SlideShare ist ein Scribd-Unternehmen logo
1 von 4
Wilmar S. Sibayan
Address: 314 Bayabas St. Cembo, Makati City, Metro Manila Philippines
Mobile: +63926 6206 076 E-mail: sibayanw@gmail.com
Objective:
To utilize my technical skills for achieving the target and developing the best performance in the
organization. I would like to implement my innovative ideas, skills and creativity for accomplishing the
projects.
Work Experience & Job Description:
Metro Global Solution Inc. (Huawie Project) (May 2015 to Present)
LTE Vindicator TDD & FDD (Swap-out & New Installation) and IBS
Performs installation, commissioning, integration, testing and troubleshooting
Metro Global Solution Inc. (ZTE – Smart LTE Project) (May 2015 to Present)
LTE Site Survey in North Luzon Area.
Indoor Installations of DCDU, BBU and Lay out Power cables, Fiber optics and Power Tapping and
equipment Power up.
Outdoor Installations of Panel Antenna, RRU, fiber optics, GPS and Pile lack.
Commissioning and Site Integrations.
LTE Alarm clearing.
Grandtech (Freelance) (May 2014 to April 2015)
Commissioning / Installer
Turbo Project
3G FMR 2100 installation, commissioning, integration, testing and troubleshooting
Comm. and Integrator at WSA (Feb 2013 to March 2014)
Suite 301, 3rd
Flr. ITC Bldg., 337 Gil Puyat Ave., Makati City
MSAN(WSA/Huawei) (Feb 2010 to May 2011)- (Feb 2013 to March 2014)
PLDT Full Turn Key Project Team Leader
Performs installation, commissioning, integration and troubleshooting of MA5600T
Performs installation, commissioning, integration and troubleshooting of MA5603
Performs installation, commissioning, integration and troubleshooting of UA5000.
Performs installation, commissioning, integration and troubleshooting of MA5616(Pizza Box).
MSAP(WSA/Huawei) (Feb 2010 to May 2011)-( Feb 2013 to March 2014)
Performs installation, commissioning, integration and troubleshooting of OSN and Metro 1000.
BTS(WSA/Huawei) (Oct 2012 to Nov 2012)-( Feb 2013 to March 2014)
Performs installation, commissioning, integration and troubleshooting of U2100,G1800,G900 and U900
Smart CEN(WSA/Huawei) ( Feb 2013 to March 2014)
Performs installation, commissioning, integration and troubleshooting of CX600/ NE40e-2 Transmission.
Telecom Supervisor at Zamil Infra (Nov 2012 to Jan 2013)
1810 Cityland Condominium 10, Tower 1, H. V Dela Costa cor. Ayala Ave., Makati City
Zamil Infra (Nov 2012 to Jan 2013)
Performs installation, commissioning, integration and troubleshooting of U2100,G1800,G900 and U900
BTS expansion
Administration Department Jan 2012 to Nov 25, 2012
Smart Project Team Leader.
Assist in Technical Support Department on Field to Transport.
Grandtech (NSN Project Smart) Oct 2012 to Nov 25, 2012
LTE Roll-out.
Installation of LTE system module.
Installation of LTE RF module.
Cabling between system module and RF module.
Software Update 3G and LTE.
Commissioning and integration of LTE eNode B.
Re-commissioning of WCDMA Node B for Antenna Sharing.
VSWR and Power Meter Testing of existing feeder.
Functionality Testing.
Grandtech (NSN Project Smart to Sun Cellular Co-locate Roll-out) Nov 2012 to Nov. 25, 2012
2G Flexi Edge,2G/3G FMR new site Installation, commissioning and integration.
Laying feeder and jumper cable.
Installation of triplexer/diplexer for antenna sharing.
Performs functionality test (sms, mms, voice, video call and video streaming), sweeptest, power meter
test.
Grandtech (NSN Project Smart) Nov 2011 up to Feb 2012
Swap Out Supreme 2100 and RBS 850 (split/common) (Full IP,Dual Iub,ATM and Hybrid).
3G FMR installation, commissioning and integration.
Installation of FMSE system module, FRGL RF module and FTLB transport module for 2100.
Installation of FMSE system module, FXCA RF module and FTLB transport module for 850.
Dismantled Supreme / RBS put label with color coding good or faulty and full out.
Laying of E1 cable cross connect in DDF TR & RX and alarms cable terminates in existing.
Laying of DC cable terminate in rectifier, grounding cable to bus bar.
Change the jumper cable and performs sweeptest per jumper cable.
Commission and call NOC personnel for block the site define other parameters and integrate.
Performs test call per sector sms, mms, voice, video call and video streaming.
Performs Power meter test and external alarms simulation. Conduct acceptance and troubleshooting.
Grandtech (NSN Project Smart and Globe) Nov 2011 up to Feb 2012
SWAP Out Ultrasite 900 and 1800 to 2G FMR / New site
2G FMR installation, commissioning and integration.
Installation of ESMB system module, FXDA 900 and FXEA 1800 RF module and FIQA transport module.
Laying of E1 cable cross connects in DDF TR & RX and alarms cable terminates in existing.
Laying of DC cable terminate in rectifier, grounding cable to bus bar.
Change of jumper cable and performs sweeptest per jumper cable.
