CHAPTER TWO
MEASURMENT OF HORIZONTAL
DISTANCES
1
2.1 chain surveying
• Definitions:- Chain Surveying is a kinds of
surveying which is concerned in determining the
linear measurements b/n two points on the
surface of the earth.
• There are two methods of determining the
distance b/n two points on the surface of the
earth .
1. Direct measurements:- In these case distances
are directly measured by means of chain, tape etc.
2. Indirect (commutative methods):- In this case
distance are determined by calculation eg. in
triangulations traversing.
2
Instruments for Measuring Distance
• The materials for measuring horizontal distance directly are
o Tape:- either metallic tape, steel tape, cloth tape plastic tape.
o Steel band. (Surveyors band)
o Chains:- is measuring instruments which has It is available in lengths
varying from 15m to 100m
o EDM (Electronic Distance Measurement):- instruments that work using the
invariant velocity of light or electromagnetic waves in vacuum
 The other instruments which are involved in measuring a distance
(horizontal) are i.e to make station.
 Ranging Rods:- a circular section of 2m, 2.5m or 3m pointed with red &
white.
 Pegs:- these are either wooden or steel which are either circular or
square with length 30cm.
 Tripod:- in hard or paved pound tripod is used to support the ranging
rods.
 Plumb bob:- This is used to transfer the end points of the chain where
measuring distance in a hilly terrain. It is also to test the vertically of
ranging rod leveling etc.
3
Horizontal Distance Measuring tools
tripod
Tape
pegs
Plum bob
EDM
4
Principle of chaining
• In most of Engineering Surveying Steel band is
used.
• So to measure the length of a line which is
greater than the length of steel band the
following principle should be followed.
• Person is needed in chaining i.e with two chain
man.
Leader chain man (with ranging rod & peg).
Follower chain man.
One who is recording measurements (optional).
5
• Example 1 (on flat ground):- To measure the length
of line A which is 800m.
• Example 2 (On slopped ground): To measure a
distance AB.
6
Correction applied to steel taping error
• Systematic errors in taping are due to
(1) incorrect tape length,
(2) tape not horizontal,
(3) fluctuation in temperature of the tape,
(4) in correct tension or pull,
(5) sag in tape,
(6) incorrect alignment and
(7) tape not straight.
7
1. Correction for temperature: - The length of the tape
increases while the temperature is increased and
decreases if the temperature is lowered
Where L = measured length of a line
t = mean temperature during measurement in 𝑜𝑐.
ts = nominal temperature of standardization.
Ct = correction due to temperature
 = co-efficient of linear expansion.(6.5*10−6
oF)or
11.2*10-6oc
• If the Tfield>Tstan the correction is positive Tfield>Tstan it is
negative.
• Example: You must lay out two points that are exactly 100m
apart. Field conditions indicate that standard conditions
apply except the measured temperature is 27oC. Determine
the distance to be laid out. (Ts=20oc)
ANS: Ct = 11.2x10-6 /oC (27-20 oC) 100.000 m = +0.00784 m
8
2. Correction for Sag:- When the tape is suspended
from two support in air, is assumes the shape of
centenary.
Lc – L = Cs
CS= =
Where Cs = Correction for sag
w = weight per unit length
l = measured length of open
p = pull applied during measurement
Example: calculate the horizontal length b/n two
supports, if the recorded length is 30.6m, the tape
weights is 15N/m and applied tension is 20N.(-0.069)9
3. Correction for tension:- If the pull applied to the
tape during measurements is more than it is
standardized its length increase and the measured
distance become less than the actual.
• Correction for tensions is there for positive.
Let P = the tension of pull at field (N).
Ps = standardized tension. (N).
L = length measured.
A = Cross – sectional of steel band
E = Yoong’s modulus of elasticity of the steel bond.
Cten = Correction for tension
10
• Example : A heavy 50‐m tape having a
cross‐sectional sectional area of 0.05 cm2 has
been standardized at a tension of 5.5 kg. If E =
2.10 x 106
kg/cm2 , determine the elongation of
the tape if a pull of 12 kg is applied .
• 𝐶𝑡𝑒𝑛 =
12𝑘𝑔−5.5𝑘𝑔
0.05𝑐𝑚2∗2.1∗106 𝑘𝑔
𝑐𝑚2
0.5cm=3.1*𝟏𝟎−𝟓
cm
11
4. Correction for Altitude-: If the surveying is
connected to the functional mapping of the
country, the distance will need to be reduced to
the common datum at that system normally.
12
The correction for altitude for surface work is
negative & positive for tunneling work or mining
work below MSL.
Example: Let R=6,37 3,002m, LH=160,934m, then
calculate correction for altitude.
𝐶𝑎𝑙 =
160934𝑚
6373002𝑚
= 0.025
13
5. Correction for slope: - The distance measured
along the slope between two station is always
greater than the horizontal distance is known as
slope correction.
• This is always negative.
Where h = elevation differences between points
• similarly correction for slope if angle  is known.
14
Example: if h=1.37m, L=106.86m and 𝜃 = 60°
then determine the slope correction.
