IT Strategic Planning
• An IT Strategic Plan (ITSP) generally covers a 3 – 5 year planning horizon
  and ensures senior leadership is on the same page regarding
    – What IT investments are going to made, when, and why
    – What the value of IT is to the organization
    – How IT investment decisions are made in the organization
• IT is generally the largest capital spend in an health system after new
  construction – management should participate and drive the IT
  investment decision-making process
• The “sweet spot” of an ITSP is the alignment between the business
  strategy and the IT strategy
• The key construct of the ITSP is the gap analysis
    – What it will take from the current state to the future state
• Since the arrival of the Meaningful Use, ITSP’s have not been a focal point
  for many health systems, however, this is changing as key stakeholders
  ask, “now what? – where is this frenzy of IT implementation activity
  going?”
                                                                                2
                             © 2011 DIVURGENT. All rights reserved.
IT Strategic Planning
    Level-Setting                         Future State/ Gap Analysis                                             Strategic Plan


  Charter                                       Governance




                                                                                           Consensus Workshops
                    Education Workshops

                                                                                                                 Opportunity
 Interviews                                Clinical Transformation                                               Validation

Benchmarking                                 Physician Alignment                                                  Benefits/ Prioritization

  External
                                               Meaningful Use                                                    Implementation
  Drivers
                                                                                                                 Planning
Current State                                   Infrastructure


                                                Strategic IT Enablement




                                                                                                                                             3
                                                  © 2011 DIVURGENT. All rights reserved.
Methodology Overview
• Charter. An opportunity for DIVURGENT and the project sponsor(s) to
  refine the project scope and critical success factors and memorialize in a
  written project charter.
    –   What is the definition of success for the project?
    –   Who should be interviewed?
    –   What is the optimal workshop schedule and format?
    –   Where should DIVURGENT put their primary focus?


• Interviews. Structured, probing interviews conducted with a broad cross-
  section of Health System constituents.
    – Interview guides are prepared in advance and distributed
    – Interviews are confidential with resulting “take-aways” aggregated with other
      interview responses
    – A generous number of interviews brings more people into the process and
      produces more buy-in of the resulting plan



                                                                                      4
                             © 2011 DIVURGENT. All rights reserved.
Methodology Overview
• Benchmarking. Brings empirical evidence into the planning process,
  measuring Health System relative to their peers. Compared to their peers:
    – How much progress on MU has Health System made?
    – How much does Health System spend on IT?
    – How large is the I.S. department?


• External Drivers. Industry trends, government regulations, and other
  forces driving Health System’s decision making process are fully explored,
  e.g.
    – Does Health System intend to pursue full meaningful use stimulus funding for
      both their hospital and eligible providers?
    – Is Health System positioned to convert to ICD-10 on time?
    – Is Health System beginning to put in place the building blocks in preparation
      for value-based purchasing?




                                                                                      5
                             © 2011 DIVURGENT. All rights reserved.
Methodology Overview
• Current State. The “as-is” environment is documented to ensure a
  common understanding of the current state and as input into the gap
  analysis
    – Is there consensus among Health System leadership on the health system’s
      current capabilities, issues, strengths, weaknesses, etc.?
    – Did DIVURGENT miss any salient points on the current state assessment that
      need to be added?


• Educational Workshop(s). Educational sessions to ensure that decision-
  makers have enough background information to participate fully in
  planning process
    – Does Health System leadership understand MU and its implications and can
      they communicate these concepts to others?
    – Do the owners of MU objectives clearly understand what they are “owning”?




                                                                                   6
                            © 2011 DIVURGENT. All rights reserved.
Methodology Overview
• Future State & Gap Analysis. Where does Health System want to be in 3-
  5 years? What is required to achieve this desired state?
    – IT Governance. What type of IT Governance structure would optimally serve
      Health System? Where can existing committee structures be leveraged? How
      will expediency, accountability, and sound decision-making be instilled into the
      IT Governance model? How will physicians be given a prominent role in IT
      Governance?
    – Clinical Transformation. How will clinical processes be optimized and fully
      exploit the potential of Meditech’s advanced clinical systems? How will the
      clinical community be brought into the transformation process? How will
      change management and user adoption be managed?
    – Physician Alignment. Does the health system and the physicians have a
      common vision for the use of IT at Health System? Have physicians been
      fully engaged on IT, workflow, and business model decisions? Do physicians
      fully understand the quality and safety imperative and the role of CPOE and
      MU?
    – Meaningful Use. Is the vendor’s MU roadmap clear and unambiguous with
      commitments to milestone dates? Are the Health System owners of the
      objectives positioned for success? Have all necessary modules been
      purchased, including needed 3rd party modules?

