownex In Coal EnergyFlownex In Coal Energy
Flownex In Coal Energy
Santhosh N L
 
4 b = 58 p 45 basic ur plant description 06.09.2021-1
4 b = 58 p  45 basic ur plant description 06.09.2021-14 b = 58 p  45 basic ur plant description 06.09.2021-1
4 b = 58 p 45 basic ur plant description 06.09.2021-1
ameermudasar
 
Desirable as run information system for energy efficiency of utility clas...
Desirable as run information system  for energy efficiency  of  utility  clas...Desirable as run information system  for energy efficiency  of  utility  clas...
Desirable as run information system for energy efficiency of utility clas...
D.Pawan Kumar
 
Boiler
BoilerBoiler
Boiler
avik
 
Thermodynamic analysis of a water tube boiler operating on natural gas with f...
Thermodynamic analysis of a water tube boiler operating on natural gas with f...Thermodynamic analysis of a water tube boiler operating on natural gas with f...
Thermodynamic analysis of a water tube boiler operating on natural gas with f...
fragelmc
 
Use of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systemsUse of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systems
Lanphuong Pham
 
Ea of cw, ct & cond. system
Ea of cw, ct & cond. systemEa of cw, ct & cond. system
Ea of cw, ct & cond. system
D.Pawan Kumar
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
ABVSAI
 

Was ist angesagt? (19)

Flownex In Coal Energy
Flownex In Coal EnergyFlownex In Coal Energy
Flownex In Coal Energy
 
4 b = 58 p 45 basic ur plant description 06.09.2021-1
4 b = 58 p  45 basic ur plant description 06.09.2021-14 b = 58 p  45 basic ur plant description 06.09.2021-1
4 b = 58 p 45 basic ur plant description 06.09.2021-1
 
Ammonia converter
Ammonia converterAmmonia converter
Ammonia converter
 
Key lessons to optimise ammonia plant
Key lessons to optimise ammonia plantKey lessons to optimise ammonia plant
Key lessons to optimise ammonia plant
 
WQD2011 - KAIZEN - EMAL - Delay In Loading of Gas Turbine during loading sequ...
WQD2011 - KAIZEN - EMAL - Delay In Loading of Gas Turbine during loading sequ...WQD2011 - KAIZEN - EMAL - Delay In Loading of Gas Turbine during loading sequ...
WQD2011 - KAIZEN - EMAL - Delay In Loading of Gas Turbine during loading sequ...
 
Desirable as run information system for energy efficiency of utility clas...
Desirable as run information system  for energy efficiency  of  utility  clas...Desirable as run information system  for energy efficiency  of  utility  clas...
Desirable as run information system for energy efficiency of utility clas...
 
Development of an innovative 3 stage steady bed gasifier slides
Development of an innovative 3 stage steady bed gasifier slidesDevelopment of an innovative 3 stage steady bed gasifier slides
Development of an innovative 3 stage steady bed gasifier slides
 
Boiler
BoilerBoiler
Boiler
 
P & i diagram and tagging philosphy for
P & i diagram and tagging philosphy forP & i diagram and tagging philosphy for
P & i diagram and tagging philosphy for
 
Thermodynamic analysis of a water tube boiler operating on natural gas with f...
Thermodynamic analysis of a water tube boiler operating on natural gas with f...Thermodynamic analysis of a water tube boiler operating on natural gas with f...
Thermodynamic analysis of a water tube boiler operating on natural gas with f...
 
Ammonia plant efficiency
Ammonia plant efficiencyAmmonia plant efficiency
Ammonia plant efficiency
 
Use of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systemsUse of nitrogen purge in flare and vent systems
Use of nitrogen purge in flare and vent systems
 
Reverse rotaion of co2 compressor
Reverse rotaion of co2 compressorReverse rotaion of co2 compressor
Reverse rotaion of co2 compressor
 
Ea of cw, ct & cond. system
Ea of cw, ct & cond. systemEa of cw, ct & cond. system
Ea of cw, ct & cond. system
 
Articmaster Refrigerant Management System
Articmaster Refrigerant Management SystemArticmaster Refrigerant Management System
Articmaster Refrigerant Management System
 
