SlideShare ist ein Scribd-Unternehmen logo
1 von 48
B                                         Smarter Supplier Management
                                          – Improving Supplier Performance Through Better
                                          Collaboration and Monitoring

                                          Sundar Kamakshisundaram – Ariba
                                          Olivier Veilhan – Bouygues Telecom
                                          Heiko Spanuth – KONE
                                          Rachel Lee – Norland Managed Services




© 2012 Ariba, Inc. All rights reserved.
Agenda


Introduction

Panel Discussion
     Olivier Veilhan – Bouygues Telecom
     Heiko Spanuth – KONE
     Rachel Lee – Norland Managed Services
Q&A




2   © 2012 Ariba, Inc. All rights reserved.
Strategic Sourcing Is Foundational, but Supplier
Management (SRM) Is Transformational...




      Source: Procurement Key Issues Study, The Hackett Group, 2011
3   © 2012 Ariba, Inc. All rights reserved.
Defining Supplier Management or
Alternately Called “SRM”…
                                                                     “Supplier Management” is multi- faceted and
                                                                     touches many aspects of Business Commerce
                  Registration &
                   On-boarding                   Supplier
                    Process                       Portals            • Supplier Information Management that unifies
                                                                       platform, process and supplier profiles across the
    Supplier                                                           company and keeps it current, complete and correct.
    Discovery                                                        • Highly usable web-based portal for suppliers to register
                            Supplier                   Performance
                                                                       and manage information collaboratively with customers
                           Management                  Management
                                                                     • Supplier Performance Management capabilities
                             or SRM
                                                                        including Process Workflow and approvals, Surveys
Vendor Master
                                                                        and scorecards, flexible role based dashboards and
 Management                                      Diversity/Green/
                                                    Corporate           customizable reports
                            Risk                  Responsibility     • A Robust technology platform that seamlessly
                         Management
                                                                        integrates in-context Supplier info such as
                                                                        Parentage, Financials, Diversity and Sustainability to
                                                                        manage and mitigate Supply Risk
                                                                     • A unified Supplier Record merging data and process
                                                                        flows to third party systems and data sources

4      © 2012 Ariba, Inc. All rights reserved.
What is Supplier Relationship
Management (SRM)*?
            “Key processes, definitions, tools, and roles to drive
    coordinated proactive management of suppliers across the business”
                                                                                                                                            Supplier Performance                                                                                                                                                                                             Supplier Development
 Supplier Stratification                            SRM Governance
                                                                                                                                               Management                                                                                                                                                                                                      and Collaboration

 How should supplier                         How should supplier-facing                                                                     How should supplier                                                                                                                                                                                              How should capabilities of
 relationships be stratified                 staff be organized and                                                                         performance be managed                                                                                                                                                                                           existing suppliers be
 based on strategic                          internal collaboration and                                                                     across different supplier                                                                                                                                                                                        developed to deliver
 importance to prioritize                    supplier interactions be                                                                       types and strata to                                                                                                                                                                                              continuous improvement
 resources and tailor                        conducted?                                                                                     maximize performance?                                                                                                                                                                                            and ongoing cost
 management processes?                                                                                                                                                                                                                                                                                                                                       reduction?

 • Supplier Stratification                   • Team Structure and                                                                           • Function KPI                                                                                                                                                                                                   • Supplier Development
   Definition                                  Roles                                                                                          Development                                                                                                                                                                                                      Needs Definition
 • Supplier Stratification                   • Ongoing Governance                                                                           • Supplier Performance                                                                                                                                                                                           • Supplier Development
   Criteria                                  • SRM Competency                                                                                 Target, KPI and                                                                                                                                                                                                  Program Definition
 • Supplier Stratification                     Management                                                                                     Scorecard Definition                                                                                                                                                                                           • Ongoing Supplier
   Process                                                                                                                                  • Ongoing Supplier                                                                                                                                                                                                 Development
                                                                                                                                              Measurement. Includes
                                                                                                                                              Cost, Quality, Risk, etc.


                                                    Executive                                                                                 Supplier Scorecard                                                                                                                                                               Supplier Name
                                                        Executive
                         Strategic
                        Company-
                                                 Management
                                                          Executive
                                                     Management
                                                  Team Roles
                                                                            Executive
                                                                             Sponsor
                                                                               Executive
                                                                                Sponsor
                                                                                  Executive
                                                                                                 Executive
                                                                                                  Sponsor
                                                                                                    Executive
                                                                                                     Sponsor
                                                                                                       Executive
                                                                                                                                              SRM Lead:
                                                                                                                                              Account Manager:
                                                                                                                                                                                                                                                                                       Functional Area / Category:
                                                                                                                                                                                                                                                                                                            Site:
                                                                                                                                                                                                                                                                                                                                                                              Intellectual
                                                                                                                                                                                                                                                                                                                                                                                capital
                                                                            Company               Supplier                                    Supplier Contact:                                                                                                                                   Scorecard Date:

                       Wide Partners                    Management
                                                     Team Roles                    Sponsor              Sponsor
                                                                                                                                              Status                    Definition                                                                                              Supplier Representatives:
                         Strategic                       Team Roles                                                                           Good                      Meets or exceeds performance target
                        Enterprise
                         Partners
                                                 Relationship
                                                     Relationship
                                                                           Relationship
                                                                         Management Lead
                                                                              Relationship
                                                                                                Relationship
                                                                                              Management Lead
                                                                                                   Relationship
                                                                                                                                              Fair
                                                                                                                                              Poor
                                                                                                                                                                        Does not meet performance target; acceptable variance; improvement needed
                                                                                                                                                                        Unacceptable variance from performance targets; action required
                                                                                                                                                                                                                                                                                Company Representatives:

                                                                                                                                                                                                                                                                                                                                                                  Joint         sharing         Joint
          80%                                     Leads Roles              Management Lead
                                                                                 Relationship   Management Lead
                                                                                                      Relationship
                                                                                                                                              Invalid                   Invalid percentage data has been entered into the cell

                                                        Relationship
       Financial
         Value        Strategic
                                                     Leads Roles
                                                        Leads Roles
                                                                            Company
                                                                              Management Lead     Supplier
                                                                                                   Management Lead                                           KPIs                                             Metrics                                    Performance Targets                  Performance Trend
                                                                                                                                                                                                                                                                                                                                Supplier Score
                                                                                                                                                                                                                                                                                                                                (Scale of 1-10)
                                                                                                                                                                                                                                                                                                                                                  Comments
                                                                                                                                                                                                                                                                                                                                                                capability                     process
                                             Business Office Roles            Operations Management Team Roles                                                                                                 Metric   Metric    Data    Score     Unaccept-                        Last    Last    Last            One Qtr   Metric     KPI

                                                                                                                                                                                                                                                                                                                                                               investment                    improvement
                                                                                                                                                                                                                                                                 Accept-
                                                                                                                                                  KPI




                                                                                                                                                                                                                                                                            Target


                                                                                                                                                                                                                                                                                                                                                                                 Multi-
                                                                                                                                                                                                                                                                                                                                                                                 Multi-
                                                                                                                                                              KPI Wt.                Metric                                                                                                                 Today
                     Strategic Suppliers                                                                                                                                                                        Wt.     Total    Source   Range     able Range able Range             Yr     Qtr     Mo               Trend    Score     Score
                      Suppliers               Business Office Roles              Operations Management Team Roles
                                                                                                                                              of Supply -
                                                                                                                                              Assurance




                                                                                                                                                                                                                                                     ≤                      ≥                                          h
                                                Business Office Roles               Operations Management Team Roles
                                                                                                                                               Delivery




                                                                                                                                                                          On time delivery percentage           50%               tbd     0 - 100         80    81 - 89         90     90     80      85     90                 9.0
                                               Contract     Communications         Operations         Initiative   Risk                                         15%
                                              Management
                                                  Contract
                                                Management
                                                             Management
                                                              Communications
                                                               Management
                                                                                    Management
                                                                                       Operations
                                                                                      Management
                                                                                                     Management
                                                                                                         Initiative
                                                                                                       Management
                                                                                                                        Management
                                                                                                                             Risk
                                                                                                                          Management
                                                                                                                                                                              Delivery conformance

                                                                                                                                                                          Additional available capacity
                                                                                                                                                                                                                50%

                                                                                                                                                                                                                56%
                                                                                                                                                                                                                        100%      tbd

                                                                                                                                                                                                                                  tbd
                                                                                                                                                                                                                                          0 - 100

                                                                                                                                                                                                                                          0 - 100
                                                                                                                                                                                                                                                     ≤

                                                                                                                                                                                                                                                     ≤
                                                                                                                                                                                                                                                          80

                                                                                                                                                                                                                                                          80
                                                                                                                                                                                                                                                                81 - 89

                                                                                                                                                                                                                                                                80 - 89
                                                                                                                                                                                                                                                                            ≥

                                                                                                                                                                                                                                                                            ≥
                                                                                                                                                                                                                                                                                90

                                                                                                                                                                                                                                                                                90
                                                                                                                                                                                                                                                                                       80

                                                                                                                                                                                                                                                                                       50
                                                                                                                                                                                                                                                                                              78

                                                                                                                                                                                                                                                                                              75
                                                                                                                                                                                                                                                                                                      85

                                                                                                                                                                                                                                                                                                      80
                                                                                                                                                                                                                                                                                                             95

                                                                                                                                                                                                                                                                                                             90
                                                                                                                                                                                                                                                                                                                       h

                                                                                                                                                                                                                                                                                                                       h
                                                                                                                                                                                                                                                                                                                                9.5

                                                                                                                                                                                                                                                                                                                                9.0
                                                                                                                                                                                                                                                                                                                                          9.3
                                                                                                                                                                                                                                                                                                                                                                               supplier
                                                                                                                                             Environment /
                                                                                                                                             Assurance of




                                                                Communications
                                                    Contract                              Operations         Initiative          Risk
                                                                                                                                                                                                                                                                                                                                                               Capability                    Systems &
                                                                                                                                               Business




                                                                                                                                                                                                                                                                                                                                                                             collaboration
                                                                                                                                               Supply -




                                               Company        Company
                                                                  Management         Company
                                                                                         Management   Company
                                                                                                          Management     Company
                                                  Management                                                                Management                          15%                                                                                  ≤                      ≥                                          i
                           Core
                       Core Suppliers          Supplier        Supplier               Supplier         Supplier          Supplier
                                                                                                                                                                                 Financial stress

                                                                                                                                                                                   Credit score
                                                                                                                                                                                                                33%

                                                                                                                                                                                                                11%     100%
                                                                                                                                                                                                                                  tbd

                                                                                                                                                                                                                                  tbd
                                                                                                                                                                                                                                          0 - 60

                                                                                                                                                                                                                                          0 - 20     ≤
                                                                                                                                                                                                                                                          48

                                                                                                                                                                                                                                                          16
                                                                                                                                                                                                                                                                49 - 53