                                                                                         7
                              © 2011 DIVURGENT. All rights reserved.
Methodology Overview
    – Infrastructure. Has the network, servers, service desk, training capabilities,
      and other infrastructure components been “right-sized” to accommodate the
      increasing I.S. customer demands (e.g. physician users)? Will Health System
      pass a privacy/ security audit?


• Consensus Workshops. Facilitated, focused working sessions with senior
  leadership to review draft recommendations and make key directional
  decisions.
    – 8-10 senior leaders participate in a 3-hour workshop
    – Various models for achieving consensus are presented; the model with the
      closest cultural fit will be selected
    – Draft recommendations are presented and vetted by the group
    – Key decision points – with pro’s and con’s of each alternative path – are
      presented for decision-making and consensus
    – A strawman matrix of opportunities and benefits is presented and vetted




                                                                                       8
                             © 2011 DIVURGENT. All rights reserved.
Methodology Overview
A strawman matrix of opportunities and benefits is presented,
deliberated, and adjusted

                    Health                       Clinical                        Physician
                    Information                  Integration                     Alignment
                    Exchange
                                                                        MU Ownership
                Achieving MU



 Benefits/
 ROI                                                                Medication
                                     BCMA                           Reconciliation
                                                                                     Growth
                                  Stark Waivers                                      Charts for
                                                                                     inpatients

                     ICD-10




                                       Lower Costs / Risks
                                                                                                  9
                           © 2011 DIVURGENT. All rights reserved.
Methodology Overview
• Opportunity Validation. Following the executive workshop where a
  strawman model of opportunities is vetted, the selected opportunities
  are further researched and defined:
    –   Opportunity description
    –   General business case of the opportunity
    –   Key stakeholders involved
    –   Cultural change required
    –   Possible impediments to realizing the opportunity

• Opportunity Benefits/ Prioritization. The benefits and dollar ROI (if
  applicable) are clearly articulated for each opportunity; the opportunities
  are then prioritized
    – Sample benefits can include quicker IT implementations, higher IT adoption,
      increased safety/ quality, etc.
    – ROI is measured in both soft dollars (e.g. time savings), and hard dollars (e.g.
      actual budgets are reduced as a result of implementation)
    – Based on the positioning of opportunities on a cost vs. benefit matrix,
      opportunities are prioritized
                                                                                         10
                              © 2011 DIVURGENT. All rights reserved.
Methodology Overview
• Implementation Planning. Opportunities and regulatory-driven initiatives
  (e.g. MU) are packaged into projects and placed on a master timeline.
    – Projects are broken into high-level tasks and key milestones
    – Projects are placed on a master Gantt chart, showing all dependencies
    – Vetting of Gantt chart ensures that projects are done in a logical sequence and
      in a manner that does not overwhelm the Health System organization
    – Resource needs are broken down by skillset, month, project – summing
      resource requirements across all projects provides total FTE requirements
    – In addition to the projects, detailed tasks, and timeline, additional information
      is embedded into the plan, for example:
             • Meaningful Use best practices
             • Project governance structure
             • Critical success factors
             • Change management strategy
             • Communication strategy



                                                                                          11
                              © 2011 DIVURGENT. All rights reserved.
Project Deliverables
• Assessment findings for each functional area
    –   Management and Operations
    –   Finance
    –   Physician Alignment
    –   Information Systems
• Identification of those specific areas providing opportunities for Health
  System to achieve the above listed goals in a well-planned, prioritized
  manner over the next several years
• Identification of any impediments observed during the engagement to
  achieve identified opportunities
• A first draft of a Total Cost of Ownership model which will be handed off to
  Health System for refinement post project completion
• Roadmap for attaining Stage 1 MU compliance




                                                                                 12
                              © 2011 DIVURGENT. All rights reserved.
Sample Timeline




                                                     13
            © 2011 DIVURGENT. All rights reserved.
Contact Information

David. Shiple@DIVURGENT.com
617.947.1925



DIVURGENT
4445 Corporation Lane, Suite 228
Virginia Beach, VA 23462
877.254.9794




                                                               14
                      © 2011 DIVURGENT. All rights reserved.

Weitere ähnliche Inhalte

Was ist angesagt?

