Suche senden
Hochladen
Result presentation 2019
•
0 gefällt mir
•
94 views
Wärtsilä Corporation
Folgen
Result presentation 2019
Weniger lesen
Mehr lesen
Ingenieurwesen
Melden
Teilen
Melden
Teilen
1 von 27
Jetzt herunterladen
Downloaden Sie, um offline zu lesen
Empfohlen
Result presentation Q1 2020
Result presentation Q1 2020
Wärtsilä Corporation
Result presentation Q1 2019
Result presentation Q1 2019
Wärtsilä Corporation
Result presentation Q3 2019
Result presentation Q3 2019
Wärtsilä Corporation
Result presentation Q314
Result presentation Q314
Wärtsilä Corporation
Wärtsilä - Q4 & Full Year Results 2015
Wärtsilä - Q4 & Full Year Results 2015
Wärtsilä Corporation
Result presentation Q1 2016
Result presentation Q1 2016
Wärtsilä Corporation
Budget 2014 Slide Pack
Budget 2014 Slide Pack
Richard Ramsey
Stora Enso Q1/2014 financial results, presentation
Stora Enso Q1/2014 financial results, presentation
Stora Enso
Empfohlen
Result presentation Q1 2020
Result presentation Q1 2020
Wärtsilä Corporation
Result presentation Q1 2019
Result presentation Q1 2019
Wärtsilä Corporation
Result presentation Q3 2019
Result presentation Q3 2019
Wärtsilä Corporation
Result presentation Q314
Result presentation Q314
Wärtsilä Corporation
Wärtsilä - Q4 & Full Year Results 2015
Wärtsilä - Q4 & Full Year Results 2015
Wärtsilä Corporation
Result presentation Q1 2016
Result presentation Q1 2016
Wärtsilä Corporation
Budget 2014 Slide Pack
Budget 2014 Slide Pack
Richard Ramsey
Stora Enso Q1/2014 financial results, presentation
Stora Enso Q1/2014 financial results, presentation
Stora Enso
Presentation to the ACT / IACT Event
Presentation to the ACT / IACT Event
Richard Ramsey
Leonardo 1Q 2017 Results Presentation
Leonardo 1Q 2017 Results Presentation
Leonardo
Leonardo 3Q/9M 2016 Results Presentation
Leonardo 3Q/9M 2016 Results Presentation
Leonardo
Finmeccanica 3 q 9m 2015 results presentation
Finmeccanica 3 q 9m 2015 results presentation
Leonardo
AT&S Quarterly Financial Report Q1 2017/18
AT&S Quarterly Financial Report Q1 2017/18
AT&S_IR
Leonardo First Half 2017 results presentation
Leonardo First Half 2017 results presentation
Leonardo
JLL Cleveland Industrial Outlook: Q2 2020
JLL Cleveland Industrial Outlook: Q2 2020
Andrew Batson
AT&S Annual Financial Report 2016/17
AT&S Annual Financial Report 2016/17
AT&S_IR
Bernard Feeney
Bernard Feeney
simishare
January-September results 2013
January-September results 2013
Ferrovial
FLSmidth Third Quarter Interim Report 2013
FLSmidth Third Quarter Interim Report 2013
FLSmidth & Co. A/S.
AT&S Report Q3 2014/15
AT&S Report Q3 2014/15
AT&S_IR
National Accounts 2015 Q2
National Accounts 2015 Q2
s.coffey
Pgc news letter 1 st aug, 2014
Pgc news letter 1 st aug, 2014
Proglobalcorp India
AT&S Annual financial report 2014/15
AT&S Annual financial report 2014/15
AT&S_IR
Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co SE
Result presentation Q1 2015
Result presentation Q1 2015
Wärtsilä Corporation
Brisa investor presentation 2014 q2 bulletin
Brisa investor presentation 2014 q2 bulletin
BrisaTurkey
ACCIONA Results Report 9 M 2014
ACCIONA Results Report 9 M 2014
acciona
Result presentation Q2 2019
Result presentation Q2 2019
Wärtsilä Corporation
Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation
Result presentation Q2 2020
Result presentation Q2 2020
Wärtsilä Corporation
Weitere ähnliche Inhalte
Was ist angesagt?