                                                                                                                                                                                                                                                                  17        ≥
                                                                                                                                                                                                                                                                                54

                                                                                                                                                                                                                                                                                18
                                                                                                                                                                                                                                                                                       40

                                                                                                                                                                                                                                                                                       15
                                                                                                                                                                                                                                                                                              54

                                                                                                                                                                                                                                                                                              16
                                                                                                                                                                                                                                                                                                      58

                                                                                                                                                                                                                                                                                                      17
                                                                                                                                                                                                                                                                                                             50

                                                                                                                                                                                                                                                                                                             18        h
                                                                                                                                                                                                                                                                                                                                8.3

                                                                                                                                                                                                                                                                                                                                9.0       8.8

                       Suppliers
                                               Financial        Legal & Audit        Customer
                                                                                                                                                                                  Rejection rate
                                                                                                                                                                        Weighted non-comformance rate
                                                                                                                                                                                                                26%               tbd     0 - 100    ≤

                                                                                                                                                                                                                                                     ≤
                                                                                                                                                                                                                                                          80    81 - 89     ≥

                                                                                                                                                                                                                                                                            ≥
                                                                                                                                                                                                                                                                                90     70     75      80     90        h

                                                                                                                                                                                                                                                                                                                       h
                                                                                                                                                                                                                                                                                                                                9.0                            acquisition                     process
                                                                                                        Escalation      Performance                                                                             26%               tbd     0 - 100         80    81 - 89         90     80     83      85     91                 9.1
                                              Performance
                                                   Financial                        Satisfaction
                                                                                        Customer       Management       Management
                                                                                                                                                                                    / CAR

                                                                                                                                                                                                                                                                                                                                                               by supplier     Value         integration
                                                                                                                                                  Quality




                                              Management           Support Audit
                                                                   Legal &          Management            Escalation       Performance                          25%              Process chage                  16%               tbd     0 - 60     ≤    48    49 - 53     ≥   54     40     45      50     60        h        10.0
                                                 Performance
                                                      Financial      Support           Satisfaction
                                                                                           Customer      Management       Management
          20%                                   Management
                                               Company            Company & Audit
                                                                      Legal           Management
                                                                                     Company
                                                                                          Satisfaction       Escalation
                                                                                                        Company               Performance
                                                                                                                         Company                                                   Audit rating                 16%               tbd     0 - 60     ≤    48    49 - 53     ≥   54     30     35      40     42        h        7.0
                          Basic                     Performance         Support                             Management        Management
       Financial
         Value
                     Basic Suppliers
                   Transactional Suppliers
                       Suppliers
                                                    Management
                                                Supplier          Supplier               Management
                                                                                     Supplier            Supplier         Supplier
                                                                                                                     Supplier 1
                                                                                                                                                                               Auidt response time

                                                                                                                                                                         Response to standard request
                                                                                                                                                                                                                16%

                                                                                                                                                                                                                9%
                                                                                                                                                                                                                        100%      tbd

                                                                                                                                                                                                                                  tbd
                                                                                                                                                                                                                                          0 - 60

                                                                                                                                                                                                                                          0 - 100
                                                                                                                                                                                                                                                     ≤

                                                                                                                                                                                                                                                     ≤
                                                                                                                                                                                                                                                          48

                                                                                                                                                                                                                                                          80
                                                                                                                                                                                                                                                                49 - 53

                                                                                                                                                                                                                                                                81 - 89
                                                                                                                                                                                                                                                                            ≥

                                                                                                                                                                                                                                                                            ≥
                                                                                                                                                                                                                                                                                54

                                                                                                                                                                                                                                                                                90
                                                                                                                                                                                                                                                                                       40

                                                                                                                                                                                                                                                                                       60
                                                                                                                                                                                                                                                                                              43

                                                                                                                                                                                                                                                                                              70
                                                                                                                                                                                                                                                                                                      45

                                                                                                                                                                                                                                                                                                      80
                                                                                                                                                                                                                                                                                                             56

                                                                                                                                                                                                                                                                                                             91
                                                                                                                                                                                                                                                                                                                       h

                                                                                                                                                                                                                                                                                                                       h
                                                                                                                                                                                                                                                                                                                                9.3

                                                                                                                                                                                                                                                                                                                                9.1
                                                                                                                                                                                                                                                                                                                                          8.9
                                                                                                                                                                                                                                                                                                                                                                              creation
                                                                                                                       Supplier 2
                                                                                                                           Supplier 3
                                                                                                                                                                        Response to emergency request
                                                                                                                                                                         Communication about potential
                                                                                                                                                                                 problems
                                                                                                                                                                                                                9%

                                                                                                                                                                                                                9%
                                                                                                                                                                                                                                  tbd

                                                                                                                                                                                                                                  tbd
                                                                                                                                                                                                                                          0 - 100

                                                                                                                                                                                                                                          0 - 100
                                                                                                                                                                                                                                                     ≤

                                                                                                                                                                                                                                                     ≤
                                                                                                                                                                                                                                                          80

                                                                                                                                                                                                                                                          80
                                                                                                                                                                                                                                                                81 - 89

                                                                                                                                                                                                                                                                81 - 89
                                                                                                                                                                                                                                                                            ≥

                                                                                                                                                                                                                                                                            ≥
                                                                                                                                                                                                                                                                                90

                                                                                                                                                                                                                                                                                90
                                                                                                                                                                                                                                                                                       90

                                                                                                                                                                                                                                                                                       70
                                                                                                                                                                                                                                                                                              80

                                                                                                                                                                                                                                                                                              75
                                                                                                                                                                                                                                                                                                      70

                                                                                                                                                                                                                                                                                                      76
                                                                                                                                                                                                                                                                                                             60

                                                                                                                                                                                                                                                                                                             78
                                                                                                                                                                                                                                                                                                                       i

                                                                                                                                                                                                                                                                                                                       h
                                                                                                                                                                                                                                                                                                                                6.0

                                                                                                                                                                                                                                                                                                                                7.8
                                                                                                                                                                                                                                                                                                                                                                             opportunity
                                                                                                                                                                               Flexibility to change            9%                tbd     0 - 100    ≤    80    81 - 89     ≥   90     80     85      85     91        h        9.1
                                                                 Roles    Company Team Member        Supplier Team Member
                                                                                                                                                                                                                                                     ≤                      ≥                                          h
                   Non-Preferred                                                                                                                                               Customer services                9%                tbd     0 - 100         80    81 - 89         90     70     75      80     85                 8.5
                                                                                                                                                  Services




                                                                                                                                                                15%     Efficiency in providing information     9%                tbd     0 - 100    ≤    80    81 - 89     ≥   90     90     80      70     60        i        6.0

                                                                                                                                                                             Local support efficiency           9%                tbd     0 - 100    ≤    80    81 - 89     ≥   90     75     80      85     91        h        9.1

                                                                                                                                                                              Production lead-times             9%                tbd     0 - 100    ≤    80    81 - 89     ≥   90     90     80      70     60        i        6.0
                                                                                                                                                                         Competitiveness of Production
                                                                                                                                                                                                                9%                tbd     0 - 100    ≤    80    81 - 89     ≥   90     75     80      85     90        h        9.0
                                                                                                                                                                                   lead-times
                                                                                                                                                                              Stability of lead-times           9%                tbd     0 - 100    ≤    80    81 - 89     ≥   90     75     80      80     80        g        8.0
                                                                                                                                                                          Compliance with quoted lead-
                                                                                                                                                                                                                9%      100%      tbd     0 - 100    ≤    80    81 - 89     ≥   90     75     80      85     90        h        9.0       8.0




* Hackett Group Study on SRM
                                                                                                                                                                                    times
Value of SRM?
•   Value beyond Sourcing Savings
                                                       World-Class procurement groups create:
            TCO reduction and „disciplined growth‟
                                                           – 3.6x greater savings from SRM than peers in
            Non-cost performance improvement                   direct spend

•   The Growth Agenda                                      – 13.1x greater savings from SRM than peers
                                                               in indirect!
            More innovation
                                                                                  Source: 2011 Hackett Procurement Benchmark




            Emerging markets
                                                                         Incremental revenue from
            “Agility” (variabilization, flexibility)                    supplier innovation efforts

•   Supply Risk
                                                                        facilitated by Procurement
                                                                                                  8.3%
            Viability/capacity
            Compliance (quality, regulatory, etc.)                          3.5%

•   Third-party governance
•   Supply Chain vs. Supply Chain
            Multi-tier management
•
                                                                           Peer Group          Top Quartile
    Efficiency/automation of SRM                                           Source: 2011 Hackett Procurement Benchmark




6   © 2012 Ariba, Inc. All rights reserved.
B
                                          Bouygues Telecom

                                          Olivier Veilhan, Head of Purchasing and IT
                                          Processes




© 2012 Ariba, Inc. All rights reserved.
Agenda


    • Ariba Solution within Bouygues Telecom
    • Supplier Relationship Management
          • 360° View
          • Current situation
          • Next Steps




8   © 2012 Ariba, Inc. All rights reserved.
Bouygues Telecom : 3rd operator in
    France
    • Key dates
                 Creation of company: October 1994
                 Commercial launch: 29 May 1996
                 Acquisition of fixed network: 1 July 2008


    • Key figures
                 11,304,000 mobile customers (end December 2011)
                 1,241,000 fixed broadband customers (end December 2011)
                 9,800 employees (end 2011)
                 5.741 B€ sales in 2011


    • Ownership structure
                                     89.5%                            10.5%


9   © 2012 Ariba, Inc. All rights reserved.
Purchasing Organisation
                                                                 Over 2.4 B€ ordered in 2011
                                                            80 people in purchasing organisation
                           Center of Service, IT, Process

                          Performance and Sustainable
                                 development

                                               Network

                                               Handsets

                           Marketing, adv. com, General
                                     supplies

                                                  IT

                                          Fixed services

10   © 2012 Ariba, Inc. All rights reserved.
Ariba On-demand Solution within
     Bouygues Telecom
     •   Ariba upstream solution since end 2010 :
                   Sourcing, Supplier Information and Performance
                   Management
                   All commodities are sourced in Sourcing
                   200 sourcing events done today
                   300 internal users (buyers and team members)
                   900 suppliers contacts
     •   Contract module to be deployed in june 2012


11   © 2012 Ariba, Inc. All rights reserved.
Our Goal : 360°-view of Supplier

                                                           Sourcing
                                                            events


 •   Sustainable
 •   Financial                  External
                                                                              Contracts
     (ratings…)               informations
 •   …                                                     Supplier
                                                            Profile



                                                                        Supplier
                                                                                    •   Surveys
                                                   Spend                            •   Scorecards
                                                                      Performance
         © 2012 Ariba, Inc. All rights reserved.



