SlideShare ist ein Scribd-Unternehmen logo
1 von 24
S
Spare Part
Management
By Smita Sharma
What is a Spare and why it is
needed?
S Manufacturing Process comprise complex equipment
with thousands of subassemblies and discrete parts.
Parts and sub assemblies of machines will eventually
require repair and replacement.
S Increased efficiency of production plants requires
minimization of machine downtime. However, we don’t
know which machine part will fail when? Therefore ,
availability of a wide range of spare parts is major factor
for reduction in downtime when a breakdown occurs.
What is a Spare and why it is
needed?
S A logical approach to solve the issue of spare parts
availability lies in stocking large quantities of spare parts
for immediate use whenever needed.
S On the other hand stocking is limited by space and cost.
S Therefore designing a system and managing spare part
in an optimal way represents a critical and important task.
Objectives
1. Discuss the different classifications of service parts
2. Analyse the importance of spare part management
3. Explain how maintenance policies impact maintenance economics
4. Analyse mathematical models for spare parts decision making
5. Define classification and other models for spare part decision making
6. Discuss the major issues in optimally managing spare parts
7. Assess the success factors of spare parts management
Basics of Spare parts
management
S Spare parts and services account for 8 percent of the annual gross
domestic product in the United States.
S Spare parts management is the process of planning and aligning service
parts inventories, resources and processes to ensure optimal customer
service and response with minimal risk and cost.
S Spare parts management embraces three different kinds of service spare
parts.
1. First Party Spare parts
2. Second Party Spare parts
3. Third Party Spare parts
S Each type of service part also reflects a different types of
control situation. On this basis service spare parts can
further be subdivided into two main categories:
1. Repairable
2. Non repairable or disposables
S Spare part management is at the heart of any effective
service operation. Service operation depends on the
knowledge about the failure behavior of the system and
the ability to project the demand.
Basics of Spare parts
management
The Economics of Service
parts
S Spare parts inventory value is important. The issue is to
have the right parts, at the right time, so that either plant
utilization or revenue generation is not negatively
impacted.
S How can spare parts management be turned into a
competitive advantage?
S Which service parts have to be stocked?
S Where are the service parts to be stocked?
S How many of them to be kept in stock for each of these
service parts?
Economies of Maintenance
S As spare parts management is directly related to
maintenance, we first need to understand maintenance
economics.
S Some of the common approaches to maintenance are;
1. Breakdown Maintenance
2. Preventive maintenance
3. Predictive maintenance
4. Proactive mantenance
Economies of Maintenance
S Cost of Maintenance: Total cost due to failure of an
equipment will be;
1. Cost of lost sales
2. Cost of idle labour both direct and indirect
3. Cost of delays in downstream process
4. Cost of scrap, wastage and rejection
5. Start up cost
6. Cost of customer dissatisfaction due to delays
Economies of Maintenance
S A good Maintenance Policy ensures
1. Expediting the entire maintenance task and eliminating
delays by applying sound system and methods, adequate
maintenance facilities, well trained crew etc.
2. Minimizing breakdowns by installing a suitable preventive
maintenance system and scheduling maintenance jobs
during non production shifts
Decision models
Efficient and cost effective service operations hinge on the ability
of the organization to accurately plan inventories and service
parts.
1. Avoid excess inventories
2. Maintain required service levels
3. Avoid stock outs
When looking at demand processes, much depends on the
context we are considering. First party and second party spares
are sourced from OEM. For third party spares, experience with
comparable service parts plays an important role.
Decision models
There are two main approaches followed to develop possible
spares provisioning decision models:
1. Mathematical model
2. Classification approaches
Mathematical Models
S The first approach concerns the development of
mathematical models based on linear programming ,
dynamic programming, goal programming, simulation etc.
S Mathematical models generally concentrate on the
