Materials of equipment
for reactor plants
V-320 and V-491
Banyuk G.F., Ryzhov S.B.,
Mokhov V.Š., Piminov V.Š.
International Topical Meeting
VVER 2010. Experience & Perspectives
01 ā€“ 03 November 2010
Prague, Czech Republic
Units with VVER-1000
02
Country Number of Units
Russian
Federation
7 (VVER-1000/320) + 3 (VVER-1000/small
series)
Czech
Republic
2 (VVER-1000/320)
Bulgaria 2 (VVER-1000/320)
Ukraine
11 (VVER-1000/320)+ 2 (VVER-1000/small
series)
China 2 (VVER-1000/V-428)
Units of AES-2006 design under construction
03
NPP Number of Units
Novovoronezh-2 (V-392Šœ) 2
Leningrad-2 (V-491) 2
Baltic NPP (V-491) (preparation
for construction)
2
Main equipment of reactor plant
04
Reactor pressure vessel and top head
Stream generator
Pressurizer
ECCS hydroaccumulator
Pipelines (MCP)
Reactor plant
05
Reactor pressure vessel
06
Parameter
Value
V-320 V-491
Length, mm 10897 11185
Inner diameter, mm 4150 4250
Wall thickness in the belt
line region, mm
192,5 197,5
Mass, t 320 330
Reactor pressure vessel
07
Additional requirements for materials are caused by:
the stronger requirements for equipment and high thermal power as
compared with those for a commercial Unit:
ļ‚§ service life (60 years) and life (fuel cycle 8400 h) are extended;
ļ‚§ primary and secondary coolant (pressure and temperature) parameters
are increased
Reactor pressure vessel
08
Implementation of the measures aimed at improvement of brittle
fracture
resistance (BFR) of reactor vessels:
ļ‚§ decrease in radiation embrittlement of RPV materials;
ļ‚§ decrease in loads onto RPV under pressurized thermal shocks;
ļ‚§ improved monitoring of changes in RPV material properties.
Reactor pressure vessel
09
Component
Grade of steel
RP V-320 RP V-491
Supporting shell.
Cylindrical upper and lower shells
15Š„2ŠŠœŠ¤Š-Š 15Š„2ŠŠœŠ¤Š class 1
Shells of nozzle area 15Š„2ŠŠœŠ¤Š-Š
Bottom head, flange 15Š„2ŠŠœŠ¤Š
Ni influence on radiation embrittlement of reactor
pressure vessel steel
Surveillance testing results and the results of research programs for
VVER-1000 RPV materials have shown, that radiation embrittlement
essentially depends on the nickel and manganese content
010
Decrease in radiation embrittlement of RPV
materials
011
Chemical composition of RPV base metal (supporting and core shells)
Grade of steel
(RP type)
Chemical composition, %
C Si Mn Cr Ni Mo
V
Calc.
15Š„2ŠŠœŠ¤Š-Š
(Š’-320)
0.13-0.18 0.17-0.37 0.30-0.60 1.8-2.3
1.0 ā€“ 1.5
0.5-0.7 0.10-0.12
15Š„2ŠŠœŠ¤Š
class 1 (Š’-491)
1.0 ā€“ 1.3
Grade of steel
(RP type)
Chemical composition, %
Cu S P As Co Sb Sn Š  + Sb + Sn
No more than
15Š„2ŠŠœŠ¤Š-Š
(Š’-320)
0.10
0.006
0.008
0.010 0.03 0.005 0.005
-
15Š„2ŠŠœŠ¤Š
class 1 (Š’-491)
0.06 0.007 0,012
Decrease in radiation embrittlement of RPV
materials
012
Chemical composition of RPV welds metal (welds of core range)
Welding wire, flux
(RP type)
Chemical composition, %
C Si Mn Cr Ni Mo Ti
Š”Š²-12Š„2Š2ŠœŠŠ,
flux Š¤Š¦-16Š (Š’-320)
0.04-0.10 0.15-0.45
0.65-1.10 1.4-2.1 1.2 ā€“ 1.9 0.45-0.75
-
0.45-1.10 1.2-2.0 1.0 ā€“ 1.3 0.40-0.75 0.01-0.06
Š”Š²-09Š„Š“ŠŠœŠ¢ŠŠ-Š’Š˜,
flux ŠŠ¤-18Šœ (Š’-491)
Welding wire, flux
(RP type)
Chemical composition, %
Co S P Cu Sb Sn As
No more than
Š”Š²-12Š„2Š2ŠœŠŠ,
flux Š¤Š¦-16Š (Š’-320)
0.02 0.015 0.012
0.10
0.008 0.001 0.010
Š”Š²-09Š„Š“ŠŠœŠ¢ŠŠ-Š’Š˜,
flux ŠŠ¤-18Šœ (Š’-491) 0.08
Š¢ŠŗŠ¾
of core weld metal: Š’-320 ā‰¤ 0 0
Š”
Š’-491 ā‰¤ minus 15 0
Š”
Decrease in radiation embrittlement of RPV
materials
013
Decrease in neutron fluence
Fluence decrease is implemented due to increase in the RPV diameter
and core arrangement (FA placing) with reduced neutron leakage
Maximum values of neutron fluence with an energy above 0.5 MeV for various
points
Location
Design data of neutron fluence (F āˆ— 1023
), n/m2
Š’-320 (40 years) Š’-491 (60 years)
Core top (supporting shell) 2.44 1.28
Base metal in the place of max.
neutron fluence
5.7 4.22
Weld No. 2 5.7 4.06
Weld No. 3 4.5 3.58
Decrease in radiation embrittlement of RPV
materials
014
Tk calculation results
Location
Tk, 0
C
Š’-320 (40 years) Š’-491 (60 years)
Core top (supporting shell) 42 29
Base metal in point of max neutron fluence 64 55
Weld No. 2 77 69*
Weld No. 3 71 66*
* - without regard for Š¢ŠŗŠ¾
ā‰¤ minus 15Ā°Š”
Decrease in loads onto RPV under PTS
015
Decrease in loads is achieved due to limitation of the minimum water
temperature in the emergency core cooling system
Decrease in loads on RPV under PTS
Reactor plant type
Temperature of ECCS water, 0
C,
not less than
V-320 10
V-491 20
Improved monitoring of changes in RPV material
properties
016
Improvement is achieved due to change in location of surveillance
specimen casks.
In RP V-320 the surveillance specimen casks were located in the
channels of the reactor core baffle.