Dismantled Ultrasite put label with color coding good / faulty and full out.
Commission call NOC personnel for block the site define other parameters and integrate.
Performs test call per sector sms, mms, voice call, power meter and external alarms simulation.
2G flexiedge installation, commissioning and integration.
Antenna inatallation, feeder cable and power up rectifier for new site.
Node B F2 Upgrade from 1+1+1 to 2+2+2 and Dual Frequency.
Install dual RF FRGL module and replace single RF FRGD module.
FSMB upgrade replace FSMB to FSME and Update SW to recognize new module and license.
Dual IUB upgrade replace transport module FTIB to FTIA.
Re-commission calls NOC for block the site define other parameters and integrate.
Performs test call per sector sms, mms, voice, video call and browsing.
Conduct acceptance and troubleshooting.
Grandtech (NSN Project Smart) Feb 2010 to June 2011
2G Ultrasite new site Installation, commissioning and integration.
Assembly Ultrasite cabinet bolt down and plug in TRX,BB2f,BOI,PWSB, combiner and other unit.
Assembly cabinet rectifier laying AC cable to ACPDB terminate and power up.
Laying of DC cable from Ultrasite to rectifier and grounding cable to bus bar.
Laying of abis cable cross connect in DDF TR & RX.
Laying jumper cable and performs sweeptest.
Laying alarms cable and simulate of alarms.
Supervision during antenna installation orientation base on plan.
Grandtech (NSN Project Smart) July 2010 to Oct 2010
Node B IUB IP Migration from E1 to Fast Ethernet (FE)
Re-commissioning TRS to define some parameters
Laying of FE cable going to Tellabs or Access Node
Connect FE cable in EIF2 of Node B to Tellabs or Access Node
Commission call NOC personnel for block the site define other parameters and IP Ping test.
Performs test call per cell sms, mms, voice, video call and browsing.
Troubleshooting if no IP connectivity.
Grandtech (PLDT Project) July 2009 up to Jan 2010
MSAN UTStarcom iAn-8000 (VOIP) Per site Commissioning, integration and acceptance.
INTEX TELECOM SYSTEM (NSN Project Globe) from May 2010 up to July 2013
Swap out Siemens to 3G Node B (indoor / outdoor)
3G Node B installation, commissioning and integration.
Installation of FMSB system module, FRGC and FRGD RF module.
Dismantled Siemens cabinet and pull out.
Laying of E1cable cross connect in DDF TR & RX and alarms cable.
Cross connection of E1 and loop test.
Laying of DC cable terminate in rectifier and grounding cable to bus bar.
Change the jumper cable and performs sweeptest per jumper cable.
Commission and call NOC personnel for block the site, swing E1 to Nokia RNC and define parameters.
Performs test call per sector sms, mms, voice, video call and video streaming.
Performs external alarms simulation test.
Conduct acceptance and troubleshooting.
3G Node B upgrade with additional FSMB extension.
MSAN Access Gateway (VOIP Project)
Performs installation, commissioning and integration of IP-DSLAM D500-17 (Nokia).
Performs installation, commissioning and integration of iAN-8000 (UTStarcom) VOIP.
Conducting Acceptance.
Prepare documents for site folder.
Performs installation, modem configuration and testing for DSL connection (CPE).
Performs installation and Integration Baseband modems (CPE).
Trainings and Workshop
Huawei LTE Vindicator Workshop (June 02, 2015) – QA / QC, Site Audit & Survey, Site Planning &
Proper Installation/Commissioning of Site.
WCDMA Nokia 3G - Installation/Commissioning Phil-Am Tower Makati City Metro Manila, Phil.
iAN8000(UTStarcom) - Access Gateway Installation/Commissioning PLDT Dansalan Metro Manila,
Phil..
MSAN UA5000 - Installation/Commissioning PBCOM Tower Makati Metro Manila, Phil.
IP DSLAM D500-17 (NOKIA) - Installation/Commissioning Phil-Am Tower Makati City Metro Manila,
Phil.
On Site Training of Huawei BTS Swap Out, Indoor to Outdoor (Huawei Globe Project).
Emerson Outdoor DC Plant Product at Emerson Network Power Phils, Inc, The Orient Square Bldg.,
Ortigas Center, Pasig City – Emerson Rectifier Proper Settings Configuration & Installation.
Nokia Siemens Network LTE - Installation/Commissioning/Integration/Functionality Test at Sun Life
Bldg., Global City, Taguig.
Huawei Globe Project COPA Training.
Huawei Globe Project CX600 Transmission Training.
EDUCATIONAL
Adamson University
2004-2009-BS ECE
Secondary- St.Charles Educational Institution,Makati City
Elementary- Cembo Elem. School,Makati City
Personal Details
Name: Wilmar S. Sibayan
Year of Birth: April 27, 1989
Country of Birth: Makati Philippines
Marital status: Single
Nationality: Filipino
Reference:
Benjamin R. Bustos
President & CEO
Wireless services
+63918 9165002
Ricky Garde
Extension NSN Phillippines
Site Engineer
+639081369351
Sergs Frayna
Operational Manager
Grandtech Telecom
+63920 9238504

