SlideShare a Scribd company logo
1 of 29
Materials of equipment
for reactor plants
V-320 and V-491
Banyuk G.F., Ryzhov S.B.,
Mokhov V.А., Piminov V.А.
International Topical Meeting
VVER 2010. Experience & Perspectives
01 – 03 November 2010
Prague, Czech Republic
Units with VVER-1000
02
Country Number of Units
Russian
Federation
7 (VVER-1000/320) + 3 (VVER-1000/small
series)
Czech
Republic
2 (VVER-1000/320)
Bulgaria 2 (VVER-1000/320)
Ukraine
11 (VVER-1000/320)+ 2 (VVER-1000/small
series)
China 2 (VVER-1000/V-428)
Units of AES-2006 design under construction
03
NPP Number of Units
Novovoronezh-2 (V-392М) 2
Leningrad-2 (V-491) 2
Baltic NPP (V-491) (preparation
for construction)
2
Main equipment of reactor plant
04
Reactor pressure vessel and top head
Stream generator
Pressurizer
ECCS hydroaccumulator
Pipelines (MCP)
Reactor plant
05
Reactor pressure vessel
06
Parameter
Value
V-320 V-491
Length, mm 10897 11185
Inner diameter, mm 4150 4250
Wall thickness in the belt
line region, mm
192,5 197,5
Mass, t 320 330
Reactor pressure vessel
07
Additional requirements for materials are caused by:
the stronger requirements for equipment and high thermal power as
compared with those for a commercial Unit:
 service life (60 years) and life (fuel cycle 8400 h) are extended;
 primary and secondary coolant (pressure and temperature) parameters
are increased
Reactor pressure vessel
08
Implementation of the measures aimed at improvement of brittle
fracture
resistance (BFR) of reactor vessels:
 decrease in radiation embrittlement of RPV materials;
 decrease in loads onto RPV under pressurized thermal shocks;
 improved monitoring of changes in RPV material properties.
Reactor pressure vessel
09
Component
Grade of steel
RP V-320 RP V-491
Supporting shell.
Cylindrical upper and lower shells
15Х2НМФА-А 15Х2НМФА class 1
Shells of nozzle area 15Х2НМФА-А
Bottom head, flange 15Х2НМФА
Ni influence on radiation embrittlement of reactor
pressure vessel steel
Surveillance testing results and the results of research programs for
VVER-1000 RPV materials have shown, that radiation embrittlement
essentially depends on the nickel and manganese content
010
Decrease in radiation embrittlement of RPV
materials
011
Chemical composition of RPV base metal (supporting and core shells)
Grade of steel
(RP type)
Chemical composition, %
C Si Mn Cr Ni Mo
V
Calc.
15Х2НМФА-А
(В-320)
0.13-0.18 0.17-0.37 0.30-0.60 1.8-2.3
1.0 – 1.5
0.5-0.7 0.10-0.12
15Х2НМФА
class 1 (В-491)
1.0 – 1.3
Grade of steel
(RP type)
Chemical composition, %
Cu S P As Co Sb Sn Р + Sb + Sn
No more than
15Х2НМФА-А
(В-320)
0.10
0.006
0.008
0.010 0.03 0.005 0.005
-
15Х2НМФА
class 1 (В-491)
0.06 0.007 0,012
Decrease in radiation embrittlement of RPV
materials
012
Chemical composition of RPV welds metal (welds of core range)
Welding wire, flux
(RP type)
Chemical composition, %
C Si Mn Cr Ni Mo Ti
Св-12Х2Н2МАА,
flux ФЦ-16А (В-320)
0.04-0.10 0.15-0.45
0.65-1.10 1.4-2.1 1.2 – 1.9 0.45-0.75
-
0.45-1.10 1.2-2.0 1.0 – 1.3 0.40-0.75 0.01-0.06
Св-09ХГНМТАА-ВИ,
flux НФ-18М (В-491)
Welding wire, flux
(RP type)
Chemical composition, %
Co S P Cu Sb Sn As