In RP V-491 the casks are placed directly on the inside wall of the
reactor pressure vessel in the place of maximum fluence
Monitoring of RPV metal state during operation
(surveillance program)
Irradiated surveillance sets are located opposite to the core and fixed
directly on the RPV wall.
017
Surveillance specimens
Surveillance specimen program for RPV of RP V-491 defines:
1.Irradiated sets (materials, number and date of removal).
2.Temperature sets (Š¼Š°Ń‚ŠµŃ€ŠøŠ°Š»Ń‹, number and date of removal).
3.Test sets.
4.Scheme for cutting of specimens.
5.Number of specimens for each type of tests.
6.Type of specimens.
7.Quality Assurance Program.
018
Surveillance specimens
019
Basic requirements for fabrication of surveillance specimens
Surveillance specimens for in-service inspection of change in RPV metal
properties shall be fabricated from:
ļ‚§ base metal;
ļ‚§ weld metal;
ļ‚§ HAZ metal.
Billets of the base metal surveillance specimens shall be cut out of the test
ring of the standard shells after basic heat treatment.
The billets shall be subject to heat treatments under the modes identical to
heat treatment modes of the shell, from which the test ring is cut out, in the
course of the vessel manufacture.
Surveillance specimens
020
Basic requirements for fabrication of surveillance specimens
Billets of specimens of weld metal and HAZ metal shall be cut out of the
circular welded sample, made of metal cut from one of the RPV shells.
The sample shall be of the same thickness and the same grooving as
the RPV welds.
The circular welded sample shall be made under the same modes and
using the same welding process and welding materials of the same lots
as the tested RPV welds.
The sample shall be subject to the same complex of heat treatments as
the RPV welds to be tested.
The first AES-2006 RPV for Novovoronezh-2 NPP was manufactured at the
Izhora plant in this year
The second AES-2006 RPV for Novovoronezh-2 is planned in the next year
021
Main coolant pipeline
022
Tubes for manufacture of MCP
Technical conditions TU 108.1197-83 (the Manufacturer - Ā«EUROTUBE
GmbHĀ»)
Outer diameter,
mm
Inner diameter,
mm
Wall thickness,
mm
Maximum length,
mm
Thickness of
cladding layer,
mm
990 850 70 8400 5
1130 990 70 8400 5
Main coolant pipeline
023
Materials
Chemical composition of the base metal of MCP tubes
Grade of
steel
Content of elements, %
C Si Mn Ni Mo V S P Cr Cu
10Š“Š2ŠœŠ¤Š
0.08-
0.12
0.17-
0.37
0.70-
0.90
1.70-
2.00
0.40-
0.60
not more than
0.04 0.020 0.020 0.30 0.30
Main coolant pipeline
024
Materials
Chemical composition of deposited corrosion-resistant coating 03Š„22Š11Š“2Š‘
Content of element, %
C Si S P Cu Co N Mn Cr Ni Nb
not more than
1.00-
2.50
17.50-
20.50
8.50-
11.0
0.70-
1.000.05 1.00 0.02 0.03 0.30 0.02 0.05
Regulatory requirements
025
Regulations for design and safe operation of nuclear plant equipment
and pipings (PNAE G -7-008-89).
Regulations for strength calculation of equipment and pipings of nuclear
power plants (PNAE G -7-002-86).
Equipment and pipings of nuclear power plants. Welding and cladding.
General provisions (PNAE G -7-009-89).
Equipment and pipings of nuclear power plants. Welded joints and
claddings. Rules of inspection (PNAE G -7-010-89).
Regulatory requirements
026
Guiding technological document. Equipment and pipings of nuclear power plants.
Welding, cladding and heat treatment of welded joints of components of steels of
grades 10Š“Š2ŠœŠ¤Š, 10Š“Š2ŠœŠ¤ŠŠ›, 15Š„2ŠŠœŠ¤Š, 15Š„2ŠŠœŠ¤Š-Š, 15Š„2ŠŠœŠ¤Š class
1 (RTD 2730.300.02.91).
Standardized control procedures for inspection of base materials (semi-products),
welded joints and claddings of nuclear power plant equipment and pipings:
Ultrasonic test. Inspection of base materials (semi-products) (PNAE G -7-014-89).
Magnetic particle test (PNAE G -7-015-89).
Visual and measurement check (PNAE G -7-016-89).
Regulatory requirements
027
Radiographic examination (PNAE G -7-017-89).
Penetrant test (PNAE G -7-018-89).
Check of leak-tightness. Gas and liquid methods (PNAE G -7-019-89).
Ultrasonic test. Part II. Inspection of welded joints and claddings (PNAE G -7-030-
91).
Standardized control procedures for inspection of base materials (semi-products),
welded joints and claddings of nuclear power plant equipment and pipings
Ultrasonic test. Part III. Measurement of thickness of monometals, bimetals and
corrosion-resistant coatings (PNAE G -7-031-91).
Ultrasonic test. Part IV. Inspection of welded joints of austenitic steels (PNAE G
-7-032-91).
Welcome to the 7th
International Scientific and Technical Conference
ā€œSafety Assurance of NPP with VVERā€ which will take place at
OKB ā€œGIDROPRESSā€, Podolsk, Russia on 17-20 May, 2011
More details at www.gidropress.podolsk.ru
028
THANK YOU FOR YOUR ATTENTION
029

