© Wärtsilä PUBLIC
WÄRTSILÄ CORPORATION
RESULT PRESENTATION 2019
30 January 2020
Jaakko Eskola, President & CEO
30 January 2020 RESULT PRESENTATION 20191
© Wärtsilä PUBLIC
Third quarter burdened by project
related challenges and low equipment
demand – services activity remains sound
2019 – A year marked by
difficult market conditions and
project related challenges
© Wärtsilä PUBLIC
KEY FIGURES 2019
Order intake EUR 5,327 million, -16%
Order book at the end of the period
EUR 5,878 million, -5%
Net sales EUR 5,170 million, -0%
Book-to-bill 1.03 (1.22)
Comparable operating result EUR 457 million
(577), or 8.8% of net sales (11.2)
Earnings per share EUR 0.37 (0.65)
Cash flow from operating activities
EUR 232 million (470)
Dividend proposal EUR 0.48
per share (0.48)
© Wärtsilä PUBLIC
61%
39%
Wärtsilä Marine
Wärtsilä Energy
RESULT PRESENTATION 20194
Order intake declined despite sequential improvement in Q4
Rolling 12m, MEUR
1,874 1,555
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419
Q4
-17%
Fourth quarter 2019 and comparison 2018
30 January 2020
46%
54% Services
Equipment
Order intake
by business type
Order intake
by business area
Fourth quarter development
(45)
(55)
(63)
(37)
© Wärtsilä PUBLIC RESULT PRESENTATION 20195
Net sales growth in marine equipment and services offset the decline
in energy equipment
1,532 1,684
0
1,000
2,000
3,000
4,000
5,000
6,000
Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419
Rolling 12m, MEUR
Fourth quarter 2019 and comparison 2018
30 January 2020
Q4
+10%
61%
39%
Wärtsilä Marine
Wärtsilä Energy
44%56% Services
Equipment
Net sales
by business type
Net sales
by business area
Fourth quarter development
(46)
(54)
(52) (48)
© Wärtsilä PUBLIC RESULT PRESENTATION 20196
Book-to-bill
1.15 1.15
1.20
1.17
1.22
1.18 1.15 1.13
1.03
0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Q117-Q417 Q217-Q118 Q317-Q218 Q417-Q318 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419
Order intake Net sales Book-to-bill
Rolling 12m, MEUR
30 January 2020
© Wärtsilä PUBLIC RESULT PRESENTATION 20197
Order book distribution
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
31.12.2018 31.12.2019
Delivery next year Delivery after next year
MEUR
30 January 2020
© Wärtsilä PUBLIC RESULT PRESENTATION 20198
Comparable operating result still burdened by project cost overruns
11.2% 11.3% 11.1%
9.6%
8.8%
0%
2%
4%
6%
8%
10%
12%
0
100
200
300
400
500
600
700
Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319* Q119-Q419*
Comparable operating result Comparable operating result, %
11.2%
8.8%
0%
2%
4%
6%
8%
10%
12%
14%
0
100
200
300
400
500
600
700
1-12/2018 1-12/2019*
Rolling 12m, MEUR Review period development
MEUR
◼ Wärtsilä
Energy
◼ Wärtsilä
Marine
◼ Wärtsilä Group,
% of sales
30 January 2020
* The operating result for 2019 includes a charge related to cost overruns in certain large and complex project deliveries in the Marine and Energy businesses:
• EUR 84 million in January-September, of which EUR 17 million recognised in Wärtsilä Marine and EUR 67 million in Wärtsilä Energy
• EUR 152 million in January-December, of which EUR 51 million recognised in Wärtsilä Marine and EUR 101 million in Wärtsilä Energy
© Wärtsilä PUBLIC
0
100
200
300
400
500
600
700
2015 2016 2017 2018 2019
RESULT PRESENTATION 20199
Cash flow from operating activities
MEUR
30 January 2020
© Wärtsilä PUBLIC RESULT PRESENTATION 201910
Working capital
543
490
563 581
732
10.8% 10.2%
11.5%
11.2%
14.2%
0%
5%
10%
15%
20%
0
250
500
750
1,000
1,250
1,500
2015 2016 2017 2018 2019
Working capital Total inventories Advances received Working capital / net sales
MEUR
30 January 2020
© Wärtsilä PUBLIC RESULT PRESENTATION 201911
Gearing
0.00
0.10
0.20
0.30
0.40
0.50
2015 2016 2017 2018 2019*
30 January 2020