Cslope= -106.86m(1-cos60°)=-53.43m
Or
Cslope=
−1.372 𝑚
2∗106.86𝑚
=-0.0087m
15
6. Correction for alignment: Generally when a
surveying line is set out obstruction to follow
line may be composed of two or more straight
lines subtending on angle other than 1800
16
7. Correction for standard length:
• If you have given a tape for measuring a length at
field. Before using the tape its actual length
should be ascertained by comparing it with a
standard tape of known length.
• The designated nominal length of the tape is its
designated length e.g 30m or 100m
• The absolute length of the tape is it actual length
under specified condition.
• The absolute length of tape is seldom & Equal to
nominal length of the tape.
17
where:
CL= is the correction applied to the recorded measurement
l = is the actual tape length
l’= is the “nominal” tape length
L=is the recorded measurement
Example: A measurement of 171.278 m was recorded with a
30-m tape that was only 29.996 m long under standard
conditions. What is the corrected measurement?
L=171.278m, l=29.996m, l’=30m
𝐶𝐿 = L
𝑙′−𝑙
𝑙
= 171.278m
30𝑚−29.996𝑚
29.996𝑚
=0.228m
18
Degree of Accuracy in Chaining
• Some conditions affecting the accuracy are:
 Fitness of graduation of the chain.
 Nature of the ground.
 Time and money available
 Weather etc.
• Application of chain Surveying
 The main purpose of chain Surveying is to carry out one of
the following purpose.
 To have necessary data’s for exact description of the
boundaries of plot of lands.
 To determine the area of plot of land.
 To prepare accurate plan of plot of land.
 To determine the boundaries of plot of lands which is
previously surveyed.
 To divide the plot of lands in to a number of smaller unit.
19
Technical terms and their definition
• Some of the most technical terms which are use in
applications of chain surveying are.
• Main survey station: - the principle of chain surveying is to
divide the areas in to a number of triangles
• Main survey line: - The chain line joining the two main
stations.
• Subsidiary survey station: - the stations which are selected
on the main survey line for running auxiliary lines
• Subsidiary survey lines: - is the chain line going the main
survey stations and subsidiary survey stations.
• Based line:- is the longest of main survey lines
• Check line:- to check the accuracy of the field.
• If the measured length of a check line agrees with the
scaled off the plan, the survey is accurate.
20
• A, C, D, B=main
survey station
• AB, AC, CD, BD, =main
survey line
• E, F, =subsidiary
stations
• BF, CF= subsidiary line
• AD= base line
• GH, MN= check line
• L1, L2= offset lines
21
• Offset: the positions of details i.e. boundaries,
roads, churches, stream, bends etc. are
located with respect to the chain line by
measuring their distance right or left of the
chain lines. Such lateral measurements are
called offset
• There are two kinds of offset.
– Perpendicular offsets: - when the lateral
measurements are perpendicular to chain lines.
– Oblique offsets:- when the lateral measurements
are made of any angle to the chain line
22
23
Measurements of perpendicular offsets
• The offsets are generally measured either
metallic or steel tapes depending up on the
accuracy required of surveying.
• For every offset the following information has to
book.
I. The distance along the chain line or change.
II. The length of the offsets.
24
1. Cross staff
1.1 Open cross staff: - it is the simplest types of cross staff,
which is commonly used.
• It consists of head and leg.
• The head is wooden block octagonal or round, about 15
cm side or 20cm diameter and 4cm deep.
• The wooden block is provided with two cats 1cm deep at
right angle to each other for establishing two line of
rights.
25
Instruments for measuring right angles
26
1.2. French cross staff:-
• It consists of octagonal brass box with slits
cut in each face so that the opposite pairs
form a sight line.
• The instruments may be mounted on a
short ranging rods, and to set out a right
angle
27
1.3. Adjustable cross staff:-
 It consists of a brass cylinder tube divided at the
middle.
 The lower potions remains fixed and upper portions
can be rotated relative to the lower one by circular
rack.
 Sighting slits are provided in the both parts.
 The lower part is graduated in to degrees and their sub-
divisions while the upper one carries a vernier.
• Example for procedures is open cross staff: for siding
the foot of perpendicular offsets, proceed as under.
Chain line B A
• The cross staff is held vertically on the chain line where
perpendicular from an object is expected to meet.
• Turn the cross staff until one pair of opposite slits, is
directed to a ranging rod at A.
• Look through the other pair of slits and see if the points
to which the offset is taken, is bisected (C)
• If not, the cross staff is moved forward or backward on
the chain line tangented to A and bisect C.
• Care should be taken while holding the cross staff
vertically. 28
29
Optical square
Prism square

