SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Downloaden Sie, um offline zu lesen
ISSN: 2278 – 1323
International Journal of Advanced Research in Computer Engineering & Technology (IJARCET)
Volume 2, Issue 6, June 2013
2091
www.ijarcet.org
Optimization of Hamilton Path
Tournament Schedule1
Trinetra Kumar Pathak, 2
Vinod Kumar Bhalla
Abstract: A Hamilton path tournament design
involving n teams and n/2 stadiums, is a round robin
schedule on n − 1 days in which each team plays in
each stadium at most twice, and the set of games
played in each stadium induce a Hamilton path on n
teams[1]. We have created an algorithm to calculate
the cost of all pairs which is generated using Hamilton
path tournament Design [1] that work on n teams,
,n/2 stadiums and n − 1 days schedule in which each
team played at most twice in each stadium [1]. In our
algorithm, we have calculated the cost of each
combination of pairs and choose the Optimize
Hamilton path tournament.
Index Terms – Cost, Combination, Schedule, Path.
1 INTRODUCTION
There are number of algorithms for scheduling
balanced tournament designs [2], [6], [7]. Yoshiko
T. Ikebe and Akihisa Tamura [1] introduced a
Hamilton path tournament design and have proved
it for all n = 2p ≥ 8 teams. Gelling and Odeh
introduced the balanced tournament design [4], and
Schellenberg, van Rees and Vanstone proved its
existence for all even n ≥ 6 [9]. In this paper, we
have introduced cost effect approach for
tournament design using Hamilton path. We have
used cost constant to find the optimized
combination of pairs of balance tournament.
Several authors have recently have proposed a
schedule closely related to balanced tournament
design [3], [5], [8], [10]. We have designed an
optimized Hamilton path tournament in which there
are n teams, n-1 days and n/2 stadiums. Cost for
each and every team in each combination of pairs is
calculated and then add these costs in a single one
for each pair and compare with last minimum cost
and at last we got the optimize combination of
Hamilton path tournament.
II CONSTRUCTIONS
First, we have taken combination of pair in which
we have n team means n/2 stadium. Then, we
calculate the cost of each and every team traversal
according to a given combination of pair. Suppose
team t1 play first match in stadium s1 than we
initiate the cost of team t1 as 0 and check the next
match play by team t1, if t1 play second match in
stadium s2 the add the transportation cost of s1 to
s2 into cost of team t1 and check for the next match
for team t1 up to last match of t1 and same
procedure apply for the all remaining teams and
then add the cost of all teams which is called First
Combination Cost.
Now this procedure applies for all the combinations
of pairs and then we select the best Combination
of pairs generated by Hamilton path tournament.
II ILLUSTRATION USING EXAMPLE
Table 1 indicate the one combination of pairs
according to Hamilton path tournament for n=8.
Let there are 8 team t1, t2, t3, t4, t5, t6, t7 and t8, 4
stadiums s s1, s2, s3 and s4 and 7 days d1, d2, d3,
d4, d5, d6 and d7 [1].
Days 
Stadium
s1 s2 s3 s4
d1 1,5 2,6 3,7 4,8
d2 1,6 5,7 2,8 3,4
d3 6,8 2,3 5,4 1,7
d4 7,4 6,3 1,8 5,2
d5 8,3 1,4 7,2 6,5
d6 4,2 8,5 1,3 7,6
d7 3,5 8,7 4,6 1,2
Table 1
And Table-2 indicate the transportation cost
between stadiums such as transportation cost
between s1 to s2 is a, s2 to s3 is b, s3 to s4 is c, s1
to s4 is d, s1 to s3 is e and s2 to s4 if f.
Stadiums s1 s2 s3 s4
s1 0 a e d
s2 a 0 b f
s3 e b 0 c
s4 d f c 0
Table 2
Also show by figure1.
a
e
f
d b
c
Fig. 1
And table3 indicate the transportation cost of each
team day by day. D1 is the cost of traversal
s1
s4 s3
s2
ISSN: 2278 – 1323
International Journal of Advanced Research in Computer Engineering & Technology (IJARCET)
Volume 2, Issue 6, June 2013
2092
www.ijarcet.org
between Stadiums for Team1 at Day1 and Day2.
D2 is the cost of traversal between stadiums for
Team1 at Day2 and Day3 and so on for D3, D4 and
D5.
teams
days
d1 d2 d3 d4 d4 d5
t1 0 d c b b c
t2 b b f c e d
t3 c f 0 a e e
t4 0 c e a a e
t5 a b c 0 f a
t6 a 0 a f 0 c
t7 b f d e c f
t8 c a e e a 0
Table 3
So for the team t1 total transportation cost in the
combination1 of this tournament is TCT1.
TCT1= Transportation Cost of Team t1.
It means
TCT1 = 0 + d + c + b + b + c
=0 *a + 2 * b + 2 * c+ 1 * d + 0 * e + 0 * f
Same for the team t2 total transportation cost in the
combination1 of this tournament is TCT2.
TCT2= Transportation Cost of Team t2
It means
TCT2 = b + b + f + c + e + d
= 0 *a + 2 * b +1* c + 1 * d + 1 * e + 1 * f
And so on for all the remaining teams.
And the total transportation cost of Combination1
is TC1.
Or
If we will take the transportation cost between all
stadiums as an unit cost then transportation cost of
team t1 in Combination1 of this tournament is
TCT1.
TCT1 = 0 + 2 + 2 + 1 + 0 + 0
= 5
TCT2 = 0 + 2 + 1 + 1 + 1 + 1
= 6
TCT3 = 5
TCT4 = 5
TCT5 = 5
TCT6 = 4
TCT7 = 6
TCT8 = 5
And TC1= 41
And for another combination of Hamilton path
tournament we have calculated the total
transportation cost as TC2. Table4 indicate the
another combination of pairs according to Hamilton
path tournament for n=8. If there are 8 team t1, t2,
t3, t4, t5, t6, t7 and t8, 4 stadiums s1, s2, s3 and s4
and 7 days d1, d2, d3, d4, d5, d6 and d7.
Days 
Stadium
s1 s2 s3 s4