Weitere ähnliche Inhalte

Was ist angesagt?

Resume from bhupathi ramu
Resume from bhupathi ramuResume from bhupathi ramu
Resume from bhupathi ramuSriramBhupathi1
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu KumarViNu Kumar
 
Mohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed MustafaMohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed MustafaMd Asif
 
Fictoria_Edwin_2Aresume
Fictoria_Edwin_2AresumeFictoria_Edwin_2Aresume
Fictoria_Edwin_2AresumeEdwin Fictoria
 
John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)John Greenwood
 
Telecom Instument engineer
Telecom  Instument engineerTelecom  Instument engineer
Telecom Instument engineerKamran Saeed
 
resume_anjuln
resume_anjulnresume_anjuln
resume_anjulnANJUL N
 
Istc presentation 2016 17
Istc presentation 2016 17Istc presentation 2016 17
Istc presentation 2016 17Eric Samuel
 
LTE mobile system coverage, capacity and quality and its application to commu...
LTE mobile system coverage, capacity and quality and its application to commu...LTE mobile system coverage, capacity and quality and its application to commu...
LTE mobile system coverage, capacity and quality and its application to commu...Comms Connect
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNANGOPALA46
 

Was ist angesagt? (19)

CV_ Sudhir
CV_ Sudhir CV_ Sudhir
CV_ Sudhir
 
Resume from bhupathi ramu
Resume from bhupathi ramuResume from bhupathi ramu
Resume from bhupathi ramu
 
CV- Vinu Kumar
CV- Vinu KumarCV- Vinu Kumar
CV- Vinu Kumar
 
Mohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed MustafaMohammed Asif Mohammed Mustafa
Mohammed Asif Mohammed Mustafa
 