Weitere Ƥhnliche Inhalte

Was ist angesagt?

AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...Global CCS Institute
Ā 
Dienhathe.com miniature circuit breakers
Dienhathe.com miniature circuit breakersDienhathe.com miniature circuit breakers
Dienhathe.com miniature circuit breakersDien Ha The
Ā 
Vextec Small Gas Turbine Testing
Vextec Small Gas Turbine TestingVextec Small Gas Turbine Testing
Vextec Small Gas Turbine Testingvexteclg
Ā 
Corrosion & Coatings
Corrosion & CoatingsCorrosion & Coatings
Corrosion & Coatingsjacobrajeev
Ā 
Cathodic Protection
Cathodic ProtectionCathodic Protection
Cathodic Protectionmichaeljmack
Ā 
Automating lifetime simulation of power PCBs
Automating lifetime simulation of power PCBsAutomating lifetime simulation of power PCBs
Automating lifetime simulation of power PCBsGreg Caswell
Ā 
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement PacTec 2nd Source
Ā 
A view of semiconductor industry
A view of semiconductor industryA view of semiconductor industry
A view of semiconductor industryLen Mei
Ā 
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...Daniel GarcĆ­a
Ā 
KEMET Webinar - Update on ESA and military standard portfolio
KEMET Webinar - Update on ESA and military standard portfolioKEMET Webinar - Update on ESA and military standard portfolio
KEMET Webinar - Update on ESA and military standard portfolioIvana Ivanovska
Ā 
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBC
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBCNexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBC
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBCThorne & Derrick International
Ā 
Baldor_LEMUG
Baldor_LEMUGBaldor_LEMUG
Baldor_LEMUGBob Perdue
Ā 
Liang lian brief presentation
Liang lian brief presentationLiang lian brief presentation
Liang lian brief presentationliangliantw
Ā 

Was ist angesagt? (13)

AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
Ā 
Dienhathe.com miniature circuit breakers
Dienhathe.com miniature circuit breakersDienhathe.com miniature circuit breakers
Dienhathe.com miniature circuit breakers
Ā 
Vextec Small Gas Turbine Testing
Vextec Small Gas Turbine TestingVextec Small Gas Turbine Testing
Vextec Small Gas Turbine Testing
Ā 
Corrosion & Coatings
Corrosion & CoatingsCorrosion & Coatings
Corrosion & Coatings
Ā 
Cathodic Protection
Cathodic ProtectionCathodic Protection
Cathodic Protection
Ā 
Automating lifetime simulation of power PCBs
Automating lifetime simulation of power PCBsAutomating lifetime simulation of power PCBs
Automating lifetime simulation of power PCBs
Ā 
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement
Ā 
A view of semiconductor industry
A view of semiconductor industryA view of semiconductor industry
A view of semiconductor industry
Ā 
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...
Ā 
KEMET Webinar - Update on ESA and military standard portfolio
KEMET Webinar - Update on ESA and military standard portfolioKEMET Webinar - Update on ESA and military standard portfolio
KEMET Webinar - Update on ESA and military standard portfolio
Ā 
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBC
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBCNexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBC
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBC
Ā 
Baldor_LEMUG
Baldor_LEMUGBaldor_LEMUG
Baldor_LEMUG
Ā 
Liang lian brief presentation
Liang lian brief presentationLiang lian brief presentation
Liang lian brief presentation
Ā 

Ƅhnlich wie Banyuk vver 2010

Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...Versli Lietuva (Enterprise Lithuania)
Ā 
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...Denis Senin
Ā 
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec SheetASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec SheetThorne & Derrick UK
Ā 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
Ā 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-addmozsubasi
Ā 
Welding Procces
Welding ProccesWelding Procces
Welding ProccesAlen Pepa
Ā 
Welding
WeldingWelding
WeldingAlen Pepa
Ā 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overviewAshifuddinAli
Ā 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship PresentationPiyush Verma
Ā 
Flow measurement solution general catalog
Flow measurement solution general catalogFlow measurement solution general catalog
Flow measurement solution general catalogEmily Xu
Ā 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
Ā 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-systemAdeoye Okunoye
Ā 
Fabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationFabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationckbgroup
Ā 
welding procedure-P F number And WPS.ppt
welding procedure-P  F number And WPS.pptwelding procedure-P  F number And WPS.ppt
welding procedure-P F number And WPS.pptmrujjavalsinghvarana
Ā 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protectionHedi Mohamed
Ā 

