ORDER DEFINITION MEETING CENELCA II   Houston, TX ,June 23, 24, 2005 Wilson Contreras Site Manager GE Aero LM 6000 Cenelca II Project . Presentations to GE staff and  Cenelca Chile customer .
0DM Manual Table of Contents ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Agenda May 23 , 2005 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Agenda cont’d May 24 ,2005 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
GEAEP Organization  Single Point of Contact
DRM ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Performance Test 9037 KJ/KW.hr LHV First Fire  Customer Resp. Fuel cleaning )   ,[object Object],[object Object],[object Object],[object Object],COD  Before 45 Days After Perfomance Test  ,[object Object],[object Object],[object Object],CENELCA II Milestone Schedule ,[object Object],[object Object],PSOR
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Project Net
Delivery Cenelca II Scheduled      
Scope of Supply ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Scope of Supply continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Scope of Supply continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Scope of Supply continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Scope of Supply continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Scope of Supply continued (Open Items) ,[object Object],[object Object],[object Object],[object Object],[object Object]
TA Construction &Commission Hours
Drawings and Documentation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Drawings and Documentation continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Drawings and Documentation continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Weitere ähnliche Inhalte

Was ist angesagt?

Project Report - Spring 2014
Project Report - Spring 2014Project Report - Spring 2014
Project Report - Spring 2014
Garret Stec
 
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
Franklin Del Rosario, P.Eng.
 
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
South Shore Clean Cities
 

Was ist angesagt? (20)

MIS External
MIS ExternalMIS External
MIS External
 
Callibration of LPG Terminal
Callibration of LPG TerminalCallibration of LPG Terminal
Callibration of LPG Terminal
 
Texas Eastern Update on Penn-Jersey pipeline system
Texas Eastern Update on Penn-Jersey pipeline systemTexas Eastern Update on Penn-Jersey pipeline system
Texas Eastern Update on Penn-Jersey pipeline system
 
Breakdown of Eco-Friendly Shipping
Breakdown of Eco-Friendly ShippingBreakdown of Eco-Friendly Shipping
Breakdown of Eco-Friendly Shipping
 
IGRC-KOREA
IGRC-KOREAIGRC-KOREA
IGRC-KOREA
 
Comparison of PEMS and CEMS
Comparison of PEMS and CEMSComparison of PEMS and CEMS
Comparison of PEMS and CEMS
 
Product Line
Product LineProduct Line
Product Line
 
Raghu Resume
Raghu Resume Raghu Resume
Raghu Resume
 
Design Checklist_Electrical
Design Checklist_Electrical Design Checklist_Electrical
Design Checklist_Electrical
 
NSPS Subpart OOOO: Applicability and Compliance Basics
NSPS Subpart OOOO: Applicability and Compliance BasicsNSPS Subpart OOOO: Applicability and Compliance Basics
NSPS Subpart OOOO: Applicability and Compliance Basics
 
Project Report - Spring 2014
Project Report - Spring 2014Project Report - Spring 2014
Project Report - Spring 2014
 
Ratio Controller Usage in Aspen HYSYS Dynamics
Ratio Controller Usage in Aspen HYSYS DynamicsRatio Controller Usage in Aspen HYSYS Dynamics
Ratio Controller Usage in Aspen HYSYS Dynamics
 
DUT-E GSM Fuel Level Sensor
DUT-E GSM Fuel Level SensorDUT-E GSM Fuel Level Sensor
DUT-E GSM Fuel Level Sensor
 
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
2. FDR-RAE Int Training 2015 - Pipeline Integrity - Copy
 
Refinery Flares
Refinery FlaresRefinery Flares
Refinery Flares
 
EPA’s NSPS OOOOa(Quad Oa) Rule
EPA’s NSPS OOOOa(Quad Oa) RuleEPA’s NSPS OOOOa(Quad Oa) Rule
EPA’s NSPS OOOOa(Quad Oa) Rule
 
Ellis, Melissa, Tellevate, NESHAP Regulations Update, 2015 Midwest Environmen...
Ellis, Melissa, Tellevate, NESHAP Regulations Update, 2015 Midwest Environmen...Ellis, Melissa, Tellevate, NESHAP Regulations Update, 2015 Midwest Environmen...
Ellis, Melissa, Tellevate, NESHAP Regulations Update, 2015 Midwest Environmen...
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
 
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
Gas Technology Institute, Boehlke Bottled Gas Corporation & AmeriGas - Statio...
 