Enterprise Architecture, Project Management & Digital Transformation
Enterprise Architecture, Project Management & Digital TransformationEnterprise Architecture, Project Management & Digital Transformation
Enterprise Architecture, Project Management & Digital TransformationRiaz A. Khan, OpenCA, TOGAF
 
Introduction to Enterprise architecture and the steps to perform an Enterpris...
Introduction to Enterprise architecture and the steps to perform an Enterpris...Introduction to Enterprise architecture and the steps to perform an Enterpris...
Introduction to Enterprise architecture and the steps to perform an Enterpris...Prashanth Panduranga
 
Enterprise Architecture for Dummies
Enterprise Architecture for DummiesEnterprise Architecture for Dummies
Enterprise Architecture for DummiesSebastien Juras
 
IT Demand and Delivery Management
IT Demand and Delivery ManagementIT Demand and Delivery Management
IT Demand and Delivery ManagementDavid Messineo
 
Improving IT Service Delivery
Improving IT Service DeliveryImproving IT Service Delivery
Improving IT Service DeliveryFormicio
 
Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Jean Gehring
 
Enterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHubEnterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHubRichardNowack
 
How to develop and govern a Technology Strategy in 10 weeks
How to develop and govern a Technology Strategy in 10 weeksHow to develop and govern a Technology Strategy in 10 weeks
How to develop and govern a Technology Strategy in 10 weeksLeo Barella
 
Target Architecture And Landscape
Target Architecture And LandscapeTarget Architecture And Landscape
Target Architecture And LandscapeAjay Kumar Uppal
 
Define an IT Strategy and Roadmap
Define an IT Strategy and RoadmapDefine an IT Strategy and Roadmap
Define an IT Strategy and RoadmapAndrew Byers
 
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy WebinarIntegrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy WebinarITSM Academy, Inc.
 
It Service Management Implementation Overview
It Service Management Implementation OverviewIt Service Management Implementation Overview
It Service Management Implementation OverviewAlan McSweeney
 
How to Articulate the Value of Enterprise Architecture
How to Articulate the Value of Enterprise ArchitectureHow to Articulate the Value of Enterprise Architecture
How to Articulate the Value of Enterprise Architecturecccamericas
 
Operating model - Restructuring - Case study
Operating model - Restructuring - Case studyOperating model - Restructuring - Case study
Operating model - Restructuring - Case studyMohammad Mujeeb Beg
 
It governance
It governanceIt governance
It governanceMahetab Khan
 
Togaf introduction and core concepts
Togaf introduction and core conceptsTogaf introduction and core concepts
Togaf introduction and core conceptsPaul Sullivan
 
Digital Operating Model & IT4IT
Digital Operating Model & IT4ITDigital Operating Model & IT4IT
Digital Operating Model & IT4ITDavid Favelle
 

Was ist angesagt? (20)

Enterprise Architecture, Project Management & Digital Transformation
Enterprise Architecture, Project Management & Digital TransformationEnterprise Architecture, Project Management & Digital Transformation
Enterprise Architecture, Project Management & Digital Transformation
 
Introduction to Enterprise architecture and the steps to perform an Enterpris...
Introduction to Enterprise architecture and the steps to perform an Enterpris...Introduction to Enterprise architecture and the steps to perform an Enterpris...
Introduction to Enterprise architecture and the steps to perform an Enterpris...
 
Enterprise Architecture for Dummies
Enterprise Architecture for DummiesEnterprise Architecture for Dummies
Enterprise Architecture for Dummies
 
IT Demand and Delivery Management
IT Demand and Delivery ManagementIT Demand and Delivery Management
IT Demand and Delivery Management
 
Improving IT Service Delivery
Improving IT Service DeliveryImproving IT Service Delivery
Improving IT Service Delivery
 
Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2Enterprise Architecture & Project Portfolio Management 1/2
Enterprise Architecture & Project Portfolio Management 1/2
 
Enterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHubEnterprise Architecture Management (EAM) I Best Practices I NuggetHub
Enterprise Architecture Management (EAM) I Best Practices I NuggetHub
 
TOGAF Complete Slide Deck
TOGAF Complete Slide DeckTOGAF Complete Slide Deck
TOGAF Complete Slide Deck
 
How to develop and govern a Technology Strategy in 10 weeks
How to develop and govern a Technology Strategy in 10 weeksHow to develop and govern a Technology Strategy in 10 weeks
How to develop and govern a Technology Strategy in 10 weeks
 
Target Architecture And Landscape
Target Architecture And LandscapeTarget Architecture And Landscape
Target Architecture And Landscape
 
Define an IT Strategy and Roadmap
Define an IT Strategy and RoadmapDefine an IT Strategy and Roadmap
Define an IT Strategy and Roadmap
 
