SlideShare ist ein Scribd-Unternehmen logo
1 von 28
Submitted By:
VIJAY KUMAR
DEPARTMENT OF CIVIL ENGINEERING
JAMIA MILLIA ISLAMIA
Review of design criteria of existing system of
sewerage system.
Design of sewerage system.
Cost estimation of sewerage system as per
Delhi Schedule of Rates 2012 (DSR).
To transport water or waste water from
one location to another by means of
connecting pipes through gravity.
To provide a hygienic and healthy
environment.
Increases the aesthesis and property
value.
Combined system
Sanitary system
 Strom system
• Collects sanitary sewage & storm water run off in a single pipe system.
• Can cause serious water pollution problems due to combined sewer
overflows
• Caused by large variations in flow between dry and wet weather.
• This type of sewer design is no longer used in building new communities.
• Used for transporting sewage from houses and commercial buildings
• Sanitary sewers serving industrial areas also carry Industrial sewage.
• Sanitary sewage is collected with the help of sanitary sewer line
• The sanitary sewer is attached to a main sewer.
• The main sewer runs directly to the sewage treatment plant.
• A storm sewer collects storm water with the help of gutter & catch basin
• Gutter allow the storm water to drain from the street directly into the storm
sewer.
Manhole
Drop Manhole
Flushing Tank
Lamp hole
Vent shaft
Inverted Siphon
Storm Water Inlets /Street Inlets
Cover and Frames
Catch Basin
1.Straight-Through Manhole
2.Junction Manhole
3.Side Entrance Manhole
4.Drop Manhole
5.Scraper (Service) Type Manhole
6.Flushing Manhole
Quantity of sewage to be handled
Land use pattern
Contour Layout
Design period
Discharge
Self cleansing velocity (Vmin)
Scouring velocity (Vmax)
Roughness of pipes
Depth of sewer
Gradient
Post monsoon ground water table
Design Period of Civil Work (Trunk,
Main Branch Sewer & Appurtenances) - 30 Years
Sewage Generated - 80% of Total Water supply
Flow Assumptions - Minimum Flow Varies
from 1/3 to ½ of average flow
Ground Water Infiltration -500 to 5,000 litres/km/day
Manning’s Roughness Coefficient - 0.013
Velocity of Flow - 0.60 m/s to 3.0 m/s
Rate of Flow - 80% Running Full
 Minimum Size of Sewer - 150 mm
Minimum gradient for sewers shall be designed to
fulfill the requirement of self cleansing velocity
Present Peak Flow
(Cumec)
Recommended slope
1 in
0.002 165
0.003 250
0.005 320
0.010 500
0.015 770
0.020 835
0.030 1000
Contributory
Population Range
Peak Factor
Up to 20,000 3.0
20,000 to 50,000 2.5
50,000 to 7,50,000 2.25
Above 7,50,000 2.0
MANNINGS FORMULA
and
Q= A x V
Where
Q = Discharge
S = Slope of hydraulic gradient
D = Internal dia of pipe line
R = Hydraulic radius in m
V = Velocity in m/s
n = Manning's roughness coefficient
The Problem has been taken from the Manual on
Sewerage and sewage Treatment-1993 of Central Public
Health and Environmental Engineering Organization
(CPHEEO).
 Layout Plan of Manual.
 Ground Levels of various nodes.
 Total Population of the Area is two Lacs.
 Total Area = 101.02 ha.
 Average Length of sewer line between Manhole = 30 m
 Water supply = 150 L/C/day
 Total Population = 2 lacs
 Total Length of sewer line = 7275.12 m
 Population Equivalent = (200000/7275.12)
= 27.49 Persons/m
 Rate of Infiltration = 5000 Lit/Km/Day
 Minimum cover to be provided over
the crown of the sewer = 1.0 m
 Minimum velocity in sewer at peak flow = 0.6 m/s
 Maximum Velocity in sewer = 2 m/s
 Minimum size of the sewer = 150 mm
 Peak factor = 3.0
Section From MH-69 to MH-70
Diameter of Sewer Line = 150 mm
Min. Velocity = 0.60 m/s
Slope of the sewer Line = 1 in 160
Detail Design
 Layout Plan of the Area
 Sewer Network
 Hydraulic Design Sewer Lines
 Colour Coding Plan of the Network
 Typical L-section of Sewer Line
 Typical Details of Appurtenances
 Typical Details of Excavation Pipe Bedding
Sl.
No.
Description
of Item
Maximum Minimum
1 Ground Level 39.00 Mtr. 32.00 Mtr.
2 Discharge 0.625 Cumec 0.0027 Cumec
(2.70 Lit.)
3 Slope 1 in 1100 1 in 100
4 Velocity 1.83 m/s 0.61 m/s
5 Dia of Pipe 1000 mm 150 mm
Diameter (mm) Length of Pipe (m)
150 Φ 1936.01
200 Φ 2015.31
250 Φ 1169.21
300 Φ 642.06
350 Φ 180.76
400 Φ 233.00
500 Φ 493.86
600 Φ 212.91
900 Φ 305.00
1000 Φ 87.00
Total Length 7275.12 m
Circular type manhole 0.91m
internal diameter (at
bottom) beyond 0.91m to
1.67m
129
Circular type manhole 1.22m
internal diameter (at
bottom) beyond 1.68 m to
2.29 m :
67
Circular type manhole 1.52 m
internal diameter (at
bottom) beyond 2.30 m :
60
 Total Cost of Excavation(Rs.) = 25.16 Lacs
 Total Cost Of Manholes (Rs.) = 33.83 Lacs
 Total Cost of Pipes (Rs.) = 33.08 Lacs
 Total Cost of Foot Rest (Rs.) = 3.69 Lacs
 Cost of P.C.C. (1.2.4) (Rs.) = 1.69 Lacs
Total cost of the Project (Rs.) = 97.46 Lacs
Avg. cost / Km (Rs.) = 13.40 Lacs
Manual on sewerage and sewage treatment
(Second edition-1993)
Manual on sewerage and sewage treatment (Final
Draft-2012)
Delhi Schedule of Rates – 2012,
Delhi analysis of Rates Vol. I & II,
Environmental Engineering Vol. II, by S.K.Garg
(Twenty Second Edition)
Basic Environmental Engineering by Jeery
A.Nathson.
www.google.co.in/Images for logo of
Jamia, images and photos etc.
THANKS