Weitere ähnliche Inhalte

Was ist angesagt?

Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingDolat Ram
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)Bhavik Patel
 
Introduction of surveying in Civil Engineering.
Introduction of surveying in Civil Engineering.Introduction of surveying in Civil Engineering.
Introduction of surveying in Civil Engineering.MD Sakib Hasan
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offsetMir Zafarullah
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURINGANAND JIBHKATE
 
surveying and levelling 2
surveying and levelling 2surveying and levelling 2
surveying and levelling 2Self-employed
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
 
Fundamentals of surveying
Fundamentals of surveyingFundamentals of surveying
Fundamentals of surveyingSimonReuben2
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and TrilaterationPramesh Hada
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsBahzad5
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - ReportSarchia Khursheed
 
traversing of survey
traversing of surveytraversing of survey
traversing of surveySelf-employed
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying Krish Bhavsar
 

Was ist angesagt? (20)

Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
EDM
EDMEDM
EDM
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Setting out of curve (Survey)
Setting out of curve (Survey)Setting out of curve (Survey)
Setting out of curve (Survey)
 
Introduction of surveying in Civil Engineering.
Introduction of surveying in Civil Engineering.Introduction of surveying in Civil Engineering.
Introduction of surveying in Civil Engineering.
 
Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offset
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
surveying and levelling 2
surveying and levelling 2surveying and levelling 2
surveying and levelling 2
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Fundamentals of surveying
Fundamentals of surveyingFundamentals of surveying
Fundamentals of surveying
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and Trilateration
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
Levelling
LevellingLevelling
Levelling
 
Unit 4
Unit 4Unit 4
Unit 4
 
Angular measurement for surveying
Angular measurement for surveyingAngular measurement for surveying
Angular measurement for surveying
 
Triangulation
Triangulation Triangulation
Triangulation
 
Profile and Cross-Section - Report
Profile and Cross-Section - ReportProfile and Cross-Section - Report
Profile and Cross-Section - Report
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Tacheometric surveying
Tacheometric surveying Tacheometric surveying
Tacheometric surveying
 

Ähnlich wie Surveying ch-two

Chain Surveying Lecture notes very important 2.pptx
Chain Surveying Lecture  notes very important 2.pptxChain Surveying Lecture  notes very important 2.pptx
Chain Surveying Lecture notes very important 2.pptxsahaniashish582003
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aRai University
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aRai University
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingParimal Jha
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGKamal B
 