* Excluding the impact of lease liabilities, gearing amounted to 0.22.
© Wärtsilä PUBLIC 30 January 2019 Full year result presentation 201812
Earnings and dividend per share
0.75
0.60
0.63 0.65
0.37
0.40
0.43
0.46 0.48 0.48
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
2015 2016 2017 2018 2019*
EPS Dividend
*Proposal of the Board
Figures for 2015-2017 have been restated to reflect the increased number of shares.
EUR
© Wärtsilä PUBLIC
Wärtsilä
Marine Business
© Wärtsilä PUBLIC14
Market sentiment still cautious – improvement in specialised vessels
Specialised tonnageTotal vessel contracting
Source: Clarksons Research, contracting as per January 8th, 2020
CGT= gross tonnage compensated with workload
WÄRTSILÄ MARINE BUSINESS
30 January 2020 RESULT PRESENTATION 2019
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0
50
100
150
200
250
01/10
05/10
09/10
01/11
05/11
09/11
01/12
05/12
09/12
01/13
05/13
09/13
01/14
05/14
09/14
01/15
05/15
09/15
01/16
05/16
09/16
01/17
05/17
09/17
01/18
05/18
09/18
01/19
05/19
09/19
MillionCGT
Numberofvessels
Merchant Offshore
Cruise and Ferry Special vessels
3 months moving average in CGT
0
10
20
30
40
50
60
70
80
01/10
05/10
09/10
01/11
05/11
09/11
01/12
05/12
09/12
01/13
05/13
09/13
01/14
05/14
09/14
01/15
05/15
09/15
01/16
05/16
09/16
01/17
05/17
09/17
01/18
05/18
09/18
01/19
05/19
09/19
Numberofvessels
Offshore Cruise and Ferry Special vessels LNG carriers LPG carriers
© Wärtsilä PUBLIC RESULT PRESENTATION 201915
Order intake development
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
0
200
400
600
800
1,000
1,200
10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019
Wärtsilä Marine, equipment
Wärtsilä Marine, services
Wärtsilä Marine total, rolling 12 months
WÄRTSILÄ MARINE BUSINESS
QTD, MEUR Rolling 12m, MEUR
53%
4%
21%
1%
13%
5% 3%
28%
15%
9%
11%
24%
11%
2%
Services
order intake
by segment
Equipment
order intake
by segment
◼ Offshore
◼ Navy
◼ Special Vessels
◼ Merchant
◼ Others
◼ Cruise & Ferry
◼ Gas carriers
30 January 2020
Fourth quarter development
© Wärtsilä PUBLIC 30 January 2020 RESULT PRESENTATION 201916
Marine installed base covered by long-term service agreements
0%
2%
4%
6%
8%
10%
12%
14%
16%
18%
0
5,000
10,000
15,000
20,000
25,000
2014 2015 2016 2017 2018 2019
MW under agreement % of Marine installed base
WÄRTSILÄ MARINE BUSINESS
MW
© Wärtsilä PUBLIC RESULT PRESENTATION 201917
Net sales development
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
0
200
400
600
800
1,000
1,200
10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019
Wärtsilä Marine, equipment
Wärtsilä Marine, services
Wärtsilä Marine total, rolling 12 months
23%
13%
5%
6%
53%
Spare parts Field service
Service agreements Service projects
Wärtsilä Marine, equipment
WÄRTSILÄ MARINE BUSINESS
QTD, MEUR Rolling 12m, MEUR
Fourth quarter
development
EUR 1,020 million (831)
30 January 2020
(45)
(6)
(17)
(26)
(6)
© Wärtsilä PUBLIC
• Wärtsilä Fleet Operations Solution (FOS)
will be rolled out to Anglo-Eastern’s global
fleet of more than 600 vessels
• The solution integrates individual
processes to optimise voyage planning,
weather routing, fuel consumption, and
the speed of a vessel
ANGLO-EASTERN PARTNERS WITH WÄRTSILÄ TO DIGITALISE ITS FLEET OPERATIONS
© Wärtsilä PUBLIC
Wärtsilä
Energy Business
© Wärtsilä PUBLIC RESULT PRESENTATION 201920
Market for gas and liquid fuel power plants, <500 MW
19% 21% 17% 13% 14% 15% 14% 17%
0
5,000
10,000
15,000
20,000
25,000
Q117-Q417 Q217-Q118 Q317-Q218 Q417-Q318 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319
Wärtsilä Others
WÄRTSILÄ ENERGY BUSINESS
Rolling 12m, MW
30 January 2020
The total market, including also power plants with prime movers above 500 MW, remained stable at 43.0 GW during the twelve-month period ending in September 2019 (42.8 at the end of June).