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy WebinarIntegrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy Webinar
 
It Service Management Implementation Overview
It Service Management Implementation OverviewIt Service Management Implementation Overview
It Service Management Implementation Overview
 
How to Articulate the Value of Enterprise Architecture
How to Articulate the Value of Enterprise ArchitectureHow to Articulate the Value of Enterprise Architecture
How to Articulate the Value of Enterprise Architecture
 
Business Architecture Foundations
Business Architecture FoundationsBusiness Architecture Foundations
Business Architecture Foundations
 
Strategic Operating Model
Strategic Operating Model Strategic Operating Model
Strategic Operating Model
 
Operating model - Restructuring - Case study
Operating model - Restructuring - Case studyOperating model - Restructuring - Case study
Operating model - Restructuring - Case study
 
It governance
It governanceIt governance
It governance
 
Togaf introduction and core concepts
Togaf introduction and core conceptsTogaf introduction and core concepts
Togaf introduction and core concepts
 
Digital Operating Model & IT4IT
Digital Operating Model & IT4ITDigital Operating Model & IT4IT
Digital Operating Model & IT4IT
 

Andere mochten auch

MSP Best Practice: Using Service Blueprints and Strategic IT Roadmaps to Get ...
MSP Best Practice: Using Service Blueprints and Strategic IT Roadmaps to Get ...MSP Best Practice: Using Service Blueprints and Strategic IT Roadmaps to Get ...
MSP Best Practice: Using Service Blueprints and Strategic IT Roadmaps to Get ...Kaseya
 
Approach To It Strategy And Architecture
Approach To It Strategy And ArchitectureApproach To It Strategy And Architecture
Approach To It Strategy And ArchitectureAlan McSweeney
 
IT Strategy Framework
IT Strategy FrameworkIT Strategy Framework
IT Strategy FrameworkVishal Sharma
 
ICT Strategic Planning
ICT Strategic PlanningICT Strategic Planning
ICT Strategic PlanningSuzie Vesper
 
Strategic Planning PowerPoint Presentation
Strategic Planning PowerPoint PresentationStrategic Planning PowerPoint Presentation
Strategic Planning PowerPoint PresentationLawrence Podgorny
 
Solution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Solution Architecture – Approach to Rapidly Scoping The Initial Solution OptionsSolution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Solution Architecture – Approach to Rapidly Scoping The Initial Solution OptionsAlan McSweeney
 

Andere mochten auch (8)

MSP Best Practice: Using Service Blueprints and Strategic IT Roadmaps to Get ...
MSP Best Practice: Using Service Blueprints and Strategic IT Roadmaps to Get ...MSP Best Practice: Using Service Blueprints and Strategic IT Roadmaps to Get ...
MSP Best Practice: Using Service Blueprints and Strategic IT Roadmaps to Get ...
 
Approach To It Strategy And Architecture
Approach To It Strategy And ArchitectureApproach To It Strategy And Architecture
Approach To It Strategy And Architecture
 
IT Strategy Framework
IT Strategy FrameworkIT Strategy Framework
IT Strategy Framework
 
IT strategy
IT strategyIT strategy
IT strategy
 
ICT Strategic Planning
ICT Strategic PlanningICT Strategic Planning
ICT Strategic Planning
 
ICT Strategic Planning
ICT Strategic PlanningICT Strategic Planning
ICT Strategic Planning
 
Strategic Planning PowerPoint Presentation
Strategic Planning PowerPoint PresentationStrategic Planning PowerPoint Presentation
Strategic Planning PowerPoint Presentation
 
Solution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Solution Architecture – Approach to Rapidly Scoping The Initial Solution OptionsSolution Architecture – Approach to Rapidly Scoping The Initial Solution Options
Solution Architecture – Approach to Rapidly Scoping The Initial Solution Options
 

Ă„hnlich wie IT Strategic Planning Methodology

IT governance and its impact on National Healthcare Service
IT governance and its impact on National Healthcare ServiceIT governance and its impact on National Healthcare Service
IT governance and its impact on National Healthcare ServiceMadhav Chablani
 
IT planning evolution(1).pdf
IT planning evolution(1).pdfIT planning evolution(1).pdf
IT planning evolution(1).pdfkami47
 
Hit Service Strategy
Hit Service StrategyHit Service Strategy
Hit Service StrategyJohn Anderson
 
Chap 6 IMplementation of Information System
Chap 6 IMplementation of Information SystemChap 6 IMplementation of Information System
Chap 6 IMplementation of Information SystemSanat Maharjan
 