d1 1,5 2,6 3,7 4,8
d2 1,6 3,4 2,8 5,7
d3 5,4 1,7 6,8 2,3
d4 6,3 7,4 5,2 1,8
d5 7,2 8,3 1,4 6,5
d6 4,2 8,5 7,6 1,3
d7 8,7 1,2 3,5 4,6
Table 4
And table5 indicate the transportation cost of each
team day after previous day. D1 is the cost of
traversal between Stadiums for Team1 at Day1 and
Day2. D2 is the cost of traversal between stadiums
for Team1 at Day2 and Day3 and so on for D3, D4
and D5.
teams
 days
D1 D2 D3 D4 D4 D5
t1 0 a f c c f
t2 b c c e 0 a
t3 b f d a f c
t4 f a a b e d
ISSN: 2278 – 1323
International Journal of Advanced Research in Computer Engineering & Technology (IJARCET)
Volume 2, Issue 6, June 2013
2093
www.ijarcet.org
t5 d d e c f b
t6 a e e d c c
t7 c f 0 a e e
t8 c 0 c f 0 a
So for the team t1 total transportation cost in the
combination1 of this tournament is TCT1.
TCT1= Transportation Cost of Team t1.
It means
TCT1 = 0 + a + f + c + c + f
= 1 *a + 0 * b + 2 * c + 0 * d + 0 * e + 2 *
f
Same for the team t2 total transportation cost in the
combination1 of this tournament is TCT2.
TCT2= Transportation Cost of Team t2
It means
TCT2 = b + c + c + e + 0 + a
= 1 *a + 1 * b + 2 * c + 0 * d + 1 * e + 0 * f
And so on for all the remaining teams.
And the total transportation cost of Combination2
is TC2.
Or
If we will take the transportation cost between all
stadiums as an unit cost then transportation cost of
team t1 in Combination1 of this tournament is
TCT1 and value of TCT1 is
TCT1 = 1 + 0 + 2 + 0 + 0 + 2
= 5
TCT2 = 1 + 1 + 2 + 0 + 1 + 0
= 5
TCT3 = 6
TCT4 = 6
TCT5 = 6
TCT6 = 6
TCT7 = 5
TCT8 = 4
And the total transportation cost of the second
combination of same tournament is TC2.
TC2= 43
And so on for the all remains combinations and
then we select minimum cost and optimized
combination for Hamilton path tournament.
IV ALGORITHM
Optimize_Hamilton_Path_Tournament(A,TC,n, m)
A is the 4 dimension array used to store all the
combination of pairs generated by Hamilton path
tournament and n is the number of team played in
this tournament. m is indicate the number of total
combination and TC used to store the
Transportation cost of combinations.
I. Set p ← 1 min ← MAX_VALUE
Best_Combination ← 1
II. Repeat while p ≤ m
1. Set i ← 1
2. Repeat while i ≤ n
(a) Set sum← 0 D1 ← 0 D2 ←
0 j ← 1
(b) Repeat while j ˂ n
(i) Set k ← 1
(ii) Repeat while k ≤ n/2
(A) If A[j][k][0] = i or A[j][k][1] = i
then do
a. If D1= 0 then set D1 ← k
b. Set D2 ← k
c. If D1 = D2 then
set sum ← sum + 0
Otherwise set sum ← sum + 1
D1 ← D2
d. Go to step (b)
(B) Set k ← k + 1
(iii) Set j ← j + 1
(c) Set TCT[i] ← sum
(d) Set TC[p] ← TC[p] + sum
(e) Set i ← i + 1
3. If min > TC[p] then
set min ← TC[p]
Best_Combination ← p
4. Set p ← p + 1
III. Return Best_Combination
V CONCLUSION
Using Cost constraint on various combinations of
Hamilton path tournament design for n teams, we
have selected the combination of teams and
stadiums such that all teams have to travel
minimum distance for whole tournament. As all the
teams will travel minimum distance, so the cost of
their transportation and other expenses associated
with them will also be minimum. This algorithm
ISSN: 2278 – 1323
International Journal of Advanced Research in Computer Engineering & Technology (IJARCET)
Volume 2, Issue 6, June 2013
2094
www.ijarcet.org
can be used to design tournaments in a cost
effective manner and also if the teams will travel
less, their performance will also increase. In future,
time constraint can also be added to this algorithm.
REFERENCES
[1] Yoshiko T. Ikebe, Akihisa Tamura: Construction of
Hamilton Path Tournament Designs. Graphs and
Combinatorics (2011) 27:703–711 DOI
10.1007/s00373-010-0998-6
[2] de Werra, D.: Some models of graphs for scheduling
sports competitions. Discrete Appl. Math. 21, 47–65
(1988)
[3] de Werra, D., Ekim, T., Raess, C.: Construction of
sports schedules with multiple venues. Discrete
Appl. Math. 154, 47–58 (2006)
[4] Gelling, E.N., Odeh, R.E.: On 1-factorizations of the
complete graph and the relationship to roundrobin
tournaments, Proc. Third Manitoba Conference on
Numerical Math.,Winnipeg 213–221 (1973)
[5] Ikebe, Y.T., Tamura, A.: On the existence of sports
schedules with multiple venues. Discrete Appl. Math.
156, 1694–1710 (2008) 123 Graphs and
Combinatorics (2011) 27:703–711 711
[6] . Lamken,E.R.,Vanstone, S.A.: Balanced tournament
designs and related topics.Discrete Math. 77, 159–
176 (1989)
[7] Nemhauser, G., Trick,M.: Scheduling a major
college basketball conference. Oper. Res. 46, 1–8
(1998)
[8] Russell, R.A., Urban, T.L.:Aconstraint-programming
approach to themultiple-venue sport-scheduling
problem. Comput. Oper. Res. 33, 1895–1906 (2006)
[9] Schellenberg, P.J., van Rees, G.H.J., Vanstone, S.A.:
The existence of balanced tournament design. Ars
Combinatoria 3, 303–317 (1977)
[10] Urban, T.L., Russell, R.A.: Scheduling sports
competitions on multiple venues. European J. Oper.
Res. 148, 302–311 (2003) 123
Trinetra Kumar Pathak is
pursuing his Master of
Engineering in Software
Engineering from Thapar
University. He has qualified
Gate and is currently
pursuing his six months
thesis on Algorithms.
Vinod Kumar Bhalla is
working as Assistant
Professor in Computer
Science and Engineering
Department, Thapar
University, Patiala since
2001. He is taking courses of
Object Oriented
Programming, Analysis &
Design, Software
Engineering