Ƅhnlich wie Banyuk vver 2010 (20)

Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Ā 
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), ā€žVisagino VAE projektas. Techniniai...
Ā 
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec SheetASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
Ā 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ā 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ā 
Welding Procces
Welding ProccesWelding Procces
Welding Procces
Ā 
Welding
WeldingWelding
Welding
Ā 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
Ā 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
Ā 
Sb ng gel_series_a4_sp
Sb ng gel_series_a4_spSb ng gel_series_a4_sp
Sb ng gel_series_a4_sp
Ā 
Conductive Level Switches From Nivelco
Conductive Level Switches From NivelcoConductive Level Switches From Nivelco
Conductive Level Switches From Nivelco
Ā 
Flow measurement solution general catalog
Flow measurement solution general catalogFlow measurement solution general catalog
Flow measurement solution general catalog
Ā 
OMK_Corp_Presentation
OMK_Corp_PresentationOMK_Corp_Presentation
OMK_Corp_Presentation
Ā 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
Ā 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
Ā 
Fabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationFabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentation
Ā 
welding procedure-P F number And WPS.ppt
welding procedure-P  F number And WPS.pptwelding procedure-P  F number And WPS.ppt
welding procedure-P F number And WPS.ppt
Ā 
Cp
CpCp
Cp
Ā 
Borusan Mannesmann
Borusan MannesmannBorusan Mannesmann
Borusan Mannesmann
Ā 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protection
Ā 

Mehr von myatom

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6myatom
Ā 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3myatom
Ā 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2myatom
Ā 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_atmyatom
Ā 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushimamyatom
Ā 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010myatom
Ā 
Š Š°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
Š Š°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚цŠ Š°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
Š Š°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚цmyatom
Ā 
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц3
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц3рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц3
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц3myatom
Ā 
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚црŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚цmyatom
Ā 
щŠµŠ“рŠ¾Š²ŠøцŠŗŠøŠ¹2010 Š½Š¾Š²Š°Ń ŠæŠ»Š°Ń‚Ń„Š¾Ń€Š¼Š°
щŠµŠ“рŠ¾Š²ŠøцŠŗŠøŠ¹2010 Š½Š¾Š²Š°Ń ŠæŠ»Š°Ń‚Ń„Š¾Ń€Š¼Š°Ń‰ŠµŠ“рŠ¾Š²ŠøцŠŗŠøŠ¹2010 Š½Š¾Š²Š°Ń ŠæŠ»Š°Ń‚Ń„Š¾Ń€Š¼Š°
щŠµŠ“рŠ¾Š²ŠøцŠŗŠøŠ¹2010 Š½Š¾Š²Š°Ń ŠæŠ»Š°Ń‚Ń„Š¾Ń€Š¼Š°myatom
Ā 
фŠ¾Ń€Š¼ŠøрŠ¾Š²Š°Š½ŠøŠµ ŠŗŠ°Š“рŠ¾Š²
фŠ¾Ń€Š¼ŠøрŠ¾Š²Š°Š½ŠøŠµ ŠŗŠ°Š“рŠ¾Š²Ń„Š¾Ń€Š¼ŠøрŠ¾Š²Š°Š½ŠøŠµ ŠŗŠ°Š“рŠ¾Š²
фŠ¾Ń€Š¼ŠøрŠ¾Š²Š°Š½ŠøŠµ ŠŗŠ°Š“рŠ¾Š²myatom
Ā 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBMmyatom
Ā 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1myatom
Ā 
10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelinmyatom
Ā 
Š¢Š¾ŠæŠ»ŠøŠ²Š¾ Š’Š’Š­Š : Š”Š¾Š²ŠµŃ€ŃˆŠµŠ½ŃŃ‚Š²Š¾Š²Š°Š½ŠøŠµ тŠµŃ…Š½Š¾Š»Š¾Š³ŠøŠø ŠøŠ·Š³Š¾Ń‚Š¾Š²Š»ŠµŠ½Šøя Šø ŠŗŠ¾Š½ŃŃ‚Ń€ŃƒŠŗцŠøŠø, Š¾Šæыт Šø...
Š¢Š¾ŠæŠ»ŠøŠ²Š¾ Š’Š’Š­Š : Š”Š¾Š²ŠµŃ€ŃˆŠµŠ½ŃŃ‚Š²Š¾Š²Š°Š½ŠøŠµ тŠµŃ…Š½Š¾Š»Š¾Š³ŠøŠø ŠøŠ·Š³Š¾Ń‚Š¾Š²Š»ŠµŠ½Šøя Šø ŠŗŠ¾Š½ŃŃ‚Ń€ŃƒŠŗцŠøŠø, Š¾Šæыт Šø...Š¢Š¾ŠæŠ»ŠøŠ²Š¾ Š’Š’Š­Š : Š”Š¾Š²ŠµŃ€ŃˆŠµŠ½ŃŃ‚Š²Š¾Š²Š°Š½ŠøŠµ тŠµŃ…Š½Š¾Š»Š¾Š³ŠøŠø ŠøŠ·Š³Š¾Ń‚Š¾Š²Š»ŠµŠ½Šøя Šø ŠŗŠ¾Š½ŃŃ‚Ń€ŃƒŠŗцŠøŠø, Š¾Šæыт Šø...
Š¢Š¾ŠæŠ»ŠøŠ²Š¾ Š’Š’Š­Š : Š”Š¾Š²ŠµŃ€ŃˆŠµŠ½ŃŃ‚Š²Š¾Š²Š°Š½ŠøŠµ тŠµŃ…Š½Š¾Š»Š¾Š³ŠøŠø ŠøŠ·Š³Š¾Ń‚Š¾Š²Š»ŠµŠ½Šøя Šø ŠŗŠ¾Š½ŃŃ‚Ń€ŃƒŠŗцŠøŠø, Š¾Šæыт Šø...myatom
Ā 
Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010myatom
Ā 
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...myatom
Ā 
MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010myatom
Ā 
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd... Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...myatom
Ā 
Nuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLNuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLmyatom
Ā 