Design Checklist Process
Design Checklist ProcessDesign Checklist Process
Design Checklist Process
 

Andere mochten auch

Hpev Presentation October 2013
Hpev Presentation October 2013Hpev Presentation October 2013
Hpev Presentation October 2013
Company Spotlight
 
Varnish in turbine lube
Varnish in turbine lubeVarnish in turbine lube
Varnish in turbine lube
bocah666
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and Fill
Shad Edwards
 
Generator protection gers
Generator protection gersGenerator protection gers
Generator protection gers
Habudin Hassan
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
Mohammad Basid
 
Lubricant testing in thermal power plants
Lubricant testing in thermal power plantsLubricant testing in thermal power plants
Lubricant testing in thermal power plants
SHIVAJI CHOUDHURY
 
Generator capability curve
Generator capability curveGenerator capability curve
Generator capability curve
Amit Pathak
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
Priten Vasa
 

Andere mochten auch (20)

Hpev Presentation October 2013
Hpev Presentation October 2013Hpev Presentation October 2013
Hpev Presentation October 2013
 
Motor lubrication
Motor lubricationMotor lubrication
Motor lubrication
 
Generator protection system by nicholas naing
Generator protection system by nicholas naingGenerator protection system by nicholas naing
Generator protection system by nicholas naing
 
Reliability Centered Lubrication
Reliability Centered LubricationReliability Centered Lubrication
Reliability Centered Lubrication
 
Maximize Equipment Life with Lubricant Condition Management
Maximize Equipment Life with Lubricant Condition ManagementMaximize Equipment Life with Lubricant Condition Management
Maximize Equipment Life with Lubricant Condition Management
 
Transformer oil dehydration importance & process
Transformer oil dehydration importance & processTransformer oil dehydration importance & process
Transformer oil dehydration importance & process
 
Varnish in turbine lube
Varnish in turbine lubeVarnish in turbine lube
Varnish in turbine lube
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and Fill
 
660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries
 
Generators
GeneratorsGenerators
Generators
 
Power System Protection
Power System ProtectionPower System Protection
Power System Protection
 
Generator protection gers
Generator protection gersGenerator protection gers
Generator protection gers
 
synchronous generator excitation
synchronous generator excitationsynchronous generator excitation
synchronous generator excitation
 
Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
 
Lubricant testing in thermal power plants
Lubricant testing in thermal power plantsLubricant testing in thermal power plants
Lubricant testing in thermal power plants
 
Generator capability curve
Generator capability curveGenerator capability curve
Generator capability curve
 
Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generator
 
Generator Protection
Generator ProtectionGenerator Protection
Generator Protection
 
Dissolved Gas Analysis in Transformer Oil
Dissolved Gas Analysis in Transformer OilDissolved Gas Analysis in Transformer Oil
Dissolved Gas Analysis in Transformer Oil
 
Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma Generator Protection By - Er Rahul Sharma
Generator Protection By - Er Rahul Sharma
 

Ähnlich wie Cenelca Ii Drm Presentation

CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
Deva Narayanan
 
C:\documents and settings\jmason\my documents\avtron metals ind. capabilitie ...
C:\documents and settings\jmason\my documents\avtron metals ind. capabilitie ...C:\documents and settings\jmason\my documents\avtron metals ind. capabilitie ...
C:\documents and settings\jmason\my documents\avtron metals ind. capabilitie ...
guest796b72f
 
Inst Sr.Tech new
Inst Sr.Tech newInst Sr.Tech new
Inst Sr.Tech new
Job Jose
 
IFS General Presentation 120315
IFS General Presentation 120315IFS General Presentation 120315
IFS General Presentation 120315
Bill Marsh
 

Ähnlich wie Cenelca Ii Drm Presentation (20)

Atef_2015_linkedin
Atef_2015_linkedinAtef_2015_linkedin
Atef_2015_linkedin
 
Livewire Automation Daandine Expansion Project
Livewire Automation Daandine Expansion ProjectLivewire Automation Daandine Expansion Project
Livewire Automation Daandine Expansion Project
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
eLearning Odesie catalog 2016
eLearning Odesie catalog 2016eLearning Odesie catalog 2016
eLearning Odesie catalog 2016
 
Job1.doc
Job1.docJob1.doc
Job1.doc
 
electrician
electricianelectrician
electrician
 
116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt116805771-Gas-Turbine.ppt
116805771-Gas-Turbine.ppt
 
GHULAM HASNAIN CV
GHULAM HASNAIN CVGHULAM HASNAIN CV
GHULAM HASNAIN CV
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Controls of Aero Gas Turbine Engines
Controls of Aero Gas Turbine EnginesControls of Aero Gas Turbine Engines
Controls of Aero Gas Turbine Engines
 
Porject final review
Porject final reviewPorject final review
Porject final review
 
RASCO MEP Company Profile.pdf
RASCO MEP Company Profile.pdfRASCO MEP Company Profile.pdf
RASCO MEP Company Profile.pdf
 
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
 
C:\documents and settings\jmason\my documents\avtron metals ind. capabilitie ...
C:\documents and settings\jmason\my documents\avtron metals ind. capabilitie ...C:\documents and settings\jmason\my documents\avtron metals ind. capabilitie ...
C:\documents and settings\jmason\my documents\avtron metals ind. capabilitie ...
 