Presentation to the ACT / IACT Event
Presentation to the ACT / IACT Event
Richard Ramsey
Leonardo 1Q 2017 Results Presentation
Leonardo 1Q 2017 Results Presentation
Leonardo
Leonardo 3Q/9M 2016 Results Presentation
Leonardo 3Q/9M 2016 Results Presentation
Leonardo
Finmeccanica 3 q 9m 2015 results presentation
Finmeccanica 3 q 9m 2015 results presentation
Leonardo
AT&S Quarterly Financial Report Q1 2017/18
AT&S Quarterly Financial Report Q1 2017/18
AT&S_IR
Leonardo First Half 2017 results presentation
Leonardo First Half 2017 results presentation
Leonardo
JLL Cleveland Industrial Outlook: Q2 2020
JLL Cleveland Industrial Outlook: Q2 2020
Andrew Batson
AT&S Annual Financial Report 2016/17
AT&S Annual Financial Report 2016/17
AT&S_IR
Bernard Feeney
Bernard Feeney
simishare
January-September results 2013
January-September results 2013
Ferrovial
FLSmidth Third Quarter Interim Report 2013
FLSmidth Third Quarter Interim Report 2013
FLSmidth & Co. A/S.
AT&S Report Q3 2014/15
AT&S Report Q3 2014/15
AT&S_IR
National Accounts 2015 Q2
National Accounts 2015 Q2
s.coffey
Pgc news letter 1 st aug, 2014
Pgc news letter 1 st aug, 2014
Proglobalcorp India
AT&S Annual financial report 2014/15
AT&S Annual financial report 2014/15
AT&S_IR
Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co SE
Result presentation Q1 2015
Result presentation Q1 2015
Wärtsilä Corporation
Brisa investor presentation 2014 q2 bulletin
Brisa investor presentation 2014 q2 bulletin
BrisaTurkey
ACCIONA Results Report 9 M 2014
ACCIONA Results Report 9 M 2014
acciona
Was ist angesagt?
(19)
Presentation to the ACT / IACT Event
Presentation to the ACT / IACT Event
Leonardo 1Q 2017 Results Presentation
Leonardo 1Q 2017 Results Presentation
Leonardo 3Q/9M 2016 Results Presentation
Leonardo 3Q/9M 2016 Results Presentation
Finmeccanica 3 q 9m 2015 results presentation
Finmeccanica 3 q 9m 2015 results presentation
AT&S Quarterly Financial Report Q1 2017/18
AT&S Quarterly Financial Report Q1 2017/18
Leonardo First Half 2017 results presentation
Leonardo First Half 2017 results presentation
JLL Cleveland Industrial Outlook: Q2 2020
JLL Cleveland Industrial Outlook: Q2 2020
AT&S Annual Financial Report 2016/17
AT&S Annual Financial Report 2016/17
Bernard Feeney
Bernard Feeney
January-September results 2013
January-September results 2013
FLSmidth Third Quarter Interim Report 2013
FLSmidth Third Quarter Interim Report 2013
AT&S Report Q3 2014/15
AT&S Report Q3 2014/15
National Accounts 2015 Q2
National Accounts 2015 Q2
Pgc news letter 1 st aug, 2014
Pgc news letter 1 st aug, 2014
AT&S Annual financial report 2014/15
AT&S Annual financial report 2014/15
Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co - Roadshow Presentation January 2011
Result presentation Q1 2015
Result presentation Q1 2015
Brisa investor presentation 2014 q2 bulletin
Brisa investor presentation 2014 q2 bulletin
ACCIONA Results Report 9 M 2014
ACCIONA Results Report 9 M 2014
Ähnlich wie Result presentation 2019
Result presentation Q2 2019
Result presentation Q2 2019
Wärtsilä Corporation
Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation
Result presentation Q2 2020
Result presentation Q2 2020
Wärtsilä Corporation
Result presentation Q2 2016
Result presentation Q2 2016
Wärtsilä Corporation
Result presentation Q3 2020
Result presentation Q3 2020
Wärtsilä Corporation
Result presentation 2020
Result presentation 2020
Wärtsilä Corporation
Result presentation Q2 2018
Result presentation Q2 2018
Wärtsilä Corporation
Result presentation Q2 2021
Result presentation Q2 2021
Wärtsilä Corporation
Result presentation Q1 2017
Result presentation Q1 2017
Wärtsilä Corporation
Result presentation Q3 2015
Result presentation Q3 2015
Wärtsilä Corporation
Result presentation 2016
Result presentation 2016
Wärtsilä Corporation
Result presentation Q3 2018
Result presentation Q3 2018
Wärtsilä Corporation
Result presentation Q1 2021
Result presentation Q1 2021
Wärtsilä Corporation
Result presentation Q2 2017
Result presentation Q2 2017
Wärtsilä Corporation
Result presentation Q3 2016
Result presentation Q3 2016
Wärtsilä Corporation
Result presentation Q3 2017