Mehr von myatom (20)

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6
Ā 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3
Ā 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2
Ā 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_at
Ā 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushima
Ā 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010
Ā 
Š Š°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
Š Š°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚цŠ Š°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
Š Š°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
Ā 
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц3
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц3рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц3
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц3
Ā 
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚црŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
рŠ°Ń‡ŠŗŠ¾Š² Š·ŃŃ‚ц
Ā 
щŠµŠ“рŠ¾Š²ŠøцŠŗŠøŠ¹2010 Š½Š¾Š²Š°Ń ŠæŠ»Š°Ń‚Ń„Š¾Ń€Š¼Š°
щŠµŠ“рŠ¾Š²ŠøцŠŗŠøŠ¹2010 Š½Š¾Š²Š°Ń ŠæŠ»Š°Ń‚Ń„Š¾Ń€Š¼Š°Ń‰ŠµŠ“рŠ¾Š²ŠøцŠŗŠøŠ¹2010 Š½Š¾Š²Š°Ń ŠæŠ»Š°Ń‚Ń„Š¾Ń€Š¼Š°
щŠµŠ“рŠ¾Š²ŠøцŠŗŠøŠ¹2010 Š½Š¾Š²Š°Ń ŠæŠ»Š°Ń‚Ń„Š¾Ń€Š¼Š°
Ā 
фŠ¾Ń€Š¼ŠøрŠ¾Š²Š°Š½ŠøŠµ ŠŗŠ°Š“рŠ¾Š²
фŠ¾Ń€Š¼ŠøрŠ¾Š²Š°Š½ŠøŠµ ŠŗŠ°Š“рŠ¾Š²Ń„Š¾Ń€Š¼ŠøрŠ¾Š²Š°Š½ŠøŠµ ŠŗŠ°Š“рŠ¾Š²
фŠ¾Ń€Š¼ŠøрŠ¾Š²Š°Š½ŠøŠµ ŠŗŠ°Š“рŠ¾Š²
Ā 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBM
Ā 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1
Ā 
10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin
Ā 
Š¢Š¾ŠæŠ»ŠøŠ²Š¾ Š’Š’Š­Š : Š”Š¾Š²ŠµŃ€ŃˆŠµŠ½ŃŃ‚Š²Š¾Š²Š°Š½ŠøŠµ тŠµŃ…Š½Š¾Š»Š¾Š³ŠøŠø ŠøŠ·Š³Š¾Ń‚Š¾Š²Š»ŠµŠ½Šøя Šø ŠŗŠ¾Š½ŃŃ‚Ń€ŃƒŠŗцŠøŠø, Š¾Šæыт Šø...
Š¢Š¾ŠæŠ»ŠøŠ²Š¾ Š’Š’Š­Š : Š”Š¾Š²ŠµŃ€ŃˆŠµŠ½ŃŃ‚Š²Š¾Š²Š°Š½ŠøŠµ тŠµŃ…Š½Š¾Š»Š¾Š³ŠøŠø ŠøŠ·Š³Š¾Ń‚Š¾Š²Š»ŠµŠ½Šøя Šø ŠŗŠ¾Š½ŃŃ‚Ń€ŃƒŠŗцŠøŠø, Š¾Šæыт Šø...Š¢Š¾ŠæŠ»ŠøŠ²Š¾ Š’Š’Š­Š : Š”Š¾Š²ŠµŃ€ŃˆŠµŠ½ŃŃ‚Š²Š¾Š²Š°Š½ŠøŠµ тŠµŃ…Š½Š¾Š»Š¾Š³ŠøŠø ŠøŠ·Š³Š¾Ń‚Š¾Š²Š»ŠµŠ½Šøя Šø ŠŗŠ¾Š½ŃŃ‚Ń€ŃƒŠŗцŠøŠø, Š¾Šæыт Šø...
Š¢Š¾ŠæŠ»ŠøŠ²Š¾ Š’Š’Š­Š : Š”Š¾Š²ŠµŃ€ŃˆŠµŠ½ŃŃ‚Š²Š¾Š²Š°Š½ŠøŠµ тŠµŃ…Š½Š¾Š»Š¾Š³ŠøŠø ŠøŠ·Š³Š¾Ń‚Š¾Š²Š»ŠµŠ½Šøя Šø ŠŗŠ¾Š½ŃŃ‚Ń€ŃƒŠŗцŠøŠø, Š¾Šæыт Šø...
Ā 
Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010
Ā 
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Ā 
MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010
Ā 
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd... Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Ā 
Nuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLNuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADL
Ā 