Health Care Information Exchange Strategy & Roadmap
Health Care Information Exchange Strategy & RoadmapHealth Care Information Exchange Strategy & Roadmap
Health Care Information Exchange Strategy & Roadmappmulrooney
 
HIT Service Strategy
HIT Service StrategyHIT Service Strategy
HIT Service StrategyJohn Anderson
 
Chapter 101. Describe the concepts and models of plann.docx
Chapter 101. Describe the concepts and models of plann.docxChapter 101. Describe the concepts and models of plann.docx
Chapter 101. Describe the concepts and models of plann.docxcravennichole326
 
CSMT 442 Top of FormConstruction Management IIBottom of Form
CSMT 442 Top of FormConstruction Management IIBottom of FormCSMT 442 Top of FormConstruction Management IIBottom of Form
CSMT 442 Top of FormConstruction Management IIBottom of FormMargenePurnell14
 
Rcmppt
RcmpptRcmppt
RcmpptDIVURGENT
 
The Challenges of Post-Merger Integration-Luis Taveras, RWJ Barnabas Health
The Challenges of Post-Merger Integration-Luis Taveras, RWJ Barnabas HealthThe Challenges of Post-Merger Integration-Luis Taveras, RWJ Barnabas Health
The Challenges of Post-Merger Integration-Luis Taveras, RWJ Barnabas HealthHealthcare Network marcus evans
 
HHS IT Challenges
HHS IT ChallengesHHS IT Challenges
HHS IT ChallengesBrian Ahier
 
Introduction & EHR Benefits Realization
Introduction & EHR Benefits RealizationIntroduction & EHR Benefits Realization
Introduction & EHR Benefits RealizationDave Shiple
 
MaRS Market Insights - Consumer Digital Health: Market Opportunities and New ...
MaRS Market Insights - Consumer Digital Health: Market Opportunities and New ...MaRS Market Insights - Consumer Digital Health: Market Opportunities and New ...
MaRS Market Insights - Consumer Digital Health: Market Opportunities and New ...MaRS Discovery District
 
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...Association for Project Management
 
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011Pink Elephant
 
The 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalThe 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalTroy DuMoulin
 
Driving strategic vision & value
Driving strategic vision & valueDriving strategic vision & value
Driving strategic vision & valueGary Maggiolino
 
IT Governance in Banks, May, 2014
IT Governance in Banks, May, 2014IT Governance in Banks, May, 2014
IT Governance in Banks, May, 2014ArmeniaFED
 

Ă„hnlich wie IT Strategic Planning Methodology (20)

IT governance and its impact on National Healthcare Service
IT governance and its impact on National Healthcare ServiceIT governance and its impact on National Healthcare Service
IT governance and its impact on National Healthcare Service
 
IT planning evolution(1).pdf
IT planning evolution(1).pdfIT planning evolution(1).pdf
IT planning evolution(1).pdf
 
Hit Service Strategy
Hit Service StrategyHit Service Strategy
Hit Service Strategy
 
Chap 6 IMplementation of Information System
Chap 6 IMplementation of Information SystemChap 6 IMplementation of Information System
Chap 6 IMplementation of Information System
 
IRH Lessons Learned in "Embracing Scale Up Error" in Five Countries
IRH Lessons Learned in "Embracing Scale Up Error" in Five CountriesIRH Lessons Learned in "Embracing Scale Up Error" in Five Countries
IRH Lessons Learned in "Embracing Scale Up Error" in Five Countries
 
Health Care Information Exchange Strategy & Roadmap
Health Care Information Exchange Strategy & RoadmapHealth Care Information Exchange Strategy & Roadmap
Health Care Information Exchange Strategy & Roadmap
 
HIT Service Strategy
HIT Service StrategyHIT Service Strategy
HIT Service Strategy
 
Chapter 101. Describe the concepts and models of plann.docx
Chapter 101. Describe the concepts and models of plann.docxChapter 101. Describe the concepts and models of plann.docx
Chapter 101. Describe the concepts and models of plann.docx
 
CSMT 442 Top of FormConstruction Management IIBottom of Form
CSMT 442 Top of FormConstruction Management IIBottom of FormCSMT 442 Top of FormConstruction Management IIBottom of Form
CSMT 442 Top of FormConstruction Management IIBottom of Form
 