Boiler commissioning procedure
Boiler commissioning procedureBoiler commissioning procedure
Boiler commissioning procedure
 
Gas measurement
Gas measurementGas measurement
Gas measurement
 
Ch e354 pumps
Ch e354 pumpsCh e354 pumps
Ch e354 pumps
 
EQ-COMP - Process Simulation Software
EQ-COMP - Process Simulation SoftwareEQ-COMP - Process Simulation Software
EQ-COMP - Process Simulation Software
 

Andere mochten auch

power-plant-basics
power-plant-basicspower-plant-basics
power-plant-basics
kulanji Siva
 

Andere mochten auch (8)

Black Gold Vegetable Oil Heater
Black Gold Vegetable Oil HeaterBlack Gold Vegetable Oil Heater
Black Gold Vegetable Oil Heater
 
Roger Sanders' Waste Oil Heater
Roger Sanders' Waste Oil HeaterRoger Sanders' Waste Oil Heater
Roger Sanders' Waste Oil Heater
 
Furnace Improvements Sales Presentation
Furnace Improvements Sales PresentationFurnace Improvements Sales Presentation
Furnace Improvements Sales Presentation
 
Fired Heater and Combustion eBook
Fired Heater and Combustion eBookFired Heater and Combustion eBook
Fired Heater and Combustion eBook
 
Fired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From YokogawaFired Heater and Combustion Optimization From Yokogawa
Fired Heater and Combustion Optimization From Yokogawa
 
Heater operation
Heater operationHeater operation
Heater operation
 
Burner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia PlantsBurner Design, Operation and Maintenance on Ammonia Plants
Burner Design, Operation and Maintenance on Ammonia Plants
 
power-plant-basics
power-plant-basicspower-plant-basics
power-plant-basics
 

Ähnlich wie 9 1229 innovative control and optimization of fired heaters v2

9 1228 predict-pro delivers results at rompetrolæs constanta refinery crude f...
9 1228 predict-pro delivers results at rompetrolæs constanta refinery crude f...9 1228 predict-pro delivers results at rompetrolæs constanta refinery crude f...
9 1228 predict-pro delivers results at rompetrolæs constanta refinery crude f...
Radu Iscovici
 
Clean Fuels Hydrogen
Clean Fuels HydrogenClean Fuels Hydrogen
Clean Fuels Hydrogen
UPES Dehradun
 
Thermal cracking (2)
Thermal cracking (2)Thermal cracking (2)
Thermal cracking (2)
Kumar
 
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
Sandra Valenzuela
 
Sustaining the Environment Lower GWP Refrigerants & Options
Sustaining the Environment Lower GWP Refrigerants & OptionsSustaining the Environment Lower GWP Refrigerants & Options
Sustaining the Environment Lower GWP Refrigerants & Options
UNEP OzonAction
 

Ähnlich wie 9 1229 innovative control and optimization of fired heaters v2 (20)

9 1228 predict-pro delivers results at rompetrolæs constanta refinery crude f...
9 1228 predict-pro delivers results at rompetrolæs constanta refinery crude f...9 1228 predict-pro delivers results at rompetrolæs constanta refinery crude f...
9 1228 predict-pro delivers results at rompetrolæs constanta refinery crude f...
 
Freecooling Solution for HVAC
Freecooling Solution for HVACFreecooling Solution for HVAC
Freecooling Solution for HVAC
 
Us Chamber Of Commerce (May 20)Final
Us Chamber Of Commerce (May 20)FinalUs Chamber Of Commerce (May 20)Final
Us Chamber Of Commerce (May 20)Final
 
LPG.PPT
LPG.PPTLPG.PPT
LPG.PPT
 
utilzing wasted flared gas
utilzing wasted flared gasutilzing wasted flared gas
utilzing wasted flared gas
 
World Coal-to-Liquids Presentation
World Coal-to-Liquids PresentationWorld Coal-to-Liquids Presentation
World Coal-to-Liquids Presentation
 
Nuovi refrigeranti ad elevato glide - S. Filippini - LU-VE
Nuovi refrigeranti ad elevato glide - S. Filippini - LU-VENuovi refrigeranti ad elevato glide - S. Filippini - LU-VE
Nuovi refrigeranti ad elevato glide - S. Filippini - LU-VE
 
