CRISIS AT MARUTI
SUZUKI’S MANESAR
      PLANT
        1




        PRESENTATION BY –
                  ANSHAK KALIA
                  NAINA CHAUDHARY
                  SAGAR RANJAN
                  SUMIT TYAGI
                  TANYA KAUR

                           11/8/2011
TABLE OF CONTENTS
                              2

S.NO.   CONTENTS                  SLIDE NUMBER


1       OVERVIEW                  3
2       PROBLEM                   4
3       FALL IN DEMAND            5
4       LOSS IN OUTPUT            6-7
5       WORKERS PERSPECTIVE       8-10
6       MANAGEMENT PERSPECTIVE    11-13
7       ACTIONS TAKEN             14-15
8       FACTS                     16-19
9       SOLUTION                  20-23
                                          11/8/2011
OVERVIEW
                              3

 India's largest passenger car company, accounting
    for over 45% of the domestic car market
   First company in India to mass-produce and sell
    more than a million cars
   Annually exports more than 50,000 cars
   Manufacturing facilities are located at two facilities
    Gurgaon and Manesar
   It offers 14 brands and over 150 variants ranging
    from peoples car Maruti 800 to the stylish hatchback
    Ritz
                                                     11/8/2011
THE PROBLEM
     4




              11/8/2011
FALL IN DEMAND
                           5

 Expected fall in demand during crucial festive
  season, when car sales touch the peak.
 The Manesar plant is the hub for the key 'Swift'
  model, which runs a huge backlog in the retail
  market.
 The bookings for the new Swift and waiting list of
  customers are very high. Delay in production affect
  the delivery of cars resulting in disappointment
  among customers.


                                                   11/8/2011
LOSS IN OUTPUT
                           6

 Estimated loss of more than 90 million dollar.
 On August 24, 1,230 cars were planned to be
  produced, but only 437 were assembled. Out of
  which, just 96 cars could pass quality check.
 Halt in production on the 5th September, around
  4000 workers rallied till the highway to block it.
 Poor dispatch numbers with respect to meeting
  targets and quality control



                                                   11/8/2011
CONT.
                          7




 With only around 20-25 of 950-odd workers agreed
  to sign the “Good Conduct” undertaking
 Production was stalled as the company barricaded
  various entrances to prohibit entry of those who
  refused to sign the 'good conduct bond'.




                                                11/8/2011
PROBLEM FROM WORKERS VIEW POINT
                            8




 “If the floor supervisor is rude and even slaps us, he
 is awarded with a promotion but in case a labourer
 dares to reply, he is issued a notice on grounds of
 disciplinary action," said Rajender Kumar, a
 technician




                                                    11/8/2011
CONT.
                                     9
 Revenge for June's strike.
 Cockroaches and dead flies found in the food in the hurried lunch-
    break that workers earn in the canteen ½ km from the working
    station.
   The tea was without tea leaves or sugar in the 7 minute break
   The company doctor give heavy doses of „instant‟ medicines even on
    minor complaint so that disruption of work could be prevented.
   One day‟s wage cut of Rs.1500, two days Rs.2200, three days cut of
    Rs.7-8000 is implemented, so that almost the total month‟s wage is
    cut.
   One second late into punching-card entry is a day‟s wage cut, but they
    have to give full production for that day too.
    Forced to fill an undertaking form, which means that in case of any
    problem, workers cannot raise any objections against management.
                                                                 11/8/2011
WORKER’S DEMAND
                         10



 Worker‟s demand to establish an independent union
  Maruti Suzuki Employees Union (MSEU)in the
  company.
 Currently, the company has one recognized union –
  Maruti Udyog Kamgar Union which is dominated by
  workers at the Gurgaon plant




                                               11/8/2011
MANAGEMENT VIEW OF PROBLEM
                         11




“ Unhappy workers have found out a new way to disrupt
  ongoing work at the plant by creating serious defects
  in quality of the cars, so they would fail the
  compulsory vehicle inspection (VI) quality test.”