Market shares are calculated on a 12 months rolling basis. Market data includes all Wärtsilä power plants and other manufacturers’ gas and liquid fuelled gas turbine based power plants with prime movers below 500 MW, as well as the estimated output of steam turbines
for combined cycles. The data is gathered from the McCoy Power Report. The main gas turbine competitors are GE, Siemens, Mitsubishi, and Ansaldo. Other combustion engines are not included.
© Wärtsilä PUBLIC
11%
41%
23%
25%
32%
26%
26%
16%
Services
order intake
by segment
Equipment
order intake
by segment
◼ Independent Power Producers
◼ Industrials
◼ Others
◼ Utilities
RESULT PRESENTATION 201921
Order intake development
0
500
1,000
1,500
2,000
2,500
0
100
200
300
400
500
600
700
800
900
1,000
10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019
Wärtsilä Energy, equipment
Wärtsilä Energy, services
Wärtsilä Energy total, rolling 12 months
WÄRTSILÄ ENERGY BUSINESS
QTD, MEUR Rolling 12m, MEUR
30 January 2020
Fourth quarter development
© Wärtsilä PUBLIC RESULT PRESENTATION 201922
Orders received for energy equipment globally
WÄRTSILÄ ENERGY BUSINESS
IPP’s
(Independent
Power Producers)
Utilities
Industrials
Order intake 1-12/2019:
1,980 MW (2,911)
Asia 986
(1,426)
Africa and
Middle East
344 (329)
Americas
410 (824)
Europe
240 (332)
30 January 2020
Others
© Wärtsilä PUBLIC23
Energy installed base covered by long-term service agreements
0%
5%
10%
15%
20%
25%
30%
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
2014 2015 2016 2017 2018 2019
MW under agreement* % of Wärtsilä Energy installed base
Wärtsilä signed a spare parts
supply agreement in the
Dominican Republic
• The service agreement covers
all three Wärtsilä power plants
owned and/or operated by EGE
Haina, which total approx. 400
MW in installed capacity
• The agreement will allow
accurate predictability of spare
part and maintenance costs
WÄRTSILÄ ENERGY BUSINESS
30 January 2020 RESULT PRESENTATION 2019
MW
*Includes agreements covering both installed assets and assets to be installed in the future
© Wärtsilä PUBLIC RESULT PRESENTATION 201924
Net sales development
0
500
1,000
1,500
2,000
2,500
0
200
400
600
800
1,000
10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019
Wärtsilä Energy, equipment
Wärtsilä Energy, services
Wärtsilä Energy total, rolling 12 months
15%
5%
12%
7%
61%
Spare parts Field service
Service agreements Service projects
Wärtsilä Energy, equipment
WÄRTSILÄ ENERGY BUSINESS
QTD, MEUR Rolling 12m, MEUR
Fourth quarter
development
EUR 664 million (701)
30 January 2020
(61)
(4)
(12)
(17)
(5)
© Wärtsilä PUBLIC
COLLABORATING FOR LIFECYCLE INNOVATION
• Wärtsilä’s hybrid, dual-fuel solution
establishes the new Wasaline RoPax ferry
as a benchmark in efficiency and
sustainability
• Predictive maintenance lowers operating
costs and improves reliability
• Wärtsilä benefits in the form of a floating
technology demonstrator and R&D lab
in connection to the Smart Technology
Hub being built in Vaasa
MODULAR BLOCK TO MODERNISE POWER GENERATION IN MALI
• Wärtsilä secured the first order of the
innovative Modular Block solution, to be
delivered to an off-grid gold mine in Mali
• The solution will replace the existing diesel
generators, create substantial monthly
savings in fuel costs, and facilitate the
integration of renewables into the mine’s
energy system
© Wärtsilä PUBLIC
PROSPECTS
The demand for Wärtsilä’s services and
solutions in 2020 is expected to be
somewhat below that of 2019.
Demand by business area is anticipated
to be as follows:
• Soft in Wärtsilä Marine Business
• Soft in Wärtsilä Energy Business
THANK YOU
Further information:
Natalia Valtasaari
Vice President, Investor Relations
Tel. +358 (0) 10 709 5637
E-mail: natalia.valtasaari@wartsila.com