Rcmppt
RcmpptRcmppt
Rcmppt
 
The Challenges of Post-Merger Integration-Luis Taveras, RWJ Barnabas Health
The Challenges of Post-Merger Integration-Luis Taveras, RWJ Barnabas HealthThe Challenges of Post-Merger Integration-Luis Taveras, RWJ Barnabas Health
The Challenges of Post-Merger Integration-Luis Taveras, RWJ Barnabas Health
 
HHS IT Challenges
HHS IT ChallengesHHS IT Challenges
HHS IT Challenges
 
Introduction & EHR Benefits Realization
Introduction & EHR Benefits RealizationIntroduction & EHR Benefits Realization
Introduction & EHR Benefits Realization
 
MaRS Market Insights - Consumer Digital Health: Market Opportunities and New ...
MaRS Market Insights - Consumer Digital Health: Market Opportunities and New ...MaRS Market Insights - Consumer Digital Health: Market Opportunities and New ...
MaRS Market Insights - Consumer Digital Health: Market Opportunities and New ...
 
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
Benefits Management: it works, so why isn’t everybody doing it? Webinar, 10th...
 
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
The Seven Enablers & Constraints Of IT Service Management - Research Update 2011
 
The 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 finalThe 7 enablers and constraints of itsm 2011 v1 final
The 7 enablers and constraints of itsm 2011 v1 final
 
Driving strategic vision & value
Driving strategic vision & valueDriving strategic vision & value
Driving strategic vision & value
 
IT Governance in Banks, May, 2014
IT Governance in Banks, May, 2014IT Governance in Banks, May, 2014
IT Governance in Banks, May, 2014
 
Change The Change
Change The ChangeChange The Change
Change The Change
 

KĂĽrzlich hochgeladen

Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service MumbaiLow Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbaisonalikaur4
 
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Sonagachi Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Sonagachi Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowSonagachi Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Sonagachi Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowRiya Pathan
 
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service LucknowVIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknownarwatsonia7
 
Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Gabriel Guevara MD
 
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original PhotosCall Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photosnarwatsonia7
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Modelssonalikaur4
 
Call Girls Service Nandiambakkam | 7001305949 At Low Cost Cash Payment Booking
Call Girls Service Nandiambakkam | 7001305949 At Low Cost Cash Payment BookingCall Girls Service Nandiambakkam | 7001305949 At Low Cost Cash Payment Booking
Call Girls Service Nandiambakkam | 7001305949 At Low Cost Cash Payment BookingNehru place Escorts
 
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...narwatsonia7
 
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Availablenarwatsonia7
 
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original PhotosBook Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photosnarwatsonia7
 
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Miss joya
 
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfHemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfMedicoseAcademics
 
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Miss joya
 
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment BookingHousewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Bookingnarwatsonia7
 
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.MiadAlsulami
 
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000aliya bhat
 
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy GirlsCall Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girlsnehamumbai
 
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalorenarwatsonia7
 
Aspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliAspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliRewAs ALI
 

KĂĽrzlich hochgeladen (20)

Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service MumbaiLow Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
Low Rate Call Girls Mumbai Suman 9910780858 Independent Escort Service Mumbai
 
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Hebbal Just Call 7001305949 Top Class Call Girl Service Available
 
Sonagachi Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Sonagachi Call Girls Services 9907093804 @24x7 High Class Babes Here Call NowSonagachi Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
Sonagachi Call Girls Services 9907093804 @24x7 High Class Babes Here Call Now
 
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service LucknowVIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
VIP Call Girls Lucknow Nandini 7001305949 Independent Escort Service Lucknow
 
Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024Asthma Review - GINA guidelines summary 2024
Asthma Review - GINA guidelines summary 2024
 
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original PhotosCall Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
Call Girl Service Bidadi - For 7001305949 Cheap & Best with original Photos
 
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking ModelsMumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
Mumbai Call Girls Service 9910780858 Real Russian Girls Looking Models
 
Call Girls Service Nandiambakkam | 7001305949 At Low Cost Cash Payment Booking
Call Girls Service Nandiambakkam | 7001305949 At Low Cost Cash Payment BookingCall Girls Service Nandiambakkam | 7001305949 At Low Cost Cash Payment Booking
Call Girls Service Nandiambakkam | 7001305949 At Low Cost Cash Payment Booking
 
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
Russian Call Girls Chickpet - 7001305949 Booking and charges genuine rate for...
 
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service AvailableCall Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
Call Girls Jayanagar Just Call 7001305949 Top Class Call Girl Service Available
 
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original PhotosBook Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
Book Call Girls in Yelahanka - For 7001305949 Cheap & Best with original Photos
 
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
Russian Call Girls in Pune Riya 9907093804 Short 1500 Night 6000 Best call gi...
 