Lecture 3-4(part 2).pdf
Lecture 3-4(part 2).pdfLecture 3-4(part 2).pdf
Lecture 3-4(part 2).pdfPlanningHCEGC
 
Lecture 02 distance corrections
Lecture 02 distance correctionsLecture 02 distance corrections
Lecture 02 distance correctionsRehan Hanif
 
Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringA Makwana
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingKishanKelothu
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineeringAshok Narisetti
 
Linear measurement
Linear measurementLinear measurement
Linear measurementNirant Patel
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdfsandipanpaul16
 
Linear measurement
Linear measurementLinear measurement
Linear measurementKHUSHBU SHAH
 
2-Linear-Measurements.pptx
2-Linear-Measurements.pptx2-Linear-Measurements.pptx
2-Linear-Measurements.pptxojjeswigautam
 

Ähnlich wie Surveying ch-two (20)

Chain Surveying Lecture notes very important 2.pptx
Chain Surveying Lecture  notes very important 2.pptxChain Surveying Lecture  notes very important 2.pptx
Chain Surveying Lecture notes very important 2.pptx
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
 
Lecture 3-4(part 2).pdf
Lecture 3-4(part 2).pdfLecture 3-4(part 2).pdf
Lecture 3-4(part 2).pdf
 
2-KMJ16303 Distance.pdf
2-KMJ16303 Distance.pdf2-KMJ16303 Distance.pdf
2-KMJ16303 Distance.pdf
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
Lecture 02 distance corrections
Lecture 02 distance correctionsLecture 02 distance corrections
Lecture 02 distance corrections
 
surveying and geomatics
surveying and geomaticssurveying and geomatics
surveying and geomatics
 
Chain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil EngineeringChain survey_Surveying, Civil Engineering
Chain survey_Surveying, Civil Engineering
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdf
 
Linear measurement
Linear measurementLinear measurement
Linear measurement
 
2-Linear-Measurements.pptx
2-Linear-Measurements.pptx2-Linear-Measurements.pptx
2-Linear-Measurements.pptx
 
Part 6 ece
Part 6 ecePart 6 ece
Part 6 ece
 

Kürzlich hochgeladen

Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIShubhangi Sonawane
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 

Kürzlich hochgeladen (20)

Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-IIFood Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
Food Chain and Food Web (Ecosystem) EVS, B. Pharmacy 1st Year, Sem-II
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 