Weitere ähnliche Inhalte

Was ist angesagt?

Presentation to the ACT / IACT Event
Presentation to the ACT / IACT EventPresentation to the ACT / IACT Event
Presentation to the ACT / IACT EventRichard Ramsey
 
Leonardo 1Q 2017 Results Presentation
Leonardo 1Q 2017 Results PresentationLeonardo 1Q 2017 Results Presentation
Leonardo 1Q 2017 Results PresentationLeonardo
 
Leonardo 3Q/9M 2016 Results Presentation
Leonardo 3Q/9M 2016 Results PresentationLeonardo 3Q/9M 2016 Results Presentation
Leonardo 3Q/9M 2016 Results PresentationLeonardo
 
Finmeccanica 3 q 9m 2015 results presentation
Finmeccanica 3 q 9m 2015 results presentationFinmeccanica 3 q 9m 2015 results presentation
Finmeccanica 3 q 9m 2015 results presentationLeonardo
 
AT&S Quarterly Financial Report Q1 2017/18
AT&S Quarterly Financial Report Q1 2017/18AT&S Quarterly Financial Report Q1 2017/18
AT&S Quarterly Financial Report Q1 2017/18AT&S_IR
 
Leonardo First Half 2017 results presentation
Leonardo First Half 2017 results presentationLeonardo First Half 2017 results presentation
Leonardo First Half 2017 results presentationLeonardo
 
JLL Cleveland Industrial Outlook: Q2 2020
JLL Cleveland Industrial Outlook: Q2 2020JLL Cleveland Industrial Outlook: Q2 2020
JLL Cleveland Industrial Outlook: Q2 2020Andrew Batson
 
AT&S Annual Financial Report 2016/17
AT&S  Annual Financial Report 2016/17AT&S  Annual Financial Report 2016/17
AT&S Annual Financial Report 2016/17AT&S_IR
 
Bernard Feeney
Bernard FeeneyBernard Feeney
Bernard Feeneysimishare
 
January-September results 2013
January-September results 2013January-September results 2013
January-September results 2013Ferrovial
 
FLSmidth Third Quarter Interim Report 2013
FLSmidth Third Quarter Interim Report 2013FLSmidth Third Quarter Interim Report 2013
FLSmidth Third Quarter Interim Report 2013FLSmidth & Co. A/S.
 
AT&S Report Q3 2014/15
AT&S Report Q3 2014/15AT&S Report Q3 2014/15
AT&S Report Q3 2014/15AT&S_IR
 
National Accounts 2015 Q2
National Accounts 2015 Q2National Accounts 2015 Q2
National Accounts 2015 Q2s.coffey
 
AT&S Annual financial report 2014/15
AT&S Annual financial report 2014/15AT&S Annual financial report 2014/15
AT&S Annual financial report 2014/15AT&S_IR
 
Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co - Roadshow Presentation January 2011Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co - Roadshow Presentation January 2011Klöckner & Co SE
 
Brisa investor presentation 2014 q2 bulletin
Brisa investor presentation 2014 q2 bulletinBrisa investor presentation 2014 q2 bulletin
Brisa investor presentation 2014 q2 bulletinBrisaTurkey
 
ACCIONA Results Report 9 M 2014
ACCIONA Results Report 9 M 2014ACCIONA Results Report 9 M 2014
ACCIONA Results Report 9 M 2014acciona
 

Was ist angesagt? (19)

Presentation to the ACT / IACT Event
Presentation to the ACT / IACT EventPresentation to the ACT / IACT Event
Presentation to the ACT / IACT Event
 
Leonardo 1Q 2017 Results Presentation
Leonardo 1Q 2017 Results PresentationLeonardo 1Q 2017 Results Presentation
Leonardo 1Q 2017 Results Presentation
 
Leonardo 3Q/9M 2016 Results Presentation
Leonardo 3Q/9M 2016 Results PresentationLeonardo 3Q/9M 2016 Results Presentation
Leonardo 3Q/9M 2016 Results Presentation
 
Finmeccanica 3 q 9m 2015 results presentation
Finmeccanica 3 q 9m 2015 results presentationFinmeccanica 3 q 9m 2015 results presentation
Finmeccanica 3 q 9m 2015 results presentation
 
AT&S Quarterly Financial Report Q1 2017/18
AT&S Quarterly Financial Report Q1 2017/18AT&S Quarterly Financial Report Q1 2017/18
AT&S Quarterly Financial Report Q1 2017/18
 
Leonardo First Half 2017 results presentation
Leonardo First Half 2017 results presentationLeonardo First Half 2017 results presentation
Leonardo First Half 2017 results presentation
 
JLL Cleveland Industrial Outlook: Q2 2020
JLL Cleveland Industrial Outlook: Q2 2020JLL Cleveland Industrial Outlook: Q2 2020
JLL Cleveland Industrial Outlook: Q2 2020
 
AT&S Annual Financial Report 2016/17
AT&S  Annual Financial Report 2016/17AT&S  Annual Financial Report 2016/17
AT&S Annual Financial Report 2016/17
 
Bernard Feeney
Bernard FeeneyBernard Feeney
Bernard Feeney
 
January-September results 2013
January-September results 2013January-September results 2013
January-September results 2013
 
FLSmidth Third Quarter Interim Report 2013
FLSmidth Third Quarter Interim Report 2013FLSmidth Third Quarter Interim Report 2013
FLSmidth Third Quarter Interim Report 2013
 