12
Our Goal : 360°-view of Supplier

                         Supplier Profile



  Spend


                                       Contracts
                                                        Surveys




                              Sourcing
                               events

                                                   Scorecards


  © 2012 Ariba, Inc. All rights reserved.
Supplier Profile

     •   Supplier creation initiated by each buyer
     •   Supplier profile to be fulfilled by each supplier at
         first event
                   All questions are not mandatory at first
     •   Standard Non Disclosure Agreement (NDA) included in
         the profile, dematerialized. On-line agreement is
         mandatory to access the event (RFx)



14   © 2012 Ariba, Inc. All rights reserved.
Subscriber Profile : 60 Questions




15   © 2012 Ariba, Inc. All rights reserved.
Subscriber Profile : Generic NDA




16   © 2012 Ariba, Inc. All rights reserved.
Today : Sustainable Infos

     •   Interface with Ecovadis sustainable informations
     •   Ecovadis main scores of suppliers‟ evaluations uploaded
         in Ariba suppliers profiles, including a link to the
         Ecovadis supplier profile
     •   Ecovadis provides a file with all the informations
     •   Bouygues Telecom uploads those informations in Ariba
         suppliers profile every month



17   © 2012 Ariba, Inc. All rights reserved.
Today : Sustainable Infos




18   © 2012 Ariba, Inc. All rights reserved.
Today : Sustainable Infos




19   © 2012 Ariba, Inc. All rights reserved.
Today : Suppliers Surveys
     •   190 {supplier-contract} surveys done based on an
         analysis process to identify business critical
         suppliers/contracts
     •   Evaluations every 6 months
     •   Scoring done in Excel

     •   Evolution to be studied with Ariba
                   Simplify the process of collecting the surveys
                   Implement scoring cards inside the platform

20   © 2012 Ariba, Inc. All rights reserved.
Today : Supplier Surveys
     Note des couples Fournisseur – prestation                                       Note des couples Fournisseur – prestation
     VAGUE 2                                                                         VAGUE 1
      Zone de risque
                                                                     LIVRAISONS
4     Nb de frns ds la zone
                                                                    PDT - SERVICES
                                                     DEPENDANCE
                                                     ECONOMIQUE
                                                                                              MAITRISE DE LA       Évaluation
                         évaluation                                                            PRESTATION
                                                                                                                   Opérationnelle
                         Financière

                                                                                                                MAINTENANCE /
                        RATING FINANCIER                                                                             SAV




                    DEVISE DE                                                                                     TRANSPARENCE
                REFERENCE = EURO


       Évaluation
       Économique
                               SUBSTITUABILITE                                                           RSE / ENVIRONNEMENT




                                               RSE / FOURNISSEURS                            RSE / LAB-SOCIAL

                                                                                                                   rating RSE
                                                                    RSE / ETHIQUE DES                              écovadis
21   © 2012 Ariba, Inc. All rights reserved.                            AFFAIRES
Tomorrow : Enrich the Supplier
     Vision
     •   Spend informations : extracted from our BW/ERP SAP
     •   Financial informations :
                   Eg : Dun & Bradstreet ratings and informations
     •   Possibly, legal suppliers documentation
     •   To be studied, self registration of new suppliers directly
         through Ariba




22   © 2012 Ariba, Inc. All rights reserved.
One-stop Supplier Shopping !




23   © 2012 Ariba, Inc. All rights reserved.
Thank you for your attention




24   © 2012 Ariba, Inc. All rights reserved.
B
                                          Norland’s Approach
                                          to Supplier
                                          Management
                                          Rachel Lee, Procurement Director




© 2012 Ariba, Inc. All rights reserved.
Norland at a Glance
      Private Limited Company – profits invested in future growth
      27 years – Hard Services led FM
      Turnover for 2010/11 - £252m - 96% Customer retention
      D&B Rating: 2A1
      2,452 members of staff - 93% Staff retention
      Customer focused Business Units
                                                300
                                                250

                                                200

                                                150
                                                                                     252
                                                100                   191.2   211
                                                              150.8
                                                50    122.9

                                                 0
                                                      FY07    FY08    FY09    FY10   FY11




26    © 2012 Ariba, Inc. All rights reserved.
Our Aim for SRM


                                      Gain competitive advantage by
                                               truly being a
                                           „customer of choice‟




27   © 2012 Ariba, Inc. All rights reserved.
Our Market

     •   Highly competitive market
     •   Common set of suppliers as our competitors
     •   Suppliers much larger than us
     •   Highly diverse supply chain
     •   Our customers often have greater brand recognition
         than us




28   © 2012 Ariba, Inc. All rights reserved.
Key Challenges
     •   Vast number of suppliers
     •   Volume of information needed
                   Including statutory requirement
     •   Downstreamed procurement model
     •   Many touch points with suppliers
     •   Varying service level requirements from our customers




29   © 2012 Ariba, Inc. All rights reserved.
SRM Objectives

     •   Fast, efficient on-boarding
     •   Statutory compliance
     •   Consistent pricing across our many sites
     •   Common view of supplier performance
     •   In summary
                             Manage our risks
                       Become „customer of choice‟


30   © 2012 Ariba, Inc. All rights reserved.
Our Market

     •   Highly competitive market
     •   Common set of suppliers as our competitors
     •   Suppliers much larger than us
     •   Highly diverse supply chain
     •   Our customers often have greater brand recognition
         than us




31   © 2012 Ariba, Inc. All rights reserved.
Operating Model

                                                                                               Supplier
            Supplier                            Contract                Sourcing
                                               Management                                    Performance
        Self registration                                            (tenders/auctions)
                                                                                                (SRM)



                                                                        Supplier selection
                Supplier data                      Repository           (category/region)       Automated
                  (scored)                     (controlled access)                              scorecards
                                                                        Drive compliance




                 Credential                       Search utility        Selection decision     Performance
                management                      (pricing & terms)         (negotiation)         dashboard




32   © 2012 Ariba, Inc. All rights reserved.
What We Did

     •   Developed Full and Lite SRM programme
     •   Kept it simple
     •   Extensive stakeholder engagement
     •   Training programme for business managers
     •   Soft skill development for Procurement team
     •   Clarified everyone‟s role in procurement
     •   Continual communication with suppliers


33   © 2012 Ariba, Inc. All rights reserved.
Barriers to Success

     •   Suppliers don‟t always „get it‟
     •   Procurement team need ability to „sell‟
     •   Time and resource available
     •   Trying to get to end game too quickly




34   © 2012 Ariba, Inc. All rights reserved.
B
                                          Ariba and Supplier
                                          Performance
                                          Management at KONE
                                          How ARIBA supports KONE in Supplier
                                          Performance Management
                                          Heiko Spanuth, Manager, Sourcing Processes




© 2012 Ariba, Inc. All rights reserved.
KONE – In Brief

                                               •   KONE provides
                                                      industry-leading elevators, escalators and automatic
                                                      building doors
                                                      innovative solutions for maintenance and
                                                      modernization
                                               •   KONE is one of the leading companies in its
                                                   industry
                                               •   KONE was founded in Finland in 1910
                                               •   KONE operates worldwide
                                               •   KONE has approx. 35,000 employees
                                               •   Net sales EUR 5.2 billion (2011)
                                               •   KONE is listed on the NASDAQ OMX Helsinki
                                                   since 1967



36   © 2012 Ariba, Inc. All rights reserved.
KONE Sourcing Organization
                                                                       MISSION
                                               •   Continuously improve customer value and profit
                                                   contribution by proactively engaging best-in-
                                                   class suppliers as well as our organization in
                                                   collaborative teamwork.
                                               •   Relentlessly provide innovative solutions and
                                                   reduce total cost of ownership so that KONE is
                                                   competitively positioned in every market.



                                                                     VISION
                                               •   To be recognized as a world-class sourcing
                                                   organization


37   © 2012 Ariba, Inc. All rights reserved.
KONE Sourcing Organization

     •   Team of approx. 140 central and local dedicated
         sourcing resources
     •   Category management concept (10 DM categories,
         6 NPR categories)
     •   Spend of approx. 2,5 billion EUR (approx. 60% direct
         materials)
     •   Dedicated supplier quality management team of
         approx. 35 people


38   © 2012 Ariba, Inc. All rights reserved.
How KONE Works with ARIBA

           Stage 1                              Stage 2     Stage 3      Stage 4       Stage 5
     Baseline                                  Evaluate   Negotiate   Implement       Manage




                                                                         ARIBA (=KONE SRM)
                                                                            supports all key
                                                                           phases of KONE‟s
                                                                           strategic sourcing
                                                                                  process



39   © 2012 Ariba, Inc. All rights reserved.
KONE SRM - Objectives
     •     SPEND MANAGEMENT
              Fast and reliable analyses
              and savings opportunity identification
              Automated quarterly Sourcing KPI reporting

     •     SOURCING MANAGEMENT
              Professional tendering through eRFXs and eNegotiations
              Sourcing cycle time reduction and increased transparency

     •     CONTRACTS MANAGEMENT
              Central repository for local and global sourcing agreements
              Creation of new agreements utilizing up-to-date templates
              Company wide system based contract approval flow

     •     SUPPLIER PERFORMANCE MANAGEMENT
              Standardized measurement of supplier performance for direct material suppliers
              and subcontracting suppliers based on objective criteria for all key suppliers
              Assessment of supplier risk

40       © 2012 Ariba, Inc. All rights reserved.
KONE SRM – In Numbers (2011)

     •   Users trained:                        230

     •   Contracts published:                  3200

     •   eSourcing events executed:            300

     •   Supplier Scorecards run:              666


41   © 2012 Ariba, Inc. All rights reserved.
Supplier Performance and Risk
     Management Challenges
     •   Production, employees and customers in all continents
     •   Low volume, high diversity operations, especially in
         maintenance business
     •   People Flow  Excellence in safety, quality and
         innovations
     •   Economic uncertainty and increased risk of supplier
         financial distress
     •   Increased need to manage sub-tier suppliers


42   © 2012 Ariba, Inc. All rights reserved.
Supplier Classification and Impact
     on Performance Measurement

                                                  •   Common Long Term plans (3-5 years)
                                                  •   Dedicated Team + Key Account
                                                  •   Supplier scorecard & Risk assessment
                                                  •   Supplier excellent certification
                                      Strategic   •   ...

                                                  •   Common Mid Term plans (1-3 years)
                                                  •   Establishes Dedicated Key Account
                                     Preferred    •   Supplier Scorecard & Risk assessment in place
                                                  •   ...
                                                  •   Common short Term plans (1 year)
                                                  •   Existing Purchasing contract/term and conditions
                                     Approved
                                                  •   KPI measurement
                                                  •   ...