KĆ¼rzlich hochgeladen

Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...Sheetaleventcompany
Ā 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
Ā 
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...lizamodels9
Ā 
JAYNAGAR CALL GIRL IN 98274*61493 ā¤CALL GIRLS IN ESCORT SERVICEā¤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ā¤CALL GIRLS IN ESCORT SERVICEā¤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ā¤CALL GIRLS IN ESCORT SERVICEā¤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ā¤CALL GIRLS IN ESCORT SERVICEā¤CALL GIRLkapoorjyoti4444
Ā 
Call Now ā˜ŽļøšŸ” 9332606886šŸ”Ā Call Girls ā¤ Service In Bhilwara Female Escorts Serv...
Call Now ā˜ŽļøšŸ” 9332606886šŸ”Ā Call Girls ā¤ Service In Bhilwara Female Escorts Serv...Call Now ā˜ŽļøšŸ” 9332606886šŸ”Ā Call Girls ā¤ Service In Bhilwara Female Escorts Serv...
Call Now ā˜ŽļøšŸ” 9332606886šŸ”Ā Call Girls ā¤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
Ā 
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...rajveerescorts2022
Ā 
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...lizamodels9
Ā 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000dlhescort
Ā 
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...amitlee9823
Ā 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
Ā 
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangaloreamitlee9823
Ā 
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...amitlee9823
Ā 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
Ā 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting
Ā 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
Ā 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
Ā 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
Ā 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
Ā 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
Ā 

KĆ¼rzlich hochgeladen (20)

Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Call Girls ZirakpuršŸ‘§ Book NowšŸ“±7837612180 šŸ“žšŸ‘‰Call Girl Service In Zirakpur No A...
Ā 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
Ā 
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ā¤ļø8448577510 āŠ¹Best Escorts Service ...
Ā 
JAYNAGAR CALL GIRL IN 98274*61493 ā¤CALL GIRLS IN ESCORT SERVICEā¤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ā¤CALL GIRLS IN ESCORT SERVICEā¤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ā¤CALL GIRLS IN ESCORT SERVICEā¤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ā¤CALL GIRLS IN ESCORT SERVICEā¤CALL GIRL
Ā 
Call Now ā˜ŽļøšŸ” 9332606886šŸ”Ā Call Girls ā¤ Service In Bhilwara Female Escorts Serv...
Call Now ā˜ŽļøšŸ” 9332606886šŸ”Ā Call Girls ā¤ Service In Bhilwara Female Escorts Serv...Call Now ā˜ŽļøšŸ” 9332606886šŸ”Ā Call Girls ā¤ Service In Bhilwara Female Escorts Serv...
Call Now ā˜ŽļøšŸ” 9332606886šŸ”Ā Call Girls ā¤ Service In Bhilwara Female Escorts Serv...
Ā 
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
šŸ‘‰Chandigarh Call Girls šŸ‘‰9878799926šŸ‘‰Just CallšŸ‘‰Chandigarh Call Girl In Chandiga...
Ā 
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ā¤ļø8448577510 āŠ¹Best Escorts Service I...
Ā 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Ā 
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: šŸ“ 7737669865 šŸ“ High Profile Model Escorts | Bangalore...
Ā 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
Ā 
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bangalore
Ā 
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call šŸ‘— 7737669865 šŸ‘— Top Class Call Girl Service Bang...
Ā 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
Ā 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
Ā 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
Ā 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
Ā 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Ā 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
Ā 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Ā 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
Ā 