AT&S Report Q3 2014/15
AT&S Report Q3 2014/15AT&S Report Q3 2014/15
AT&S Report Q3 2014/15
 
National Accounts 2015 Q2
National Accounts 2015 Q2National Accounts 2015 Q2
National Accounts 2015 Q2
 
Pgc news letter 1 st aug, 2014
Pgc news letter 1 st aug, 2014Pgc news letter 1 st aug, 2014
Pgc news letter 1 st aug, 2014
 
AT&S Annual financial report 2014/15
AT&S Annual financial report 2014/15AT&S Annual financial report 2014/15
AT&S Annual financial report 2014/15
 
Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co - Roadshow Presentation January 2011Klöckner & Co - Roadshow Presentation January 2011
Klöckner & Co - Roadshow Presentation January 2011
 
Result presentation Q1 2015
Result presentation Q1 2015Result presentation Q1 2015
Result presentation Q1 2015
 
Brisa investor presentation 2014 q2 bulletin
Brisa investor presentation 2014 q2 bulletinBrisa investor presentation 2014 q2 bulletin
Brisa investor presentation 2014 q2 bulletin
 
ACCIONA Results Report 9 M 2014
ACCIONA Results Report 9 M 2014ACCIONA Results Report 9 M 2014
ACCIONA Results Report 9 M 2014
 

Ähnlich wie Result presentation 2019

Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation
 
ACCIONA Results Report 9M 2013
ACCIONA Results Report 9M 2013ACCIONA Results Report 9M 2013
ACCIONA Results Report 9M 2013acciona
 

Ähnlich wie Result presentation 2019 (20)

Result presentation Q2 2019
Result presentation Q2 2019Result presentation Q2 2019
Result presentation Q2 2019
 
Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018Wärtsilä Corporation's Result presentation 2018
Wärtsilä Corporation's Result presentation 2018
 
Result presentation Q2 2020
Result presentation Q2 2020Result presentation Q2 2020
Result presentation Q2 2020
 
Result presentation Q2 2016
Result presentation Q2 2016Result presentation Q2 2016
Result presentation Q2 2016
 
Result presentation Q3 2020
Result presentation Q3 2020Result presentation Q3 2020
Result presentation Q3 2020
 
Result presentation 2020
Result presentation 2020Result presentation 2020
Result presentation 2020
 
Result presentation Q2 2018
Result presentation Q2 2018Result presentation Q2 2018
Result presentation Q2 2018
 
Result presentation Q2 2021
Result presentation Q2 2021Result presentation Q2 2021
Result presentation Q2 2021
 
Result presentation Q1 2017
Result presentation Q1 2017Result presentation Q1 2017
Result presentation Q1 2017
 
Result presentation Q3 2015
Result presentation Q3 2015Result presentation Q3 2015
Result presentation Q3 2015
 
Result presentation 2016
Result presentation 2016Result presentation 2016
Result presentation 2016
 
Result presentation Q3 2018
Result presentation Q3 2018Result presentation Q3 2018
Result presentation Q3 2018
 
Result presentation Q1 2021
Result presentation Q1 2021Result presentation Q1 2021
Result presentation Q1 2021
 
Result presentation Q2 2017
Result presentation Q2 2017Result presentation Q2 2017
Result presentation Q2 2017
 
Result presentation Q3 2016
Result presentation Q3 2016Result presentation Q3 2016
Result presentation Q3 2016
 
Result presentation Q3 2017
Result presentation Q3 2017Result presentation Q3 2017
Result presentation Q3 2017
 
Wärtsilä Q1 2014 presentation
Wärtsilä Q1 2014 presentationWärtsilä Q1 2014 presentation
Wärtsilä Q1 2014 presentation
 
Result presentation Q2 2014
Result presentation Q2 2014Result presentation Q2 2014
Result presentation Q2 2014
 
Result presentation Q1 2018
Result presentation Q1 2018Result presentation Q1 2018
Result presentation Q1 2018
 
ACCIONA Results Report 9M 2013
ACCIONA Results Report 9M 2013ACCIONA Results Report 9M 2013
ACCIONA Results Report 9M 2013
 

Mehr von Wärtsilä Corporation

Biogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläBiogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläWärtsilä Corporation
 
Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Wärtsilä Corporation
 
Marine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunitiesMarine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunitiesWärtsilä Corporation
 
Wartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overviewWartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overviewWärtsilä Corporation
 
GHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa MarttinenGHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa MarttinenWärtsilä Corporation
 

Mehr von Wärtsilä Corporation (8)

Compact Reliq™
Compact Reliq™Compact Reliq™
Compact Reliq™
 
Biogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by WärtsiläBiogas & BioLNG solutions by Wärtsilä
Biogas & BioLNG solutions by Wärtsilä
 
Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...Renewable fuels for the transportation sector with focus on maritime industry...
Renewable fuels for the transportation sector with focus on maritime industry...
 