Result presentation Q3 2017
Wärtsilä Corporation
Wärtsilä Q1 2014 presentation
Wärtsilä Q1 2014 presentation
Wärtsilä Corporation
Result presentation Q2 2014
Result presentation Q2 2014
Wärtsilä Corporation
Result presentation Q1 2018
Result presentation Q1 2018
Wärtsilä Corporation
ACCIONA Results Report 9M 2013
ACCIONA Results Report 9M 2013
acciona
Ähnlich wie Result presentation 2019
(20)
Result presentation Q2 2019
Result presentation Q2 2019
Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018
Result presentation Q2 2020
Result presentation Q2 2020
Result presentation Q2 2016
Result presentation Q2 2016
Result presentation Q3 2020
Result presentation Q3 2020
Result presentation 2020
Result presentation 2020
Result presentation Q2 2018
Result presentation Q2 2018
Result presentation Q2 2021
Result presentation Q2 2021
Result presentation Q1 2017
Result presentation Q1 2017
Result presentation Q3 2015
Result presentation Q3 2015
Result presentation 2016
Result presentation 2016
Result presentation Q3 2018
Result presentation Q3 2018
Result presentation Q1 2021
Result presentation Q1 2021
Result presentation Q2 2017
Result presentation Q2 2017
Result presentation Q3 2016
Result presentation Q3 2016
Result presentation Q3 2017
Result presentation Q3 2017
Wärtsilä Q1 2014 presentation
Wärtsilä Q1 2014 presentation
Result presentation Q2 2014
Result presentation Q2 2014
Result presentation Q1 2018
Result presentation Q1 2018
ACCIONA Results Report 9M 2013
ACCIONA Results Report 9M 2013
Mehr von Wärtsilä Corporation
Compact Reliq™
Compact Reliq™
Wärtsilä Corporation
Biogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by Wärtsilä
Wärtsilä Corporation
Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...
Wärtsilä Corporation
Marine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunities
Wärtsilä Corporation
Modern gas-fueled power generation
Modern gas-fueled power generation
Wärtsilä Corporation
Wartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overview
Wärtsilä Corporation
GHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa Marttinen
Wärtsilä Corporation
Result presentation 2017
Result presentation 2017
Wärtsilä Corporation
Mehr von Wärtsilä Corporation
(8)
Compact Reliq™
Compact Reliq™
Biogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by Wärtsilä
Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...
Marine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunities
Modern gas-fueled power generation
Modern gas-fueled power generation
Wartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overview
GHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa Marttinen
Result presentation 2017
Result presentation 2017
Kürzlich hochgeladen
Computer Networks Basics of Network Devices
Computer Networks Basics of Network Devices
ChandrakantDivate1
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
RAJNEESHKUMAR341697
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
meghakumariji156
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
JiananWang21
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
SCMS School of Architecture
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
maisarahman1
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
Morshed Ahmed Rahath
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
Arindam Chakraborty, Ph.D., P.E. (CA, TX)
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
vanyagupta248
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
BhangaleSonal
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
MairaAshraf6
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
Quintin Balsdon
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
NANDHAKUMARA10
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
hamedmustafa094
Kürzlich hochgeladen
(20)
Computer Networks Basics of Network Devices
Computer Networks Basics of Network Devices
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
Result presentation 2019
1.
© Wärtsilä PUBLIC WÄRTSILÄ
CORPORATION RESULT PRESENTATION 2019 30 January 2020 Jaakko Eskola, President & CEO 30 January 2020 RESULT PRESENTATION 20191
2.
