Site Surveying - Report I (Leveling)
Table of Content
Cover Page

1

Table of Content

2

Introduction to Levelling

3–4

Objective

5

Outline of Apparatus

6–7

Levelling Result

8

Adjustment on Misclosure

9

Discussion

10

Conclusion

11

Learning Outcomes

2

Page

12

Site Surveying - Report I (Leveling)
Introduction to Levelling
Levelling is the art of determining the relative heights or elevations of a point on the
earth’s surface. It deals with measurements in a vertical plane.
In general terms,

Level Surfaceis any surface parallel to the mean spheroidal surface of the earth. Since
the earth is an oblate spheroid, a level surface may be regarded as a curved surface,
every point on which is equidistant from the center of the earth.
Vertical Line is a normal linelying on the level surface.
Horizontal Line is any line lying on the horizontal plane. It is usually a straight line
tangential to the level line.
Reduced Levelis a vertical distance of a point above or below the datum. The elevation
of a point is either plus or minus according to the point above or below the datum.
Benchmark (BM) is fixed reference point of known elevation.

3

Site Surveying - Report I (Leveling)
Introduction to Levelling
The line of collimation (HI)is the line intersectswith the cross hairs of the optical center
of the object glass. It is also called the line of sight.
Backsight (BS)is a point whose elevation is to be determined. It is the reading taken
after setting up the instrument.

Foresight(FS)is a reading on a point whose elevation is to be determined or on a
change points. It is the last reading before shifting the instrument.

An Intermediate sight (IS)is any reading taken ona point of unknown elevation from
the same set up of the level. All sights taken between the backsight and the foresight
are intermediate sights.
Change Point (CP)is atransfer point of the levelling. It is a point inwhich the foresight
and backsight are taken. Any defined objectscan beused as a change point. A
benchmark may also be taken as a change point. Sometimes, it is called as a turning
point (TP).

4

Site Surveying - Report I (Leveling)
Objective
 To establish a new benchmark
 To determine the difference in height of discrete points
 To identify the spot relative heights
 To identify possible errors occurred

5

Site Surveying - Report I (Leveling)
Outline of Apparatus
Theodolite is a device used widely to determine the
horizontal and vertical angles, distance, depths, etc.
Besides that, it is used to identify the ground level and the
ways to construct super-structure or sub-structure. A basic
theodolite consists of a small sized telescope with the
mechanism to measure horizontal and vertical angles.
Theodolite is able to rotate 360 degree on a tripod stand
by a levelling system. The angle can be measured on the
scale on the tripod. The calculation of the theodolite is
based on the principal of trigonometry, as used in
triangulation network. It is a key tool in surveying and
engineering work.

Tripodis a rigid type of stand that is capable of fixing minor lateral
movement on its top when required. It is used to support the other
components of theodolite including the telescope.

Horizontal bubble levelis an instrument used to indicate
the horizontal level. A slightly curved glass tube which in
incompletely filled with either spirit or alcohol.

Optical Plummetis a device that used to center the instrument
over a ground station. This component used in place of a
plumb bob to center transits and theodolite over a given point.

6

Site Surveying - Report I (Leveling)
Outline of Apparatus

Ruleris used to obtain the height of collimation through the scope
of theodolite.

Theodolite Telescopeis an instrument used to view distant
object. Telescope is an arrangement of lens that gather
visible light, permitting direct observation of a point through
the theodolite in a distance. There is a focusing screw to
adjust the clarity of the view in the telescope.

7

Site Surveying - Report I (Leveling)
Levelling Result
Backsight Foresight

Rise

Fall

Line of

Reduced

Collimation

Level

1.313

Remarks

100.000
101.313

99.899

TP 1

1.415

1.414

1.414

1.415

0.000

101.314

99.899

TP 2

1.414

1.313

0.101

101.313

100.000

TP 3

1.112

3.434

2.020

101.414

97.980

TP 4

1.516

1.314

0.202

99.092

97.778

TP 5

1.415

1.516

0.000

99.294

97.778

TP 6

1.515

1.313

0.102

99.193

97.880

TP 7

4.041

1.515

0.000

99.395

97.880

TP 8

1.515

1.414

2.627

101.921

100.507

TP 9

1.213

0.302

102.022

100.809

BM 1

- 15.861

3.132

0.809

=

16.670

0.101

BM 1

0.809

Correction

- 2.323
0.809

= (100.809 – 100.000) / 10
= 0.809 / 10
= 0.081

8

Site Surveying - Report I (Leveling)
Adjustment on Misclosure
Calculated

Line of

Reduced Level

Collimation

100.000

Remarks

Adjustment

Adjusted

Adjusted Line

Reduced Level

of Collimation

BM 1

(0.000)