Marine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunitiesMarine lng fuel, challanges and opportunities
Marine lng fuel, challanges and opportunities
 
Modern gas-fueled power generation
Modern gas-fueled power generationModern gas-fueled power generation
Modern gas-fueled power generation
 
Wartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overviewWartsila smart voyage optimisation overview
Wartsila smart voyage optimisation overview
 
GHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa MarttinenGHG Emission Reduction - Vesa Marttinen
GHG Emission Reduction - Vesa Marttinen
 
Result presentation 2017
Result presentation 2017Result presentation 2017
Result presentation 2017
 

Kürzlich hochgeladen

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 

Kürzlich hochgeladen (20)

Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 

Result presentation 2019

  • 1. © Wärtsilä PUBLIC WÄRTSILÄ CORPORATION RESULT PRESENTATION 2019 30 January 2020 Jaakko Eskola, President & CEO 30 January 2020 RESULT PRESENTATION 20191
  • 2. © Wärtsilä PUBLIC Third quarter burdened by project related challenges and low equipment demand – services activity remains sound 2019 – A year marked by difficult market conditions and project related challenges
  • 3. © Wärtsilä PUBLIC KEY FIGURES 2019 Order intake EUR 5,327 million, -16% Order book at the end of the period EUR 5,878 million, -5% Net sales EUR 5,170 million, -0% Book-to-bill 1.03 (1.22) Comparable operating result EUR 457 million (577), or 8.8% of net sales (11.2) Earnings per share EUR 0.37 (0.65) Cash flow from operating activities EUR 232 million (470) Dividend proposal EUR 0.48 per share (0.48)
  • 4. © Wärtsilä PUBLIC 61% 39% Wärtsilä Marine Wärtsilä Energy RESULT PRESENTATION 20194 Order intake declined despite sequential improvement in Q4 Rolling 12m, MEUR 1,874 1,555 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419 Q4 -17% Fourth quarter 2019 and comparison 2018 30 January 2020 46% 54% Services Equipment Order intake by business type Order intake by business area Fourth quarter development (45) (55) (63) (37)
  • 5. © Wärtsilä PUBLIC RESULT PRESENTATION 20195 Net sales growth in marine equipment and services offset the decline in energy equipment 1,532 1,684 0 1,000 2,000 3,000 4,000 5,000 6,000 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419 Rolling 12m, MEUR Fourth quarter 2019 and comparison 2018 30 January 2020 Q4 +10% 61% 39% Wärtsilä Marine Wärtsilä Energy 44%56% Services Equipment Net sales by business type Net sales by business area Fourth quarter development (46) (54) (52) (48)
  • 6. © Wärtsilä PUBLIC RESULT PRESENTATION 20196 Book-to-bill 1.15 1.15 1.20 1.17 1.22 1.18 1.15 1.13 1.03 0.00 0.20 0.40 0.60 0.80 1.00 1.20 1.40 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Q117-Q417 Q217-Q118 Q317-Q218 Q417-Q318 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Q119-Q419 Order intake Net sales Book-to-bill Rolling 12m, MEUR 30 January 2020
  • 7. © Wärtsilä PUBLIC RESULT PRESENTATION 20197 Order book distribution 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 31.12.2018 31.12.2019 Delivery next year Delivery after next year MEUR 30 January 2020
  • 8. © Wärtsilä PUBLIC RESULT PRESENTATION 20198 Comparable operating result still burdened by project cost overruns 11.2% 11.3% 11.1% 9.6% 8.8% 0% 2% 4% 6% 8% 10% 12% 0 100 200 300 400 500 600 700 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319* Q119-Q419* Comparable operating result Comparable operating result, % 11.2% 8.8% 0% 2% 4% 6% 8% 10% 12% 14% 0 100 200 300 400 500 600 700 1-12/2018 1-12/2019* Rolling 12m, MEUR Review period development MEUR ◼ Wärtsilä Energy ◼ Wärtsilä Marine ◼ Wärtsilä Group, % of sales 30 January 2020 * The operating result for 2019 includes a charge related to cost overruns in certain large and complex project deliveries in the Marine and Energy businesses: • EUR 84 million in January-September, of which EUR 17 million recognised in Wärtsilä Marine and EUR 67 million in Wärtsilä Energy • EUR 152 million in January-December, of which EUR 51 million recognised in Wärtsilä Marine and EUR 101 million in Wärtsilä Energy