Weitere ähnliche Inhalte

Ähnlich wie Volume 2-issue-6-2091-2094

Theory of Advanced Relativity
Theory of Advanced RelativityTheory of Advanced Relativity
Theory of Advanced RelativityMihir Jha
 
Traveling salesman problem: Game Scheduling Problem Solution: Ant Colony Opti...
Traveling salesman problem: Game Scheduling Problem Solution: Ant Colony Opti...Traveling salesman problem: Game Scheduling Problem Solution: Ant Colony Opti...
Traveling salesman problem: Game Scheduling Problem Solution: Ant Colony Opti...Soumen Santra
 
General Mathematics Introduction to Functions.pptx
General Mathematics Introduction to Functions.pptxGeneral Mathematics Introduction to Functions.pptx
General Mathematics Introduction to Functions.pptxJeffreySantos46
 
June 03 P2
June 03 P2June 03 P2
June 03 P2Samimvez
 
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEMA NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEMJournal For Research
 
The optimum seeking method of Pavement maintenance based on interval fuzzy so...
The optimum seeking method of Pavement maintenance based on interval fuzzy so...The optimum seeking method of Pavement maintenance based on interval fuzzy so...
The optimum seeking method of Pavement maintenance based on interval fuzzy so...IJERA Editor
 
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...cscpconf
 
Comparison among Different Adders
Comparison among Different Adders Comparison among Different Adders
Comparison among Different Adders iosrjce
 
Design of a Lift Mechanism for Disabled People
Design of a Lift Mechanism for Disabled PeopleDesign of a Lift Mechanism for Disabled People
Design of a Lift Mechanism for Disabled PeopleSamet Baykul
 
IJREI- Vibration Analysis and Response Characteristics of a Half Car Model Su...
IJREI- Vibration Analysis and Response Characteristics of a Half Car Model Su...IJREI- Vibration Analysis and Response Characteristics of a Half Car Model Su...
IJREI- Vibration Analysis and Response Characteristics of a Half Car Model Su...Star Web Maker Services Pvt. Ltd.
 
fdocuments.us_turning-moment-diagram-flywheel.ppt
fdocuments.us_turning-moment-diagram-flywheel.pptfdocuments.us_turning-moment-diagram-flywheel.ppt
fdocuments.us_turning-moment-diagram-flywheel.pptSukantaMandal17
 
Highway designing calculations
Highway designing calculationsHighway designing calculations
Highway designing calculationsjanaka ruwan
 
IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET Journal
 
Performance of metaheuristic methods for loop
Performance of metaheuristic methods for loopPerformance of metaheuristic methods for loop
Performance of metaheuristic methods for loopIAEME Publication
 
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesPlatoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesKaustav Mondal
 
Project matlab group one,dzaklo courage kwasi
Project matlab group one,dzaklo courage kwasiProject matlab group one,dzaklo courage kwasi
Project matlab group one,dzaklo courage kwasiKNUST
 
OPTIMIZATION OF AERODYNAMIC AND STRUCTURAL PERFORMANCES OF A WIND TURBINE BLA...
OPTIMIZATION OF AERODYNAMIC AND STRUCTURAL PERFORMANCES OF A WIND TURBINE BLA...OPTIMIZATION OF AERODYNAMIC AND STRUCTURAL PERFORMANCES OF A WIND TURBINE BLA...
OPTIMIZATION OF AERODYNAMIC AND STRUCTURAL PERFORMANCES OF A WIND TURBINE BLA...IAEME Publication
 

Ähnlich wie Volume 2-issue-6-2091-2094 (20)

Theory of Advanced Relativity
Theory of Advanced RelativityTheory of Advanced Relativity
Theory of Advanced Relativity
 
Traveling salesman problem: Game Scheduling Problem Solution: Ant Colony Opti...
Traveling salesman problem: Game Scheduling Problem Solution: Ant Colony Opti...Traveling salesman problem: Game Scheduling Problem Solution: Ant Colony Opti...
Traveling salesman problem: Game Scheduling Problem Solution: Ant Colony Opti...
 