No more than
Св-12Х2Н2МАА,
flux ФЦ-16А (В-320)
0.02 0.015 0.012
0.10
0.008 0.001 0.010
Св-09ХГНМТАА-ВИ,
flux НФ-18М (В-491) 0.08
Тко
of core weld metal: В-320 ≤ 0 0
С
В-491 ≤ minus 15 0
С
Decrease in radiation embrittlement of RPV
materials
013
Decrease in neutron fluence
Fluence decrease is implemented due to increase in the RPV diameter
and core arrangement (FA placing) with reduced neutron leakage
Maximum values of neutron fluence with an energy above 0.5 MeV for various
points
Location
Design data of neutron fluence (F ∗ 1023
), n/m2
В-320 (40 years) В-491 (60 years)
Core top (supporting shell) 2.44 1.28
Base metal in the place of max.
neutron fluence
5.7 4.22
Weld No. 2 5.7 4.06
Weld No. 3 4.5 3.58
Decrease in radiation embrittlement of RPV
materials
014
Tk calculation results
Location
Tk, 0
C
В-320 (40 years) В-491 (60 years)
Core top (supporting shell) 42 29
Base metal in point of max neutron fluence 64 55
Weld No. 2 77 69*
Weld No. 3 71 66*
* - without regard for Тко
≤ minus 15°С
Decrease in loads onto RPV under PTS
015
Decrease in loads is achieved due to limitation of the minimum water
temperature in the emergency core cooling system
Decrease in loads on RPV under PTS
Reactor plant type
Temperature of ECCS water, 0
C,
not less than
V-320 10
V-491 20
Improved monitoring of changes in RPV material
properties
016
Improvement is achieved due to change in location of surveillance
specimen casks.
In RP V-320 the surveillance specimen casks were located in the
channels of the reactor core baffle.
In RP V-491 the casks are placed directly on the inside wall of the
reactor pressure vessel in the place of maximum fluence
Monitoring of RPV metal state during operation
(surveillance program)
Irradiated surveillance sets are located opposite to the core and fixed
directly on the RPV wall.
017
Surveillance specimens
Surveillance specimen program for RPV of RP V-491 defines:
1.Irradiated sets (materials, number and date of removal).
2.Temperature sets (материалы, number and date of removal).
3.Test sets.
4.Scheme for cutting of specimens.
5.Number of specimens for each type of tests.
6.Type of specimens.
7.Quality Assurance Program.
018
Surveillance specimens
019
Basic requirements for fabrication of surveillance specimens
Surveillance specimens for in-service inspection of change in RPV metal
properties shall be fabricated from:
 base metal;
 weld metal;
 HAZ metal.
Billets of the base metal surveillance specimens shall be cut out of the test
ring of the standard shells after basic heat treatment.
The billets shall be subject to heat treatments under the modes identical to
heat treatment modes of the shell, from which the test ring is cut out, in the
course of the vessel manufacture.
Surveillance specimens
020
Basic requirements for fabrication of surveillance specimens
Billets of specimens of weld metal and HAZ metal shall be cut out of the
circular welded sample, made of metal cut from one of the RPV shells.
The sample shall be of the same thickness and the same grooving as
the RPV welds.
The circular welded sample shall be made under the same modes and