mathematical optimization of the inventory costs and
service levels associated with a potential spares
inventory policy in terms of economic order quantity,
reorder point and safety stocks.
Mathematical Models
S A mathematical optimization of inventory costs is a
difficult task in the case of spare parts.
S Standard methods of inventory control fall short of finding
adequate solutions.
S Common statistical models for inventory control lose their
applicability when historical demand figures are
unavailable or invalid.
Mathematical Models
S The control of service part is complex matter. Many of the
models evolved are too complex, abstract or oversimplified.
S These models do not consider several intangible factors, such
as obsolescence, standard characteristic of the item, type and
quality of suppliers, etc..
S The models assume demand to be constant or stationary,
following a Poisson process.
S For fast moving items theoretical safety stock can be calculated
using statistical theory
Classification models
S Considering the limitations of mathematical models, the
use of classifications system as a spare parts
management tool represent a popular approach in
industry.
S Service parts are expensive, demand is erratic and
hence hard to predict, delivery times are long and
stochastic and customers want their service parts
quickly.
Classification models
S In order to approach the problem a criticality classification of
spare parts is generally used. Most classification models are
based on this and on this administrative efficiency
considerations
S Some of the classification criteria are:
1. Criticality of the function to be performed by a system that
become defective
2. Price
3. Delivery time
4. Life cycle phase of the service part
Classification models
S ABC Classifications This is perhaps the most well known and
used classification system for inventory management. This is
based on Pareto’s principle. After calculating rupee usage for
each inventory item, the items are ranked by rupee usage, from
highest to lowest. The first 20 % are assigned to class A, the
next 30 % items are classified as class B and finally the last
50% items are C class items
S Attributes which have intangible aspects such as safety
objectives, provisioning characteristic, type of maintenance
adopted, loss of production etc. cannot be included.
Classification models
S VED classification: This is the most commonly used classification
system for spare parts inventory management . When used in
combination with other techniques, it is generally quite effective.
Here parts are called vital, essential and desirables.
1. Vital parts: Items that cause high losses due to non-availability
of equipment. In case they are needed while not in stock.
2. Essential parts: Items that cause moderate losses due to non-
availability of equipment, in case they are not in stock
3. Desirable parts: Items that cause minor disruptions, in case
they are needed while not in stock.
Classification models
S A systematic procedure that could be helpful here is the
Analytic Hierarchy process (AHP). This multi criteria
decision making tool finds the relative priorities or weights
to be assigned to different criteria and alternatives which
characterize the spare part decision.
S Both qualitative and quantitative aspects need to be
considered. Critical aspects of a problem are organised
into hierarchical structure similar to a family tree. *
formula can be discussed later
Classification models
S The AHP approach is characterized by some important
properties:
1. It makes possible to tackle the problem in a complete and
thorough way taking several factors in to account
2. A direct quantitative judgment of the relevant factors is not
required
3. AHP analysis can also handle qualitative judgments
4. Its result can be evaluated performing a sensitivity analysis.
Issues regarding Service
parts
1. Lack of visibility into service parts inventory levels
2. Disparate sources of service part data
3. Inconsistent naming conventions for service parts and
suppliers
4. Disconnected inventory planning and execution procedures.
5. Insufficient and fragmented use of automated and advance
analytics.
Success factors
1. Align and coordinate service parts planning and operations
across an extended service network.
2. Leverage alternate service providers: pooling, standardization
and outsourcing of service parts management to logistics
service providers are the most successful strategies
3. Aggregate, classify and enhance service parts data
4. Automate service parts planning and execution activities.
S
Thank you!