ivirn resume
ivirn resumeivirn resume
ivirn resume
 
Minjie shen 201512
Minjie shen 201512Minjie shen 201512
Minjie shen 201512
 
Inst Sr.Tech new
Inst Sr.Tech newInst Sr.Tech new
Inst Sr.Tech new
 
IFS General Presentation 120315
IFS General Presentation 120315IFS General Presentation 120315
IFS General Presentation 120315
 
jayakumarcv
jayakumarcvjayakumarcv
jayakumarcv
 
Jim Thomas: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Jim Thomas: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopJim Thomas: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Jim Thomas: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
 

Cenelca Ii Drm Presentation

Hinweis der Redaktion

  1. Hello and welcome to GE. My name is Lesley Exum-Goudeaux and I am the project manager for the Alliance City of Riverside project. We are here today to conduct the design review meeting.
  2. The design review manual table of contents is in the front section of the book. Behind tab four is the document submittal list. In the manual, you will find the following specifications – Paint and protective coating, gas fuel, gas turbine compressor wash, lube oil, weld procedure and weld inspection. There is also a punch list procedure behind tab 11.
  3. We started this morning with our factory tour. Now lets review today’s agenda. Next we’ll proceed with the introduction of companies and personnel. Then we’ll have Bruce Pohlman give the customer’s project overview. Followed by an explanation of the GEAEP org chart and we'll discuss the lines of communication between Alliance and GEAEP. Then we’ll review the scope of supply. We’ll break for lunch. Then we will continue with a review of documentation and drawing deliverables, we’ll cover the design review manual table of contents.
  4. Continuing with the discipline breakouts. Bill Ferguson will cover the electrical and control systems. Followed by Valentin Vasquez who will lead the Mechanical technical discussion. We will then discuss any open commercial items. We will have a review of Project Net and close the day by reviewing the action items generated from today’s discussions.
  5. I will serve as the single point of contact for all commercial and technical issues for this project.
  6. This is the milestone schedule for Clatskanie. The DRM marks the beginning of the project’s life cycle. Project net training can be scheduled. Then we’ll have an interface meeting to update progress. Transportation requirements will be finalized. Followed by an Installation/Start-up meeting used to decide shipping dates, etc. Then we’ll have a first fire meeting and verify that punch list items have been closed out. The performance test is next followed by the customer commercial operation date. Then we’ll monitor the plant for 60 days of reliable operation.
  7. The GE 10B/1 is a single shaft heavy duty gas turbine designed with modular concepts to facilitate accessibility and maintainability. The unit consists of an 11 stage, high efficiency axial low compressor coupled to a three stage turbine. The nominal rotational speed is 11,000 rpm. There is air bleeding from the 4 th stage to buffer front and rear bearings and to cool exhaust casing. Air bleeding from the 7 th stage is used only during start-up and shut-down for anti-surge purposes.
  8. The Dry Low Nox system utilizes the pre-mix combustion chamber to limit the firing temperature by the use of excess air. The turbine base plate supports the turbine, gearbox, enclosure and unit auxiliaries. The lube oil system will deliver the oil to the gas turbine bearings, generator bearings, gear box, and the starting system. The oil used is mineral oil customer provided fill. The lube oil fin fan cooler cools the lubricating oil. The electro-hydraulic start system starts the turbine. The air intake system uses filters to provide a clean, distortion free flow of air to the gas turbine inlet. Filter is equipped with a differential pressure alarm to warn of fouling or icing.
  9. The epicyclic reduction gearbox converts the turbine shaft speed from 11,000 rpm to 1800rpm for the generator shaft. The turbine is coupled to the gearbox via a gear type high speed coupling. The generator is coupled to the gearbox via a flexible type low speed coupling. Aluminum coupling guards protect the couplings. The acoustic enclosure comes with a noise guarantee of 85 decibles at 3 feet. The unit has a simplex evacuated ventillation system with three air intake sections and one forced air ventilation outlet. There is a CO2 fire detection system which protects the entire package.
  10. GE provides a 13.8kv, 3 phase, 4 pole generator inside a weather proof type 2 enclosure that is suitable for outdoor installation. The generator has class F insulation and a Class B temperature rise. A GE 90/70 PLC controls the package and the Mark 6 is used for fuel control. The controls is equipped with both Auto and Manual synchronization capability Solid state generator protection There is an off line water wash system. The engine must be periodically cleaned to remove dust, oil vapor, salt and other contaminants produced during operation or that pass through the filters. Lead Acid batteries, chargers, and racks are provided for dc control power and fire protection.
  11. Additionally Drawings and documentation are provided - Access to project net, customer drawings, Operation and maintenance manuals – are available on CD Rom. The generator and engine will be static tested at the manufacturer’s factory. The contract includes ocean shipment (45-60 days) to a port on the west coast The unit will be packed for ocean shipment.
  12. There were shipping options included in the May 2 nd proposal. Is the included ocean shipment sufficient or have you decided on one of the shipping options?
  13. The list of drawings has been included in the manual. Please review and ask any questions. Included in the drawings you will receive are the unit general arrangement drawings, a lift plan, Flow and instrument diagrams
  14. Also included is a generator one line and three line diagram of the generator metering, plan and elevation drawings and schematic diagrams.
  15. Also included are wiring diagrams.