Tanveer HFC CV 1.1
Tanveer HFC CV 1.1Tanveer HFC CV 1.1
Tanveer HFC CV 1.1
 
shriram2016
shriram2016shriram2016
shriram2016
 
Fictoria_Edwin_2Aresume
Fictoria_Edwin_2AresumeFictoria_Edwin_2Aresume
Fictoria_Edwin_2Aresume
 
John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)
 
Telecom Instument engineer
Telecom  Instument engineerTelecom  Instument engineer
Telecom Instument engineer
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 
Bharath R-CV
Bharath R-CVBharath R-CV
Bharath R-CV
 
resume_anjuln
resume_anjulnresume_anjuln
resume_anjuln
 
Istc presentation 2016 17
Istc presentation 2016 17Istc presentation 2016 17
Istc presentation 2016 17
 
Abdallah Al Sagheir Cv
Abdallah Al Sagheir CvAbdallah Al Sagheir Cv
Abdallah Al Sagheir Cv
 
BrianTechResume
BrianTechResumeBrianTechResume
BrianTechResume
 
Mir Ahmed Raza
Mir Ahmed RazaMir Ahmed Raza
Mir Ahmed Raza
 
LTE mobile system coverage, capacity and quality and its application to commu...
LTE mobile system coverage, capacity and quality and its application to commu...LTE mobile system coverage, capacity and quality and its application to commu...
LTE mobile system coverage, capacity and quality and its application to commu...
 
SRahman.CV
SRahman.CVSRahman.CV
SRahman.CV
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 

Andere mochten auch

Tutorial pasen isaac
Tutorial pasen isaacTutorial pasen isaac
Tutorial pasen isaacedufran22
 
2016 term one week six itinerary
2016 term one week six itinerary2016 term one week six itinerary
2016 term one week six itineraryWaihiCollege
 
Iστορία Bυζαντινής Aγιογραφίας
Iστορία Bυζαντινής AγιογραφίαςIστορία Bυζαντινής Aγιογραφίας
Iστορία Bυζαντινής AγιογραφίαςMichelangelo705
 
2016 term two week three itinerary
2016 term two week three itinerary2016 term two week three itinerary
2016 term two week three itineraryWaihiCollege
 
Η βυζαντινή τέχνη
Η βυζαντινή τέχνηΗ βυζαντινή τέχνη
Η βυζαντινή τέχνηAkis Ampelas
 
ASRS system and material handling or industrial robots
ASRS system and material handling or industrial robotsASRS system and material handling or industrial robots
ASRS system and material handling or industrial robotsMd Imran hossain
 
Pallet Raf - Palletasrs - paletraf tanıtım broşür
Pallet Raf - Palletasrs - paletraf tanıtım broşürPallet Raf - Palletasrs - paletraf tanıtım broşür
Pallet Raf - Palletasrs - paletraf tanıtım broşürmatmaca
 

Andere mochten auch (17)

No Title
No TitleNo Title
No Title
 
Tutorial pasen isaac
Tutorial pasen isaacTutorial pasen isaac
Tutorial pasen isaac
 
Animals animales
Animals   animalesAnimals   animales
Animals animales
 
Ministry of Ethics
Ministry of EthicsMinistry of Ethics
Ministry of Ethics
 
Portfolio.M.ABR
Portfolio.M.ABRPortfolio.M.ABR
Portfolio.M.ABR
 
Hernia Presentation
Hernia PresentationHernia Presentation
Hernia Presentation
 
Statistical Model Report
Statistical Model ReportStatistical Model Report
Statistical Model Report
 
sjbect pronouns
sjbect pronounssjbect pronouns
sjbect pronouns
 
Nωπογραφία
NωπογραφίαNωπογραφία
Nωπογραφία
 
Mr. mahesh kumar
Mr. mahesh kumar Mr. mahesh kumar
Mr. mahesh kumar
 
2016 term one week six itinerary
2016 term one week six itinerary2016 term one week six itinerary
2016 term one week six itinerary
 
Iστορία Bυζαντινής Aγιογραφίας
Iστορία Bυζαντινής AγιογραφίαςIστορία Bυζαντινής Aγιογραφίας
Iστορία Bυζαντινής Aγιογραφίας
 