43   © 2012 Ariba, Inc. All rights reserved.
Supplier Scorecards Used in KONE
             DM Supplier Scorecard                                              Risk Scorecard
     Quality KPIs                                                     Criticality to KONE
     Logistics and Responsiveness                                     Financial Viability
     Cost Competitiveness                                             Supplier Dependency
     Technical Capability                                             Dependency on tier-2 suppliers
     Service level and Proactivity                                    Supplier Operations
     Reaction Time Non-stock                                          Criticality to KONE

                                                     Installation Scorecard
                                               Safety KPIs
                                               Quality KPIs
                                               Cost Competitiveness
                                               Service Level
                                               Site Management
                                               Technical Competence

44   © 2012 Ariba, Inc. All rights reserved.
Supplier Performance Scorecard
     Facts & Principles
          Scorecard
                                           Suppliers
                                                       Frequency
                                                                      •   Supplier scorecards are generated and
                                           in Scope                       shared with suppliers based on the
     Direct Material                                                      questionaire results
     Supplier                                   150    4 x per year
     Scorecard                                                        •   Scores are given by selected individuals
                                                                          from selected functions within KONE
     Risk Scorecard                             120    2 x per year
                                                                      •   Scorecards are managed by a
                                                                          central team
     Installation
     Subcontracting                             200    2 x per year   •   Suppliers provide initial input for Risk
     Scorecard                                                            Scorecards

     Other scorecards                            -
                                                       on needed      •    Scorecard outcome is 1 input for KONE‟s
                                                         basis            supplier certification program



45    © 2012 Ariba, Inc. All rights reserved.
Thank you



                                               Any questions?




46   © 2012 Ariba, Inc. All rights reserved.
Q&A




     Contact info:
     Sundar Kamakshisundaram: sundar@ariba.com




47   © 2012 Ariba, Inc. All rights reserved.
Share This Session…NOW…from
     your mobile!
     •   All presentations are posted:
                   Guidebook mobile app
                       – Search Apple or Android app store
                         for Guidebook
                       – Enter code “collabor8”
                   Or at Slideshare.net/Ariba
     •   Share via email or social media

     **Come back soon – we are syncing                       #AribaLIVE
     audio and video interviews to
     the presentations**

48   © 2012 Ariba, Inc. All rights reserved.

Weitere ähnliche Inhalte

Was ist angesagt?

Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...Optimus BT
 
Warehouse management system
Warehouse management systemWarehouse management system
Warehouse management systemarunvarikoli
 
Purchasing and Procurement management
Purchasing and Procurement managementPurchasing and Procurement management
Purchasing and Procurement managementFarouk Nasser
 
SUPPLYCHAIN PROCESS FLOW CHART
SUPPLYCHAIN PROCESS FLOW CHARTSUPPLYCHAIN PROCESS FLOW CHART
SUPPLYCHAIN PROCESS FLOW CHARTAndrew Mugambi
 
Supply Chain Management Resilience
Supply Chain Management ResilienceSupply Chain Management Resilience
Supply Chain Management ResilienceTom Craig
 
Vendor Managed Inventory
Vendor Managed InventoryVendor Managed Inventory
Vendor Managed Inventoryloganath85
 
Procurement negotiations PJM400 Mod4
Procurement negotiations PJM400 Mod4Procurement negotiations PJM400 Mod4
Procurement negotiations PJM400 Mod4KHogan62
 
Supplier Relationship Management Program
Supplier Relationship Management ProgramSupplier Relationship Management Program
Supplier Relationship Management ProgramPeter Woon
 
use of IT in supply chain management
use of IT in supply chain managementuse of IT in supply chain management
use of IT in supply chain managementRohit Bhabal
 
What is a vendor-managed inventory system?
What is a vendor-managed inventory system?What is a vendor-managed inventory system?
What is a vendor-managed inventory system?ThreadSol
 
An approach to strategic sourcing /category management
An approach to strategic sourcing /category managementAn approach to strategic sourcing /category management
An approach to strategic sourcing /category managementDr Gordon Murray
 
Supply chain management Collaboration
Supply chain management CollaborationSupply chain management Collaboration
Supply chain management Collaborationbosp1
 
Basics of Supply Chain Managment
Basics of Supply Chain ManagmentBasics of Supply Chain Managment
Basics of Supply Chain ManagmentYoussef Serroukh
 
A view of procurement best practice
A view of procurement best practiceA view of procurement best practice
A view of procurement best practiceDr Gordon Murray
 

Was ist angesagt? (20)

Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
 
Warehouse management system
Warehouse management systemWarehouse management system
Warehouse management system
 
Purchasing and Procurement management
Purchasing and Procurement managementPurchasing and Procurement management
Purchasing and Procurement management
 
Srm Presentation
Srm PresentationSrm Presentation
Srm Presentation
 
SUPPLYCHAIN PROCESS FLOW CHART
SUPPLYCHAIN PROCESS FLOW CHARTSUPPLYCHAIN PROCESS FLOW CHART
SUPPLYCHAIN PROCESS FLOW CHART
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
Procurement: Strategies | Best Practices
Procurement: Strategies | Best PracticesProcurement: Strategies | Best Practices
Procurement: Strategies | Best Practices
 
Modeling Supply Chain
Modeling Supply ChainModeling Supply Chain
Modeling Supply Chain
 
S&OP FINAL
S&OP FINALS&OP FINAL
S&OP FINAL
 
Supply Chain Management Resilience
Supply Chain Management ResilienceSupply Chain Management Resilience
Supply Chain Management Resilience
 
Vendor Managed Inventory
Vendor Managed InventoryVendor Managed Inventory
Vendor Managed Inventory
 
Procurement negotiations PJM400 Mod4
Procurement negotiations PJM400 Mod4Procurement negotiations PJM400 Mod4
Procurement negotiations PJM400 Mod4
 
Supplier Relationship Management Program
Supplier Relationship Management ProgramSupplier Relationship Management Program
Supplier Relationship Management Program
 
use of IT in supply chain management
use of IT in supply chain managementuse of IT in supply chain management
use of IT in supply chain management
 
What is a vendor-managed inventory system?
What is a vendor-managed inventory system?What is a vendor-managed inventory system?
What is a vendor-managed inventory system?
 
An approach to strategic sourcing /category management
An approach to strategic sourcing /category managementAn approach to strategic sourcing /category management
An approach to strategic sourcing /category management
 
Supply chain management Collaboration
Supply chain management CollaborationSupply chain management Collaboration
Supply chain management Collaboration
 
Basics of Supply Chain Managment
Basics of Supply Chain ManagmentBasics of Supply Chain Managment
Basics of Supply Chain Managment
 
Analytics in Supply Chain Management
Analytics in Supply Chain ManagementAnalytics in Supply Chain Management
Analytics in Supply Chain Management
 
A view of procurement best practice
A view of procurement best practiceA view of procurement best practice
A view of procurement best practice
 

Andere mochten auch

Supplier Performance Management Webinar
Supplier Performance Management Webinar Supplier Performance Management Webinar
Supplier Performance Management Webinar Qualsys Ltd
 
Sogeti seminar Supplier Performance Measurement
Sogeti seminar Supplier Performance MeasurementSogeti seminar Supplier Performance Measurement
Sogeti seminar Supplier Performance MeasurementHarold van Heeringen
 
Building The Case For Supplier Relationship Management
Building The Case For Supplier Relationship ManagementBuilding The Case For Supplier Relationship Management
Building The Case For Supplier Relationship ManagementSource One Management Services
 
Presentazione Geom. Fabio Pecoraro "Fare Prevenzione Srls" 09 07-2015
Presentazione Geom. Fabio Pecoraro "Fare Prevenzione Srls" 09 07-2015Presentazione Geom. Fabio Pecoraro "Fare Prevenzione Srls" 09 07-2015
Presentazione Geom. Fabio Pecoraro "Fare Prevenzione Srls" 09 07-2015Fabio Pecoraro
 
Key Supplier Performance Metrics Process - Bill Kohnen
Key Supplier Performance Metrics Process - Bill KohnenKey Supplier Performance Metrics Process - Bill Kohnen
Key Supplier Performance Metrics Process - Bill KohnenBill Kohnen
 
Mitigating Global Supply Chain Risks through Smarter Supplier Management
Mitigating Global Supply Chain Risks through Smarter Supplier ManagementMitigating Global Supply Chain Risks through Smarter Supplier Management
Mitigating Global Supply Chain Risks through Smarter Supplier ManagementSAP Ariba
 
Smarter Supplier Management - Moving Beyond the Stick to Become a Customer o...
Smarter Supplier Management  - Moving Beyond the Stick to Become a Customer o...Smarter Supplier Management  - Moving Beyond the Stick to Become a Customer o...
Smarter Supplier Management - Moving Beyond the Stick to Become a Customer o...SAP Ariba
 
Next Generation Of Cloud Analytics
Next Generation Of Cloud AnalyticsNext Generation Of Cloud Analytics
Next Generation Of Cloud Analyticsvaleriepreston
 
Supplier relationship management srm research 2013
Supplier relationship management srm research 2013Supplier relationship management srm research 2013
Supplier relationship management srm research 2013tdolder
 
Supplier Relationship Management practices on corporate performance in the ke...
Supplier Relationship Management practices on corporate performance in the ke...Supplier Relationship Management practices on corporate performance in the ke...
Supplier Relationship Management practices on corporate performance in the ke...Gabriel Lubale
 
Quality manager performance appraisal
Quality manager performance appraisalQuality manager performance appraisal
Quality manager performance appraisaloscarjenkins342
 
Esouag r12 presentation
Esouag r12 presentationEsouag r12 presentation
Esouag r12 presentationBerry Clemens
 
Supplier Relationship Management Srm Research 2010 2011
Supplier Relationship Management  Srm  Research 2010 2011Supplier Relationship Management  Srm  Research 2010 2011
Supplier Relationship Management Srm Research 2010 2011salleijn
 
FDA Requirements for Supplier Management: A Primer from EduQuest
FDA Requirements for Supplier Management: A Primer from EduQuestFDA Requirements for Supplier Management: A Primer from EduQuest
FDA Requirements for Supplier Management: A Primer from EduQuestEduQuest, Inc.
 