                                                      11/8/2011
                                   Source: http://www.ndtv.com/
CONT.
                          12



 Workers indulging in deliberate attempts to reduce
  output and are compromising customer interests
 Revenge for the June strike.
 Refused to sign good conduct form which aims at
  ensuring the production of good quality products.
 Employees are being charged with sabotage and
  causing quality problems in the cars produced.



                                                 11/8/2011
CONT.
                             13

 "In the last three days, a series of serious quality
 problems have been observed in the vehicles
 produced. For example, vehicle door was not
 properly clamped leading to doors falling during
 production, wiring harnesses were found cut in
 produced vehicle, dents were noticed on the body
 and critical components were not fitted on to
 vehicles. Such deliberate acts, if not detected during
 quality checks, would have led to serious
 implications and directly harmed customers," a
 senior company official said.


                                                         11/8/2011
ACTION TAKEN AGAINST EMPLOYEES
                              14

 Suspension of 10 workers
 Dismissal of five
 Discontinued the services of six trainees.
 Also suspended four workers for "instigating indiscipline"
  a week before
 Another four suspended in late July for manhandling
  supervisors.
 Charges of sabotage and causing quality problems in the
  cars produced.
 On 14th August; police force of 500 send to occupy the
  factory to „prevent violent activities‟           11/8/2011
CONT.
                           15

 The company terminated 11 workers and suspended
  38 on August 29th and 30th on false charges
  demanding a „good-conduct bond‟ with the state
  police and administration, the media, and „bouncers‟
  on its payroll as its willing pawns.
 The Maruti Suzuki Employees Union (MSEU) is
  demanding as an immediate measure, the
  withdrawal of the charge-sheet, termination,
  suspension of the 49 workers. The workers are
  sitting day-and-night at the factory gate, peeling off
  the layers of Maruti Suzuki‟s “way of life”.

                                                   11/8/2011
Facts
                                         16

     June –
     1) 13-days strike demanding the recognition of the MSEU at the Manesar plant
     2) Production loss of 12,600 cars, valued at about Rs 630 crore.

    July –
     1) Production stopped for a day at the same plant because of strike by some
     workers.

    August –
      1) Reported 12.74 per cent fall in sales for August to 91,442 as compare
       to the sale of 1,04,791 units in the same month last year

    September 7
     1) Loss suffered is estimated at about 8,550 units, valued at about Rs 425 crore.
Source: Economic Times
                                                                            11/8/2011
Confirmed by company‟s spokesperson
                           17

 Production is right now at a stop at Manesar
 Third production halt in three months at Manesar.
 The company stopped operations for 10 working
  days in June
 The firm lost Rs 400 crore because of the strike.




                                                      11/8/2011
Fall in Shares
                          18




 Shares fell as much as 2 per cent on the news to
 close at Rs 1,080 on the Bombay Stock Exchange




                         SOURCE: TIMES OF INDIA




                                                  11/8/2011
According to Chairman R.C. Bhargava
                          19

“ Manesar labour problem is essentially a political
 issue and not a problem which involves any
 significant demand from the workers”




                                                  11/8/2011
Solution
                            20

 Identified reasons of the conflict.
1. Establishment of separate union for Manesar Plant
2. Code of Conduct- Falling standards of
   manufacturing.
3. Basic sanitary enhancements demanded by the
   workforce.




                                               11/8/2011
Trade Union Establishment
                          21

 Trade union would be established with prior
  conditions: -
1. Members of the trade union to be nominated with
   consent of both workers and management.
2. The leader of this union would be appointed by the
   management.
 If not agreed then management would move to
   plan B.
1. Technology oriented operations reducing demand
   of man power.
                                                11/8/2011
Code Of Conduct And Sanitary Problems
                              22

 ADOPT CHANGE PROCESS THEORY
     Unfreezing
     Change through cognitive restructuring
     Refreezing




                                               11/8/2011
23



     Improved hygienic
     conditions at
     workplace reduces
     employee‟s
     dissatisfaction




                11/8/2011
24




     11/8/2011

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Maruti unrest
Maruti unrestMaruti unrest
Maruti unrest
 
Manesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of BusinessManesar Violence - Industrial Relation - Legal Aspects Of Business
Manesar Violence - Industrial Relation - Legal Aspects Of Business
 