General Mathematics Introduction to Functions.pptx
General Mathematics Introduction to Functions.pptxGeneral Mathematics Introduction to Functions.pptx
General Mathematics Introduction to Functions.pptx
 
June 03 P2
June 03 P2June 03 P2
June 03 P2
 
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEMA NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
A NEW APPROACH FOR SOLVING TRANSPORTATION PROBLEM
 
The optimum seeking method of Pavement maintenance based on interval fuzzy so...
The optimum seeking method of Pavement maintenance based on interval fuzzy so...The optimum seeking method of Pavement maintenance based on interval fuzzy so...
The optimum seeking method of Pavement maintenance based on interval fuzzy so...
 
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
OPTIMAL TRAJECTORY OF ROBOT MANIPULATOR FOR ENERGY MINIMIZATION WITH QUARTIC ...
 
Comparison among Different Adders
Comparison among Different Adders Comparison among Different Adders
Comparison among Different Adders
 
Design of a Lift Mechanism for Disabled People
Design of a Lift Mechanism for Disabled PeopleDesign of a Lift Mechanism for Disabled People
Design of a Lift Mechanism for Disabled People
 
IJREI- Vibration Analysis and Response Characteristics of a Half Car Model Su...
IJREI- Vibration Analysis and Response Characteristics of a Half Car Model Su...IJREI- Vibration Analysis and Response Characteristics of a Half Car Model Su...
IJREI- Vibration Analysis and Response Characteristics of a Half Car Model Su...
 
D044042432
D044042432D044042432
D044042432
 
fdocuments.us_turning-moment-diagram-flywheel.ppt
fdocuments.us_turning-moment-diagram-flywheel.pptfdocuments.us_turning-moment-diagram-flywheel.ppt
fdocuments.us_turning-moment-diagram-flywheel.ppt
 
Highway designing calculations
Highway designing calculationsHighway designing calculations
Highway designing calculations
 
IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...IRJET- Design and Development of Open Differential for Transmission System of...
IRJET- Design and Development of Open Differential for Transmission System of...
 
Performance of metaheuristic methods for loop
Performance of metaheuristic methods for loopPerformance of metaheuristic methods for loop
Performance of metaheuristic methods for loop
 
Optimizing last mile delivery
Optimizing last mile deliveryOptimizing last mile delivery
Optimizing last mile delivery
 
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier SplinesPlatoon Control of Nonholonomic Robots using Quintic Bezier Splines
Platoon Control of Nonholonomic Robots using Quintic Bezier Splines
 
Turning moment-diagram-flywheel
Turning moment-diagram-flywheelTurning moment-diagram-flywheel
Turning moment-diagram-flywheel
 
Project matlab group one,dzaklo courage kwasi
Project matlab group one,dzaklo courage kwasiProject matlab group one,dzaklo courage kwasi
Project matlab group one,dzaklo courage kwasi
 
OPTIMIZATION OF AERODYNAMIC AND STRUCTURAL PERFORMANCES OF A WIND TURBINE BLA...
OPTIMIZATION OF AERODYNAMIC AND STRUCTURAL PERFORMANCES OF A WIND TURBINE BLA...OPTIMIZATION OF AERODYNAMIC AND STRUCTURAL PERFORMANCES OF A WIND TURBINE BLA...
OPTIMIZATION OF AERODYNAMIC AND STRUCTURAL PERFORMANCES OF A WIND TURBINE BLA...
 

Mehr von Editor IJARCET

Electrically small antennas: The art of miniaturization
Electrically small antennas: The art of miniaturizationElectrically small antennas: The art of miniaturization
Electrically small antennas: The art of miniaturizationEditor IJARCET
 
Volume 2-issue-6-2205-2207
Volume 2-issue-6-2205-2207Volume 2-issue-6-2205-2207
Volume 2-issue-6-2205-2207Editor IJARCET
 
Volume 2-issue-6-2195-2199
Volume 2-issue-6-2195-2199Volume 2-issue-6-2195-2199
Volume 2-issue-6-2195-2199Editor IJARCET
 
Volume 2-issue-6-2200-2204
Volume 2-issue-6-2200-2204Volume 2-issue-6-2200-2204
Volume 2-issue-6-2200-2204Editor IJARCET
 
Volume 2-issue-6-2190-2194
Volume 2-issue-6-2190-2194Volume 2-issue-6-2190-2194
Volume 2-issue-6-2190-2194Editor IJARCET
 
Volume 2-issue-6-2186-2189
Volume 2-issue-6-2186-2189Volume 2-issue-6-2186-2189
Volume 2-issue-6-2186-2189Editor IJARCET
 
Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Editor IJARCET
 
Volume 2-issue-6-2173-2176
Volume 2-issue-6-2173-2176Volume 2-issue-6-2173-2176
Volume 2-issue-6-2173-2176Editor IJARCET
 
Volume 2-issue-6-2165-2172
Volume 2-issue-6-2165-2172Volume 2-issue-6-2165-2172
Volume 2-issue-6-2165-2172Editor IJARCET
 
Volume 2-issue-6-2159-2164
Volume 2-issue-6-2159-2164Volume 2-issue-6-2159-2164
Volume 2-issue-6-2159-2164Editor IJARCET
 
Volume 2-issue-6-2155-2158
Volume 2-issue-6-2155-2158Volume 2-issue-6-2155-2158
Volume 2-issue-6-2155-2158Editor IJARCET
 