Surveying ch-two

  • 1. CHAPTER TWO MEASURMENT OF HORIZONTAL DISTANCES 1
  • 2. 2.1 chain surveying • Definitions:- Chain Surveying is a kinds of surveying which is concerned in determining the linear measurements b/n two points on the surface of the earth. • There are two methods of determining the distance b/n two points on the surface of the earth . 1. Direct measurements:- In these case distances are directly measured by means of chain, tape etc. 2. Indirect (commutative methods):- In this case distance are determined by calculation eg. in triangulations traversing. 2
  • 3. Instruments for Measuring Distance • The materials for measuring horizontal distance directly are o Tape:- either metallic tape, steel tape, cloth tape plastic tape. o Steel band. (Surveyors band) o Chains:- is measuring instruments which has It is available in lengths varying from 15m to 100m o EDM (Electronic Distance Measurement):- instruments that work using the invariant velocity of light or electromagnetic waves in vacuum  The other instruments which are involved in measuring a distance (horizontal) are i.e to make station.  Ranging Rods:- a circular section of 2m, 2.5m or 3m pointed with red & white.  Pegs:- these are either wooden or steel which are either circular or square with length 30cm.  Tripod:- in hard or paved pound tripod is used to support the ranging rods.  Plumb bob:- This is used to transfer the end points of the chain where measuring distance in a hilly terrain. It is also to test the vertically of ranging rod leveling etc. 3
  • 4. Horizontal Distance Measuring tools tripod Tape pegs Plum bob EDM 4
  • 5. Principle of chaining • In most of Engineering Surveying Steel band is used. • So to measure the length of a line which is greater than the length of steel band the following principle should be followed. • Person is needed in chaining i.e with two chain man. Leader chain man (with ranging rod & peg). Follower chain man. One who is recording measurements (optional). 5
  • 6. • Example 1 (on flat ground):- To measure the length of line A which is 800m. • Example 2 (On slopped ground): To measure a distance AB. 6
  • 7. Correction applied to steel taping error • Systematic errors in taping are due to (1) incorrect tape length, (2) tape not horizontal, (3) fluctuation in temperature of the tape, (4) in correct tension or pull, (5) sag in tape, (6) incorrect alignment and (7) tape not straight. 7
  • 8. 1. Correction for temperature: - The length of the tape increases while the temperature is increased and decreases if the temperature is lowered Where L = measured length of a line t = mean temperature during measurement in 𝑜𝑐. ts = nominal temperature of standardization. Ct = correction due to temperature  = co-efficient of linear expansion.(6.5*10−6 oF)or 11.2*10-6oc • If the Tfield>Tstan the correction is positive Tfield>Tstan it is negative. • Example: You must lay out two points that are exactly 100m apart. Field conditions indicate that standard conditions apply except the measured temperature is 27oC. Determine the distance to be laid out. (Ts=20oc) ANS: Ct = 11.2x10-6 /oC (27-20 oC) 100.000 m = +0.00784 m 8
  • 9. 2. Correction for Sag:- When the tape is suspended from two support in air, is assumes the shape of centenary. Lc – L = Cs CS= = Where Cs = Correction for sag w = weight per unit length l = measured length of open p = pull applied during measurement Example: calculate the horizontal length b/n two supports, if the recorded length is 30.6m, the tape weights is 15N/m and applied tension is 20N.(-0.069)9
  • 10. 3. Correction for tension:- If the pull applied to the tape during measurements is more than it is standardized its length increase and the measured distance become less than the actual. • Correction for tensions is there for positive. Let P = the tension of pull at field (N). Ps = standardized tension. (N). L = length measured. A = Cross – sectional of steel band E = Yoong’s modulus of elasticity of the steel bond. Cten = Correction for tension 10
  • 11. • Example : A heavy 50‐m tape having a cross‐sectional sectional area of 0.05 cm2 has been standardized at a tension of 5.5 kg. If E = 2.10 x 106 kg/cm2 , determine the elongation of the tape if a pull of 12 kg is applied . • 𝐶𝑡𝑒𝑛 = 12𝑘𝑔−5.5𝑘𝑔 0.05𝑐𝑚2∗2.1∗106 𝑘𝑔 𝑐𝑚2 0.5cm=3.1*𝟏𝟎−𝟓 cm 11
  • 12. 4. Correction for Altitude-: If the surveying is connected to the functional mapping of the country, the distance will need to be reduced to the common datum at that system normally. 12
  • 13. The correction for altitude for surface work is negative & positive for tunneling work or mining work below MSL. Example: Let R=6,37 3,002m, LH=160,934m, then calculate correction for altitude. 𝐶𝑎𝑙 = 160934𝑚 6373002𝑚 = 0.025 13
  • 14. 5. Correction for slope: - The distance measured along the slope between two station is always greater than the horizontal distance is known as slope correction. • This is always negative. Where h = elevation differences between points • similarly correction for slope if angle  is known. 14