using the same welding process and welding materials of the same lots
as the tested RPV welds.
The sample shall be subject to the same complex of heat treatments as
the RPV welds to be tested.
The first AES-2006 RPV for Novovoronezh-2 NPP was manufactured at the
Izhora plant in this year
The second AES-2006 RPV for Novovoronezh-2 is planned in the next year
021
Main coolant pipeline
022
Tubes for manufacture of MCP
Technical conditions TU 108.1197-83 (the Manufacturer - «EUROTUBE
GmbH»)
Outer diameter,
mm
Inner diameter,
mm
Wall thickness,
mm
Maximum length,
mm
Thickness of
cladding layer,
mm
990 850 70 8400 5
1130 990 70 8400 5
Main coolant pipeline
023
Materials
Chemical composition of the base metal of MCP tubes
Grade of
steel
Content of elements, %
C Si Mn Ni Mo V S P Cr Cu
10ГН2МФА
0.08-
0.12
0.17-
0.37
0.70-
0.90
1.70-
2.00
0.40-
0.60
not more than
0.04 0.020 0.020 0.30 0.30
Main coolant pipeline
024
Materials
Chemical composition of deposited corrosion-resistant coating 03Х22Н11Г2Б
Content of element, %
C Si S P Cu Co N Mn Cr Ni Nb
not more than
1.00-
2.50
17.50-
20.50
8.50-
11.0
0.70-
1.000.05 1.00 0.02 0.03 0.30 0.02 0.05
Regulatory requirements
025
Regulations for design and safe operation of nuclear plant equipment
and pipings (PNAE G -7-008-89).
Regulations for strength calculation of equipment and pipings of nuclear
power plants (PNAE G -7-002-86).
Equipment and pipings of nuclear power plants. Welding and cladding.
General provisions (PNAE G -7-009-89).
Equipment and pipings of nuclear power plants. Welded joints and
claddings. Rules of inspection (PNAE G -7-010-89).
Regulatory requirements
026
Guiding technological document. Equipment and pipings of nuclear power plants.
Welding, cladding and heat treatment of welded joints of components of steels of
grades 10ГН2МФА, 10ГН2МФАЛ, 15Х2НМФА, 15Х2НМФА-А, 15Х2НМФА class
1 (RTD 2730.300.02.91).
Standardized control procedures for inspection of base materials (semi-products),
welded joints and claddings of nuclear power plant equipment and pipings:
Ultrasonic test. Inspection of base materials (semi-products) (PNAE G -7-014-89).
Magnetic particle test (PNAE G -7-015-89).
Visual and measurement check (PNAE G -7-016-89).
Regulatory requirements
027
Radiographic examination (PNAE G -7-017-89).
Penetrant test (PNAE G -7-018-89).
Check of leak-tightness. Gas and liquid methods (PNAE G -7-019-89).
Ultrasonic test. Part II. Inspection of welded joints and claddings (PNAE G -7-030-
91).
Standardized control procedures for inspection of base materials (semi-products),
welded joints and claddings of nuclear power plant equipment and pipings
Ultrasonic test. Part III. Measurement of thickness of monometals, bimetals and
corrosion-resistant coatings (PNAE G -7-031-91).
Ultrasonic test. Part IV. Inspection of welded joints of austenitic steels (PNAE G
-7-032-91).
Welcome to the 7th
International Scientific and Technical Conference
“Safety Assurance of NPP with VVER” which will take place at
OKB “GIDROPRESS”, Podolsk, Russia on 17-20 May, 2011
More details at www.gidropress.podolsk.ru
028
THANK YOU FOR YOUR ATTENTION
029

