2. Proficiency
Ground Water Targeting & Development
Watershed plans for sustainable ground water
development and management
Geophysical Investigations
Water Conservation & Recharge
Ground Water Modeling
Conceptualization
Mathematical Translation
Predictive Solutions
Solid Waste Management,
Lake Restoration & Management
3. Some Case Studies
Honda Seil, Tapukara, Bhiwadi, Alwar, Rajasthan
British Pertolieum, CBM Block, Birbhum, West Bengal
Jindal Steel and Power, Angul, Orissa
Objective:
Study the hydrogeological settings and provide ground
water development and management plan for
optimum utilization and augmentation of the ground
water .
4. Honda Seil, Tapukara, Bhiwadi
Water Solutions Provided:
Assessment of ground water availability and its
development prospects to meet the water demand of
Honda Seil.
Suggested scientifically based ground water
management plan for sustainable water supply.
Suggested suitable well design for tube wells and
artificial recharge structures to ameliorate the adverse
impact on the ground water regime.
Suggested plan for ground water regime monitoring
for surveillance on water levels and quality.
5. Approach for Investigations
Hydrogeological investigation to assess the ground water
potential, yield prospects and design of the production wells
through application of advanced analytical tools.
Physiographic and Geomorphological studies dovetailed with
Remote Sensing studies to support the hydrogeological
investigations.
Geophysical investigations to decipher subsurface lithology and
disposition of the aquifer for locating the best site for production
well and ground water recharge.
Assessment of recharge potential and availability of monsoon
runoff for “Rain Water harvesting and Artificial Recharge to
Ground Water” for its augmentation.
Designing of production wells and recharge structures with full
scientific and technical specifications
Honda Seil, Tapukara, Bhiwadi…….contd.
9. British Petroleum, CBM Block, Birbhum
Water Solutions Provided:
Regional hydrogeological setting of CBM Block through
geological, geomorphological and remote sensing studies.
Ground water development prospects, proposed
methodologies for delineating ground water worthy areas
sites for tube well.
Qualitative and Quantitative assessment of ground water
resources.
Delineation of vertical and lateral extents of aquifers.
Developing conceptual model of area.
Development of ground water management plan for the
identified areas.
11. Approach
Prepared maps on various themes pertaining to
Physiography, geomorphology, geology, hydrogeology,
etc. at regional, district and CBM block levels to collate
the information and developed the regional model of
Birbhum district and conceptual model of the CBM
block incorporating regional hydrogeological setting,
ground water worthy areas, development prospects,
water quality and suggested sustainable management
options.
British Petroleum, CBM Block, Birbhum…….contd.
12. Panel Diagram
developed based on
Primary and Secondary
data collected from
study area.
British Petroleum, CBM Block, Birbhum…….contd.
15. Jindal Steel and Power, Angul
Study aims suggesting most viable and scientifically
managed plan for development and utilization of surface
and ground water on a watershed management approach.
In order to provide sustainability, number of artificial
recharge structures has also been proposed.
Detailed hydrogeological and hydrological investigation
has been carried out.
Various tools such as remote sensing , GIS and advanced
analytical techniques has been used at various levels for
run off computations, identify suitable areas for ground
water development, rain water harvesting and artificial
recharge structures.
16. Approach & Findings
Detailed hydrogeological and hydrological investigation has been
carried out using tools such as remote sensing, GIS and advanced
analytical techniques at various levels for run off computations,
Suitable areas for ground water development, rain water harvesting
and artificial recharge structures have been identified.
Surface water availability and surface runoff being generated is
assessed in entire study area which is divided into number of
watersheds using the drainage network.
Area of interest lies in the watershed of Kurdhabhali Nala , covers
major part of the project area offering good prospect of water
harvesting .
British Petroleum, CBM Block, Birbhum…….contd.
17. Approach & Findings
Watershed has been divided and demarcated into 11
micro watersheds considering the lowest order of
drainage network.
The monthly surface water run off computed for each
micro watershed and about 10 Million Cubic Meter
(MCM) ) of water is assessed as run off from the entire
watershed in the four monsoon months.
Water harvesting structures designed to harness only 20
to 25% of the flow to the tune of 2 to 2.5 MCM so as to
keep minimum flow in the downstream as well as to
maintain the ecological balance of the area.
British Petroleum, CBM Block, Birbhum…….contd.