  • 15. Example: if h=1.37m, L=106.86m and 𝜃 = 60° then determine the slope correction. Cslope= -106.86m(1-cos60°)=-53.43m Or Cslope= −1.372 𝑚 2∗106.86𝑚 =-0.0087m 15
  • 16. 6. Correction for alignment: Generally when a surveying line is set out obstruction to follow line may be composed of two or more straight lines subtending on angle other than 1800 16
  • 17. 7. Correction for standard length: • If you have given a tape for measuring a length at field. Before using the tape its actual length should be ascertained by comparing it with a standard tape of known length. • The designated nominal length of the tape is its designated length e.g 30m or 100m • The absolute length of the tape is it actual length under specified condition. • The absolute length of tape is seldom & Equal to nominal length of the tape. 17
  • 18. where: CL= is the correction applied to the recorded measurement l = is the actual tape length l’= is the “nominal” tape length L=is the recorded measurement Example: A measurement of 171.278 m was recorded with a 30-m tape that was only 29.996 m long under standard conditions. What is the corrected measurement? L=171.278m, l=29.996m, l’=30m 𝐶𝐿 = L 𝑙′−𝑙 𝑙 = 171.278m 30𝑚−29.996𝑚 29.996𝑚 =0.228m 18
  • 19. Degree of Accuracy in Chaining • Some conditions affecting the accuracy are:  Fitness of graduation of the chain.  Nature of the ground.  Time and money available  Weather etc. • Application of chain Surveying  The main purpose of chain Surveying is to carry out one of the following purpose.  To have necessary data’s for exact description of the boundaries of plot of lands.  To determine the area of plot of land.  To prepare accurate plan of plot of land.  To determine the boundaries of plot of lands which is previously surveyed.  To divide the plot of lands in to a number of smaller unit. 19
  • 20. Technical terms and their definition • Some of the most technical terms which are use in applications of chain surveying are. • Main survey station: - the principle of chain surveying is to divide the areas in to a number of triangles • Main survey line: - The chain line joining the two main stations. • Subsidiary survey station: - the stations which are selected on the main survey line for running auxiliary lines • Subsidiary survey lines: - is the chain line going the main survey stations and subsidiary survey stations. • Based line:- is the longest of main survey lines • Check line:- to check the accuracy of the field. • If the measured length of a check line agrees with the scaled off the plan, the survey is accurate. 20
  • 21. • A, C, D, B=main survey station • AB, AC, CD, BD, =main survey line • E, F, =subsidiary stations • BF, CF= subsidiary line • AD= base line • GH, MN= check line • L1, L2= offset lines 21
  • 22. • Offset: the positions of details i.e. boundaries, roads, churches, stream, bends etc. are located with respect to the chain line by measuring their distance right or left of the chain lines. Such lateral measurements are called offset • There are two kinds of offset. – Perpendicular offsets: - when the lateral measurements are perpendicular to chain lines. – Oblique offsets:- when the lateral measurements are made of any angle to the chain line 22
  • 23. 23
  • 24. Measurements of perpendicular offsets • The offsets are generally measured either metallic or steel tapes depending up on the accuracy required of surveying. • For every offset the following information has to book. I. The distance along the chain line or change. II. The length of the offsets. 24
  • 25. 1. Cross staff 1.1 Open cross staff: - it is the simplest types of cross staff, which is commonly used. • It consists of head and leg. • The head is wooden block octagonal or round, about 15 cm side or 20cm diameter and 4cm deep. • The wooden block is provided with two cats 1cm deep at right angle to each other for establishing two line of rights. 25 Instruments for measuring right angles
  • 26. 26 1.2. French cross staff:- • It consists of octagonal brass box with slits cut in each face so that the opposite pairs form a sight line. • The instruments may be mounted on a short ranging rods, and to set out a right angle
  • 27. 27 1.3. Adjustable cross staff:-  It consists of a brass cylinder tube divided at the middle.  The lower potions remains fixed and upper portions can be rotated relative to the lower one by circular rack.  Sighting slits are provided in the both parts.  The lower part is graduated in to degrees and their sub- divisions while the upper one carries a vernier.
  • 28. • Example for procedures is open cross staff: for siding the foot of perpendicular offsets, proceed as under. Chain line B A • The cross staff is held vertically on the chain line where perpendicular from an object is expected to meet. • Turn the cross staff until one pair of opposite slits, is directed to a ranging rod at A. • Look through the other pair of slits and see if the points to which the offset is taken, is bisected (C) • If not, the cross staff is moved forward or backward on the chain line tangented to A and bisect C. • Care should be taken while holding the cross staff vertically. 28