Weitere ähnliche Inhalte

Was ist angesagt?

Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance ManagementBisina Keshara
 
World class factory equipment spare parts program
World class factory equipment spare parts programWorld class factory equipment spare parts program
World class factory equipment spare parts programs_bhut
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementawantika diwan
 
sparepartsmanagment
sparepartsmanagmentsparepartsmanagment
sparepartsmanagmentRAKESH SINGH
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORINGlaxtwinsme
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Amirul Faiz Amil Azman
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategygumma alsgier
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementTripti Mittal
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)kabul university
 
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceDhanesh S
 
A CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEA CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEZubair Ali ali
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenanceSHIVAJI CHOUDHURY
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenanceAbhik Rathod
 
Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Dr.Muftooh Ur Rehman Siddiqi
 

Was ist angesagt? (20)

03.chapter3.4.spares.criticality
03.chapter3.4.spares.criticality03.chapter3.4.spares.criticality
03.chapter3.4.spares.criticality
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
World class factory equipment spare parts program
World class factory equipment spare parts programWorld class factory equipment spare parts program
World class factory equipment spare parts program
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
sparepartsmanagment
sparepartsmanagmentsparepartsmanagment
sparepartsmanagment
 
CONDITION MONITORING
CONDITION MONITORINGCONDITION MONITORING
CONDITION MONITORING
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategy
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of Maintenance
 
Maintanance management
Maintanance managementMaintanance management
Maintanance management
 
A CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCEA CASE STUDY ON PREVENTIVE MAINTENANCE
A CASE STUDY ON PREVENTIVE MAINTENANCE
 
Reliability centred maintenance
Reliability centred maintenanceReliability centred maintenance
Reliability centred maintenance
 
Types of maintenance
Types of maintenanceTypes of maintenance
Types of maintenance
 
Maintenence management
Maintenence managementMaintenence management
Maintenence management
 
Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]Lecture 25 flexible manufacturing systems [compatibility mode]
Lecture 25 flexible manufacturing systems [compatibility mode]
 

Ähnlich wie Spare parts management

CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNINGCUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNINGIRJET Journal
 
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Sagar Sangam Sahu
 
Om0015 maintenance management..
Om0015   maintenance management..Om0015   maintenance management..
Om0015 maintenance management..smumbahelp
 
Om0015 maintenance management..
Om0015   maintenance management..Om0015   maintenance management..
Om0015 maintenance management..smumbahelp
 
BEE.pdfUHF They good view year keep know
BEE.pdfUHF They good view year keep knowBEE.pdfUHF They good view year keep know
BEE.pdfUHF They good view year keep knowteddiyfentaw
 
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....Naveen Kumar
 
Presentation maintenence management
Presentation maintenence managementPresentation maintenence management
Presentation maintenence managementVaisakh S Babu
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...Leslie Schulte
 
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...Cognizant
 
Diagnostic Techniques Notes
Diagnostic Techniques NotesDiagnostic Techniques Notes
Diagnostic Techniques Notesrajimech06
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCEkifayat ullah
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCEkifayat ullah
 
PDM System for Automobile Assembly
PDM System for Automobile AssemblyPDM System for Automobile Assembly
PDM System for Automobile AssemblyIRJET Journal
 
How To Improve Your Maintenance Spare Parts Management
How To Improve Your Maintenance Spare Parts ManagementHow To Improve Your Maintenance Spare Parts Management
How To Improve Your Maintenance Spare Parts ManagementSMGlobal Inc.
 
maintanancemanagement-140709234319-phpapp02.pptx
maintanancemanagement-140709234319-phpapp02.pptxmaintanancemanagement-140709234319-phpapp02.pptx
maintanancemanagement-140709234319-phpapp02.pptxJagjotSinghRandhawa
 

Ähnlich wie Spare parts management (20)

Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
Lcc book chapter_6_parra_asset_management
Lcc book chapter_6_parra_asset_managementLcc book chapter_6_parra_asset_management
Lcc book chapter_6_parra_asset_management
 
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNINGCUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
CUSTOMER SEGMENTATION IN SHOPPING MALL USING CLUSTERING IN MACHINE LEARNING
 
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
Modern Maintenance & Reliability Management: Planning and Estimating Workshop...
 
Om 4 th
Om 4 thOm 4 th
Om 4 th
 
Om0015 maintenance management..
Om0015   maintenance management..Om0015   maintenance management..
Om0015 maintenance management..
 
Om0015 maintenance management..
Om0015   maintenance management..Om0015   maintenance management..
Om0015 maintenance management..
 
BEE.pdfUHF They good view year keep know
BEE.pdfUHF They good view year keep knowBEE.pdfUHF They good view year keep know
BEE.pdfUHF They good view year keep know
 
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
SOLVED SMU MBA ASSIGNMENTS AVAILABLE....
 
Presentation maintenence management
Presentation maintenence managementPresentation maintenence management
Presentation maintenence management
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...A STUDY OF SPARE PARTS INVENTORY MANAGEMENT  CASE STUDY OF REDUCTION HALVE SP...
A STUDY OF SPARE PARTS INVENTORY MANAGEMENT CASE STUDY OF REDUCTION HALVE SP...
 