People management fiasco @ hmsi by Prem Giri
People management fiasco @ hmsi by Prem GiriPeople management fiasco @ hmsi by Prem Giri
People management fiasco @ hmsi by Prem Giri
 
HMSI HR Failure
HMSI HR FailureHMSI HR Failure
HMSI HR Failure
 
Maruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) AssignmentMaruti Manesar Dispute (Human Resource management issue) Assignment
Maruti Manesar Dispute (Human Resource management issue) Assignment
 
Maruti Manesar Issue
Maruti Manesar IssueMaruti Manesar Issue
Maruti Manesar Issue
 
Conflict Management-Honda Motorcycle & Scooter India Pvt Ltd.
Conflict Management-Honda Motorcycle & Scooter India Pvt Ltd.Conflict Management-Honda Motorcycle & Scooter India Pvt Ltd.
Conflict Management-Honda Motorcycle & Scooter India Pvt Ltd.
 
Case study of toyata industrial dispute
Case study of toyata industrial dispute Case study of toyata industrial dispute
Case study of toyata industrial dispute
 
Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002Maruthi Suzuki Industrial issue in 2002
Maruthi Suzuki Industrial issue in 2002
 
HR Process & Policy Study – Indian Oil Corporation Limited
HR Process & Policy Study – Indian Oil Corporation LimitedHR Process & Policy Study – Indian Oil Corporation Limited
HR Process & Policy Study – Indian Oil Corporation Limited
 
Cottle Taylor:Expanding the Oral Care Group in India
Cottle Taylor:Expanding the Oral Care Group in IndiaCottle Taylor:Expanding the Oral Care Group in India
Cottle Taylor:Expanding the Oral Care Group in India
 
Ongc hrm report
Ongc hrm reportOngc hrm report
Ongc hrm report
 
Strategic management by Hero motocop
Strategic management by Hero motocopStrategic management by Hero motocop
Strategic management by Hero motocop
 
Honda hr
Honda hr Honda hr
Honda hr
 
Honda Motorcycles and Scooters India Ltd. (HMSI) case study
Honda Motorcycles and Scooters India Ltd. (HMSI) case studyHonda Motorcycles and Scooters India Ltd. (HMSI) case study
Honda Motorcycles and Scooters India Ltd. (HMSI) case study
 
Financial Management - Adani Group
Financial Management - Adani GroupFinancial Management - Adani Group
Financial Management - Adani Group
 
Maruti manesar case study august 6 2012
Maruti manesar case study august 6 2012Maruti manesar case study august 6 2012
Maruti manesar case study august 6 2012
 
Ricardo Semler case study
Ricardo Semler  case study Ricardo Semler  case study
Ricardo Semler case study
 
Henry Tam and the MGI Team
Henry Tam and the MGI TeamHenry Tam and the MGI Team
Henry Tam and the MGI Team
 
Hul
HulHul
Hul
 

Andere mochten auch

case study of Philips india
case study of Philips indiacase study of Philips india
case study of Philips india
Sandeep Jadagoud
 
Maruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignmentMaruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignment
Navneet Jingar
 

Andere mochten auch (18)

Maruti strike Case study.ER
Maruti strike Case study.ERMaruti strike Case study.ER
Maruti strike Case study.ER
 
maruti case study
maruti case  studymaruti case  study
maruti case study
 
Maruti suzuki ppt
Maruti suzuki pptMaruti suzuki ppt
Maruti suzuki ppt
 
case study of Philips india
case study of Philips indiacase study of Philips india
case study of Philips india
 
Ammy maruti
Ammy marutiAmmy maruti
Ammy maruti
 
Toyota – case study
Toyota – case study   Toyota – case study
Toyota – case study
 
Maruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignmentMaruti Suzuki a brief PPT assignment
Maruti Suzuki a brief PPT assignment
 
Maruti manesar
Maruti manesarMaruti manesar
Maruti manesar
 
settlement of industrial disputes with case study: Hero Honda
 settlement of industrial disputes with case study: Hero Honda  settlement of industrial disputes with case study: Hero Honda
settlement of industrial disputes with case study: Hero Honda
 