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdfHemostasis Physiology and Clinical correlations by Dr Faiza.pdf
Hemostasis Physiology and Clinical correlations by Dr Faiza.pdf
 
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
Low Rate Call Girls Pune Esha 9907093804 Short 1500 Night 6000 Best call girl...
 
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment BookingHousewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
Housewife Call Girls Hoskote | 7001305949 At Low Cost Cash Payment Booking
 
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
Artifacts in Nuclear Medicine with Identifying and resolving artifacts.
 
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000Ahmedabad Call Girls CG Road 🔝9907093804  Short 1500  💋 Night 6000
Ahmedabad Call Girls CG Road 🔝9907093804 Short 1500 💋 Night 6000
 
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy GirlsCall Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
Call Girls In Andheri East Call 9920874524 Book Hot And Sexy Girls
 
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service BangaloreCall Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
Call Girl Bangalore Nandini 7001305949 Independent Escort Service Bangalore
 
Aspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas AliAspirin presentation slides by Dr. Rewas Ali
Aspirin presentation slides by Dr. Rewas Ali
 

IT Strategic Planning Methodology

  • 1. IT Strategic Planning Methodology and Approach David Shiple Senior Consultant June 2, 2012 1 © 2011 DIVURGENT. All rights reserved.
  • 2. IT Strategic Planning • An IT Strategic Plan (ITSP) generally covers a 3 – 5 year planning horizon and ensures senior leadership is on the same page regarding – What IT investments are going to made, when, and why – What the value of IT is to the organization – How IT investment decisions are made in the organization • IT is generally the largest capital spend in an health system after new construction – management should participate and drive the IT investment decision-making process • The “sweet spot” of an ITSP is the alignment between the business strategy and the IT strategy • The key construct of the ITSP is the gap analysis – What it will take from the current state to the future state • Since the arrival of the Meaningful Use, ITSP’s have not been a focal point for many health systems, however, this is changing as key stakeholders ask, “now what? – where is this frenzy of IT implementation activity going?” 2 © 2011 DIVURGENT. All rights reserved.
  • 3. IT Strategic Planning Level-Setting Future State/ Gap Analysis Strategic Plan Charter Governance Consensus Workshops Education Workshops Opportunity Interviews Clinical Transformation Validation Benchmarking Physician Alignment Benefits/ Prioritization External Meaningful Use Implementation Drivers Planning Current State Infrastructure Strategic IT Enablement 3 © 2011 DIVURGENT. All rights reserved.
  • 4. Methodology Overview • Charter. An opportunity for DIVURGENT and the project sponsor(s) to refine the project scope and critical success factors and memorialize in a written project charter. – What is the definition of success for the project? – Who should be interviewed? – What is the optimal workshop schedule and format? – Where should DIVURGENT put their primary focus? • Interviews. Structured, probing interviews conducted with a broad cross- section of Health System constituents. – Interview guides are prepared in advance and distributed – Interviews are confidential with resulting “take-aways” aggregated with other interview responses – A generous number of interviews brings more people into the process and produces more buy-in of the resulting plan 4 © 2011 DIVURGENT. All rights reserved.
  • 5. Methodology Overview • Benchmarking. Brings empirical evidence into the planning process, measuring Health System relative to their peers. Compared to their peers: – How much progress on MU has Health System made? – How much does Health System spend on IT? – How large is the I.S. department? • External Drivers. Industry trends, government regulations, and other forces driving Health System’s decision making process are fully explored, e.g. – Does Health System intend to pursue full meaningful use stimulus funding for both their hospital and eligible providers? – Is Health System positioned to convert to ICD-10 on time? – Is Health System beginning to put in place the building blocks in preparation for value-based purchasing? 5 © 2011 DIVURGENT. All rights reserved.
  • 6. Methodology Overview • Current State. The “as-is” environment is documented to ensure a common understanding of the current state and as input into the gap analysis – Is there consensus among Health System leadership on the health system’s current capabilities, issues, strengths, weaknesses, etc.? – Did DIVURGENT miss any salient points on the current state assessment that need to be added? • Educational Workshop(s). Educational sessions to ensure that decision- makers have enough background information to participate fully in planning process – Does Health System leadership understand MU and its implications and can they communicate these concepts to others? – Do the owners of MU objectives clearly understand what they are “owning”? 6 © 2011 DIVURGENT. All rights reserved.