© Wärtsilä PUBLIC Third
quarter burdened by project related challenges and low equipment demand – services activity remains sound 2019 – A year marked by difficult market conditions and project related challenges
3.
© Wärtsilä PUBLIC KEY
FIGURES 2019 Order intake EUR 5,327 million, -16% Order book at the end of the period EUR 5,878 million, -5% Net sales EUR 5,170 million, -0% Book-to-bill 1.03 (1.22) Comparable operating result EUR 457 million (577), or 8.8% of net sales (11.2) Earnings per share EUR 0.37 (0.65) Cash flow from operating activities EUR 232 million (470) Dividend proposal EUR 0.48 per share (0.48)
4.
© Wärtsilä PUBLIC 61% 39% Wärtsilä
Marine Wärtsilä Energy RESULT PRESENTATION 20194 Order intake declined despite sequential improvement in Q4 Rolling 12m, MEUR 1,874 1,555 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419 Q4 -17% Fourth quarter 2019 and comparison 2018 30 January 2020 46% 54% Services Equipment Order intake by business type Order intake by business area Fourth quarter development (45) (55) (63) (37)
5.
© Wärtsilä PUBLIC
RESULT PRESENTATION 20195 Net sales growth in marine equipment and services offset the decline in energy equipment 1,532 1,684 0 1,000 2,000 3,000 4,000 5,000 6,000 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419 Rolling 12m, MEUR Fourth quarter 2019 and comparison 2018 30 January 2020 Q4 +10% 61% 39% Wärtsilä Marine Wärtsilä Energy 44%56% Services Equipment Net sales by business type Net sales by business area Fourth quarter development (46) (54) (52) (48)
6.
© Wärtsilä PUBLIC
RESULT PRESENTATION 20196 Book-to-bill 1.15 1.15 1.20 1.17 1.22 1.18 1.15 1.13 1.03 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Q117-Q417 Q217-Q118 Q317-Q218 Q417-Q318 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419 Order intake Net sales Book-to-bill Rolling 12m, MEUR 30 January 2020
7.
© Wärtsilä PUBLIC
RESULT PRESENTATION 20197 Order book distribution 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 31.12.2018 31.12.2019 Delivery next year Delivery after next year MEUR 30 January 2020
8.
© Wärtsilä PUBLIC
RESULT PRESENTATION 20198 Comparable operating result still burdened by project cost overruns 11.2% 11.3% 11.1% 9.6% 8.8% 0% 2% 4% 6% 8% 10% 12% 0 100 200 300 400 500 600 700 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319* Q119-Q419* Comparable operating result Comparable operating result, % 11.2% 8.8% 0% 2% 4% 6% 8% 10% 12% 14% 0 100 200 300 400 500 600 700 1-12/2018 1-12/2019* Rolling 12m, MEUR Review period development MEUR ◼ Wärtsilä Energy ◼ Wärtsilä Marine ◼ Wärtsilä Group, % of sales 30 January 2020 * The operating result for 2019 includes a charge related to cost overruns in certain large and complex project deliveries in the Marine and Energy businesses: • EUR 84 million in January-September, of which EUR 17 million recognised in Wärtsilä Marine and EUR 67 million in Wärtsilä Energy • EUR 152 million in January-December, of which EUR 51 million recognised in Wärtsilä Marine and EUR 101 million in Wärtsilä Energy
9.
© Wärtsilä PUBLIC 0 100 200 300 400 500 600 700 2015
2016 2017 2018 2019 RESULT PRESENTATION 20199 Cash flow from operating activities MEUR 30 January 2020
10.
© Wärtsilä PUBLIC
RESULT PRESENTATION 201910 Working capital 543 490 563 581 732 10.8% 10.2% 11.5% 11.2% 14.2% 0% 5% 10% 15% 20% 0 250 500 750 1,000 1,250 1,500 2015 2016 2017 2018 2019 Working capital Total inventories Advances received Working capital / net sales MEUR 30 January 2020
11.
© Wärtsilä PUBLIC
RESULT PRESENTATION 201911 Gearing 0.00 0.10 0.20 0.30 0.40 0.50 2015 2016 2017 2018 2019* 30 January 2020 * Excluding the impact of lease liabilities, gearing amounted to 0.22.
12.