Industrial Dispute at Jet Airways
Industrial Dispute at Jet AirwaysIndustrial Dispute at Jet Airways
Industrial Dispute at Jet Airways
 
IR Case Study
IR Case StudyIR Case Study
IR Case Study
 
Hrm maruti suzuki
Hrm maruti suzukiHrm maruti suzuki
Hrm maruti suzuki
 
Hr policy in maruthi
Hr policy in maruthi Hr policy in maruthi
Hr policy in maruthi
 
Strike
StrikeStrike
Strike
 
Maruti
MarutiMaruti
Maruti
 
Labour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzukiLabour unrest at manesar, plant of maruti suzuki
Labour unrest at manesar, plant of maruti suzuki
 
Maruti
Maruti Maruti
Maruti
 
My Activa 401
My Activa 401My Activa 401
My Activa 401
 

Ähnlich wie Presentation1

Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 final
Jagtar Dhaliwal
 
manesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdfmanesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdf
ssusercd51df
 
Customer satisfaction with reference to ambuja cement ltd
Customer satisfaction with reference to ambuja cement ltdCustomer satisfaction with reference to ambuja cement ltd
Customer satisfaction with reference to ambuja cement ltd
Shakti Prasad Tiwari
 
Assets performance of the select cement companies in tamilnadu
Assets performance of the select cement companies in tamilnaduAssets performance of the select cement companies in tamilnadu
Assets performance of the select cement companies in tamilnadu
IAEME Publication
 

Ähnlich wie Presentation1 (20)

Manesar plant
Manesar plantManesar plant
Manesar plant
 
Maruti
MarutiMaruti
Maruti
 
Maruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 finalMaruti case_LAB_Group 4 final
Maruti case_LAB_Group 4 final
 
manesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdfmanesarissue-140331131632-phpapp01.pdf
manesarissue-140331131632-phpapp01.pdf
 
Collective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case studyCollective bargaing maruti suzuki manesar plant case study
Collective bargaing maruti suzuki manesar plant case study
 
Sustainability of Kia motors.
Sustainability of Kia motors. Sustainability of Kia motors.
Sustainability of Kia motors.
 
KIAMotors.pdf
KIAMotors.pdfKIAMotors.pdf
KIAMotors.pdf
 
comprehensive report
comprehensive report comprehensive report
comprehensive report
 
Customer satisfaction with reference to ambuja cement ltd
Customer satisfaction with reference to ambuja cement ltdCustomer satisfaction with reference to ambuja cement ltd
Customer satisfaction with reference to ambuja cement ltd
 
0601022 marketing possibilities of mr.cook product
0601022 marketing possibilities of mr.cook product0601022 marketing possibilities of mr.cook product
0601022 marketing possibilities of mr.cook product
 
Insights of metro corporation
Insights of metro corporationInsights of metro corporation
Insights of metro corporation
 
hi tech arai pvt ltd madurai
hi tech arai pvt ltd maduraihi tech arai pvt ltd madurai
hi tech arai pvt ltd madurai
 
Identification of Operational Issues at a Switchgear Manufacturing Company: A...
Identification of Operational Issues at a Switchgear Manufacturing Company: A...Identification of Operational Issues at a Switchgear Manufacturing Company: A...
Identification of Operational Issues at a Switchgear Manufacturing Company: A...
 
Assets performance of the select cement companies in tamilnadu
Assets performance of the select cement companies in tamilnaduAssets performance of the select cement companies in tamilnadu
Assets performance of the select cement companies in tamilnadu
 
TRY6.pdf
TRY6.pdfTRY6.pdf
TRY6.pdf
 
ultratech cement 2017
ultratech cement 2017 ultratech cement 2017
ultratech cement 2017
 
Equity Market Reactions based on Company’s Financial Strategies
Equity Market Reactions based on Company’s Financial StrategiesEquity Market Reactions based on Company’s Financial Strategies
Equity Market Reactions based on Company’s Financial Strategies
 