More Related Content

What's hot

AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
Global CCS Institute
 
Vextec Small Gas Turbine Testing
Vextec Small Gas Turbine TestingVextec Small Gas Turbine Testing
Vextec Small Gas Turbine Testing
vexteclg
 
Corrosion & Coatings
Corrosion & CoatingsCorrosion & Coatings
Corrosion & Coatings
jacobrajeev
 
Liang lian brief presentation
Liang lian brief presentationLiang lian brief presentation
Liang lian brief presentation
liangliantw
 

What's hot (13)

AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
AEP Mountaineer - Commercial Scale Carbon Capture & Storage Project Phase 1 L...
 
Dienhathe.com miniature circuit breakers
Dienhathe.com miniature circuit breakersDienhathe.com miniature circuit breakers
Dienhathe.com miniature circuit breakers
 
Vextec Small Gas Turbine Testing
Vextec Small Gas Turbine TestingVextec Small Gas Turbine Testing
Vextec Small Gas Turbine Testing
 
Corrosion & Coatings
Corrosion & CoatingsCorrosion & Coatings
Corrosion & Coatings
 
Cathodic Protection
Cathodic ProtectionCathodic Protection
Cathodic Protection
 
Automating lifetime simulation of power PCBs
Automating lifetime simulation of power PCBsAutomating lifetime simulation of power PCBs
Automating lifetime simulation of power PCBs
 
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement
PacTec 2nd Source - Metrology Equipment Argon Laser Tube Replacement
 
A view of semiconductor industry
A view of semiconductor industryA view of semiconductor industry
A view of semiconductor industry
 
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...
Weg us300-us-aumation-catalog-part.2-contactors-relays-breakers-and-motor-pro...
 
KEMET Webinar - Update on ESA and military standard portfolio
KEMET Webinar - Update on ESA and military standard portfolioKEMET Webinar - Update on ESA and military standard portfolio
KEMET Webinar - Update on ESA and military standard portfolio
 
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBC
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBCNexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBC
Nexans Euromold Bushings 800 Amps 12kV - Nexans Euromold 600TBC
 
Baldor_LEMUG
Baldor_LEMUGBaldor_LEMUG
Baldor_LEMUG
 
Liang lian brief presentation
Liang lian brief presentationLiang lian brief presentation
Liang lian brief presentation
 

Similar to Banyuk vver 2010

Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Versli Lietuva (Enterprise Lithuania)
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Denis Senin
 
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec SheetASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
Thorne & Derrick UK
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
ddmozsubasi
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
ddmozsubasi
 
Welding Procces
Welding ProccesWelding Procces
Welding Procces
Alen Pepa
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
Adeoye Okunoye
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
Adeoye Okunoye
 

Similar to Banyuk vver 2010 (20)

Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
Purje Juha, Inspecta Tarkastus (Suomija), „Visagino VAE projektas. Techniniai...
 
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec SheetASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
ASCO ATEX Solenoid Valves - 327 Series - Spec Sheet
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-aEd0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
Ed0733 a 50a10 - drs-00-vbr-tr-fwb-010-a
 
Welding Procces
Welding ProccesWelding Procces
Welding Procces
 
Welding
WeldingWelding
Welding
 
Asme sec ix overview
Asme sec ix overviewAsme sec ix overview
Asme sec ix overview
 
Summer Internship Presentation
Summer Internship PresentationSummer Internship Presentation
Summer Internship Presentation
 
Sb ng gel_series_a4_sp
Sb ng gel_series_a4_spSb ng gel_series_a4_sp
Sb ng gel_series_a4_sp
 
Conductive Level Switches From Nivelco
Conductive Level Switches From NivelcoConductive Level Switches From Nivelco
Conductive Level Switches From Nivelco
 
Flow measurement solution general catalog
Flow measurement solution general catalogFlow measurement solution general catalog
Flow measurement solution general catalog
 
OMK_Corp_Presentation
OMK_Corp_PresentationOMK_Corp_Presentation
OMK_Corp_Presentation
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system20392769 design-calculation-cathodic-protection-impressed-cureent-system
20392769 design-calculation-cathodic-protection-impressed-cureent-system
 
Fabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentationFabrication Gate Valve ckb presentation
Fabrication Gate Valve ckb presentation
 
welding procedure-P F number And WPS.ppt
welding procedure-P  F number And WPS.pptwelding procedure-P  F number And WPS.ppt
welding procedure-P F number And WPS.ppt
 
Cp
CpCp
Cp
 
Borusan Mannesmann
Borusan MannesmannBorusan Mannesmann
Borusan Mannesmann
 
M 503 cathodic protection
M 503 cathodic protectionM 503 cathodic protection
M 503 cathodic protection
 

More from myatom

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6
myatom
 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3
myatom
 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2
myatom
 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_at
myatom
 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushima
myatom
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010
myatom
 