2016 term two week three itinerary
2016 term two week three itinerary2016 term two week three itinerary
2016 term two week three itinerary
 
ASRS
ASRSASRS
ASRS
 
Η βυζαντινή τέχνη
Η βυζαντινή τέχνηΗ βυζαντινή τέχνη
Η βυζαντινή τέχνη
 
ASRS system and material handling or industrial robots
ASRS system and material handling or industrial robotsASRS system and material handling or industrial robots
ASRS system and material handling or industrial robots
 
Pallet Raf - Palletasrs - paletraf tanıtım broşür
Pallet Raf - Palletasrs - paletraf tanıtım broşürPallet Raf - Palletasrs - paletraf tanıtım broşür
Pallet Raf - Palletasrs - paletraf tanıtım broşür
 

Ähnlich wie Wilmar Sibayan CV (20)

MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
vimal resume
vimal resumevimal resume
vimal resume
 
jack george cv
jack george cv jack george cv
jack george cv
 
RAMZAN MALIK
RAMZAN MALIKRAMZAN MALIK
RAMZAN MALIK
 
resume
resumeresume
resume
 
Dennis A Santos
Dennis A SantosDennis A Santos
Dennis A Santos
 
Caldona Erwin CV 2015
Caldona Erwin CV 2015Caldona Erwin CV 2015
Caldona Erwin CV 2015
 
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
MYDEL BERDIN CV new
MYDEL BERDIN CV newMYDEL BERDIN CV new
MYDEL BERDIN CV new
 
pravendra -cv
pravendra -cvpravendra -cv
pravendra -cv
 
Saeed Jalal CV
Saeed Jalal CVSaeed Jalal CV
Saeed Jalal CV
 
AVISHESH BHARGAVA resume
AVISHESH BHARGAVA resumeAVISHESH BHARGAVA resume
AVISHESH BHARGAVA resume
 
Felix_Bonilla Resume
Felix_Bonilla ResumeFelix_Bonilla Resume
Felix_Bonilla Resume
 
Bashir_cv
Bashir_cvBashir_cv
Bashir_cv
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
MTA
MTAMTA
MTA
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 