Cement 120322054853-phpapp02
Cement 120322054853-phpapp02Cement 120322054853-phpapp02
Cement 120322054853-phpapp02
 
English research report
English research report English research report
English research report
 
A STUDY OF ENQUIRY RESPONSE LEAD TIME AND CAPACITY UTILIZATION AT PEEKAY STEE...
A STUDY OF ENQUIRY RESPONSE LEAD TIME AND CAPACITY UTILIZATION AT PEEKAY STEE...A STUDY OF ENQUIRY RESPONSE LEAD TIME AND CAPACITY UTILIZATION AT PEEKAY STEE...
A STUDY OF ENQUIRY RESPONSE LEAD TIME AND CAPACITY UTILIZATION AT PEEKAY STEE...
 

Kürzlich hochgeladen

Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
laloo_007
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 

Kürzlich hochgeladen (20)

Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 

Presentation1

  • 1. CRISIS AT MARUTI SUZUKI’S MANESAR PLANT 1 PRESENTATION BY – ANSHAK KALIA NAINA CHAUDHARY SAGAR RANJAN SUMIT TYAGI TANYA KAUR 11/8/2011
  • 2. TABLE OF CONTENTS 2 S.NO. CONTENTS SLIDE NUMBER 1 OVERVIEW 3 2 PROBLEM 4 3 FALL IN DEMAND 5 4 LOSS IN OUTPUT 6-7 5 WORKERS PERSPECTIVE 8-10 6 MANAGEMENT PERSPECTIVE 11-13 7 ACTIONS TAKEN 14-15 8 FACTS 16-19 9 SOLUTION 20-23 11/8/2011
  • 3. OVERVIEW 3  India's largest passenger car company, accounting for over 45% of the domestic car market  First company in India to mass-produce and sell more than a million cars  Annually exports more than 50,000 cars  Manufacturing facilities are located at two facilities Gurgaon and Manesar  It offers 14 brands and over 150 variants ranging from peoples car Maruti 800 to the stylish hatchback Ritz 11/8/2011
  • 4. THE PROBLEM 4 11/8/2011
  • 5. FALL IN DEMAND 5  Expected fall in demand during crucial festive season, when car sales touch the peak.  The Manesar plant is the hub for the key 'Swift' model, which runs a huge backlog in the retail market.  The bookings for the new Swift and waiting list of customers are very high. Delay in production affect the delivery of cars resulting in disappointment among customers. 11/8/2011
  • 6. LOSS IN OUTPUT 6  Estimated loss of more than 90 million dollar.  On August 24, 1,230 cars were planned to be produced, but only 437 were assembled. Out of which, just 96 cars could pass quality check.  Halt in production on the 5th September, around 4000 workers rallied till the highway to block it.  Poor dispatch numbers with respect to meeting targets and quality control 11/8/2011
  • 7. CONT. 7  With only around 20-25 of 950-odd workers agreed to sign the “Good Conduct” undertaking  Production was stalled as the company barricaded various entrances to prohibit entry of those who refused to sign the 'good conduct bond'. 11/8/2011
  • 8. PROBLEM FROM WORKERS VIEW POINT 8  “If the floor supervisor is rude and even slaps us, he is awarded with a promotion but in case a labourer dares to reply, he is issued a notice on grounds of disciplinary action," said Rajender Kumar, a technician 11/8/2011
  • 9. CONT. 9  Revenge for June's strike.  Cockroaches and dead flies found in the food in the hurried lunch- break that workers earn in the canteen ½ km from the working station.  The tea was without tea leaves or sugar in the 7 minute break  The company doctor give heavy doses of „instant‟ medicines even on minor complaint so that disruption of work could be prevented.  One day‟s wage cut of Rs.1500, two days Rs.2200, three days cut of Rs.7-8000 is implemented, so that almost the total month‟s wage is cut.  One second late into punching-card entry is a day‟s wage cut, but they have to give full production for that day too.  Forced to fill an undertaking form, which means that in case of any problem, workers cannot raise any objections against management. 11/8/2011
  • 10. WORKER’S DEMAND 10  Worker‟s demand to establish an independent union Maruti Suzuki Employees Union (MSEU)in the company.  Currently, the company has one recognized union – Maruti Udyog Kamgar Union which is dominated by workers at the Gurgaon plant 11/8/2011