Supplier Relation Management Revisited
Supplier Relation Management Revisited Supplier Relation Management Revisited
Supplier Relation Management Revisited ubmconference
 
Supply Base Optimization
Supply Base OptimizationSupply Base Optimization
Supply Base Optimizationmubarak2009
 

Andere mochten auch (20)

Supplier Performance Management Webinar
Supplier Performance Management Webinar Supplier Performance Management Webinar
Supplier Performance Management Webinar
 
Sogeti seminar Supplier Performance Measurement
Sogeti seminar Supplier Performance MeasurementSogeti seminar Supplier Performance Measurement
Sogeti seminar Supplier Performance Measurement
 
Building The Case For Supplier Relationship Management
Building The Case For Supplier Relationship ManagementBuilding The Case For Supplier Relationship Management
Building The Case For Supplier Relationship Management
 
Presentazione Geom. Fabio Pecoraro "Fare Prevenzione Srls" 09 07-2015
Presentazione Geom. Fabio Pecoraro "Fare Prevenzione Srls" 09 07-2015Presentazione Geom. Fabio Pecoraro "Fare Prevenzione Srls" 09 07-2015
Presentazione Geom. Fabio Pecoraro "Fare Prevenzione Srls" 09 07-2015
 
From elevators to people flow - Ari Virtanen - KONE
From elevators to people flow - Ari Virtanen - KONEFrom elevators to people flow - Ari Virtanen - KONE
From elevators to people flow - Ari Virtanen - KONE
 
Key Supplier Performance Metrics Process - Bill Kohnen
Key Supplier Performance Metrics Process - Bill KohnenKey Supplier Performance Metrics Process - Bill Kohnen
Key Supplier Performance Metrics Process - Bill Kohnen
 
Mitigating Global Supply Chain Risks through Smarter Supplier Management
Mitigating Global Supply Chain Risks through Smarter Supplier ManagementMitigating Global Supply Chain Risks through Smarter Supplier Management
Mitigating Global Supply Chain Risks through Smarter Supplier Management
 
Smarter Supplier Management - Moving Beyond the Stick to Become a Customer o...
Smarter Supplier Management  - Moving Beyond the Stick to Become a Customer o...Smarter Supplier Management  - Moving Beyond the Stick to Become a Customer o...
Smarter Supplier Management - Moving Beyond the Stick to Become a Customer o...
 
Next Generation Of Cloud Analytics
Next Generation Of Cloud AnalyticsNext Generation Of Cloud Analytics
Next Generation Of Cloud Analytics
 
Supplier relationship management srm research 2013
Supplier relationship management srm research 2013Supplier relationship management srm research 2013
Supplier relationship management srm research 2013
 
Supplier Relationship Management practices on corporate performance in the ke...
Supplier Relationship Management practices on corporate performance in the ke...Supplier Relationship Management practices on corporate performance in the ke...
Supplier Relationship Management practices on corporate performance in the ke...
 
Quality manager performance appraisal
Quality manager performance appraisalQuality manager performance appraisal
Quality manager performance appraisal
 
Esouag r12 presentation
Esouag r12 presentationEsouag r12 presentation
Esouag r12 presentation
 
Supplier Relationship Management Srm Research 2010 2011
Supplier Relationship Management  Srm  Research 2010 2011Supplier Relationship Management  Srm  Research 2010 2011
Supplier Relationship Management Srm Research 2010 2011
 
FDA Requirements for Supplier Management: A Primer from EduQuest
FDA Requirements for Supplier Management: A Primer from EduQuestFDA Requirements for Supplier Management: A Primer from EduQuest
FDA Requirements for Supplier Management: A Primer from EduQuest
 
Supplier Relation Management Revisited
Supplier Relation Management Revisited Supplier Relation Management Revisited
Supplier Relation Management Revisited
 
Value chain strategy 180315
Value chain strategy 180315Value chain strategy 180315
Value chain strategy 180315
 
Supplier kpi examples
Supplier kpi examplesSupplier kpi examples
Supplier kpi examples
 
Supply Base Optimization
Supply Base OptimizationSupply Base Optimization
Supply Base Optimization
 
Crm
CrmCrm
Crm
 

Ähnlich wie Smarter Supplier Management - Improving Supplier Performance Through Better Collaboration and Monitoring

Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010Shanker Sareen
 
10 steps to_4_g_service_assurance
10 steps to_4_g_service_assurance10 steps to_4_g_service_assurance
10 steps to_4_g_service_assuranceTelecosm
 
tripleA Brochure
tripleA BrochuretripleA Brochure
tripleA Brochurefoggitt
 
Richard J. Sherman from Emeritus Supply Chain Council; Chairman’s Day Two Kic...
Richard J. Sherman from Emeritus Supply Chain Council; Chairman’s Day Two Kic...Richard J. Sherman from Emeritus Supply Chain Council; Chairman’s Day Two Kic...
Richard J. Sherman from Emeritus Supply Chain Council; Chairman’s Day Two Kic...eyefortransport
 
Nari Viswanathan from Aberdeen Group on ‘The Supply Chain Executive's Strateg...
Nari Viswanathan from Aberdeen Group on ‘The Supply Chain Executive's Strateg...Nari Viswanathan from Aberdeen Group on ‘The Supply Chain Executive's Strateg...
Nari Viswanathan from Aberdeen Group on ‘The Supply Chain Executive's Strateg...eyefortransport
 
STRATEGIC USE OF MIS DRGORAD
STRATEGIC USE OF MIS DRGORADSTRATEGIC USE OF MIS DRGORAD
STRATEGIC USE OF MIS DRGORADDeepak R Gorad
 
Supply Chain Conference Brochure 20101
Supply Chain Conference Brochure 20101Supply Chain Conference Brochure 20101
Supply Chain Conference Brochure 20101carolinesalen
 
Chris Coan The Strategically Aligned Performance Management Solution
Chris Coan The Strategically Aligned Performance Management SolutionChris Coan The Strategically Aligned Performance Management Solution
Chris Coan The Strategically Aligned Performance Management SolutionTomOwenHughes
 
Performance Management Overview
Performance Management OverviewPerformance Management Overview
Performance Management OverviewRichard Merrick
 
Strategy - assessment template
Strategy - assessment templateStrategy - assessment template
Strategy - assessment templateMichael Ling
 
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery ModelSaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery ModelHROAssoc
 
Recruit and retain IT professionals Gary Fay
Recruit and retain IT professionals Gary FayRecruit and retain IT professionals Gary Fay
Recruit and retain IT professionals Gary FaySFIA User Forum
 
Information systems-outsourcingasperp4459
Information systems-outsourcingasperp4459Information systems-outsourcingasperp4459
Information systems-outsourcingasperp4459StudsPlanet.com
 
Direct Spend Management
Direct Spend ManagementDirect Spend Management
Direct Spend ManagementGenpact Ltd
 
Sage er px3-puerto rico
Sage er px3-puerto ricoSage er px3-puerto rico
Sage er px3-puerto ricoSuzanne Spear
 
InfosysPublicServices - Provider Network & Performance Management | Solutions
InfosysPublicServices - Provider Network & Performance Management | SolutionsInfosysPublicServices - Provider Network & Performance Management | Solutions
InfosysPublicServices - Provider Network & Performance Management | SolutionsInfosys
 
Link Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources
 

Ähnlich wie Smarter Supplier Management - Improving Supplier Performance Through Better Collaboration and Monitoring (20)

Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010Mukesh:IT Asset Management Pulse 2010
Mukesh:IT Asset Management Pulse 2010
 
10 steps to_4_g_service_assurance
10 steps to_4_g_service_assurance10 steps to_4_g_service_assurance
10 steps to_4_g_service_assurance
 
tripleA Brochure
tripleA BrochuretripleA Brochure
tripleA Brochure
 
Richard J. Sherman from Emeritus Supply Chain Council; Chairman’s Day Two Kic...
Richard J. Sherman from Emeritus Supply Chain Council; Chairman’s Day Two Kic...Richard J. Sherman from Emeritus Supply Chain Council; Chairman’s Day Two Kic...
Richard J. Sherman from Emeritus Supply Chain Council; Chairman’s Day Two Kic...
 
Nari Viswanathan from Aberdeen Group on ‘The Supply Chain Executive's Strateg...
Nari Viswanathan from Aberdeen Group on ‘The Supply Chain Executive's Strateg...Nari Viswanathan from Aberdeen Group on ‘The Supply Chain Executive's Strateg...
Nari Viswanathan from Aberdeen Group on ‘The Supply Chain Executive's Strateg...
 
STRATEGIC USE OF MIS DRGORAD
STRATEGIC USE OF MIS DRGORADSTRATEGIC USE OF MIS DRGORAD
STRATEGIC USE OF MIS DRGORAD
 
Winning With Your Supply Chain
Winning With Your Supply ChainWinning With Your Supply Chain
Winning With Your Supply Chain
 
Supply Chain Conference Brochure 20101
Supply Chain Conference Brochure 20101Supply Chain Conference Brochure 20101
Supply Chain Conference Brochure 20101
 
Chris Coan The Strategically Aligned Performance Management Solution
Chris Coan The Strategically Aligned Performance Management SolutionChris Coan The Strategically Aligned Performance Management Solution
Chris Coan The Strategically Aligned Performance Management Solution
 
Performance Management Overview
Performance Management OverviewPerformance Management Overview
Performance Management Overview
 
Workforce Productivity in BPO
Workforce Productivity in BPOWorkforce Productivity in BPO
Workforce Productivity in BPO
 
Oracle Procurement Channel
Oracle Procurement ChannelOracle Procurement Channel
Oracle Procurement Channel
 
Strategy - assessment template
Strategy - assessment templateStrategy - assessment template
Strategy - assessment template
 
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery ModelSaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
SaaS vs BPO: Operational Considerations of the SaaS Service Delivery Model
 
Recruit and retain IT professionals Gary Fay
Recruit and retain IT professionals Gary FayRecruit and retain IT professionals Gary Fay
Recruit and retain IT professionals Gary Fay
 
Information systems-outsourcingasperp4459
Information systems-outsourcingasperp4459Information systems-outsourcingasperp4459
Information systems-outsourcingasperp4459
 
Direct Spend Management
Direct Spend ManagementDirect Spend Management
Direct Spend Management
 
Sage er px3-puerto rico
Sage er px3-puerto ricoSage er px3-puerto rico
Sage er px3-puerto rico
 
InfosysPublicServices - Provider Network & Performance Management | Solutions
InfosysPublicServices - Provider Network & Performance Management | SolutionsInfosysPublicServices - Provider Network & Performance Management | Solutions
InfosysPublicServices - Provider Network & Performance Management | Solutions
 
Link Resources Nuclear Energy
Link Resources Nuclear EnergyLink Resources Nuclear Energy
Link Resources Nuclear Energy
 

Mehr von SAP Ariba

WINC. Australia and New Zealand: Collaborating with Direct Spend Suppliers - ...
WINC. Australia and New Zealand: Collaborating with Direct Spend Suppliers - ...WINC. Australia and New Zealand: Collaborating with Direct Spend Suppliers - ...
WINC. Australia and New Zealand: Collaborating with Direct Spend Suppliers - ...SAP Ariba
 
Using E-Commerce to Integrate Your Collaborative Business Transactions - SID ...
Using E-Commerce to Integrate Your Collaborative Business Transactions - SID ...Using E-Commerce to Integrate Your Collaborative Business Transactions - SID ...
Using E-Commerce to Integrate Your Collaborative Business Transactions - SID ...SAP Ariba
 
The Road to Strategic Finance: Characteristics of a Highly Effective Finance ...
The Road to Strategic Finance: Characteristics of a Highly Effective Finance ...The Road to Strategic Finance: Characteristics of a Highly Effective Finance ...
The Road to Strategic Finance: Characteristics of a Highly Effective Finance ...SAP Ariba
 