© Wärtsilä PUBLIC
30 January 2019 Full year result presentation 201812 Earnings and dividend per share 0.75 0.60 0.63 0.65 0.37 0.40 0.43 0.46 0.48 0.48 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 2015 2016 2017 2018 2019* EPS Dividend *Proposal of the Board Figures for 2015-2017 have been restated to reflect the increased number of shares. EUR
13.
© Wärtsilä PUBLIC Wärtsilä Marine
Business
14.
© Wärtsilä PUBLIC14 Market
sentiment still cautious – improvement in specialised vessels Specialised tonnageTotal vessel contracting Source: Clarksons Research, contracting as per January 8th, 2020 CGT= gross tonnage compensated with workload WÄRTSILÄ MARINE BUSINESS 30 January 2020 RESULT PRESENTATION 2019 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 0 50 100 150 200 250 01/10 05/10 09/10 01/11 05/11 09/11 01/12 05/12 09/12 01/13 05/13 09/13 01/14 05/14 09/14 01/15 05/15 09/15 01/16 05/16 09/16 01/17 05/17 09/17 01/18 05/18 09/18 01/19 05/19 09/19 MillionCGT Numberofvessels Merchant Offshore Cruise and Ferry Special vessels 3 months moving average in CGT 0 10 20 30 40 50 60 70 80 01/10 05/10 09/10 01/11 05/11 09/11 01/12 05/12 09/12 01/13 05/13 09/13 01/14 05/14 09/14 01/15 05/15 09/15 01/16 05/16 09/16 01/17 05/17 09/17 01/18 05/18 09/18 01/19 05/19 09/19 Numberofvessels Offshore Cruise and Ferry Special vessels LNG carriers LPG carriers
15.
© Wärtsilä PUBLIC
RESULT PRESENTATION 201915 Order intake development 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 0 200 400 600 800 1,000 1,200 10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019 Wärtsilä Marine, equipment Wärtsilä Marine, services Wärtsilä Marine total, rolling 12 months WÄRTSILÄ MARINE BUSINESS QTD, MEUR Rolling 12m, MEUR 53% 4% 21% 1% 13% 5% 3% 28% 15% 9% 11% 24% 11% 2% Services order intake by segment Equipment order intake by segment ◼ Offshore ◼ Navy ◼ Special Vessels ◼ Merchant ◼ Others ◼ Cruise & Ferry ◼ Gas carriers 30 January 2020 Fourth quarter development
16.
© Wärtsilä PUBLIC
30 January 2020 RESULT PRESENTATION 201916 Marine installed base covered by long-term service agreements 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 0 5,000 10,000 15,000 20,000 25,000 2014 2015 2016 2017 2018 2019 MW under agreement % of Marine installed base WÄRTSILÄ MARINE BUSINESS MW
17.
© Wärtsilä PUBLIC
RESULT PRESENTATION 201917 Net sales development 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 0 200 400 600 800 1,000 1,200 10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019 Wärtsilä Marine, equipment Wärtsilä Marine, services Wärtsilä Marine total, rolling 12 months 23% 13% 5% 6% 53% Spare parts Field service Service agreements Service projects Wärtsilä Marine, equipment WÄRTSILÄ MARINE BUSINESS QTD, MEUR Rolling 12m, MEUR Fourth quarter development EUR 1,020 million (831) 30 January 2020 (45) (6) (17) (26) (6)
18.
© Wärtsilä PUBLIC •
Wärtsilä Fleet Operations Solution (FOS) will be rolled out to Anglo-Eastern’s global fleet of more than 600 vessels • The solution integrates individual processes to optimise voyage planning, weather routing, fuel consumption, and the speed of a vessel ANGLO-EASTERN PARTNERS WITH WÄRTSILÄ TO DIGITALISE ITS FLEET OPERATIONS
19.
© Wärtsilä PUBLIC Wärtsilä Energy
Business
20.