  • 11. MANAGEMENT VIEW OF PROBLEM 11 “ Unhappy workers have found out a new way to disrupt ongoing work at the plant by creating serious defects in quality of the cars, so they would fail the compulsory vehicle inspection (VI) quality test.” 11/8/2011 Source: http://www.ndtv.com/
  • 12. CONT. 12  Workers indulging in deliberate attempts to reduce output and are compromising customer interests  Revenge for the June strike.  Refused to sign good conduct form which aims at ensuring the production of good quality products.  Employees are being charged with sabotage and causing quality problems in the cars produced. 11/8/2011
  • 13. CONT. 13  "In the last three days, a series of serious quality problems have been observed in the vehicles produced. For example, vehicle door was not properly clamped leading to doors falling during production, wiring harnesses were found cut in produced vehicle, dents were noticed on the body and critical components were not fitted on to vehicles. Such deliberate acts, if not detected during quality checks, would have led to serious implications and directly harmed customers," a senior company official said. 11/8/2011
  • 14. ACTION TAKEN AGAINST EMPLOYEES 14  Suspension of 10 workers  Dismissal of five  Discontinued the services of six trainees.  Also suspended four workers for "instigating indiscipline" a week before  Another four suspended in late July for manhandling supervisors.  Charges of sabotage and causing quality problems in the cars produced.  On 14th August; police force of 500 send to occupy the factory to „prevent violent activities‟ 11/8/2011
  • 15. CONT. 15  The company terminated 11 workers and suspended 38 on August 29th and 30th on false charges demanding a „good-conduct bond‟ with the state police and administration, the media, and „bouncers‟ on its payroll as its willing pawns.  The Maruti Suzuki Employees Union (MSEU) is demanding as an immediate measure, the withdrawal of the charge-sheet, termination, suspension of the 49 workers. The workers are sitting day-and-night at the factory gate, peeling off the layers of Maruti Suzuki‟s “way of life”. 11/8/2011
  • 16. Facts 16  June – 1) 13-days strike demanding the recognition of the MSEU at the Manesar plant 2) Production loss of 12,600 cars, valued at about Rs 630 crore.  July – 1) Production stopped for a day at the same plant because of strike by some workers.  August – 1) Reported 12.74 per cent fall in sales for August to 91,442 as compare to the sale of 1,04,791 units in the same month last year  September 7 1) Loss suffered is estimated at about 8,550 units, valued at about Rs 425 crore. Source: Economic Times 11/8/2011
  • 17. Confirmed by company‟s spokesperson 17  Production is right now at a stop at Manesar  Third production halt in three months at Manesar.  The company stopped operations for 10 working days in June  The firm lost Rs 400 crore because of the strike. 11/8/2011
  • 18. Fall in Shares 18  Shares fell as much as 2 per cent on the news to close at Rs 1,080 on the Bombay Stock Exchange SOURCE: TIMES OF INDIA 11/8/2011
  • 19. According to Chairman R.C. Bhargava 19 “ Manesar labour problem is essentially a political issue and not a problem which involves any significant demand from the workers” 11/8/2011
  • 20. Solution 20  Identified reasons of the conflict. 1. Establishment of separate union for Manesar Plant 2. Code of Conduct- Falling standards of manufacturing. 3. Basic sanitary enhancements demanded by the workforce. 11/8/2011
  • 21. Trade Union Establishment 21  Trade union would be established with prior conditions: - 1. Members of the trade union to be nominated with consent of both workers and management. 2. The leader of this union would be appointed by the management.  If not agreed then management would move to plan B. 1. Technology oriented operations reducing demand of man power. 11/8/2011
  • 22. Code Of Conduct And Sanitary Problems 22  ADOPT CHANGE PROCESS THEORY  Unfreezing  Change through cognitive restructuring  Refreezing 11/8/2011
  • 23. 23 Improved hygienic conditions at workplace reduces employee‟s dissatisfaction 11/8/2011