Banyuk vver 2010

  • 1. Materials of equipment for reactor plants V-320 and V-491 Banyuk G.F., Ryzhov S.B., Mokhov V.Š., Piminov V.Š. International Topical Meeting VVER 2010. Experience & Perspectives 01 ā€“ 03 November 2010 Prague, Czech Republic
  • 2. Units with VVER-1000 02 Country Number of Units Russian Federation 7 (VVER-1000/320) + 3 (VVER-1000/small series) Czech Republic 2 (VVER-1000/320) Bulgaria 2 (VVER-1000/320) Ukraine 11 (VVER-1000/320)+ 2 (VVER-1000/small series) China 2 (VVER-1000/V-428)
  • 3. Units of AES-2006 design under construction 03 NPP Number of Units Novovoronezh-2 (V-392Šœ) 2 Leningrad-2 (V-491) 2 Baltic NPP (V-491) (preparation for construction) 2
  • 4. Main equipment of reactor plant 04 Reactor pressure vessel and top head Stream generator Pressurizer ECCS hydroaccumulator Pipelines (MCP)
  • 6. Reactor pressure vessel 06 Parameter Value V-320 V-491 Length, mm 10897 11185 Inner diameter, mm 4150 4250 Wall thickness in the belt line region, mm 192,5 197,5 Mass, t 320 330
  • 7. Reactor pressure vessel 07 Additional requirements for materials are caused by: the stronger requirements for equipment and high thermal power as compared with those for a commercial Unit: ļ‚§ service life (60 years) and life (fuel cycle 8400 h) are extended; ļ‚§ primary and secondary coolant (pressure and temperature) parameters are increased
  • 8. Reactor pressure vessel 08 Implementation of the measures aimed at improvement of brittle fracture resistance (BFR) of reactor vessels: ļ‚§ decrease in radiation embrittlement of RPV materials; ļ‚§ decrease in loads onto RPV under pressurized thermal shocks; ļ‚§ improved monitoring of changes in RPV material properties.
  • 9. Reactor pressure vessel 09 Component Grade of steel RP V-320 RP V-491 Supporting shell. Cylindrical upper and lower shells 15Š„2ŠŠœŠ¤Š-Š 15Š„2ŠŠœŠ¤Š class 1 Shells of nozzle area 15Š„2ŠŠœŠ¤Š-Š Bottom head, flange 15Š„2ŠŠœŠ¤Š
  • 10. Ni influence on radiation embrittlement of reactor pressure vessel steel Surveillance testing results and the results of research programs for VVER-1000 RPV materials have shown, that radiation embrittlement essentially depends on the nickel and manganese content 010
  • 11. Decrease in radiation embrittlement of RPV materials 011 Chemical composition of RPV base metal (supporting and core shells) Grade of steel (RP type) Chemical composition, % C Si Mn Cr Ni Mo V Calc. 15Š„2ŠŠœŠ¤Š-Š (Š’-320) 0.13-0.18 0.17-0.37 0.30-0.60 1.8-2.3 1.0 ā€“ 1.5 0.5-0.7 0.10-0.12 15Š„2ŠŠœŠ¤Š class 1 (Š’-491) 1.0 ā€“ 1.3 Grade of steel (RP type) Chemical composition, % Cu S P As Co Sb Sn Š  + Sb + Sn No more than 15Š„2ŠŠœŠ¤Š-Š (Š’-320) 0.10 0.006 0.008 0.010 0.03 0.005 0.005 - 15Š„2ŠŠœŠ¤Š class 1 (Š’-491) 0.06 0.007 0,012
  • 12. Decrease in radiation embrittlement of RPV materials 012 Chemical composition of RPV welds metal (welds of core range) Welding wire, flux (RP type) Chemical composition, % C Si Mn Cr Ni Mo Ti Š”Š²-12Š„2Š2ŠœŠŠ, flux Š¤Š¦-16Š (Š’-320) 0.04-0.10 0.15-0.45 0.65-1.10 1.4-2.1 1.2 ā€“ 1.9 0.45-0.75 - 0.45-1.10 1.2-2.0 1.0 ā€“ 1.3 0.40-0.75 0.01-0.06 Š”Š²-09Š„Š“ŠŠœŠ¢ŠŠ-Š’Š˜, flux ŠŠ¤-18Šœ (Š’-491) Welding wire, flux (RP type) Chemical composition, % Co S P Cu Sb Sn As No more than Š”Š²-12Š„2Š2ŠœŠŠ, flux Š¤Š¦-16Š (Š’-320) 0.02 0.015 0.012 0.10 0.008 0.001 0.010 Š”Š²-09Š„Š“ŠŠœŠ¢ŠŠ-Š’Š˜, flux ŠŠ¤-18Šœ (Š’-491) 0.08 Š¢ŠŗŠ¾ of core weld metal: Š’-320 ā‰¤ 0 0 Š” Š’-491 ā‰¤ minus 15 0 Š”
  • 13. Decrease in radiation embrittlement of RPV materials 013 Decrease in neutron fluence Fluence decrease is implemented due to increase in the RPV diameter and core arrangement (FA placing) with reduced neutron leakage Maximum values of neutron fluence with an energy above 0.5 MeV for various points Location Design data of neutron fluence (F āˆ— 1023 ), n/m2 Š’-320 (40 years) Š’-491 (60 years) Core top (supporting shell) 2.44 1.28 Base metal in the place of max. neutron fluence 5.7 4.22 Weld No. 2 5.7 4.06 Weld No. 3 4.5 3.58
  • 14. Decrease in radiation embrittlement of RPV materials 014 Tk calculation results Location Tk, 0 C Š’-320 (40 years) Š’-491 (60 years) Core top (supporting shell) 42 29 Base metal in point of max neutron fluence 64 55 Weld No. 2 77 69* Weld No. 3 71 66* * - without regard for Š¢ŠŗŠ¾ ā‰¤ minus 15Ā°Š”
  • 15. Decrease in loads onto RPV under PTS 015 Decrease in loads is achieved due to limitation of the minimum water temperature in the emergency core cooling system Decrease in loads on RPV under PTS Reactor plant type Temperature of ECCS water, 0 C, not less than V-320 10 V-491 20
  • 16. Improved monitoring of changes in RPV material properties 016 Improvement is achieved due to change in location of surveillance specimen casks. In RP V-320 the surveillance specimen casks were located in the channels of the reactor core baffle. In RP V-491 the casks are placed directly on the inside wall of the reactor pressure vessel in the place of maximum fluence
