1. Frac Sand and
Transportation
Transportation Impacts from
Non-Metallic Mining in
Wisconsin
2. LOGISTICS, LOGISTICS, LOGISTICS
„Triad‟ of potential highway trips from fracture sand industry
Mine Site =>Processing Site => Bulk Load Out Site
Most mines are on local road system creating local road issues.
WI Statutes allow local units to assess highway impact fees
Most processing is on a rail line connection which eliminates one
potential truck trip from processing to load out site.
A number of locations have mining, processing, and rail load out
contained within a single site and involve no trucking.
STH impacts
Short-term – Intersections or convergence points.
Longer-term – Pavement deterioration on certain segments.
Low Risk – Segment length reconstruction or capacity.
Railroads become the critical link in the triad.
5. Frac Sand and
Transportation
Maturation and Stabilization
Summer/Fall 2012
6. PROPOSED vs. REAL
•Only about 1/3 of
proposed facilities are
actually active
•“Active” = operating
or under construction
•Many large proposals
have done nothing
7. LIMITS ON TOTAL MARKET DEMAND
North American Market only
No International Market
New Technology
Alternative Proppants Other Than “Northern White”
Alternate Methods to fracking
Other Energy Sources
Indications are that over the next five years, a „reasonable‟
market demand of 40 Million TPA with some high end
potential of 60 Million TPA .
8. LIMITS ON WI SHARE OF FRACTURE SAND MARKET
“Northern White” is also found in Illinois and Minnesota.
Two large market players, UNIMIN and U.S.
Silica, alone are producing almost 10 Million TPA in
those states.
“Brown Sand” is widely available in multiple
states, including Texas in close proximity to fracture
drilling.
Could put WI share of market at 25 Million TPA or less.
12. LIMITING FACTORS ON GEOGRAPHIC LOCATION
Physical challenges to rail access
Example: BNSF and CP along Mississippi River and
bluffs
Political issues with access to rail
Local moratoriums on mines, processing, and rail load
out
Federal Scenic Byway, WI Scenic Easement Restrictions,
Contractual relationships between producers,
shippers, and users.
„Put/Take contracts‟