Operation management-notes
Operation management-notesOperation management-notes
Operation management-notes
 
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
Using Predictive Analytics to Optimize Asset Maintenance in the Utilities Ind...
 
Diagnostic Techniques Notes
Diagnostic Techniques NotesDiagnostic Techniques Notes
Diagnostic Techniques Notes
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
 
RELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCERELIABILITY CENTERED MAINTAINANCE
RELIABILITY CENTERED MAINTAINANCE
 
PDM System for Automobile Assembly
PDM System for Automobile AssemblyPDM System for Automobile Assembly
PDM System for Automobile Assembly
 
How To Improve Your Maintenance Spare Parts Management
How To Improve Your Maintenance Spare Parts ManagementHow To Improve Your Maintenance Spare Parts Management
How To Improve Your Maintenance Spare Parts Management
 
maintanancemanagement-140709234319-phpapp02.pptx
maintanancemanagement-140709234319-phpapp02.pptxmaintanancemanagement-140709234319-phpapp02.pptx
maintanancemanagement-140709234319-phpapp02.pptx
 

Kürzlich hochgeladen

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 

Kürzlich hochgeladen (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 

Spare parts management

  • 2. What is a Spare and why it is needed? S Manufacturing Process comprise complex equipment with thousands of subassemblies and discrete parts. Parts and sub assemblies of machines will eventually require repair and replacement. S Increased efficiency of production plants requires minimization of machine downtime. However, we don’t know which machine part will fail when? Therefore , availability of a wide range of spare parts is major factor for reduction in downtime when a breakdown occurs.
  • 3. What is a Spare and why it is needed? S A logical approach to solve the issue of spare parts availability lies in stocking large quantities of spare parts for immediate use whenever needed. S On the other hand stocking is limited by space and cost. S Therefore designing a system and managing spare part in an optimal way represents a critical and important task.
  • 4. Objectives 1. Discuss the different classifications of service parts 2. Analyse the importance of spare part management 3. Explain how maintenance policies impact maintenance economics 4. Analyse mathematical models for spare parts decision making 5. Define classification and other models for spare part decision making 6. Discuss the major issues in optimally managing spare parts 7. Assess the success factors of spare parts management
  • 5. Basics of Spare parts management S Spare parts and services account for 8 percent of the annual gross domestic product in the United States. S Spare parts management is the process of planning and aligning service parts inventories, resources and processes to ensure optimal customer service and response with minimal risk and cost. S Spare parts management embraces three different kinds of service spare parts. 1. First Party Spare parts 2. Second Party Spare parts 3. Third Party Spare parts
  • 6. S Each type of service part also reflects a different types of control situation. On this basis service spare parts can further be subdivided into two main categories: 1. Repairable 2. Non repairable or disposables S Spare part management is at the heart of any effective service operation. Service operation depends on the knowledge about the failure behavior of the system and the ability to project the demand. Basics of Spare parts management
  • 7. The Economics of Service parts S Spare parts inventory value is important. The issue is to have the right parts, at the right time, so that either plant utilization or revenue generation is not negatively impacted. S How can spare parts management be turned into a competitive advantage? S Which service parts have to be stocked? S Where are the service parts to be stocked? S How many of them to be kept in stock for each of these service parts?
  • 8. Economies of Maintenance S As spare parts management is directly related to maintenance, we first need to understand maintenance economics. S Some of the common approaches to maintenance are; 1. Breakdown Maintenance 2. Preventive maintenance 3. Predictive maintenance 4. Proactive mantenance
  • 9. Economies of Maintenance S Cost of Maintenance: Total cost due to failure of an equipment will be; 1. Cost of lost sales 2. Cost of idle labour both direct and indirect 3. Cost of delays in downstream process 4. Cost of scrap, wastage and rejection 5. Start up cost 6. Cost of customer dissatisfaction due to delays
  • 10. Economies of Maintenance S A good Maintenance Policy ensures 1. Expediting the entire maintenance task and eliminating delays by applying sound system and methods, adequate maintenance facilities, well trained crew etc. 2. Minimizing breakdowns by installing a suitable preventive maintenance system and scheduling maintenance jobs during non production shifts
  • 11. Decision models Efficient and cost effective service operations hinge on the ability of the organization to accurately plan inventories and service parts. 1. Avoid excess inventories 2. Maintain required service levels 3. Avoid stock outs When looking at demand processes, much depends on the context we are considering. First party and second party spares are sourced from OEM. For third party spares, experience with comparable service parts plays an important role.