  • 9. © Wärtsilä PUBLIC 0 100 200 300 400 500 600 700 2015 2016 2017 2018 2019 RESULT PRESENTATION 20199 Cash flow from operating activities MEUR 30 January 2020
  • 10. © Wärtsilä PUBLIC RESULT PRESENTATION 201910 Working capital 543 490 563 581 732 10.8% 10.2% 11.5% 11.2% 14.2% 0% 5% 10% 15% 20% 0 250 500 750 1,000 1,250 1,500 2015 2016 2017 2018 2019 Working capital Total inventories Advances received Working capital / net sales MEUR 30 January 2020
  • 11. © Wärtsilä PUBLIC RESULT PRESENTATION 201911 Gearing 0.00 0.10 0.20 0.30 0.40 0.50 2015 2016 2017 2018 2019* 30 January 2020 * Excluding the impact of lease liabilities, gearing amounted to 0.22.
  • 12. © Wärtsilä PUBLIC 30 January 2019 Full year result presentation 201812 Earnings and dividend per share 0.75 0.60 0.63 0.65 0.37 0.40 0.43 0.46 0.48 0.48 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 2015 2016 2017 2018 2019* EPS Dividend *Proposal of the Board Figures for 2015-2017 have been restated to reflect the increased number of shares. EUR
  • 14. © Wärtsilä PUBLIC14 Market sentiment still cautious – improvement in specialised vessels Specialised tonnageTotal vessel contracting Source: Clarksons Research, contracting as per January 8th, 2020 CGT= gross tonnage compensated with workload WÄRTSILÄ MARINE BUSINESS 30 January 2020 RESULT PRESENTATION 2019 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 0 50 100 150 200 250 01/10 05/10 09/10 01/11 05/11 09/11 01/12 05/12 09/12 01/13 05/13 09/13 01/14 05/14 09/14 01/15 05/15 09/15 01/16 05/16 09/16 01/17 05/17 09/17 01/18 05/18 09/18 01/19 05/19 09/19 MillionCGT Numberofvessels Merchant Offshore Cruise and Ferry Special vessels 3 months moving average in CGT 0 10 20 30 40 50 60 70 80 01/10 05/10 09/10 01/11 05/11 09/11 01/12 05/12 09/12 01/13 05/13 09/13 01/14 05/14 09/14 01/15 05/15 09/15 01/16 05/16 09/16 01/17 05/17 09/17 01/18 05/18 09/18 01/19 05/19 09/19 Numberofvessels Offshore Cruise and Ferry Special vessels LNG carriers LPG carriers
  • 15. © Wärtsilä PUBLIC RESULT PRESENTATION 201915 Order intake development 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 0 200 400 600 800 1,000 1,200 10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019 Wärtsilä Marine, equipment Wärtsilä Marine, services Wärtsilä Marine total, rolling 12 months WÄRTSILÄ MARINE BUSINESS QTD, MEUR Rolling 12m, MEUR 53% 4% 21% 1% 13% 5% 3% 28% 15% 9% 11% 24% 11% 2% Services order intake by segment Equipment order intake by segment ◼ Offshore ◼ Navy ◼ Special Vessels ◼ Merchant ◼ Others ◼ Cruise & Ferry ◼ Gas carriers 30 January 2020 Fourth quarter development
  • 16. © Wärtsilä PUBLIC 30 January 2020 RESULT PRESENTATION 201916 Marine installed base covered by long-term service agreements 0% 2% 4% 6% 8% 10% 12% 14% 16% 18% 0 5,000 10,000 15,000 20,000 25,000 2014 2015 2016 2017 2018 2019 MW under agreement % of Marine installed base WÄRTSILÄ MARINE BUSINESS MW
  • 17. © Wärtsilä PUBLIC RESULT PRESENTATION 201917 Net sales development 0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 0 200 400 600 800 1,000 1,200 10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019 Wärtsilä Marine, equipment Wärtsilä Marine, services Wärtsilä Marine total, rolling 12 months 23% 13% 5% 6% 53% Spare parts Field service Service agreements Service projects Wärtsilä Marine, equipment WÄRTSILÄ MARINE BUSINESS QTD, MEUR Rolling 12m, MEUR Fourth quarter development EUR 1,020 million (831) 30 January 2020 (45) (6) (17) (26) (6)
  • 18. © Wärtsilä PUBLIC • Wärtsilä Fleet Operations Solution (FOS) will be rolled out to Anglo-Eastern’s global fleet of more than 600 vessels • The solution integrates individual processes to optimise voyage planning, weather routing, fuel consumption, and the speed of a vessel ANGLO-EASTERN PARTNERS WITH WÄRTSILÄ TO DIGITALISE ITS FLEET OPERATIONS