The Future of How Work Gets Done: Are You Seeing the Big Picture? - SID 51473
The Future of How Work Gets Done: Are You Seeing the Big Picture? - SID 51473The Future of How Work Gets Done: Are You Seeing the Big Picture? - SID 51473
The Future of How Work Gets Done: Are You Seeing the Big Picture? - SID 51473SAP Ariba
 
Simplify Supplier Risk Management Across Your Procurement Processes - SID 51538
Simplify Supplier Risk Management Across Your Procurement Processes - SID 51538Simplify Supplier Risk Management Across Your Procurement Processes - SID 51538
Simplify Supplier Risk Management Across Your Procurement Processes - SID 51538SAP Ariba
 
SAP Ariba Solutions Realized: Stories of Effective Implementation and Forward...
SAP Ariba Solutions Realized: Stories of Effective Implementation and Forward...SAP Ariba Solutions Realized: Stories of Effective Implementation and Forward...
SAP Ariba Solutions Realized: Stories of Effective Implementation and Forward...SAP Ariba
 
Rio Tinto: Sourcing Multiple Spend Categories in a Single Platform - SID 51255
Rio Tinto: Sourcing Multiple Spend Categories in a Single Platform - SID 51255Rio Tinto: Sourcing Multiple Spend Categories in a Single Platform - SID 51255
Rio Tinto: Sourcing Multiple Spend Categories in a Single Platform - SID 51255SAP Ariba
 
Preparing for Awesomeness: 12 Keys to Success - SID 51270
Preparing for Awesomeness: 12 Keys to Success - SID 51270Preparing for Awesomeness: 12 Keys to Success - SID 51270
Preparing for Awesomeness: 12 Keys to Success - SID 51270SAP Ariba
 
Paperless Supply Chain Collaboration at DuluxGroup - SID 51254
Paperless Supply Chain Collaboration at DuluxGroup - SID 51254Paperless Supply Chain Collaboration at DuluxGroup - SID 51254
Paperless Supply Chain Collaboration at DuluxGroup - SID 51254SAP Ariba
 
Leading Change and Diversity in Procurement - SID 51537
Leading Change and Diversity in Procurement - SID 51537Leading Change and Diversity in Procurement - SID 51537
Leading Change and Diversity in Procurement - SID 51537SAP Ariba
 
Key Strategies for Procurement to Increase Savings and Contribute to Strategi...
Key Strategies for Procurement to Increase Savings and Contribute to Strategi...Key Strategies for Procurement to Increase Savings and Contribute to Strategi...
Key Strategies for Procurement to Increase Savings and Contribute to Strategi...SAP Ariba
 
Redefining Procurement Transformation in the Digital Age - SID 51413
Redefining Procurement Transformation in the Digital Age - SID 51413Redefining Procurement Transformation in the Digital Age - SID 51413
Redefining Procurement Transformation in the Digital Age - SID 51413SAP Ariba
 
Redefining Procurement Transformation in the Digital Age - SID 51413
Redefining Procurement Transformation in the Digital Age - SID 51413Redefining Procurement Transformation in the Digital Age - SID 51413
Redefining Procurement Transformation in the Digital Age - SID 51413SAP Ariba
 
Recent Innovations in Sourcing, Contracts, and Spend Visibility - SID 51373
Recent Innovations in Sourcing, Contracts, and Spend Visibility - SID 51373Recent Innovations in Sourcing, Contracts, and Spend Visibility - SID 51373
Recent Innovations in Sourcing, Contracts, and Spend Visibility - SID 51373SAP Ariba
 
More Ways to Buy Means More Savings: Maximizing the Value of SAP Ariba Soluti...
More Ways to Buy Means More Savings: Maximizing the Value of SAP Ariba Soluti...More Ways to Buy Means More Savings: Maximizing the Value of SAP Ariba Soluti...
More Ways to Buy Means More Savings: Maximizing the Value of SAP Ariba Soluti...SAP Ariba
 
How to Get Mass Supplier Enablement: Transform Your Supplier Enablement Progr...
How to Get Mass Supplier Enablement: Transform Your Supplier Enablement Progr...How to Get Mass Supplier Enablement: Transform Your Supplier Enablement Progr...
How to Get Mass Supplier Enablement: Transform Your Supplier Enablement Progr...SAP Ariba
 
How to Craft a World-Class Commerce Program with Your Suppliers - SID 51263
How to Craft a World-Class Commerce Program with Your Suppliers - SID 51263How to Craft a World-Class Commerce Program with Your Suppliers - SID 51263
How to Craft a World-Class Commerce Program with Your Suppliers - SID 51263SAP Ariba
 
How Procurement Leaders Are Changing to Manage in the Digital Economy - SID 5...
How Procurement Leaders Are Changing to Manage in the Digital Economy - SID 5...How Procurement Leaders Are Changing to Manage in the Digital Economy - SID 5...
How Procurement Leaders Are Changing to Manage in the Digital Economy - SID 5...SAP Ariba
 
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...SAP Ariba
 
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...SAP Ariba
 

Mehr von SAP Ariba (20)

WINC. Australia and New Zealand: Collaborating with Direct Spend Suppliers - ...
WINC. Australia and New Zealand: Collaborating with Direct Spend Suppliers - ...WINC. Australia and New Zealand: Collaborating with Direct Spend Suppliers - ...
WINC. Australia and New Zealand: Collaborating with Direct Spend Suppliers - ...
 
Using E-Commerce to Integrate Your Collaborative Business Transactions - SID ...
Using E-Commerce to Integrate Your Collaborative Business Transactions - SID ...Using E-Commerce to Integrate Your Collaborative Business Transactions - SID ...
Using E-Commerce to Integrate Your Collaborative Business Transactions - SID ...
 
The Road to Strategic Finance: Characteristics of a Highly Effective Finance ...
The Road to Strategic Finance: Characteristics of a Highly Effective Finance ...The Road to Strategic Finance: Characteristics of a Highly Effective Finance ...
The Road to Strategic Finance: Characteristics of a Highly Effective Finance ...
 
The Future of How Work Gets Done: Are You Seeing the Big Picture? - SID 51473
The Future of How Work Gets Done: Are You Seeing the Big Picture? - SID 51473The Future of How Work Gets Done: Are You Seeing the Big Picture? - SID 51473
The Future of How Work Gets Done: Are You Seeing the Big Picture? - SID 51473
 
Simplify Supplier Risk Management Across Your Procurement Processes - SID 51538
Simplify Supplier Risk Management Across Your Procurement Processes - SID 51538Simplify Supplier Risk Management Across Your Procurement Processes - SID 51538
Simplify Supplier Risk Management Across Your Procurement Processes - SID 51538
 
SAP Ariba Solutions Realized: Stories of Effective Implementation and Forward...
SAP Ariba Solutions Realized: Stories of Effective Implementation and Forward...SAP Ariba Solutions Realized: Stories of Effective Implementation and Forward...
SAP Ariba Solutions Realized: Stories of Effective Implementation and Forward...
 
Rio Tinto: Sourcing Multiple Spend Categories in a Single Platform - SID 51255
Rio Tinto: Sourcing Multiple Spend Categories in a Single Platform - SID 51255Rio Tinto: Sourcing Multiple Spend Categories in a Single Platform - SID 51255
Rio Tinto: Sourcing Multiple Spend Categories in a Single Platform - SID 51255
 
Preparing for Awesomeness: 12 Keys to Success - SID 51270
Preparing for Awesomeness: 12 Keys to Success - SID 51270Preparing for Awesomeness: 12 Keys to Success - SID 51270
Preparing for Awesomeness: 12 Keys to Success - SID 51270
 
Paperless Supply Chain Collaboration at DuluxGroup - SID 51254
Paperless Supply Chain Collaboration at DuluxGroup - SID 51254Paperless Supply Chain Collaboration at DuluxGroup - SID 51254
Paperless Supply Chain Collaboration at DuluxGroup - SID 51254
 
Leading Change and Diversity in Procurement - SID 51537
Leading Change and Diversity in Procurement - SID 51537Leading Change and Diversity in Procurement - SID 51537
Leading Change and Diversity in Procurement - SID 51537
 
Key Strategies for Procurement to Increase Savings and Contribute to Strategi...
Key Strategies for Procurement to Increase Savings and Contribute to Strategi...Key Strategies for Procurement to Increase Savings and Contribute to Strategi...
Key Strategies for Procurement to Increase Savings and Contribute to Strategi...
 
Redefining Procurement Transformation in the Digital Age - SID 51413
Redefining Procurement Transformation in the Digital Age - SID 51413Redefining Procurement Transformation in the Digital Age - SID 51413
Redefining Procurement Transformation in the Digital Age - SID 51413
 
Redefining Procurement Transformation in the Digital Age - SID 51413
Redefining Procurement Transformation in the Digital Age - SID 51413Redefining Procurement Transformation in the Digital Age - SID 51413
Redefining Procurement Transformation in the Digital Age - SID 51413
 
Recent Innovations in Sourcing, Contracts, and Spend Visibility - SID 51373
Recent Innovations in Sourcing, Contracts, and Spend Visibility - SID 51373Recent Innovations in Sourcing, Contracts, and Spend Visibility - SID 51373
Recent Innovations in Sourcing, Contracts, and Spend Visibility - SID 51373
 
More Ways to Buy Means More Savings: Maximizing the Value of SAP Ariba Soluti...
More Ways to Buy Means More Savings: Maximizing the Value of SAP Ariba Soluti...More Ways to Buy Means More Savings: Maximizing the Value of SAP Ariba Soluti...
More Ways to Buy Means More Savings: Maximizing the Value of SAP Ariba Soluti...
 
How to Get Mass Supplier Enablement: Transform Your Supplier Enablement Progr...
How to Get Mass Supplier Enablement: Transform Your Supplier Enablement Progr...How to Get Mass Supplier Enablement: Transform Your Supplier Enablement Progr...
How to Get Mass Supplier Enablement: Transform Your Supplier Enablement Progr...
 
How to Craft a World-Class Commerce Program with Your Suppliers - SID 51263
How to Craft a World-Class Commerce Program with Your Suppliers - SID 51263How to Craft a World-Class Commerce Program with Your Suppliers - SID 51263
How to Craft a World-Class Commerce Program with Your Suppliers - SID 51263
 
How Procurement Leaders Are Changing to Manage in the Digital Economy - SID 5...
How Procurement Leaders Are Changing to Manage in the Digital Economy - SID 5...How Procurement Leaders Are Changing to Manage in the Digital Economy - SID 5...
How Procurement Leaders Are Changing to Manage in the Digital Economy - SID 5...
 
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
 
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
How Do Our Most Successful Customers Do It? The Must-Have Ingredients for Val...
 