100.000

100.000

99.899

101.313

TP 1

(0.081)

99.818

101.232

99.899

101.314

TP 2

(0.162)

99.737

101.152

100.000

101.313

TP 3

(0.243)

99.757

101.070

97.980

101.414

TP 4

(0.324)

97.656

101.090

97.778

99.092

TP 5

(0.405)

97.373

98.687

97.778

99.294

TP 6

(0.485)

97.293

98.809

97.880

99.193

TP 7

(0.566)

97.314

98.627

97.880

99.395

TP 8

(0.647)

97.233

98.748

100.507

101.921

TP 9

(0.728)

99.779

101.193

100.809

102.022

BM 1

(0.809)

100.000

101.213

9

Site Surveying - Report I (Leveling)
Discussion
Obtained data had been reduced;the copies of results and adjustment are included in
this report.
Bench Mark (BM) 1 has been held fixed at a Reduced Level (RL) of 100.00. From there,
the backsight (BS) and foresight (FS) are observed and recorded. Then, the amount of
rise and fall is gained from the subtraction of BS with FS.
Then, reduced level is being calculated through subtracting or adding the rise and fall, a
new reduced level is obtained. This process is then repeated for 9 times from different
points at the site. The final reduced level (RL) is to make sure the value is equal or
close to the initial RL.
However, in our report, the final RL is slightly more than the initial RL. Thus, there are
some errorsoccurred during the levelling process. If errors occurred, the reduced level
must be adjusted using the method we had been taught in class, loop misclosure. Loop
misclosure is the anout by which the measured height difference differs from the known
height. If the error in a level loop is unacceptable, the leveling must be repeated.
However, the error in a level loop in our leveling is acceptable, therefore the error can
be distributed according to the distances leveled (or the number of instrument
setups).Small misclosure in closed level loops is expected because of the accumulation
of errors.

10

Site Surveying - Report I (Leveling)
Conclusion
In conclusion, we are able to obtain the data through the usage of levelling equipment
provided by lecturer. Even though some errors occurred, we were able to identify it and
performed an adjustment to the data we obtained on site. Then, using the obtained data,
we were able to conduct a field work report.

11

Site Surveying - Report I (Leveling)
Learning Outcomes
 Able to conduct a fieldwork report regarding to levelling
 Get to experience the equipmenton site
 Learning the correct ways of levelling
 Able to obtain data through the usage of levelling equipment
 Able to identify the errors & conduct an adjustment

12

Site Surveying - Report I (Leveling)

Weitere ähnliche Inhalte

Was ist angesagt?

Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Sheng Zhe
 
Site surveying-Leveling
Site surveying-LevelingSite surveying-Leveling
Site surveying-LevelingShane Ah
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Haziq1511
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levellingYASMINE HASLAN
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1Doreen Yeo
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1tfkc1212
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-reportFelix Vong
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - TraverseKai Yun Pang
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2Shane Ah
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-levelingXinYee Khoo
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eportMELVIN tan
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling Darren Lee
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling seenyee
 
Tranverse report
Tranverse report Tranverse report
Tranverse report Wen Crystal
 

Was ist angesagt? (20)

Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)Site survey Fieldwork1 (levelling)
Site survey Fieldwork1 (levelling)
 
Site surveying-Leveling
Site surveying-LevelingSite surveying-Leveling
Site surveying-Leveling
 
Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)Site Surveying Report 1 (Levelling)
Site Surveying Report 1 (Levelling)
 
engineering survey 1 report levelling
engineering survey 1 report levellingengineering survey 1 report levelling
engineering survey 1 report levelling
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Ss report 1
Ss report 1Ss report 1
Ss report 1
 
Levelling report-1
Levelling report-1Levelling report-1
Levelling report-1
 
Traversing final-report
Traversing final-reportTraversing final-report
Traversing final-report
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
Setting out 12042018
Setting out 12042018Setting out 12042018
Setting out 12042018
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2
 
Site surveying-report-leveling
Site surveying-report-levelingSite surveying-report-leveling
Site surveying-report-leveling
 
Two Peg Test - Report
Two Peg Test - ReportTwo Peg Test - Report
Two Peg Test - Report
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Ss report 1 ----levelling eport
Ss report 1 ----levelling eportSs report 1 ----levelling eport
Ss report 1 ----levelling eport
 