  • 17. Monitoring of RPV metal state during operation (surveillance program) Irradiated surveillance sets are located opposite to the core and fixed directly on the RPV wall. 017
  • 18. Surveillance specimens Surveillance specimen program for RPV of RP V-491 defines: 1.Irradiated sets (materials, number and date of removal). 2.Temperature sets (Š¼Š°Ń‚ŠµŃ€ŠøŠ°Š»Ń‹, number and date of removal). 3.Test sets. 4.Scheme for cutting of specimens. 5.Number of specimens for each type of tests. 6.Type of specimens. 7.Quality Assurance Program. 018
  • 19. Surveillance specimens 019 Basic requirements for fabrication of surveillance specimens Surveillance specimens for in-service inspection of change in RPV metal properties shall be fabricated from: ļ‚§ base metal; ļ‚§ weld metal; ļ‚§ HAZ metal. Billets of the base metal surveillance specimens shall be cut out of the test ring of the standard shells after basic heat treatment. The billets shall be subject to heat treatments under the modes identical to heat treatment modes of the shell, from which the test ring is cut out, in the course of the vessel manufacture.
  • 20. Surveillance specimens 020 Basic requirements for fabrication of surveillance specimens Billets of specimens of weld metal and HAZ metal shall be cut out of the circular welded sample, made of metal cut from one of the RPV shells. The sample shall be of the same thickness and the same grooving as the RPV welds. The circular welded sample shall be made under the same modes and using the same welding process and welding materials of the same lots as the tested RPV welds. The sample shall be subject to the same complex of heat treatments as the RPV welds to be tested.
  • 21. The first AES-2006 RPV for Novovoronezh-2 NPP was manufactured at the Izhora plant in this year The second AES-2006 RPV for Novovoronezh-2 is planned in the next year 021
  • 22. Main coolant pipeline 022 Tubes for manufacture of MCP Technical conditions TU 108.1197-83 (the Manufacturer - Ā«EUROTUBE GmbHĀ») Outer diameter, mm Inner diameter, mm Wall thickness, mm Maximum length, mm Thickness of cladding layer, mm 990 850 70 8400 5 1130 990 70 8400 5
  • 23. Main coolant pipeline 023 Materials Chemical composition of the base metal of MCP tubes Grade of steel Content of elements, % C Si Mn Ni Mo V S P Cr Cu 10Š“Š2ŠœŠ¤Š 0.08- 0.12 0.17- 0.37 0.70- 0.90 1.70- 2.00 0.40- 0.60 not more than 0.04 0.020 0.020 0.30 0.30
  • 24. Main coolant pipeline 024 Materials Chemical composition of deposited corrosion-resistant coating 03Š„22Š11Š“2Š‘ Content of element, % C Si S P Cu Co N Mn Cr Ni Nb not more than 1.00- 2.50 17.50- 20.50 8.50- 11.0 0.70- 1.000.05 1.00 0.02 0.03 0.30 0.02 0.05
  • 25. Regulatory requirements 025 Regulations for design and safe operation of nuclear plant equipment and pipings (PNAE G -7-008-89). Regulations for strength calculation of equipment and pipings of nuclear power plants (PNAE G -7-002-86). Equipment and pipings of nuclear power plants. Welding and cladding. General provisions (PNAE G -7-009-89). Equipment and pipings of nuclear power plants. Welded joints and claddings. Rules of inspection (PNAE G -7-010-89).
  • 26. Regulatory requirements 026 Guiding technological document. Equipment and pipings of nuclear power plants. Welding, cladding and heat treatment of welded joints of components of steels of grades 10Š“Š2ŠœŠ¤Š, 10Š“Š2ŠœŠ¤ŠŠ›, 15Š„2ŠŠœŠ¤Š, 15Š„2ŠŠœŠ¤Š-Š, 15Š„2ŠŠœŠ¤Š class 1 (RTD 2730.300.02.91). Standardized control procedures for inspection of base materials (semi-products), welded joints and claddings of nuclear power plant equipment and pipings: Ultrasonic test. Inspection of base materials (semi-products) (PNAE G -7-014-89). Magnetic particle test (PNAE G -7-015-89). Visual and measurement check (PNAE G -7-016-89).
  • 27. Regulatory requirements 027 Radiographic examination (PNAE G -7-017-89). Penetrant test (PNAE G -7-018-89). Check of leak-tightness. Gas and liquid methods (PNAE G -7-019-89). Ultrasonic test. Part II. Inspection of welded joints and claddings (PNAE G -7-030- 91). Standardized control procedures for inspection of base materials (semi-products), welded joints and claddings of nuclear power plant equipment and pipings Ultrasonic test. Part III. Measurement of thickness of monometals, bimetals and corrosion-resistant coatings (PNAE G -7-031-91). Ultrasonic test. Part IV. Inspection of welded joints of austenitic steels (PNAE G -7-032-91).
  • 28. Welcome to the 7th International Scientific and Technical Conference ā€œSafety Assurance of NPP with VVERā€ which will take place at OKB ā€œGIDROPRESSā€, Podolsk, Russia on 17-20 May, 2011 More details at www.gidropress.podolsk.ru 028
  • 29. THANK YOU FOR YOUR ATTENTION 029