  • 12. Decision models There are two main approaches followed to develop possible spares provisioning decision models: 1. Mathematical model 2. Classification approaches
  • 13. Mathematical Models S The first approach concerns the development of mathematical models based on linear programming , dynamic programming, goal programming, simulation etc. S Mathematical models generally concentrate on the mathematical optimization of the inventory costs and service levels associated with a potential spares inventory policy in terms of economic order quantity, reorder point and safety stocks.
  • 14. Mathematical Models S A mathematical optimization of inventory costs is a difficult task in the case of spare parts. S Standard methods of inventory control fall short of finding adequate solutions. S Common statistical models for inventory control lose their applicability when historical demand figures are unavailable or invalid.
  • 15. Mathematical Models S The control of service part is complex matter. Many of the models evolved are too complex, abstract or oversimplified. S These models do not consider several intangible factors, such as obsolescence, standard characteristic of the item, type and quality of suppliers, etc.. S The models assume demand to be constant or stationary, following a Poisson process. S For fast moving items theoretical safety stock can be calculated using statistical theory
  • 16. Classification models S Considering the limitations of mathematical models, the use of classifications system as a spare parts management tool represent a popular approach in industry. S Service parts are expensive, demand is erratic and hence hard to predict, delivery times are long and stochastic and customers want their service parts quickly.
  • 17. Classification models S In order to approach the problem a criticality classification of spare parts is generally used. Most classification models are based on this and on this administrative efficiency considerations S Some of the classification criteria are: 1. Criticality of the function to be performed by a system that become defective 2. Price 3. Delivery time 4. Life cycle phase of the service part
  • 18. Classification models S ABC Classifications This is perhaps the most well known and used classification system for inventory management. This is based on Pareto’s principle. After calculating rupee usage for each inventory item, the items are ranked by rupee usage, from highest to lowest. The first 20 % are assigned to class A, the next 30 % items are classified as class B and finally the last 50% items are C class items S Attributes which have intangible aspects such as safety objectives, provisioning characteristic, type of maintenance adopted, loss of production etc. cannot be included.
  • 19. Classification models S VED classification: This is the most commonly used classification system for spare parts inventory management . When used in combination with other techniques, it is generally quite effective. Here parts are called vital, essential and desirables. 1. Vital parts: Items that cause high losses due to non-availability of equipment. In case they are needed while not in stock. 2. Essential parts: Items that cause moderate losses due to non- availability of equipment, in case they are not in stock 3. Desirable parts: Items that cause minor disruptions, in case they are needed while not in stock.
  • 20. Classification models S A systematic procedure that could be helpful here is the Analytic Hierarchy process (AHP). This multi criteria decision making tool finds the relative priorities or weights to be assigned to different criteria and alternatives which characterize the spare part decision. S Both qualitative and quantitative aspects need to be considered. Critical aspects of a problem are organised into hierarchical structure similar to a family tree. * formula can be discussed later
  • 21. Classification models S The AHP approach is characterized by some important properties: 1. It makes possible to tackle the problem in a complete and thorough way taking several factors in to account 2. A direct quantitative judgment of the relevant factors is not required 3. AHP analysis can also handle qualitative judgments 4. Its result can be evaluated performing a sensitivity analysis.
  • 22. Issues regarding Service parts 1. Lack of visibility into service parts inventory levels 2. Disparate sources of service part data 3. Inconsistent naming conventions for service parts and suppliers 4. Disconnected inventory planning and execution procedures. 5. Insufficient and fragmented use of automated and advance analytics.
  • 23. Success factors 1. Align and coordinate service parts planning and operations across an extended service network. 2. Leverage alternate service providers: pooling, standardization and outsourcing of service parts management to logistics service providers are the most successful strategies 3. Aggregate, classify and enhance service parts data 4. Automate service parts planning and execution activities.