Kürzlich hochgeladen

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 

Kürzlich hochgeladen (20)

Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 

Smarter Supplier Management - Improving Supplier Performance Through Better Collaboration and Monitoring

  • 1. B Smarter Supplier Management – Improving Supplier Performance Through Better Collaboration and Monitoring Sundar Kamakshisundaram – Ariba Olivier Veilhan – Bouygues Telecom Heiko Spanuth – KONE Rachel Lee – Norland Managed Services © 2012 Ariba, Inc. All rights reserved.
  • 2. Agenda Introduction Panel Discussion Olivier Veilhan – Bouygues Telecom Heiko Spanuth – KONE Rachel Lee – Norland Managed Services Q&A 2 © 2012 Ariba, Inc. All rights reserved.
  • 3. Strategic Sourcing Is Foundational, but Supplier Management (SRM) Is Transformational... Source: Procurement Key Issues Study, The Hackett Group, 2011 3 © 2012 Ariba, Inc. All rights reserved.
  • 4. Defining Supplier Management or Alternately Called “SRM”… “Supplier Management” is multi- faceted and touches many aspects of Business Commerce Registration & On-boarding Supplier Process Portals • Supplier Information Management that unifies platform, process and supplier profiles across the Supplier company and keeps it current, complete and correct. Discovery • Highly usable web-based portal for suppliers to register Supplier Performance and manage information collaboratively with customers Management Management • Supplier Performance Management capabilities or SRM including Process Workflow and approvals, Surveys Vendor Master and scorecards, flexible role based dashboards and Management Diversity/Green/ Corporate customizable reports Risk Responsibility • A Robust technology platform that seamlessly Management integrates in-context Supplier info such as Parentage, Financials, Diversity and Sustainability to manage and mitigate Supply Risk • A unified Supplier Record merging data and process flows to third party systems and data sources 4 © 2012 Ariba, Inc. All rights reserved.
  • 5. What is Supplier Relationship Management (SRM)*? “Key processes, definitions, tools, and roles to drive coordinated proactive management of suppliers across the business” Supplier Performance Supplier Development Supplier Stratification SRM Governance Management and Collaboration How should supplier How should supplier-facing How should supplier How should capabilities of relationships be stratified staff be organized and performance be managed existing suppliers be based on strategic internal collaboration and across different supplier developed to deliver importance to prioritize supplier interactions be types and strata to continuous improvement resources and tailor conducted? maximize performance? and ongoing cost management processes? reduction? • Supplier Stratification • Team Structure and • Function KPI • Supplier Development Definition Roles Development Needs Definition • Supplier Stratification • Ongoing Governance • Supplier Performance • Supplier Development Criteria • SRM Competency Target, KPI and Program Definition • Supplier Stratification Management Scorecard Definition • Ongoing Supplier Process • Ongoing Supplier Development Measurement. Includes Cost, Quality, Risk, etc. Executive Supplier Scorecard Supplier Name Executive Strategic Company- Management Executive Management Team Roles Executive Sponsor Executive Sponsor Executive Executive Sponsor Executive Sponsor Executive SRM Lead: Account Manager: Functional Area / Category: Site: Intellectual capital Company Supplier Supplier Contact: Scorecard Date: Wide Partners Management Team Roles Sponsor Sponsor Status Definition Supplier Representatives: Strategic Team Roles Good Meets or exceeds performance target Enterprise Partners Relationship Relationship Relationship Management Lead Relationship Relationship Management Lead Relationship Fair Poor Does not meet performance target; acceptable variance; improvement needed Unacceptable variance from performance targets; action required Company Representatives: Joint sharing Joint 80% Leads Roles Management Lead Relationship Management Lead Relationship Invalid Invalid percentage data has been entered into the cell Relationship Financial Value Strategic Leads Roles Leads Roles Company Management Lead Supplier Management Lead KPIs Metrics Performance Targets Performance Trend Supplier Score (Scale of 1-10) Comments capability process Business Office Roles Operations Management Team Roles Metric Metric Data Score Unaccept- Last Last Last One Qtr Metric KPI investment improvement Accept- KPI Target Multi- Multi- KPI Wt. Metric Today Strategic Suppliers Wt. Total Source Range able Range able Range Yr Qtr Mo Trend Score Score Suppliers Business Office Roles Operations Management Team Roles of Supply - Assurance ≤ ≥ h Business Office Roles Operations Management Team Roles Delivery On time delivery percentage 50% tbd 0 - 100 80 81 - 89 90 90 80 85 90 9.0 Contract Communications Operations Initiative Risk 15% Management Contract Management Management Communications Management Management Operations Management Management Initiative Management Management Risk Management Delivery conformance Additional available capacity 50% 56% 100% tbd tbd 0 - 100 0 - 100 ≤ ≤ 80 80 81 - 89 80 - 89 ≥ ≥ 90 90 80 50 78 75 85 80 95 90 h h 9.5 9.0 9.3 supplier Environment / Assurance of Communications Contract Operations Initiative Risk Capability Systems & Business collaboration Supply - Company Company Management Company Management Company Management Company Management Management 15% ≤ ≥ i Core Core Suppliers Supplier Supplier Supplier Supplier Supplier Financial stress Credit score 33% 11% 100% tbd tbd 0 - 60 0 - 20 ≤ 48 16 49 - 53 17 ≥ 54 18 40 15 54 16 58 17 50 18 h 8.3 9.0 8.8 Suppliers Financial Legal & Audit Customer Rejection rate Weighted non-comformance rate 26% tbd 0 - 100 ≤ ≤ 80 81 - 89 ≥ ≥ 90 70 75 80 90 h h 9.0 acquisition process Escalation Performance 26% tbd 0 - 100 80 81 - 89 90 80 83 85 91 9.1 Performance Financial Satisfaction Customer Management Management / CAR by supplier Value integration Quality Management Support Audit Legal & Management Escalation Performance 25% Process chage 16% tbd 0 - 60 ≤ 48 49 - 53 ≥ 54 40 45 50 60 h 10.0 Performance Financial Support Satisfaction Customer Management Management 20% Management Company Company & Audit Legal Management Company Satisfaction Escalation Company Performance Company Audit rating 16% tbd 0 - 60 ≤ 48 49 - 53 ≥ 54 30 35 40 42 h 7.0 Basic Performance Support Management Management Financial Value Basic Suppliers Transactional Suppliers Suppliers Management Supplier Supplier Management Supplier Supplier Supplier Supplier 1 Auidt response time Response to standard request 16% 9% 100% tbd tbd 0 - 60 0 - 100 ≤ ≤ 48 80 49 - 53 81 - 89 ≥ ≥ 54 90 40 60 43 70 45 80 56 91 h h 9.3 9.1 8.9 creation Supplier 2 Supplier 3 Response to emergency request Communication about potential problems 9% 9% tbd tbd 0 - 100 0 - 100 ≤ ≤ 80 80 81 - 89 81 - 89 ≥ ≥ 90 90 90 70 80 75 70 76 60 78 i h 6.0 7.8 opportunity Flexibility to change 9% tbd 0 - 100 ≤ 80 81 - 89 ≥ 90 80 85 85 91 h 9.1 Roles Company Team Member Supplier Team Member ≤ ≥ h Non-Preferred Customer services 9% tbd 0 - 100 80 81 - 89 90 70 75 80 85 8.5 Services 15% Efficiency in providing information 9% tbd 0 - 100 ≤ 80 81 - 89 ≥ 90 90 80 70 60 i 6.0 Local support efficiency 9% tbd 0 - 100 ≤ 80 81 - 89 ≥ 90 75 80 85 91 h 9.1 Production lead-times 9% tbd 0 - 100 ≤ 80 81 - 89 ≥ 90 90 80 70 60 i 6.0 Competitiveness of Production 9% tbd 0 - 100 ≤ 80 81 - 89 ≥ 90 75 80 85 90 h 9.0 lead-times Stability of lead-times 9% tbd 0 - 100 ≤ 80 81 - 89 ≥ 90 75 80 80 80 g 8.0 Compliance with quoted lead- 9% 100% tbd 0 - 100 ≤ 80 81 - 89 ≥ 90 75 80 85 90 h 9.0 8.0 * Hackett Group Study on SRM times
  • 6. Value of SRM? • Value beyond Sourcing Savings World-Class procurement groups create: TCO reduction and „disciplined growth‟ – 3.6x greater savings from SRM than peers in Non-cost performance improvement direct spend • The Growth Agenda – 13.1x greater savings from SRM than peers in indirect! More innovation Source: 2011 Hackett Procurement Benchmark Emerging markets Incremental revenue from “Agility” (variabilization, flexibility) supplier innovation efforts • Supply Risk facilitated by Procurement 8.3% Viability/capacity Compliance (quality, regulatory, etc.) 3.5% • Third-party governance • Supply Chain vs. Supply Chain Multi-tier management • Peer Group Top Quartile Efficiency/automation of SRM Source: 2011 Hackett Procurement Benchmark 6 © 2012 Ariba, Inc. All rights reserved.
  • 7. B Bouygues Telecom Olivier Veilhan, Head of Purchasing and IT Processes © 2012 Ariba, Inc. All rights reserved.
  • 8. Agenda • Ariba Solution within Bouygues Telecom • Supplier Relationship Management • 360° View • Current situation • Next Steps 8 © 2012 Ariba, Inc. All rights reserved.
  • 9. Bouygues Telecom : 3rd operator in France • Key dates  Creation of company: October 1994  Commercial launch: 29 May 1996  Acquisition of fixed network: 1 July 2008 • Key figures  11,304,000 mobile customers (end December 2011)  1,241,000 fixed broadband customers (end December 2011)  9,800 employees (end 2011)  5.741 B€ sales in 2011 • Ownership structure 89.5% 10.5% 9 © 2012 Ariba, Inc. All rights reserved.
  • 10. Purchasing Organisation Over 2.4 B€ ordered in 2011 80 people in purchasing organisation Center of Service, IT, Process Performance and Sustainable development Network Handsets Marketing, adv. com, General supplies IT Fixed services 10 © 2012 Ariba, Inc. All rights reserved.
  • 11. Ariba On-demand Solution within Bouygues Telecom • Ariba upstream solution since end 2010 : Sourcing, Supplier Information and Performance Management All commodities are sourced in Sourcing 200 sourcing events done today 300 internal users (buyers and team members) 900 suppliers contacts • Contract module to be deployed in june 2012 11 © 2012 Ariba, Inc. All rights reserved.
  • 12. Our Goal : 360°-view of Supplier Sourcing events • Sustainable • Financial External Contracts (ratings…) informations • … Supplier Profile Supplier • Surveys Spend • Scorecards Performance © 2012 Ariba, Inc. All rights reserved. 12
  • 13. Our Goal : 360°-view of Supplier Supplier Profile Spend Contracts Surveys Sourcing events Scorecards © 2012 Ariba, Inc. All rights reserved.
  • 14. Supplier Profile • Supplier creation initiated by each buyer • Supplier profile to be fulfilled by each supplier at first event All questions are not mandatory at first • Standard Non Disclosure Agreement (NDA) included in the profile, dematerialized. On-line agreement is mandatory to access the event (RFx) 14 © 2012 Ariba, Inc. All rights reserved.
  • 15. Subscriber Profile : 60 Questions 15 © 2012 Ariba, Inc. All rights reserved.