Wilmar Sibayan CV

  • 1. Wilmar S. Sibayan Address: 314 Bayabas St. Cembo, Makati City, Metro Manila Philippines Mobile: +63926 6206 076 E-mail: sibayanw@gmail.com Objective: To utilize my technical skills for achieving the target and developing the best performance in the organization. I would like to implement my innovative ideas, skills and creativity for accomplishing the projects. Work Experience & Job Description: Metro Global Solution Inc. (Huawie Project) (May 2015 to Present) LTE Vindicator TDD & FDD (Swap-out & New Installation) and IBS Performs installation, commissioning, integration, testing and troubleshooting Metro Global Solution Inc. (ZTE – Smart LTE Project) (May 2015 to Present) LTE Site Survey in North Luzon Area. Indoor Installations of DCDU, BBU and Lay out Power cables, Fiber optics and Power Tapping and equipment Power up. Outdoor Installations of Panel Antenna, RRU, fiber optics, GPS and Pile lack. Commissioning and Site Integrations. LTE Alarm clearing. Grandtech (Freelance) (May 2014 to April 2015) Commissioning / Installer Turbo Project 3G FMR 2100 installation, commissioning, integration, testing and troubleshooting Comm. and Integrator at WSA (Feb 2013 to March 2014) Suite 301, 3rd Flr. ITC Bldg., 337 Gil Puyat Ave., Makati City MSAN(WSA/Huawei) (Feb 2010 to May 2011)- (Feb 2013 to March 2014) PLDT Full Turn Key Project Team Leader Performs installation, commissioning, integration and troubleshooting of MA5600T Performs installation, commissioning, integration and troubleshooting of MA5603 Performs installation, commissioning, integration and troubleshooting of UA5000. Performs installation, commissioning, integration and troubleshooting of MA5616(Pizza Box). MSAP(WSA/Huawei) (Feb 2010 to May 2011)-( Feb 2013 to March 2014) Performs installation, commissioning, integration and troubleshooting of OSN and Metro 1000. BTS(WSA/Huawei) (Oct 2012 to Nov 2012)-( Feb 2013 to March 2014) Performs installation, commissioning, integration and troubleshooting of U2100,G1800,G900 and U900 Smart CEN(WSA/Huawei) ( Feb 2013 to March 2014) Performs installation, commissioning, integration and troubleshooting of CX600/ NE40e-2 Transmission. Telecom Supervisor at Zamil Infra (Nov 2012 to Jan 2013) 1810 Cityland Condominium 10, Tower 1, H. V Dela Costa cor. Ayala Ave., Makati City
  • 2. Zamil Infra (Nov 2012 to Jan 2013) Performs installation, commissioning, integration and troubleshooting of U2100,G1800,G900 and U900 BTS expansion Administration Department Jan 2012 to Nov 25, 2012 Smart Project Team Leader. Assist in Technical Support Department on Field to Transport. Grandtech (NSN Project Smart) Oct 2012 to Nov 25, 2012 LTE Roll-out. Installation of LTE system module. Installation of LTE RF module. Cabling between system module and RF module. Software Update 3G and LTE. Commissioning and integration of LTE eNode B. Re-commissioning of WCDMA Node B for Antenna Sharing. VSWR and Power Meter Testing of existing feeder. Functionality Testing. Grandtech (NSN Project Smart to Sun Cellular Co-locate Roll-out) Nov 2012 to Nov. 25, 2012 2G Flexi Edge,2G/3G FMR new site Installation, commissioning and integration. Laying feeder and jumper cable. Installation of triplexer/diplexer for antenna sharing. Performs functionality test (sms, mms, voice, video call and video streaming), sweeptest, power meter test. Grandtech (NSN Project Smart) Nov 2011 up to Feb 2012 Swap Out Supreme 2100 and RBS 850 (split/common) (Full IP,Dual Iub,ATM and Hybrid). 3G FMR installation, commissioning and integration. Installation of FMSE system module, FRGL RF module and FTLB transport module for 2100. Installation of FMSE system module, FXCA RF module and FTLB transport module for 850. Dismantled Supreme / RBS put label with color coding good or faulty and full out. Laying of E1 cable cross connect in DDF TR & RX and alarms cable terminates in existing. Laying of DC cable terminate in rectifier, grounding cable to bus bar. Change the jumper cable and performs sweeptest per jumper cable. Commission and call NOC personnel for block the site define other parameters and integrate. Performs test call per sector sms, mms, voice, video call and video streaming. Performs Power meter test and external alarms simulation. Conduct acceptance and troubleshooting. Grandtech (NSN Project Smart and Globe) Nov 2011 up to Feb 2012 SWAP Out Ultrasite 900 and 1800 to 2G FMR / New site 2G FMR installation, commissioning and integration. Installation of ESMB system module, FXDA 900 and FXEA 1800 RF module and FIQA transport module. Laying of E1 cable cross connects in DDF TR & RX and alarms cable terminates in existing. Laying of DC cable terminate in rectifier, grounding cable to bus bar. Change of jumper cable and performs sweeptest per jumper cable. Dismantled Ultrasite put label with color coding good / faulty and full out. Commission call NOC personnel for block the site define other parameters and integrate. Performs test call per sector sms, mms, voice call, power meter and external alarms simulation. 2G flexiedge installation, commissioning and integration. Antenna inatallation, feeder cable and power up rectifier for new site. Node B F2 Upgrade from 1+1+1 to 2+2+2 and Dual Frequency. Install dual RF FRGL module and replace single RF FRGD module. FSMB upgrade replace FSMB to FSME and Update SW to recognize new module and license.