Volume 2-issue-6-2148-2154
Volume 2-issue-6-2148-2154Volume 2-issue-6-2148-2154
Volume 2-issue-6-2148-2154Editor IJARCET
 
Volume 2-issue-6-2143-2147
Volume 2-issue-6-2143-2147Volume 2-issue-6-2143-2147
Volume 2-issue-6-2143-2147Editor IJARCET
 
Volume 2-issue-6-2119-2124
Volume 2-issue-6-2119-2124Volume 2-issue-6-2119-2124
Volume 2-issue-6-2119-2124Editor IJARCET
 
Volume 2-issue-6-2139-2142
Volume 2-issue-6-2139-2142Volume 2-issue-6-2139-2142
Volume 2-issue-6-2139-2142Editor IJARCET
 
Volume 2-issue-6-2130-2138
Volume 2-issue-6-2130-2138Volume 2-issue-6-2130-2138
Volume 2-issue-6-2130-2138Editor IJARCET
 
Volume 2-issue-6-2125-2129
Volume 2-issue-6-2125-2129Volume 2-issue-6-2125-2129
Volume 2-issue-6-2125-2129Editor IJARCET
 
Volume 2-issue-6-2114-2118
Volume 2-issue-6-2114-2118Volume 2-issue-6-2114-2118
Volume 2-issue-6-2114-2118Editor IJARCET
 
Volume 2-issue-6-2108-2113
Volume 2-issue-6-2108-2113Volume 2-issue-6-2108-2113
Volume 2-issue-6-2108-2113Editor IJARCET
 
Volume 2-issue-6-2102-2107
Volume 2-issue-6-2102-2107Volume 2-issue-6-2102-2107
Volume 2-issue-6-2102-2107Editor IJARCET
 

Mehr von Editor IJARCET (20)

Electrically small antennas: The art of miniaturization
Electrically small antennas: The art of miniaturizationElectrically small antennas: The art of miniaturization
Electrically small antennas: The art of miniaturization
 
Volume 2-issue-6-2205-2207
Volume 2-issue-6-2205-2207Volume 2-issue-6-2205-2207
Volume 2-issue-6-2205-2207
 
Volume 2-issue-6-2195-2199
Volume 2-issue-6-2195-2199Volume 2-issue-6-2195-2199
Volume 2-issue-6-2195-2199
 
Volume 2-issue-6-2200-2204
Volume 2-issue-6-2200-2204Volume 2-issue-6-2200-2204
Volume 2-issue-6-2200-2204
 
Volume 2-issue-6-2190-2194
Volume 2-issue-6-2190-2194Volume 2-issue-6-2190-2194
Volume 2-issue-6-2190-2194
 
Volume 2-issue-6-2186-2189
Volume 2-issue-6-2186-2189Volume 2-issue-6-2186-2189
Volume 2-issue-6-2186-2189
 
Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185Volume 2-issue-6-2177-2185
Volume 2-issue-6-2177-2185
 
Volume 2-issue-6-2173-2176
Volume 2-issue-6-2173-2176Volume 2-issue-6-2173-2176
Volume 2-issue-6-2173-2176
 
Volume 2-issue-6-2165-2172
Volume 2-issue-6-2165-2172Volume 2-issue-6-2165-2172
Volume 2-issue-6-2165-2172
 
Volume 2-issue-6-2159-2164
Volume 2-issue-6-2159-2164Volume 2-issue-6-2159-2164
Volume 2-issue-6-2159-2164
 
Volume 2-issue-6-2155-2158
Volume 2-issue-6-2155-2158Volume 2-issue-6-2155-2158
Volume 2-issue-6-2155-2158
 
Volume 2-issue-6-2148-2154
Volume 2-issue-6-2148-2154Volume 2-issue-6-2148-2154
Volume 2-issue-6-2148-2154
 
Volume 2-issue-6-2143-2147
Volume 2-issue-6-2143-2147Volume 2-issue-6-2143-2147
Volume 2-issue-6-2143-2147
 
Volume 2-issue-6-2119-2124
Volume 2-issue-6-2119-2124Volume 2-issue-6-2119-2124
Volume 2-issue-6-2119-2124
 
Volume 2-issue-6-2139-2142
Volume 2-issue-6-2139-2142Volume 2-issue-6-2139-2142
Volume 2-issue-6-2139-2142
 
Volume 2-issue-6-2130-2138
Volume 2-issue-6-2130-2138Volume 2-issue-6-2130-2138
Volume 2-issue-6-2130-2138
 
Volume 2-issue-6-2125-2129
Volume 2-issue-6-2125-2129Volume 2-issue-6-2125-2129
Volume 2-issue-6-2125-2129
 
Volume 2-issue-6-2114-2118
Volume 2-issue-6-2114-2118Volume 2-issue-6-2114-2118
Volume 2-issue-6-2114-2118
 
Volume 2-issue-6-2108-2113
Volume 2-issue-6-2108-2113Volume 2-issue-6-2108-2113
Volume 2-issue-6-2108-2113
 
Volume 2-issue-6-2102-2107
Volume 2-issue-6-2102-2107Volume 2-issue-6-2102-2107
Volume 2-issue-6-2102-2107
 

Kürzlich hochgeladen

Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...
Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...
Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...Eticketing.co
 
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docxSlovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docxWorld Wide Tickets And Hospitality
 
Ramban Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts In...
Ramban  Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts In...Ramban  Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts In...
Ramban Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts In...Nitya salvi
 