  • 7. Methodology Overview • Future State & Gap Analysis. Where does Health System want to be in 3- 5 years? What is required to achieve this desired state? – IT Governance. What type of IT Governance structure would optimally serve Health System? Where can existing committee structures be leveraged? How will expediency, accountability, and sound decision-making be instilled into the IT Governance model? How will physicians be given a prominent role in IT Governance? – Clinical Transformation. How will clinical processes be optimized and fully exploit the potential of Meditech’s advanced clinical systems? How will the clinical community be brought into the transformation process? How will change management and user adoption be managed? – Physician Alignment. Does the health system and the physicians have a common vision for the use of IT at Health System? Have physicians been fully engaged on IT, workflow, and business model decisions? Do physicians fully understand the quality and safety imperative and the role of CPOE and MU? – Meaningful Use. Is the vendor’s MU roadmap clear and unambiguous with commitments to milestone dates? Are the Health System owners of the objectives positioned for success? Have all necessary modules been purchased, including needed 3rd party modules? 7 © 2011 DIVURGENT. All rights reserved.
  • 8. Methodology Overview – Infrastructure. Has the network, servers, service desk, training capabilities, and other infrastructure components been “right-sized” to accommodate the increasing I.S. customer demands (e.g. physician users)? Will Health System pass a privacy/ security audit? • Consensus Workshops. Facilitated, focused working sessions with senior leadership to review draft recommendations and make key directional decisions. – 8-10 senior leaders participate in a 3-hour workshop – Various models for achieving consensus are presented; the model with the closest cultural fit will be selected – Draft recommendations are presented and vetted by the group – Key decision points – with pro’s and con’s of each alternative path – are presented for decision-making and consensus – A strawman matrix of opportunities and benefits is presented and vetted 8 © 2011 DIVURGENT. All rights reserved.
  • 9. Methodology Overview A strawman matrix of opportunities and benefits is presented, deliberated, and adjusted Health Clinical Physician Information Integration Alignment Exchange MU Ownership Achieving MU Benefits/ ROI Medication BCMA Reconciliation Growth Stark Waivers Charts for inpatients ICD-10 Lower Costs / Risks 9 © 2011 DIVURGENT. All rights reserved.
  • 10. Methodology Overview • Opportunity Validation. Following the executive workshop where a strawman model of opportunities is vetted, the selected opportunities are further researched and defined: – Opportunity description – General business case of the opportunity – Key stakeholders involved – Cultural change required – Possible impediments to realizing the opportunity • Opportunity Benefits/ Prioritization. The benefits and dollar ROI (if applicable) are clearly articulated for each opportunity; the opportunities are then prioritized – Sample benefits can include quicker IT implementations, higher IT adoption, increased safety/ quality, etc. – ROI is measured in both soft dollars (e.g. time savings), and hard dollars (e.g. actual budgets are reduced as a result of implementation) – Based on the positioning of opportunities on a cost vs. benefit matrix, opportunities are prioritized 10 © 2011 DIVURGENT. All rights reserved.
  • 11. Methodology Overview • Implementation Planning. Opportunities and regulatory-driven initiatives (e.g. MU) are packaged into projects and placed on a master timeline. – Projects are broken into high-level tasks and key milestones – Projects are placed on a master Gantt chart, showing all dependencies – Vetting of Gantt chart ensures that projects are done in a logical sequence and in a manner that does not overwhelm the Health System organization – Resource needs are broken down by skillset, month, project – summing resource requirements across all projects provides total FTE requirements – In addition to the projects, detailed tasks, and timeline, additional information is embedded into the plan, for example: • Meaningful Use best practices • Project governance structure • Critical success factors • Change management strategy • Communication strategy 11 © 2011 DIVURGENT. All rights reserved.
  • 12. Project Deliverables • Assessment findings for each functional area – Management and Operations – Finance – Physician Alignment – Information Systems • Identification of those specific areas providing opportunities for Health System to achieve the above listed goals in a well-planned, prioritized manner over the next several years • Identification of any impediments observed during the engagement to achieve identified opportunities • A first draft of a Total Cost of Ownership model which will be handed off to Health System for refinement post project completion • Roadmap for attaining Stage 1 MU compliance 12 © 2011 DIVURGENT. All rights reserved.
  • 13. Sample Timeline 13 © 2011 DIVURGENT. All rights reserved.
  • 14. Contact Information David. Shiple@DIVURGENT.com 617.947.1925 DIVURGENT 4445 Corporation Lane, Suite 228 Virginia Beach, VA 23462 877.254.9794 14 © 2011 DIVURGENT. All rights reserved.