  • 3. Dual IUB upgrade replace transport module FTIB to FTIA. Re-commission calls NOC for block the site define other parameters and integrate. Performs test call per sector sms, mms, voice, video call and browsing. Conduct acceptance and troubleshooting. Grandtech (NSN Project Smart) Feb 2010 to June 2011 2G Ultrasite new site Installation, commissioning and integration. Assembly Ultrasite cabinet bolt down and plug in TRX,BB2f,BOI,PWSB, combiner and other unit. Assembly cabinet rectifier laying AC cable to ACPDB terminate and power up. Laying of DC cable from Ultrasite to rectifier and grounding cable to bus bar. Laying of abis cable cross connect in DDF TR & RX. Laying jumper cable and performs sweeptest. Laying alarms cable and simulate of alarms. Supervision during antenna installation orientation base on plan. Grandtech (NSN Project Smart) July 2010 to Oct 2010 Node B IUB IP Migration from E1 to Fast Ethernet (FE) Re-commissioning TRS to define some parameters Laying of FE cable going to Tellabs or Access Node Connect FE cable in EIF2 of Node B to Tellabs or Access Node Commission call NOC personnel for block the site define other parameters and IP Ping test. Performs test call per cell sms, mms, voice, video call and browsing. Troubleshooting if no IP connectivity. Grandtech (PLDT Project) July 2009 up to Jan 2010 MSAN UTStarcom iAn-8000 (VOIP) Per site Commissioning, integration and acceptance. INTEX TELECOM SYSTEM (NSN Project Globe) from May 2010 up to July 2013 Swap out Siemens to 3G Node B (indoor / outdoor) 3G Node B installation, commissioning and integration. Installation of FMSB system module, FRGC and FRGD RF module. Dismantled Siemens cabinet and pull out. Laying of E1cable cross connect in DDF TR & RX and alarms cable. Cross connection of E1 and loop test. Laying of DC cable terminate in rectifier and grounding cable to bus bar. Change the jumper cable and performs sweeptest per jumper cable. Commission and call NOC personnel for block the site, swing E1 to Nokia RNC and define parameters. Performs test call per sector sms, mms, voice, video call and video streaming. Performs external alarms simulation test. Conduct acceptance and troubleshooting. 3G Node B upgrade with additional FSMB extension. MSAN Access Gateway (VOIP Project) Performs installation, commissioning and integration of IP-DSLAM D500-17 (Nokia). Performs installation, commissioning and integration of iAN-8000 (UTStarcom) VOIP. Conducting Acceptance. Prepare documents for site folder. Performs installation, modem configuration and testing for DSL connection (CPE). Performs installation and Integration Baseband modems (CPE). Trainings and Workshop Huawei LTE Vindicator Workshop (June 02, 2015) – QA / QC, Site Audit & Survey, Site Planning & Proper Installation/Commissioning of Site.
  • 4. WCDMA Nokia 3G - Installation/Commissioning Phil-Am Tower Makati City Metro Manila, Phil. iAN8000(UTStarcom) - Access Gateway Installation/Commissioning PLDT Dansalan Metro Manila, Phil.. MSAN UA5000 - Installation/Commissioning PBCOM Tower Makati Metro Manila, Phil. IP DSLAM D500-17 (NOKIA) - Installation/Commissioning Phil-Am Tower Makati City Metro Manila, Phil. On Site Training of Huawei BTS Swap Out, Indoor to Outdoor (Huawei Globe Project). Emerson Outdoor DC Plant Product at Emerson Network Power Phils, Inc, The Orient Square Bldg., Ortigas Center, Pasig City – Emerson Rectifier Proper Settings Configuration & Installation. Nokia Siemens Network LTE - Installation/Commissioning/Integration/Functionality Test at Sun Life Bldg., Global City, Taguig. Huawei Globe Project COPA Training. Huawei Globe Project CX600 Transmission Training. EDUCATIONAL Adamson University 2004-2009-BS ECE Secondary- St.Charles Educational Institution,Makati City Elementary- Cembo Elem. School,Makati City Personal Details Name: Wilmar S. Sibayan Year of Birth: April 27, 1989 Country of Birth: Makati Philippines Marital status: Single Nationality: Filipino Reference: Benjamin R. Bustos President & CEO Wireless services +63918 9165002 Ricky Garde Extension NSN Phillippines Site Engineer +639081369351 Sergs Frayna Operational Manager Grandtech Telecom +63920 9238504