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docx
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docxAlbania Vs Spain South American coaches lead Albania to Euro 2024 spot.docx
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docxWorld Wide Tickets And Hospitality
 
Personal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley DennisPersonal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley Dennisjocksofalltradespodc
 
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docxUEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docxEuro Cup 2024 Tickets
 
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdf
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdfJORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdf
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdfArturo Pacheco Alvarez
 
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verifiedDelhi Call girls
 
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...baharayali
 
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMuzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot ModelDeepika Singh
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...Health
 
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room packageWhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room packageNitya salvi
 
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls Agency
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls AgencyHire 💕 8617697112 Kasauli Call Girls Service Call Girls Agency
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls AgencyNitya salvi
 
Sports Writing (Rules,Tips, Examples, etc)
Sports Writing (Rules,Tips, Examples, etc)Sports Writing (Rules,Tips, Examples, etc)
Sports Writing (Rules,Tips, Examples, etc)CMBustamante
 
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Eticketing.co
 
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...World Wide Tickets And Hospitality
 
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docxNetherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docxEuro Cup 2024 Tickets
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)Delhi Call girls
 
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docx
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docxUEFA Euro 2024 Squad Check-in Which team is Top favorite.docx
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docxEuro Cup 2024 Tickets
 
Cricket Api Solution.pdfCricket Api Solution.pdf
Cricket Api Solution.pdfCricket Api Solution.pdfCricket Api Solution.pdfCricket Api Solution.pdf
Cricket Api Solution.pdfCricket Api Solution.pdfLatiyalinfotech
 

Kürzlich hochgeladen (20)

Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...
Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...
Italy vs Albania Italy Euro 2024 squad Luciano Spalletti's full team ahead of...
 
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docxSlovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
Slovenia Vs Serbia UEFA Euro 2024 Fixture Guide Every Fixture Detailed.docx
 
Ramban Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts In...
Ramban  Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts In...Ramban  Escorts ☎️8617697112  Starting From 5K to 15K High Profile Escorts In...
Ramban Escorts ☎️8617697112 Starting From 5K to 15K High Profile Escorts In...
 
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docx
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docxAlbania Vs Spain South American coaches lead Albania to Euro 2024 spot.docx
Albania Vs Spain South American coaches lead Albania to Euro 2024 spot.docx
 
Personal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley DennisPersonal Brand Exploration - By Bradley Dennis
Personal Brand Exploration - By Bradley Dennis
 
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docxUEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
UEFA Euro 2024 Squad Check-in Who is Most Favorite.docx
 
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdf
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdfJORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdf
JORNADA 6 LIGA MURO 2024TUXTEPECOAXACA.pdf
 
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 62, Noida Call girls :8448380779 Model Escorts | 100% verified
 
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
Asli Kala jadu, Black magic specialist in Pakistan Or Kala jadu expert in Egy...
 
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMuzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Muzaffarpur Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room packageWhatsApp Chat: 📞 8617697112 Birbhum  Call Girl available for hotel room package
WhatsApp Chat: 📞 8617697112 Birbhum Call Girl available for hotel room package
 
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls Agency
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls AgencyHire 💕 8617697112 Kasauli Call Girls Service Call Girls Agency
Hire 💕 8617697112 Kasauli Call Girls Service Call Girls Agency
 
Sports Writing (Rules,Tips, Examples, etc)
Sports Writing (Rules,Tips, Examples, etc)Sports Writing (Rules,Tips, Examples, etc)
Sports Writing (Rules,Tips, Examples, etc)
 
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
Croatia vs Italy Euro Cup 2024 Three pitfalls for Spalletti’s Italy in Group ...
 
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
Spain Vs Albania- Spain at risk of being thrown out of Euro 2024 with Tournam...
 
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docxNetherlands Players expected to miss UEFA Euro 2024 due to injury.docx
Netherlands Players expected to miss UEFA Euro 2024 due to injury.docx
 
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Sheikh Sarai (Delhi)
 
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docx
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docxUEFA Euro 2024 Squad Check-in Which team is Top favorite.docx
UEFA Euro 2024 Squad Check-in Which team is Top favorite.docx
 
Cricket Api Solution.pdfCricket Api Solution.pdf
Cricket Api Solution.pdfCricket Api Solution.pdfCricket Api Solution.pdfCricket Api Solution.pdf
Cricket Api Solution.pdfCricket Api Solution.pdf
 