  • 20. © Wärtsilä PUBLIC RESULT PRESENTATION 201920 Market for gas and liquid fuel power plants, <500 MW 19% 21% 17% 13% 14% 15% 14% 17% 0 5,000 10,000 15,000 20,000 25,000 Q117-Q417 Q217-Q118 Q317-Q218 Q417-Q318 Q118-Q418 Q218-Q119 Q318-Q219 Q418-Q319 Wärtsilä Others WÄRTSILÄ ENERGY BUSINESS Rolling 12m, MW 30 January 2020 The total market, including also power plants with prime movers above 500 MW, remained stable at 43.0 GW during the twelve-month period ending in September 2019 (42.8 at the end of June). Market shares are calculated on a 12 months rolling basis. Market data includes all Wärtsilä power plants and other manufacturers’ gas and liquid fuelled gas turbine based power plants with prime movers below 500 MW, as well as the estimated output of steam turbines for combined cycles. The data is gathered from the McCoy Power Report. The main gas turbine competitors are GE, Siemens, Mitsubishi, and Ansaldo. Other combustion engines are not included.
  • 21. © Wärtsilä PUBLIC 11% 41% 23% 25% 32% 26% 26% 16% Services order intake by segment Equipment order intake by segment ◼ Independent Power Producers ◼ Industrials ◼ Others ◼ Utilities RESULT PRESENTATION 201921 Order intake development 0 500 1,000 1,500 2,000 2,500 0 100 200 300 400 500 600 700 800 900 1,000 10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019 Wärtsilä Energy, equipment Wärtsilä Energy, services Wärtsilä Energy total, rolling 12 months WÄRTSILÄ ENERGY BUSINESS QTD, MEUR Rolling 12m, MEUR 30 January 2020 Fourth quarter development
  • 22. © Wärtsilä PUBLIC RESULT PRESENTATION 201922 Orders received for energy equipment globally WÄRTSILÄ ENERGY BUSINESS IPP’s (Independent Power Producers) Utilities Industrials Order intake 1-12/2019: 1,980 MW (2,911) Asia 986 (1,426) Africa and Middle East 344 (329) Americas 410 (824) Europe 240 (332) 30 January 2020 Others
  • 23. © Wärtsilä PUBLIC23 Energy installed base covered by long-term service agreements 0% 5% 10% 15% 20% 25% 30% 0 2,000 4,000 6,000 8,000 10,000 12,000 14,000 2014 2015 2016 2017 2018 2019 MW under agreement* % of Wärtsilä Energy installed base Wärtsilä signed a spare parts supply agreement in the Dominican Republic • The service agreement covers all three Wärtsilä power plants owned and/or operated by EGE Haina, which total approx. 400 MW in installed capacity • The agreement will allow accurate predictability of spare part and maintenance costs WÄRTSILÄ ENERGY BUSINESS 30 January 2020 RESULT PRESENTATION 2019 MW *Includes agreements covering both installed assets and assets to be installed in the future
  • 24. © Wärtsilä PUBLIC RESULT PRESENTATION 201924 Net sales development 0 500 1,000 1,500 2,000 2,500 0 200 400 600 800 1,000 10-12/2018 1-3/2019 4-6/2019 7-9/2019 10-12/2019 Wärtsilä Energy, equipment Wärtsilä Energy, services Wärtsilä Energy total, rolling 12 months 15% 5% 12% 7% 61% Spare parts Field service Service agreements Service projects Wärtsilä Energy, equipment WÄRTSILÄ ENERGY BUSINESS QTD, MEUR Rolling 12m, MEUR Fourth quarter development EUR 664 million (701) 30 January 2020 (61) (4) (12) (17) (5)
  • 25. © Wärtsilä PUBLIC COLLABORATING FOR LIFECYCLE INNOVATION • Wärtsilä’s hybrid, dual-fuel solution establishes the new Wasaline RoPax ferry as a benchmark in efficiency and sustainability • Predictive maintenance lowers operating costs and improves reliability • Wärtsilä benefits in the form of a floating technology demonstrator and R&D lab in connection to the Smart Technology Hub being built in Vaasa MODULAR BLOCK TO MODERNISE POWER GENERATION IN MALI • Wärtsilä secured the first order of the innovative Modular Block solution, to be delivered to an off-grid gold mine in Mali • The solution will replace the existing diesel generators, create substantial monthly savings in fuel costs, and facilitate the integration of renewables into the mine’s energy system
  • 26. © Wärtsilä PUBLIC PROSPECTS The demand for Wärtsilä’s services and solutions in 2020 is expected to be somewhat below that of 2019. Demand by business area is anticipated to be as follows: • Soft in Wärtsilä Marine Business • Soft in Wärtsilä Energy Business
  • 27. THANK YOU Further information: Natalia Valtasaari Vice President, Investor Relations Tel. +358 (0) 10 709 5637 E-mail: natalia.valtasaari@wartsila.com