Рачков зятц
Рачков зятцРачков зятц
Рачков зятц
myatom
 
рачков зятц3
рачков зятц3рачков зятц3
рачков зятц3
myatom
 
рачков зятц
рачков зятцрачков зятц
рачков зятц
myatom
 
щедровицкий2010 новая платформа
щедровицкий2010 новая платформащедровицкий2010 новая платформа
щедровицкий2010 новая платформа
myatom
 
формирование кадров
формирование кадровформирование кадров
формирование кадров
myatom
 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBM
myatom
 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1
myatom
 
10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin
myatom
 
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
myatom
 
Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010
myatom
 
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
myatom
 
MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010
myatom
 
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd... Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
myatom
 
Nuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLNuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADL
myatom
 

More from myatom (20)

JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6JANTI Fukushima report part 4 5 6
JANTI Fukushima report part 4 5 6
 
JANTI Fukushima report part 3
JANTI Fukushima report part 3JANTI Fukushima report part 3
JANTI Fukushima report part 3
 
JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2JANTI Fukushima report part 1 2
JANTI Fukushima report part 1 2
 
Janti fukushima report_at
Janti fukushima report_atJanti fukushima report_at
Janti fukushima report_at
 
BWR Fukushima
BWR FukushimaBWR Fukushima
BWR Fukushima
 
Updated plant costs 2010
Updated plant costs 2010Updated plant costs 2010
Updated plant costs 2010
 
Рачков зятц
Рачков зятцРачков зятц
Рачков зятц
 
рачков зятц3
рачков зятц3рачков зятц3
рачков зятц3
 
рачков зятц
рачков зятцрачков зятц
рачков зятц
 
щедровицкий2010 новая платформа
щедровицкий2010 новая платформащедровицкий2010 новая платформа
щедровицкий2010 новая платформа
 
формирование кадров
формирование кадровформирование кадров
формирование кадров
 
Vber300 OKBM
Vber300 OKBMVber300 OKBM
Vber300 OKBM
 
AES-2006, part 1
AES-2006, part 1AES-2006, part 1
AES-2006, part 1
 
10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin10 years of experience with Westinghouse fuel at NPP Temelin
10 years of experience with Westinghouse fuel at NPP Temelin
 
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
Топливо ВВЭР: Совершенствование технологии изготовления и конструкции, опыт и...
 
Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010Ryzhov VVER prospects atomexpo2010
Ryzhov VVER prospects atomexpo2010
 
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
Rothwell Braun THE COST STRUCTURE OF INTERNATIONAL URANIUM ENRICHMENT SERVICE...
 
MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010MIT Nuclear fuel cycle 2010
MIT Nuclear fuel cycle 2010
 
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd... Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
Policy Challenges of Nuclear Reactor Construction: Cost Escalation and Crowd...
 
Nuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADLNuclear New build Unveiled by ADL
Nuclear New build Unveiled by ADL
 

Recently uploaded

Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Jakarta Wa 085176963835 Apotek Jual Obat Cytotec Di Jakarta
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
doktercalysta
 
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
prakheeshc
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
LR1709MUSIC
 

Recently uploaded (20)

Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
Pay after result spell caster (,$+27834335081)@ bring back lost lover same da...
 
wagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORIwagamamaLab presentation @MIT 20240509 IRODORI
wagamamaLab presentation @MIT 20240509 IRODORI
 
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di PasuruanObat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
Obat Aborsi Pasuruan 0851\7696\3835 Jual Obat Cytotec Di Pasuruan
 
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTARPEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
PEMATANG SIANTAR 0851/8063/4797 JUAL OBAT ABORSI CYTOTEC PEMATANG SIANTAR
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 
hyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statementshyundai capital 2023 consolidated financial statements
hyundai capital 2023 consolidated financial statements
 
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
Most Visionary Leaders in Cloud Revolution, Shaping Tech’s Next Era - 2024 (2...
 