© Wärtsilä PUBLIC
RESULT PRESENTATION 201920 Market for gas and liquid fuel power plants, <500 MW 19% 21% 17% 13% 14% 15% 14% 17% 0 5,000 10,000 15,000 20,000 25,000 Q117-Q417 Q217-Q118 Q317-Q218 Q417-Q318 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Wärtsilä Others WÄRTSILÄ ENERGY BUSINESS Rolling 12m, MW 30 January 2020 The total market, including also power plants with prime movers above 500 MW, remained stable at 43.0 GW during the twelve-month period ending in September 2019 (42.8 at the end of June). Market shares are calculated on a 12 months rolling basis. Market data includes all Wärtsilä power plants and other manufacturers’ gas and liquid fuelled gas turbine based power plants with prime movers below 500 MW, as well as the estimated output of steam turbines for combined cycles. The data is gathered from the McCoy Power Report. The main gas turbine competitors are GE, Siemens, Mitsubishi, and Ansaldo. Other combustion engines are not included.
21.
© Wärtsilä PUBLIC 11% 41% 23% 25% 32% 26% 26% 16% Services order
intake by segment Equipment order intake by segment ◼ Independent Power Producers ◼ Industrials ◼ Others ◼ Utilities RESULT PRESENTATION 201921 Order intake development 0 500 1,000 1,500 2,000 2,500 0 100 200 300 400 500 600 700 800 900 1,000 10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019 Wärtsilä Energy, equipment Wärtsilä Energy, services Wärtsilä Energy total, rolling 12 months WÄRTSILÄ ENERGY BUSINESS QTD, MEUR Rolling 12m, MEUR 30 January 2020 Fourth quarter development
22.
© Wärtsilä PUBLIC
RESULT PRESENTATION 201922 Orders received for energy equipment globally WÄRTSILÄ ENERGY BUSINESS IPP’s (Independent Power Producers) Utilities Industrials Order intake 1-12/2019: 1,980 MW (2,911) Asia 986 (1,426) Africa and Middle East 344 (329) Americas 410 (824) Europe 240 (332) 30 January 2020 Others
23.
© Wärtsilä PUBLIC23 Energy
installed base covered by long-term service agreements 0% 5% 10% 15% 20% 25% 30% 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 2014 2015 2016 2017 2018 2019 MW under agreement* % of Wärtsilä Energy installed base Wärtsilä signed a spare parts supply agreement in the Dominican Republic • The service agreement covers all three Wärtsilä power plants owned and/or operated by EGE Haina, which total approx. 400 MW in installed capacity • The agreement will allow accurate predictability of spare part and maintenance costs WÄRTSILÄ ENERGY BUSINESS 30 January 2020 RESULT PRESENTATION 2019 MW *Includes agreements covering both installed assets and assets to be installed in the future
24.
© Wärtsilä PUBLIC
RESULT PRESENTATION 201924 Net sales development 0 500 1,000 1,500 2,000 2,500 0 200 400 600 800 1,000 10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019 Wärtsilä Energy, equipment Wärtsilä Energy, services Wärtsilä Energy total, rolling 12 months 15% 5% 12% 7% 61% Spare parts Field service Service agreements Service projects Wärtsilä Energy, equipment WÄRTSILÄ ENERGY BUSINESS QTD, MEUR Rolling 12m, MEUR Fourth quarter development EUR 664 million (701) 30 January 2020 (61) (4) (12) (17) (5)
25.
© Wärtsilä PUBLIC COLLABORATING
FOR LIFECYCLE INNOVATION • Wärtsilä’s hybrid, dual-fuel solution establishes the new Wasaline RoPax ferry as a benchmark in efficiency and sustainability • Predictive maintenance lowers operating costs and improves reliability • Wärtsilä benefits in the form of a floating technology demonstrator and R&D lab in connection to the Smart Technology Hub being built in Vaasa MODULAR BLOCK TO MODERNISE POWER GENERATION IN MALI • Wärtsilä secured the first order of the innovative Modular Block solution, to be delivered to an off-grid gold mine in Mali • The solution will replace the existing diesel generators, create substantial monthly savings in fuel costs, and facilitate the integration of renewables into the mine’s energy system
26.
© Wärtsilä PUBLIC PROSPECTS The
demand for Wärtsilä’s services and solutions in 2020 is expected to be somewhat below that of 2019. Demand by business area is anticipated to be as follows: • Soft in Wärtsilä Marine Business • Soft in Wärtsilä Energy Business
27.
THANK YOU Further information: Natalia
Valtasaari Vice President, Investor Relations Tel. +358 (0) 10 709 5637 E-mail: natalia.valtasaari@wartsila.com
Jetzt herunterladen