  • 16. Subscriber Profile : Generic NDA 16 © 2012 Ariba, Inc. All rights reserved.
  • 17. Today : Sustainable Infos • Interface with Ecovadis sustainable informations • Ecovadis main scores of suppliers‟ evaluations uploaded in Ariba suppliers profiles, including a link to the Ecovadis supplier profile • Ecovadis provides a file with all the informations • Bouygues Telecom uploads those informations in Ariba suppliers profile every month 17 © 2012 Ariba, Inc. All rights reserved.
  • 18. Today : Sustainable Infos 18 © 2012 Ariba, Inc. All rights reserved.
  • 19. Today : Sustainable Infos 19 © 2012 Ariba, Inc. All rights reserved.
  • 20. Today : Suppliers Surveys • 190 {supplier-contract} surveys done based on an analysis process to identify business critical suppliers/contracts • Evaluations every 6 months • Scoring done in Excel • Evolution to be studied with Ariba Simplify the process of collecting the surveys Implement scoring cards inside the platform 20 © 2012 Ariba, Inc. All rights reserved.
  • 21. Today : Supplier Surveys Note des couples Fournisseur – prestation Note des couples Fournisseur – prestation VAGUE 2 VAGUE 1 Zone de risque LIVRAISONS 4 Nb de frns ds la zone PDT - SERVICES DEPENDANCE ECONOMIQUE MAITRISE DE LA Évaluation évaluation PRESTATION Opérationnelle Financière MAINTENANCE / RATING FINANCIER SAV DEVISE DE TRANSPARENCE REFERENCE = EURO Évaluation Économique SUBSTITUABILITE RSE / ENVIRONNEMENT RSE / FOURNISSEURS RSE / LAB-SOCIAL rating RSE RSE / ETHIQUE DES écovadis 21 © 2012 Ariba, Inc. All rights reserved. AFFAIRES
  • 22. Tomorrow : Enrich the Supplier Vision • Spend informations : extracted from our BW/ERP SAP • Financial informations : Eg : Dun & Bradstreet ratings and informations • Possibly, legal suppliers documentation • To be studied, self registration of new suppliers directly through Ariba 22 © 2012 Ariba, Inc. All rights reserved.
  • 23. One-stop Supplier Shopping ! 23 © 2012 Ariba, Inc. All rights reserved.
  • 24. Thank you for your attention 24 © 2012 Ariba, Inc. All rights reserved.
  • 25. B Norland’s Approach to Supplier Management Rachel Lee, Procurement Director © 2012 Ariba, Inc. All rights reserved.
  • 26. Norland at a Glance  Private Limited Company – profits invested in future growth  27 years – Hard Services led FM  Turnover for 2010/11 - £252m - 96% Customer retention  D&B Rating: 2A1  2,452 members of staff - 93% Staff retention  Customer focused Business Units 300 250 200 150 252 100 191.2 211 150.8 50 122.9 0 FY07 FY08 FY09 FY10 FY11 26 © 2012 Ariba, Inc. All rights reserved.
  • 27. Our Aim for SRM Gain competitive advantage by truly being a „customer of choice‟ 27 © 2012 Ariba, Inc. All rights reserved.
  • 28. Our Market • Highly competitive market • Common set of suppliers as our competitors • Suppliers much larger than us • Highly diverse supply chain • Our customers often have greater brand recognition than us 28 © 2012 Ariba, Inc. All rights reserved.
  • 29. Key Challenges • Vast number of suppliers • Volume of information needed Including statutory requirement • Downstreamed procurement model • Many touch points with suppliers • Varying service level requirements from our customers 29 © 2012 Ariba, Inc. All rights reserved.
  • 30. SRM Objectives • Fast, efficient on-boarding • Statutory compliance • Consistent pricing across our many sites • Common view of supplier performance • In summary Manage our risks Become „customer of choice‟ 30 © 2012 Ariba, Inc. All rights reserved.
  • 31. Our Market • Highly competitive market • Common set of suppliers as our competitors • Suppliers much larger than us • Highly diverse supply chain • Our customers often have greater brand recognition than us 31 © 2012 Ariba, Inc. All rights reserved.
  • 32. Operating Model Supplier Supplier Contract Sourcing Management Performance Self registration (tenders/auctions) (SRM) Supplier selection Supplier data Repository (category/region) Automated (scored) (controlled access) scorecards Drive compliance Credential Search utility Selection decision Performance management (pricing & terms) (negotiation) dashboard 32 © 2012 Ariba, Inc. All rights reserved.
  • 33. What We Did • Developed Full and Lite SRM programme • Kept it simple • Extensive stakeholder engagement • Training programme for business managers • Soft skill development for Procurement team • Clarified everyone‟s role in procurement • Continual communication with suppliers 33 © 2012 Ariba, Inc. All rights reserved.
  • 34. Barriers to Success • Suppliers don‟t always „get it‟ • Procurement team need ability to „sell‟ • Time and resource available • Trying to get to end game too quickly 34 © 2012 Ariba, Inc. All rights reserved.
  • 35. B Ariba and Supplier Performance Management at KONE How ARIBA supports KONE in Supplier Performance Management Heiko Spanuth, Manager, Sourcing Processes © 2012 Ariba, Inc. All rights reserved.
  • 36. KONE – In Brief • KONE provides industry-leading elevators, escalators and automatic building doors innovative solutions for maintenance and modernization • KONE is one of the leading companies in its industry • KONE was founded in Finland in 1910 • KONE operates worldwide • KONE has approx. 35,000 employees • Net sales EUR 5.2 billion (2011) • KONE is listed on the NASDAQ OMX Helsinki since 1967 36 © 2012 Ariba, Inc. All rights reserved.
  • 37. KONE Sourcing Organization MISSION • Continuously improve customer value and profit contribution by proactively engaging best-in- class suppliers as well as our organization in collaborative teamwork. • Relentlessly provide innovative solutions and reduce total cost of ownership so that KONE is competitively positioned in every market. VISION • To be recognized as a world-class sourcing organization 37 © 2012 Ariba, Inc. All rights reserved.
  • 38. KONE Sourcing Organization • Team of approx. 140 central and local dedicated sourcing resources • Category management concept (10 DM categories, 6 NPR categories) • Spend of approx. 2,5 billion EUR (approx. 60% direct materials) • Dedicated supplier quality management team of approx. 35 people 38 © 2012 Ariba, Inc. All rights reserved.
  • 39. How KONE Works with ARIBA Stage 1 Stage 2 Stage 3 Stage 4 Stage 5 Baseline Evaluate Negotiate Implement Manage ARIBA (=KONE SRM) supports all key phases of KONE‟s strategic sourcing process 39 © 2012 Ariba, Inc. All rights reserved.
  • 40. KONE SRM - Objectives • SPEND MANAGEMENT Fast and reliable analyses and savings opportunity identification Automated quarterly Sourcing KPI reporting • SOURCING MANAGEMENT Professional tendering through eRFXs and eNegotiations Sourcing cycle time reduction and increased transparency • CONTRACTS MANAGEMENT Central repository for local and global sourcing agreements Creation of new agreements utilizing up-to-date templates Company wide system based contract approval flow • SUPPLIER PERFORMANCE MANAGEMENT Standardized measurement of supplier performance for direct material suppliers and subcontracting suppliers based on objective criteria for all key suppliers Assessment of supplier risk 40 © 2012 Ariba, Inc. All rights reserved.
  • 41. KONE SRM – In Numbers (2011) • Users trained: 230 • Contracts published: 3200 • eSourcing events executed: 300 • Supplier Scorecards run: 666 41 © 2012 Ariba, Inc. All rights reserved.
  • 42. Supplier Performance and Risk Management Challenges • Production, employees and customers in all continents • Low volume, high diversity operations, especially in maintenance business • People Flow  Excellence in safety, quality and innovations • Economic uncertainty and increased risk of supplier financial distress • Increased need to manage sub-tier suppliers 42 © 2012 Ariba, Inc. All rights reserved.
  • 43. Supplier Classification and Impact on Performance Measurement • Common Long Term plans (3-5 years) • Dedicated Team + Key Account • Supplier scorecard & Risk assessment • Supplier excellent certification Strategic • ... • Common Mid Term plans (1-3 years) • Establishes Dedicated Key Account Preferred • Supplier Scorecard & Risk assessment in place • ... • Common short Term plans (1 year) • Existing Purchasing contract/term and conditions Approved • KPI measurement • ... 43 © 2012 Ariba, Inc. All rights reserved.
  • 44. Supplier Scorecards Used in KONE DM Supplier Scorecard Risk Scorecard Quality KPIs Criticality to KONE Logistics and Responsiveness Financial Viability Cost Competitiveness Supplier Dependency Technical Capability Dependency on tier-2 suppliers Service level and Proactivity Supplier Operations Reaction Time Non-stock Criticality to KONE Installation Scorecard Safety KPIs Quality KPIs Cost Competitiveness Service Level Site Management Technical Competence 44 © 2012 Ariba, Inc. All rights reserved.
  • 45. Supplier Performance Scorecard Facts & Principles Scorecard Suppliers Frequency • Supplier scorecards are generated and in Scope shared with suppliers based on the Direct Material questionaire results Supplier 150 4 x per year Scorecard • Scores are given by selected individuals from selected functions within KONE Risk Scorecard 120 2 x per year • Scorecards are managed by a central team Installation Subcontracting 200 2 x per year • Suppliers provide initial input for Risk Scorecard Scorecards Other scorecards - on needed • Scorecard outcome is 1 input for KONE‟s basis supplier certification program 45 © 2012 Ariba, Inc. All rights reserved.
  • 46. Thank you Any questions? 46 © 2012 Ariba, Inc. All rights reserved.
  • 47. Q&A Contact info: Sundar Kamakshisundaram: sundar@ariba.com 47 © 2012 Ariba, Inc. All rights reserved.
  • 48. Share This Session…NOW…from your mobile! • All presentations are posted: Guidebook mobile app – Search Apple or Android app store for Guidebook – Enter code “collabor8” Or at Slideshare.net/Ariba • Share via email or social media **Come back soon – we are syncing #AribaLIVE audio and video interviews to the presentations** 48 © 2012 Ariba, Inc. All rights reserved.

Hinweis der Redaktion

  1. Speaking Notes: If procurement is about maximizing the value of supply, then strategic sourcing, as typically applied, addresses only a single element: pricing and TCO. Sourcing can only do so much to tap the true value of strategic relationships, drive innovation and improve supplier capabilities and performance over time. It is true that a strong sourcing process, embedded within a robust category management methodology, should set up the appropriate supplier relationship management (SRM) processes for success, especially surrounding strategic supplier relationships. But once preferred suppliers in a rationalized supply base are put in place, the game shifts toward joint value creation. This demands a collaborative approach that may prove difficult for many procurement organizations, as it requires new skills, processes, tools and organizational support.