Volume 2-issue-6-2091-2094

  • 1. ISSN: 2278 – 1323 International Journal of Advanced Research in Computer Engineering & Technology (IJARCET) Volume 2, Issue 6, June 2013 2091 www.ijarcet.org Optimization of Hamilton Path Tournament Schedule1 Trinetra Kumar Pathak, 2 Vinod Kumar Bhalla Abstract: A Hamilton path tournament design involving n teams and n/2 stadiums, is a round robin schedule on n − 1 days in which each team plays in each stadium at most twice, and the set of games played in each stadium induce a Hamilton path on n teams[1]. We have created an algorithm to calculate the cost of all pairs which is generated using Hamilton path tournament Design [1] that work on n teams, ,n/2 stadiums and n − 1 days schedule in which each team played at most twice in each stadium [1]. In our algorithm, we have calculated the cost of each combination of pairs and choose the Optimize Hamilton path tournament. Index Terms – Cost, Combination, Schedule, Path. 1 INTRODUCTION There are number of algorithms for scheduling balanced tournament designs [2], [6], [7]. Yoshiko T. Ikebe and Akihisa Tamura [1] introduced a Hamilton path tournament design and have proved it for all n = 2p ≥ 8 teams. Gelling and Odeh introduced the balanced tournament design [4], and Schellenberg, van Rees and Vanstone proved its existence for all even n ≥ 6 [9]. In this paper, we have introduced cost effect approach for tournament design using Hamilton path. We have used cost constant to find the optimized combination of pairs of balance tournament. Several authors have recently have proposed a schedule closely related to balanced tournament design [3], [5], [8], [10]. We have designed an optimized Hamilton path tournament in which there are n teams, n-1 days and n/2 stadiums. Cost for each and every team in each combination of pairs is calculated and then add these costs in a single one for each pair and compare with last minimum cost and at last we got the optimize combination of Hamilton path tournament. II CONSTRUCTIONS First, we have taken combination of pair in which we have n team means n/2 stadium. Then, we calculate the cost of each and every team traversal according to a given combination of pair. Suppose team t1 play first match in stadium s1 than we initiate the cost of team t1 as 0 and check the next match play by team t1, if t1 play second match in stadium s2 the add the transportation cost of s1 to s2 into cost of team t1 and check for the next match for team t1 up to last match of t1 and same procedure apply for the all remaining teams and then add the cost of all teams which is called First Combination Cost. Now this procedure applies for all the combinations of pairs and then we select the best Combination of pairs generated by Hamilton path tournament. II ILLUSTRATION USING EXAMPLE Table 1 indicate the one combination of pairs according to Hamilton path tournament for n=8. Let there are 8 team t1, t2, t3, t4, t5, t6, t7 and t8, 4 stadiums s s1, s2, s3 and s4 and 7 days d1, d2, d3, d4, d5, d6 and d7 [1]. Days Stadium s1 s2 s3 s4 d1 1,5 2,6 3,7 4,8 d2 1,6 5,7 2,8 3,4 d3 6,8 2,3 5,4 1,7 d4 7,4 6,3 1,8 5,2 d5 8,3 1,4 7,2 6,5 d6 4,2 8,5 1,3 7,6 d7 3,5 8,7 4,6 1,2 Table 1 And Table-2 indicate the transportation cost between stadiums such as transportation cost between s1 to s2 is a, s2 to s3 is b, s3 to s4 is c, s1 to s4 is d, s1 to s3 is e and s2 to s4 if f. Stadiums s1 s2 s3 s4 s1 0 a e d s2 a 0 b f s3 e b 0 c s4 d f c 0 Table 2 Also show by figure1. a e f d b c Fig. 1 And table3 indicate the transportation cost of each team day by day. D1 is the cost of traversal s1 s4 s3 s2
  • 2. ISSN: 2278 – 1323 International Journal of Advanced Research in Computer Engineering & Technology (IJARCET) Volume 2, Issue 6, June 2013 2092 www.ijarcet.org between Stadiums for Team1 at Day1 and Day2. D2 is the cost of traversal between stadiums for Team1 at Day2 and Day3 and so on for D3, D4 and D5. teams days d1 d2 d3 d4 d4 d5 t1 0 d c b b c t2 b b f c e d t3 c f 0 a e e t4 0 c e a a e t5 a b c 0 f a t6 a 0 a f 0 c t7 b f d e c f t8 c a e e a 0 Table 3 So for the team t1 total transportation cost in the combination1 of this tournament is TCT1. TCT1= Transportation Cost of Team t1. It means TCT1 = 0 + d + c + b + b + c =0 *a + 2 * b + 2 * c+ 1 * d + 0 * e + 0 * f Same for the team t2 total transportation cost in the combination1 of this tournament is TCT2. TCT2= Transportation Cost of Team t2 It means TCT2 = b + b + f + c + e + d = 0 *a + 2 * b +1* c + 1 * d + 1 * e + 1 * f And so on for all the remaining teams. And the total transportation cost of Combination1 is TC1. Or If we will take the transportation cost between all stadiums as an unit cost then transportation cost of team t1 in Combination1 of this tournament is TCT1. TCT1 = 0 + 2 + 2 + 1 + 0 + 0 = 5 TCT2 = 0 + 2 + 1 + 1 + 1 + 1 = 6 TCT3 = 5 TCT4 = 5 TCT5 = 5 TCT6 = 4 TCT7 = 6 TCT8 = 5 And TC1= 41 And for another combination of Hamilton path tournament we have calculated the total transportation cost as TC2. Table4 indicate the another combination of pairs according to Hamilton path tournament for n=8. If there are 8 team t1, t2, t3, t4, t5, t6, t7 and t8, 4 stadiums s1, s2, s3 and s4 and 7 days d1, d2, d3, d4, d5, d6 and d7. Days Stadium s1 s2 s3 s4 d1 1,5 2,6 3,7 4,8 d2 1,6 3,4 2,8 5,7 d3 5,4 1,7 6,8 2,3 d4 6,3 7,4 5,2 1,8 d5 7,2 8,3 1,4 6,5 d6 4,2 8,5 7,6 1,3 d7 8,7 1,2 3,5 4,6 Table 4 And table5 indicate the transportation cost of each team day after previous day. D1 is the cost of traversal between Stadiums for Team1 at Day1 and Day2. D2 is the cost of traversal between stadiums for Team1 at Day2 and Day3 and so on for D3, D4 and D5. teams days D1 D2 D3 D4 D4 D5 t1 0 a f c c f t2 b c c e 0 a t3 b f d a f c t4 f a a b e d