Levelling
LevellingLevelling
Levelling
 
Contouring Report
Contouring ReportContouring Report
Contouring Report
 
Site Surveying Levelling
Site Surveying Levelling Site Surveying Levelling
Site Surveying Levelling
 
Project 1- Levelling
Project 1- Levelling Project 1- Levelling
Project 1- Levelling
 
Tranverse report
Tranverse report Tranverse report
Tranverse report
 

Ähnlich wie Site surveying report i

Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Yap Xin
 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptNITINSURESH30
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Est
 
surveying.levelling ppt.ppt
surveying.levelling ppt.pptsurveying.levelling ppt.ppt
surveying.levelling ppt.pptivargarud
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignmentSze Ting Kuek
 
Project report1 of levelling in pdf2
Project report1 of levelling in pdf2Project report1 of levelling in pdf2
Project report1 of levelling in pdf2Ramesh Ranjan
 
Project report2 of contour
Project report2 of contourProject report2 of contour
Project report2 of contourRamesh Ranjan
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Levelingashleyyeap
 
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGLEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGATHIRA B K
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Enoch Wong
 
WHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGWHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGpwhite91
 
Total station For Btech Engineering Students
Total station For Btech Engineering StudentsTotal station For Btech Engineering Students
Total station For Btech Engineering StudentsVinayVitekari
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfAlwandBarzani
 
Lecture 11- M4_Level Survey_L1.pdf
Lecture 11- M4_Level Survey_L1.pdfLecture 11- M4_Level Survey_L1.pdf
Lecture 11- M4_Level Survey_L1.pdfPranayaKishoreRaycho
 
Surveying short question answers
Surveying short question answersSurveying short question answers
Surveying short question answersSaurabh Pare
 

Ähnlich wie Site surveying report i (20)

Levelling
LevellingLevelling
Levelling
 
Site Surveying Fieldwork 1
Site Surveying Fieldwork 1Site Surveying Fieldwork 1
Site Surveying Fieldwork 1
 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .ppt
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
 
surveying.levelling ppt.ppt
surveying.levelling ppt.pptsurveying.levelling ppt.ppt
surveying.levelling ppt.ppt
 
Site surveying assignment
Site surveying assignmentSite surveying assignment
Site surveying assignment
 
Project report1 of levelling in pdf2
Project report1 of levelling in pdf2Project report1 of levelling in pdf2
Project report1 of levelling in pdf2
 
Project report2 of contour
Project report2 of contourProject report2 of contour
Project report2 of contour
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Site Surveying Leveling
Site Surveying LevelingSite Surveying Leveling
Site Surveying Leveling
 
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYINGLEVELLING METHODS AND INSTRUMENTS IN SURVEYING
LEVELLING METHODS AND INSTRUMENTS IN SURVEYING
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
 
Activity no 1
Activity no 1Activity no 1
Activity no 1
 
WHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYINGWHAT IS DUMPY LEVEL IN SURVEYING
WHAT IS DUMPY LEVEL IN SURVEYING
 
Total station For Btech Engineering Students
Total station For Btech Engineering StudentsTotal station For Btech Engineering Students
Total station For Btech Engineering Students
 
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdfLecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
Lecture_3_The Principles of Levelling_fec6a71b84edc28ee2998f7ced9ddf68.pdf
 
Lecture 11- M4_Level Survey_L1.pdf
Lecture 11- M4_Level Survey_L1.pdfLecture 11- M4_Level Survey_L1.pdf
Lecture 11- M4_Level Survey_L1.pdf
 
Theodolite lecture 1 1
Theodolite lecture 1 1Theodolite lecture 1 1
Theodolite lecture 1 1
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
 
Surveying short question answers
Surveying short question answersSurveying short question answers
Surveying short question answers
 

Mehr von 마 이환

Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)마 이환
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)마 이환
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development마 이환
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)마 이환
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer마 이환
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment마 이환
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides마 이환
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations마 이환
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet마 이환
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report마 이환
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment마 이환
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines마 이환
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)마 이환
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)마 이환
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd마 이환
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices마 이환
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment마 이환
 

Mehr von 마 이환 (20)

Measurement V
Measurement VMeasurement V
Measurement V
 
Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)Research Methodology:Literature Review (Chapter 2)
Research Methodology:Literature Review (Chapter 2)
 
Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)Research Methodology:Introduction (Chapter 1)
Research Methodology:Introduction (Chapter 1)
 
Sustainable Housing Development
Sustainable Housing DevelopmentSustainable Housing Development
Sustainable Housing Development
 
Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)Assignment:Major Water Issue (revised)
Assignment:Major Water Issue (revised)
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Professional Practice 2: Group Assignment
Professional Practice 2: Group AssignmentProfessional Practice 2: Group Assignment
Professional Practice 2: Group Assignment
 
Financial Management:Presentation Slides
Financial Management:Presentation SlidesFinancial Management:Presentation Slides
Financial Management:Presentation Slides
 
Financial Report:Comments & Evaluations
Financial Report:Comments & EvaluationsFinancial Report:Comments & Evaluations
Financial Report:Comments & Evaluations
 
Financial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance SheetFinancial Report:Cash Budget, Income Statement & Balance Sheet
Financial Report:Cash Budget, Income Statement & Balance Sheet
 
Building Economics:Tender Report
Building Economics:Tender ReportBuilding Economics:Tender Report
Building Economics:Tender Report
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Schedule of agreed datelines
Schedule of agreed datelinesSchedule of agreed datelines
Schedule of agreed datelines
 
Reply for queries (architect)
Reply for queries (architect)Reply for queries (architect)
Reply for queries (architect)
 
Request for queries (architect)
Request for queries (architect)Request for queries (architect)
Request for queries (architect)
 
Internal memo
Internal memoInternal memo
Internal memo
 
Lembayung impian sdn bhd
Lembayung impian sdn bhdLembayung impian sdn bhd
Lembayung impian sdn bhd
 
Software application:appendices
Software application:appendicesSoftware application:appendices
Software application:appendices
 
Software application:assignment
Software application:assignmentSoftware application:assignment
Software application:assignment
 

Kürzlich hochgeladen

Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 

Kürzlich hochgeladen (20)

Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 

Site surveying report i

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) QSB1813 – Site Surveying Field Work ReportI Levelling August Semester 2013 Submission Date: 4th December 2013 Name Student ID Low Rong Tzuoo 0308336 Rueul Chan Ernyi 0315150 Wong Choong Ling 0314504 Yam Yih Hwan 0305861 1 Marks Site Surveying - Report I (Leveling)
  • 2. Table of Content Cover Page 1 Table of Content 2 Introduction to Levelling 3–4 Objective 5 Outline of Apparatus 6–7 Levelling Result 8 Adjustment on Misclosure 9 Discussion 10 Conclusion 11 Learning Outcomes 2 Page 12 Site Surveying - Report I (Leveling)
  • 3. Introduction to Levelling Levelling is the art of determining the relative heights or elevations of a point on the earth’s surface. It deals with measurements in a vertical plane. In general terms, Level Surfaceis any surface parallel to the mean spheroidal surface of the earth. Since the earth is an oblate spheroid, a level surface may be regarded as a curved surface, every point on which is equidistant from the center of the earth. Vertical Line is a normal linelying on the level surface. Horizontal Line is any line lying on the horizontal plane. It is usually a straight line tangential to the level line. Reduced Levelis a vertical distance of a point above or below the datum. The elevation of a point is either plus or minus according to the point above or below the datum. Benchmark (BM) is fixed reference point of known elevation. 3 Site Surveying - Report I (Leveling)
  • 4. Introduction to Levelling The line of collimation (HI)is the line intersectswith the cross hairs of the optical center of the object glass. It is also called the line of sight. Backsight (BS)is a point whose elevation is to be determined. It is the reading taken after setting up the instrument. Foresight(FS)is a reading on a point whose elevation is to be determined or on a change points. It is the last reading before shifting the instrument. An Intermediate sight (IS)is any reading taken ona point of unknown elevation from the same set up of the level. All sights taken between the backsight and the foresight are intermediate sights. Change Point (CP)is atransfer point of the levelling. It is a point inwhich the foresight and backsight are taken. Any defined objectscan beused as a change point. A benchmark may also be taken as a change point. Sometimes, it is called as a turning point (TP). 4 Site Surveying - Report I (Leveling)
  • 5. Objective  To establish a new benchmark  To determine the difference in height of discrete points  To identify the spot relative heights  To identify possible errors occurred 5 Site Surveying - Report I (Leveling)
  • 6. Outline of Apparatus Theodolite is a device used widely to determine the horizontal and vertical angles, distance, depths, etc. Besides that, it is used to identify the ground level and the ways to construct super-structure or sub-structure. A basic theodolite consists of a small sized telescope with the mechanism to measure horizontal and vertical angles. Theodolite is able to rotate 360 degree on a tripod stand by a levelling system. The angle can be measured on the scale on the tripod. The calculation of the theodolite is based on the principal of trigonometry, as used in triangulation network. It is a key tool in surveying and engineering work. Tripodis a rigid type of stand that is capable of fixing minor lateral movement on its top when required. It is used to support the other components of theodolite including the telescope. Horizontal bubble levelis an instrument used to indicate the horizontal level. A slightly curved glass tube which in incompletely filled with either spirit or alcohol. Optical Plummetis a device that used to center the instrument over a ground station. This component used in place of a plumb bob to center transits and theodolite over a given point. 6 Site Surveying - Report I (Leveling)
  • 7. Outline of Apparatus Ruleris used to obtain the height of collimation through the scope of theodolite. Theodolite Telescopeis an instrument used to view distant object. Telescope is an arrangement of lens that gather visible light, permitting direct observation of a point through the theodolite in a distance. There is a focusing screw to adjust the clarity of the view in the telescope. 7 Site Surveying - Report I (Leveling)
  • 8. Levelling Result Backsight Foresight Rise Fall Line of Reduced Collimation Level 1.313 Remarks 100.000 101.313 99.899 TP 1 1.415 1.414 1.414 1.415 0.000 101.314 99.899 TP 2 1.414 1.313 0.101 101.313 100.000 TP 3 1.112 3.434 2.020 101.414 97.980 TP 4 1.516 1.314 0.202 99.092 97.778 TP 5 1.415 1.516 0.000 99.294 97.778 TP 6 1.515 1.313 0.102 99.193 97.880 TP 7 4.041 1.515 0.000 99.395 97.880 TP 8 1.515 1.414 2.627 101.921 100.507 TP 9 1.213 0.302 102.022 100.809 BM 1 - 15.861 3.132 0.809 = 16.670 0.101 BM 1 0.809 Correction - 2.323 0.809 = (100.809 – 100.000) / 10 = 0.809 / 10 = 0.081 8 Site Surveying - Report I (Leveling)
  • 9. Adjustment on Misclosure Calculated Line of Reduced Level Collimation 100.000 Remarks Adjustment Adjusted Adjusted Line Reduced Level of Collimation BM 1 (0.000) 100.000 100.000 99.899 101.313 TP 1 (0.081) 99.818 101.232 99.899 101.314 TP 2 (0.162) 99.737 101.152 100.000 101.313 TP 3 (0.243) 99.757 101.070 97.980 101.414 TP 4 (0.324) 97.656 101.090 97.778 99.092 TP 5 (0.405) 97.373 98.687 97.778 99.294 TP 6 (0.485) 97.293 98.809 97.880 99.193 TP 7 (0.566) 97.314 98.627 97.880 99.395 TP 8 (0.647) 97.233 98.748 100.507 101.921 TP 9 (0.728) 99.779 101.193 100.809 102.022 BM 1 (0.809) 100.000 101.213 9 Site Surveying - Report I (Leveling)
  • 10. Discussion Obtained data had been reduced;the copies of results and adjustment are included in this report. Bench Mark (BM) 1 has been held fixed at a Reduced Level (RL) of 100.00. From there, the backsight (BS) and foresight (FS) are observed and recorded. Then, the amount of rise and fall is gained from the subtraction of BS with FS. Then, reduced level is being calculated through subtracting or adding the rise and fall, a new reduced level is obtained. This process is then repeated for 9 times from different points at the site. The final reduced level (RL) is to make sure the value is equal or close to the initial RL. However, in our report, the final RL is slightly more than the initial RL. Thus, there are some errorsoccurred during the levelling process. If errors occurred, the reduced level must be adjusted using the method we had been taught in class, loop misclosure. Loop misclosure is the anout by which the measured height difference differs from the known height. If the error in a level loop is unacceptable, the leveling must be repeated. However, the error in a level loop in our leveling is acceptable, therefore the error can be distributed according to the distances leveled (or the number of instrument setups).Small misclosure in closed level loops is expected because of the accumulation of errors. 10 Site Surveying - Report I (Leveling)
  • 11. Conclusion In conclusion, we are able to obtain the data through the usage of levelling equipment provided by lecturer. Even though some errors occurred, we were able to identify it and performed an adjustment to the data we obtained on site. Then, using the obtained data, we were able to conduct a field work report. 11 Site Surveying - Report I (Leveling)
  • 12. Learning Outcomes  Able to conduct a fieldwork report regarding to levelling  Get to experience the equipmenton site  Learning the correct ways of levelling  Able to obtain data through the usage of levelling equipment  Able to identify the errors & conduct an adjustment 12 Site Surveying - Report I (Leveling)