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
A BUSINESS PROPOSAL FOR SLAUGHTER HOUSE WASTE MANAGEMENT IN MYSORE MUNICIPAL ...
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Should Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their BookkeepingShould Law Firms Outsource their Bookkeeping
Should Law Firms Outsource their Bookkeeping
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In HarareTop^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
Top^Clinic ^%[+27785538335__Safe*Women's clinic//Abortion Pills In Harare
 
MichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdfMichaelStarkes_UncutGemsProjectSummary.pdf
MichaelStarkes_UncutGemsProjectSummary.pdf
 
HAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future ProspectsHAL Financial Performance Analysis and Future Prospects
HAL Financial Performance Analysis and Future Prospects
 
Navigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA FirmsNavigating Tax Season with Confidence Streamlines CPA Firms
Navigating Tax Season with Confidence Streamlines CPA Firms
 
1Q24_EN hyundai capital 1q performance
1Q24_EN   hyundai capital 1q performance1Q24_EN   hyundai capital 1q performance
1Q24_EN hyundai capital 1q performance
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
Global Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdfGlobal Internal Audit Standards 2024.pdf
Global Internal Audit Standards 2024.pdf
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 

Banyuk vver 2010

  • 1. Materials of equipment for reactor plants V-320 and V-491 Banyuk G.F., Ryzhov S.B., Mokhov V.А., Piminov V.А. International Topical Meeting VVER 2010. Experience & Perspectives 01 – 03 November 2010 Prague, Czech Republic
  • 2. Units with VVER-1000 02 Country Number of Units Russian Federation 7 (VVER-1000/320) + 3 (VVER-1000/small series) Czech Republic 2 (VVER-1000/320) Bulgaria 2 (VVER-1000/320) Ukraine 11 (VVER-1000/320)+ 2 (VVER-1000/small series) China 2 (VVER-1000/V-428)
  • 3. Units of AES-2006 design under construction 03 NPP Number of Units Novovoronezh-2 (V-392М) 2 Leningrad-2 (V-491) 2 Baltic NPP (V-491) (preparation for construction) 2
  • 4. Main equipment of reactor plant 04 Reactor pressure vessel and top head Stream generator Pressurizer ECCS hydroaccumulator Pipelines (MCP)
  • 6. Reactor pressure vessel 06 Parameter Value V-320 V-491 Length, mm 10897 11185 Inner diameter, mm 4150 4250 Wall thickness in the belt line region, mm 192,5 197,5 Mass, t 320 330
  • 7. Reactor pressure vessel 07 Additional requirements for materials are caused by: the stronger requirements for equipment and high thermal power as compared with those for a commercial Unit:  service life (60 years) and life (fuel cycle 8400 h) are extended;  primary and secondary coolant (pressure and temperature) parameters are increased
  • 8. Reactor pressure vessel 08 Implementation of the measures aimed at improvement of brittle fracture resistance (BFR) of reactor vessels:  decrease in radiation embrittlement of RPV materials;  decrease in loads onto RPV under pressurized thermal shocks;  improved monitoring of changes in RPV material properties.
  • 9. Reactor pressure vessel 09 Component Grade of steel RP V-320 RP V-491 Supporting shell. Cylindrical upper and lower shells 15Х2НМФА-А 15Х2НМФА class 1 Shells of nozzle area 15Х2НМФА-А Bottom head, flange 15Х2НМФА
  • 10. Ni influence on radiation embrittlement of reactor pressure vessel steel Surveillance testing results and the results of research programs for VVER-1000 RPV materials have shown, that radiation embrittlement essentially depends on the nickel and manganese content 010