Paper 11 icaer_2013modified
Paper 11 icaer_2013modifiedPaper 11 icaer_2013modified
Paper 11 icaer_2013modified
 
Clean Fuels Hydrogen
Clean Fuels HydrogenClean Fuels Hydrogen
Clean Fuels Hydrogen
 
Methanol Flowsheets - A Competitive Review
Methanol Flowsheets - A Competitive ReviewMethanol Flowsheets - A Competitive Review
Methanol Flowsheets - A Competitive Review
 
VPS Brochure
VPS BrochureVPS Brochure
VPS Brochure
 
Introduction to Gas Transportation
Introduction to Gas TransportationIntroduction to Gas Transportation
Introduction to Gas Transportation
 
Variax2000 presentation
Variax2000  presentationVariax2000  presentation
Variax2000 presentation
 
Thermal cracking (2)
Thermal cracking (2)Thermal cracking (2)
Thermal cracking (2)
 
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
 
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
1-DEVELOPMENT of Dimethylether ( Dme ) Synthesis from Natural Gas as an Alter...
 
A case study on Process Condensate Stripper in Ammonia Plant by Prem Baboo.pdf
A case study on Process Condensate Stripper in Ammonia Plant by Prem Baboo.pdfA case study on Process Condensate Stripper in Ammonia Plant by Prem Baboo.pdf
A case study on Process Condensate Stripper in Ammonia Plant by Prem Baboo.pdf
 
Sustaining the Environment Lower GWP Refrigerants & Options
Sustaining the Environment Lower GWP Refrigerants & OptionsSustaining the Environment Lower GWP Refrigerants & Options
Sustaining the Environment Lower GWP Refrigerants & Options
 
Developing Fit-for-Purpose Solutions: Gas Coolers - G. Dal Belin Peruffo - Al...
Developing Fit-for-Purpose Solutions: Gas Coolers - G. Dal Belin Peruffo - Al...Developing Fit-for-Purpose Solutions: Gas Coolers - G. Dal Belin Peruffo - Al...
Developing Fit-for-Purpose Solutions: Gas Coolers - G. Dal Belin Peruffo - Al...
 
Hovan Pems
Hovan PemsHovan Pems
Hovan Pems
 

Kürzlich hochgeladen

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Kürzlich hochgeladen (20)

Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 

9 1229 innovative control and optimization of fired heaters v2

  • 1. Innovative Control and Optimization of Fired Heaters 9-1229 Mark Brewer Radu Iscovici
  • 2. Agenda Introductions (Presenter, Rompetrol, Emerson Team) Control Objectives & APC Scope Control Design, Implementation & Commissioning Business Results Summary
  • 3. Presenter Radu Iscovici Head, Process Control Department at Rompetrol Refining SA, Romania In charge of: profit increase through advanced regulatory controls and advanced process control and optimization techniques safe and secure plant operation through safety instrumented systems implementation; data collection, transfer and processing into valuable information for management through implementation of IT industrial systems
  • 4. Presenter Mark Brewer Senior Consultant Emerson Process Management, Strategic Services Group, UK Advanced Control and Optimization Specialist
  • 5. Project Execution Project Team Emerson Emerson Romania Strategic Services (UK) AAT (US) Rompetrol Rompetrol DCS Engineer and Control Engineer embedded as part of the execution team This strategy ensures greater understanding of the installed system thus developing on-site champions of the APC technology Any DCS configuration work carried out by Rompetrol personnel
  • 6. Rompetrol – An Overview A leader in the regional oil industry Rompetrol is a multinational company with activities in 13 countries Strong operational base in the Black Sea and Mediterranean Sea region The number and the complex nature of the projects executed at a global level have turned Rompetrol over time into the best known international brand originating in Romania. Co. Size: 9,000 Employees Industry: Oil & Energy Website: http://www.rompetrol.com
  • 7. Constanta Refinery – A brief history Built in the 1980’s by Petromidia, a Romanian national owned company Now owned by Rompetrol Largest Romanian refinery (100,000 bbl/day) Recently modernized with Emerson’s DeltaV DCS Continuous drive to improve operational efficiency through exploitation of new DCS functionality and smart field instrumentation
  • 8. Emerson Process Management Strategic Services Group UK Based (Middlesbrough) Support for Europe. Middle East & Africa Consultancy in advanced control and optimization Process experts with 10 to 30 years experience (ex operating companies) Experienced project managers Process-specific technical solutions (oil & gas, refining, chemicals, utilities)
  • 9. CDU Plant Gas Naphtha To Vacuum System Steam Kerosene Steam Lt Diesel Steam LVGO Diesel Steam AGO HVGO Atmospheric Steam Tower Crude Feed Steam Residue Fired Heaters Fired Heater Vacuum Tower
  • 10. Introduction 2 fired Heaters in parallel Each fired heater has 2 process passes Control Objectives – Good temperature control in outlet – Good total flow control – Optimization (minimise excess air) Disturbances – Feed inlet temperature and flow changes – Fuel quality changes Interactions Constraint Avoidance
  • 11. Solution: PredictPro® / SmartProcess® Heater Control total feed to target with allocation for up to 4 passes Control outlet temperature to the desired target Adjust inlet air and draft dampers to minimize excess air Combustion control including fuel/ air cross limiting Stabilize heater against changes in fuel gas and feed temperature Operate within all heater constraints PredictPro CV MV (Manipulated (Control Variables) : : Variables) : : LV (Limit Variables) : : DV (Disturbance : Variables)
  • 12. Potential Problem One heater has no automatic air flow control but we need to minimise the excess air. Soultion: – Use process flow rate to change heat demand, which in turn changes the fuel requirement allowing us to push the excess air ratio to the optimum position. – The second heater (which does have a variable speed drive on its air fan), can then be used to control the total flow to the downstream process.
  • 13. Control Design Control Variables CO2 O2 Manipulated Variables Constraint Variables F T Disturbance Variables F P T dT T F CO2 O2 Air P F F T Hot Fuel Cold Process Gas Process CV Feed Feed F P T dT s P Note: Fixed air Flow (manual F Air adjustment in field) Fuel CV Gas
  • 15. Business Results Annual Fuel Saving of Baseline Period APC Period 1/7/07 to 30/09/08 12/03/09 to 27/3/09 $100,000 Average Stack Oxygen 5.13% 4.41% Average Efficiency (from US DoE table) 79.31% 79.65% Heaters require less Typical fuel usage 2200 Nm3/h 2190.34 Nm3/h manual actions Typical fuel Saving 9.66 Nm3/h Fuel Price 0.25 $/Nm3 Saving 2.37 $/h Heaters can manage $21,000/year load changes Baseline Period APC Period automatically 1/7/07 to 30/09/08 12/03/09 to 27/3/09 Average Stack Oxygen 5.83% 3.81% Heaters can now be Average Efficiency (from US DoE table) 76.05% 77.39% Typical fuel usage 2200 Nm3/h 2161.99 Nm3/h used to control Typical fuel Saving 38.01 Nm3/h Atmospheric column Fuel Price Saving 0.25 $/Nm3 9.34 $/h in closed loop mode. $82,000/year
  • 16. Summary PredictPro to optimize heaters Oxygen control without air flow control! Saving $100,000 per year
  • 17. Question Time Thank you for your attention! Questions & Feedback
  • 18. Where To Get More Information Other, Related Sessions – Inferential Analyses Enhances Benefits of PredictPro Controllers in Crude Fractionation (9-1231) – Dynamic Simulation of Fractionation Columns in PredictPro (9-1232) – PredictPro Delivers Results at Rompetrol’s Constanta Refinery Crude Fractionation Unit (9-1228) More Information Available From: Paul Dima Emerson Process Management Gara Herastrau 2-4, 5th Floor Mark Brewer 020334 Bucharest ROMANIA Emerson Process Management Eggleston Court, Startforth Road Tel +40 21 206 25 00 Middlesbrough Fax: +40 21 206 25 20 TS2 1PT paul.dima@emerson.com UK T 44 1642 773024 mark.brewer@emerson.com