  • 3. ISSN: 2278 – 1323 International Journal of Advanced Research in Computer Engineering & Technology (IJARCET) Volume 2, Issue 6, June 2013 2093 www.ijarcet.org t5 d d e c f b t6 a e e d c c t7 c f 0 a e e t8 c 0 c f 0 a So for the team t1 total transportation cost in the combination1 of this tournament is TCT1. TCT1= Transportation Cost of Team t1. It means TCT1 = 0 + a + f + c + c + f = 1 *a + 0 * b + 2 * c + 0 * d + 0 * e + 2 * f Same for the team t2 total transportation cost in the combination1 of this tournament is TCT2. TCT2= Transportation Cost of Team t2 It means TCT2 = b + c + c + e + 0 + a = 1 *a + 1 * b + 2 * c + 0 * d + 1 * e + 0 * f And so on for all the remaining teams. And the total transportation cost of Combination2 is TC2. Or If we will take the transportation cost between all stadiums as an unit cost then transportation cost of team t1 in Combination1 of this tournament is TCT1 and value of TCT1 is TCT1 = 1 + 0 + 2 + 0 + 0 + 2 = 5 TCT2 = 1 + 1 + 2 + 0 + 1 + 0 = 5 TCT3 = 6 TCT4 = 6 TCT5 = 6 TCT6 = 6 TCT7 = 5 TCT8 = 4 And the total transportation cost of the second combination of same tournament is TC2. TC2= 43 And so on for the all remains combinations and then we select minimum cost and optimized combination for Hamilton path tournament. IV ALGORITHM Optimize_Hamilton_Path_Tournament(A,TC,n, m) A is the 4 dimension array used to store all the combination of pairs generated by Hamilton path tournament and n is the number of team played in this tournament. m is indicate the number of total combination and TC used to store the Transportation cost of combinations. I. Set p ← 1 min ← MAX_VALUE Best_Combination ← 1 II. Repeat while p ≤ m 1. Set i ← 1 2. Repeat while i ≤ n (a) Set sum← 0 D1 ← 0 D2 ← 0 j ← 1 (b) Repeat while j ˂ n (i) Set k ← 1 (ii) Repeat while k ≤ n/2 (A) If A[j][k][0] = i or A[j][k][1] = i then do a. If D1= 0 then set D1 ← k b. Set D2 ← k c. If D1 = D2 then set sum ← sum + 0 Otherwise set sum ← sum + 1 D1 ← D2 d. Go to step (b) (B) Set k ← k + 1 (iii) Set j ← j + 1 (c) Set TCT[i] ← sum (d) Set TC[p] ← TC[p] + sum (e) Set i ← i + 1 3. If min > TC[p] then set min ← TC[p] Best_Combination ← p 4. Set p ← p + 1 III. Return Best_Combination V CONCLUSION Using Cost constraint on various combinations of Hamilton path tournament design for n teams, we have selected the combination of teams and stadiums such that all teams have to travel minimum distance for whole tournament. As all the teams will travel minimum distance, so the cost of their transportation and other expenses associated with them will also be minimum. This algorithm
  • 4. ISSN: 2278 – 1323 International Journal of Advanced Research in Computer Engineering & Technology (IJARCET) Volume 2, Issue 6, June 2013 2094 www.ijarcet.org can be used to design tournaments in a cost effective manner and also if the teams will travel less, their performance will also increase. In future, time constraint can also be added to this algorithm. REFERENCES [1] Yoshiko T. Ikebe, Akihisa Tamura: Construction of Hamilton Path Tournament Designs. Graphs and Combinatorics (2011) 27:703–711 DOI 10.1007/s00373-010-0998-6 [2] de Werra, D.: Some models of graphs for scheduling sports competitions. Discrete Appl. Math. 21, 47–65 (1988) [3] de Werra, D., Ekim, T., Raess, C.: Construction of sports schedules with multiple venues. Discrete Appl. Math. 154, 47–58 (2006) [4] Gelling, E.N., Odeh, R.E.: On 1-factorizations of the complete graph and the relationship to roundrobin tournaments, Proc. Third Manitoba Conference on Numerical Math.,Winnipeg 213–221 (1973) [5] Ikebe, Y.T., Tamura, A.: On the existence of sports schedules with multiple venues. Discrete Appl. Math. 156, 1694–1710 (2008) 123 Graphs and Combinatorics (2011) 27:703–711 711 [6] . Lamken,E.R.,Vanstone, S.A.: Balanced tournament designs and related topics.Discrete Math. 77, 159– 176 (1989) [7] Nemhauser, G., Trick,M.: Scheduling a major college basketball conference. Oper. Res. 46, 1–8 (1998) [8] Russell, R.A., Urban, T.L.:Aconstraint-programming approach to themultiple-venue sport-scheduling problem. Comput. Oper. Res. 33, 1895–1906 (2006) [9] Schellenberg, P.J., van Rees, G.H.J., Vanstone, S.A.: The existence of balanced tournament design. Ars Combinatoria 3, 303–317 (1977) [10] Urban, T.L., Russell, R.A.: Scheduling sports competitions on multiple venues. European J. Oper. Res. 148, 302–311 (2003) 123 Trinetra Kumar Pathak is pursuing his Master of Engineering in Software Engineering from Thapar University. He has qualified Gate and is currently pursuing his six months thesis on Algorithms. Vinod Kumar Bhalla is working as Assistant Professor in Computer Science and Engineering Department, Thapar University, Patiala since 2001. He is taking courses of Object Oriented Programming, Analysis & Design, Software Engineering