  • 11. Decrease in radiation embrittlement of RPV materials 011 Chemical composition of RPV base metal (supporting and core shells) Grade of steel (RP type) Chemical composition, % C Si Mn Cr Ni Mo V Calc. 15Х2НМФА-А (В-320) 0.13-0.18 0.17-0.37 0.30-0.60 1.8-2.3 1.0 – 1.5 0.5-0.7 0.10-0.12 15Х2НМФА class 1 (В-491) 1.0 – 1.3 Grade of steel (RP type) Chemical composition, % Cu S P As Co Sb Sn Р + Sb + Sn No more than 15Х2НМФА-А (В-320) 0.10 0.006 0.008 0.010 0.03 0.005 0.005 - 15Х2НМФА class 1 (В-491) 0.06 0.007 0,012
  • 12. Decrease in radiation embrittlement of RPV materials 012 Chemical composition of RPV welds metal (welds of core range) Welding wire, flux (RP type) Chemical composition, % C Si Mn Cr Ni Mo Ti Св-12Х2Н2МАА, flux ФЦ-16А (В-320) 0.04-0.10 0.15-0.45 0.65-1.10 1.4-2.1 1.2 – 1.9 0.45-0.75 - 0.45-1.10 1.2-2.0 1.0 – 1.3 0.40-0.75 0.01-0.06 Св-09ХГНМТАА-ВИ, flux НФ-18М (В-491) Welding wire, flux (RP type) Chemical composition, % Co S P Cu Sb Sn As No more than Св-12Х2Н2МАА, flux ФЦ-16А (В-320) 0.02 0.015 0.012 0.10 0.008 0.001 0.010 Св-09ХГНМТАА-ВИ, flux НФ-18М (В-491) 0.08 Тко of core weld metal: В-320 ≤ 0 0 С В-491 ≤ minus 15 0 С
  • 13. Decrease in radiation embrittlement of RPV materials 013 Decrease in neutron fluence Fluence decrease is implemented due to increase in the RPV diameter and core arrangement (FA placing) with reduced neutron leakage Maximum values of neutron fluence with an energy above 0.5 MeV for various points Location Design data of neutron fluence (F ∗ 1023 ), n/m2 В-320 (40 years) В-491 (60 years) Core top (supporting shell) 2.44 1.28 Base metal in the place of max. neutron fluence 5.7 4.22 Weld No. 2 5.7 4.06 Weld No. 3 4.5 3.58
  • 14. Decrease in radiation embrittlement of RPV materials 014 Tk calculation results Location Tk, 0 C В-320 (40 years) В-491 (60 years) Core top (supporting shell) 42 29 Base metal in point of max neutron fluence 64 55 Weld No. 2 77 69* Weld No. 3 71 66* * - without regard for Тко ≤ minus 15°С
  • 15. Decrease in loads onto RPV under PTS 015 Decrease in loads is achieved due to limitation of the minimum water temperature in the emergency core cooling system Decrease in loads on RPV under PTS Reactor plant type Temperature of ECCS water, 0 C, not less than V-320 10 V-491 20
  • 16. Improved monitoring of changes in RPV material properties 016 Improvement is achieved due to change in location of surveillance specimen casks. In RP V-320 the surveillance specimen casks were located in the channels of the reactor core baffle. In RP V-491 the casks are placed directly on the inside wall of the reactor pressure vessel in the place of maximum fluence
  • 17. Monitoring of RPV metal state during operation (surveillance program) Irradiated surveillance sets are located opposite to the core and fixed directly on the RPV wall. 017
  • 18. Surveillance specimens Surveillance specimen program for RPV of RP V-491 defines: 1.Irradiated sets (materials, number and date of removal). 2.Temperature sets (материалы, number and date of removal). 3.Test sets. 4.Scheme for cutting of specimens. 5.Number of specimens for each type of tests. 6.Type of specimens. 7.Quality Assurance Program. 018
  • 19. Surveillance specimens 019 Basic requirements for fabrication of surveillance specimens Surveillance specimens for in-service inspection of change in RPV metal properties shall be fabricated from:  base metal;  weld metal;  HAZ metal. Billets of the base metal surveillance specimens shall be cut out of the test ring of the standard shells after basic heat treatment. The billets shall be subject to heat treatments under the modes identical to heat treatment modes of the shell, from which the test ring is cut out, in the course of the vessel manufacture.
  • 20. Surveillance specimens 020 Basic requirements for fabrication of surveillance specimens Billets of specimens of weld metal and HAZ metal shall be cut out of the circular welded sample, made of metal cut from one of the RPV shells. The sample shall be of the same thickness and the same grooving as the RPV welds. The circular welded sample shall be made under the same modes and using the same welding process and welding materials of the same lots as the tested RPV welds. The sample shall be subject to the same complex of heat treatments as the RPV welds to be tested.
  • 21. The first AES-2006 RPV for Novovoronezh-2 NPP was manufactured at the Izhora plant in this year The second AES-2006 RPV for Novovoronezh-2 is planned in the next year 021
  • 22. Main coolant pipeline 022 Tubes for manufacture of MCP Technical conditions TU 108.1197-83 (the Manufacturer - «EUROTUBE GmbH») Outer diameter, mm Inner diameter, mm Wall thickness, mm Maximum length, mm Thickness of cladding layer, mm 990 850 70 8400 5 1130 990 70 8400 5
  • 23. Main coolant pipeline 023 Materials Chemical composition of the base metal of MCP tubes Grade of steel Content of elements, % C Si Mn Ni Mo V S P Cr Cu 10ГН2МФА 0.08- 0.12 0.17- 0.37 0.70- 0.90 1.70- 2.00 0.40- 0.60 not more than 0.04 0.020 0.020 0.30 0.30
  • 24. Main coolant pipeline 024 Materials Chemical composition of deposited corrosion-resistant coating 03Х22Н11Г2Б Content of element, % C Si S P Cu Co N Mn Cr Ni Nb not more than 1.00- 2.50 17.50- 20.50 8.50- 11.0 0.70- 1.000.05 1.00 0.02 0.03 0.30 0.02 0.05
  • 25. Regulatory requirements 025 Regulations for design and safe operation of nuclear plant equipment and pipings (PNAE G -7-008-89). Regulations for strength calculation of equipment and pipings of nuclear power plants (PNAE G -7-002-86). Equipment and pipings of nuclear power plants. Welding and cladding. General provisions (PNAE G -7-009-89). Equipment and pipings of nuclear power plants. Welded joints and claddings. Rules of inspection (PNAE G -7-010-89).
  • 26. Regulatory requirements 026 Guiding technological document. Equipment and pipings of nuclear power plants. Welding, cladding and heat treatment of welded joints of components of steels of grades 10ГН2МФА, 10ГН2МФАЛ, 15Х2НМФА, 15Х2НМФА-А, 15Х2НМФА class 1 (RTD 2730.300.02.91). Standardized control procedures for inspection of base materials (semi-products), welded joints and claddings of nuclear power plant equipment and pipings: Ultrasonic test. Inspection of base materials (semi-products) (PNAE G -7-014-89). Magnetic particle test (PNAE G -7-015-89). Visual and measurement check (PNAE G -7-016-89).
  • 27. Regulatory requirements 027 Radiographic examination (PNAE G -7-017-89). Penetrant test (PNAE G -7-018-89). Check of leak-tightness. Gas and liquid methods (PNAE G -7-019-89). Ultrasonic test. Part II. Inspection of welded joints and claddings (PNAE G -7-030- 91). Standardized control procedures for inspection of base materials (semi-products), welded joints and claddings of nuclear power plant equipment and pipings Ultrasonic test. Part III. Measurement of thickness of monometals, bimetals and corrosion-resistant coatings (PNAE G -7-031-91). Ultrasonic test. Part IV. Inspection of welded joints of austenitic steels (PNAE G -7-032-91).
  • 28. Welcome to the 7th International Scientific and Technical Conference “Safety Assurance of NPP with VVER” which will take place at OKB “GIDROPRESS”, Podolsk, Russia on 17-20 May, 2011 More details at www.gidropress.podolsk.ru 028
  • 29. THANK YOU FOR YOUR ATTENTION 029