Weitere ähnliche Inhalte

Was ist angesagt?

Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
Ankit Gola
 
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMPROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
AB MAKASANA
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenance
Manish Goyal
 

Was ist angesagt? (20)

Water demand and factor affecting water demand
Water demand and factor affecting water demandWater demand and factor affecting water demand
Water demand and factor affecting water demand
 
Design of sewers
Design of sewersDesign of sewers
Design of sewers
 
Water supply appurtenances
Water supply appurtenancesWater supply appurtenances
Water supply appurtenances
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
 
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEMPROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
PROCEDURE FOR MAINTENANCE OF SEWAGE SYSTEM
 
Water demand/Waterrequirements
Water demand/Waterrequirements Water demand/Waterrequirements
Water demand/Waterrequirements
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
Water distribution system
Water distribution systemWater distribution system
Water distribution system
 
Sewer Appurtenances
Sewer AppurtenancesSewer Appurtenances
Sewer Appurtenances
 
05 water supply system
05 water supply system05 water supply system
05 water supply system
 
Intake structures
Intake structures Intake structures
Intake structures
 
Introduction to Water Supply
Introduction to Water SupplyIntroduction to Water Supply
Introduction to Water Supply
 
Collection and estimation of sewage
Collection and estimation of sewageCollection and estimation of sewage
Collection and estimation of sewage
 
Introduction To Building Services
Introduction To Building ServicesIntroduction To Building Services
Introduction To Building Services
 
WATER SUPPLY SYSTEM
WATER SUPPLY SYSTEM WATER SUPPLY SYSTEM
WATER SUPPLY SYSTEM
 
Sustainable storm water management Presentation Slides
Sustainable storm water management Presentation SlidesSustainable storm water management Presentation Slides
Sustainable storm water management Presentation Slides
 
Hydraulic design of sewer
Hydraulic design of sewerHydraulic design of sewer
Hydraulic design of sewer
 
Storm drainage design
Storm drainage designStorm drainage design
Storm drainage design
 
sewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenancesewers and sewer netwrok - design construction and maintenance
sewers and sewer netwrok - design construction and maintenance
 
Design and construction of sewer
Design and construction of sewer Design and construction of sewer
Design and construction of sewer
 

Andere mochten auch

Structure & Infrastructure Planning
Structure & Infrastructure PlanningStructure & Infrastructure Planning
Structure & Infrastructure Planning
Ir. Abdul Aziz Abas
 
Enabling Integrated Planning through Town & Country Planning Act in India
Enabling Integrated Planning through Town & Country Planning Act in IndiaEnabling Integrated Planning through Town & Country Planning Act in India
Enabling Integrated Planning through Town & Country Planning Act in India
WRI Ross Center for Sustainable Cities
 

Andere mochten auch (10)

Road networks in india
Road networks in indiaRoad networks in india
Road networks in india
 
Planning act seminar
Planning act seminarPlanning act seminar
Planning act seminar
 
Evolution of planning legislation in india
Evolution of planning legislation in india Evolution of planning legislation in india
Evolution of planning legislation in india
 
Resources
Resources Resources
Resources
 
Structure & Infrastructure Planning
Structure & Infrastructure PlanningStructure & Infrastructure Planning
Structure & Infrastructure Planning
 
Enabling Integrated Planning through Town & Country Planning Act in India
Enabling Integrated Planning through Town & Country Planning Act in IndiaEnabling Integrated Planning through Town & Country Planning Act in India
Enabling Integrated Planning through Town & Country Planning Act in India
 
Regional plan
Regional plan Regional plan
Regional plan
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
 
History, Theories, Principles of Urban and Regional Planning
History, Theories, Principles of Urban and Regional PlanningHistory, Theories, Principles of Urban and Regional Planning
History, Theories, Principles of Urban and Regional Planning
 
Sewage Conveyance and Pumping
Sewage Conveyance and PumpingSewage Conveyance and Pumping
Sewage Conveyance and Pumping
 

Ähnlich wie Design of sewerage collection system and cost estimation

Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
AsnelTiffa
 
Lec-10-Week (7)( Hydraulics of water Distribution System).pdf
Lec-10-Week (7)( Hydraulics of water Distribution System).pdfLec-10-Week (7)( Hydraulics of water Distribution System).pdf
Lec-10-Week (7)( Hydraulics of water Distribution System).pdf
KkkhanHan
 

Ähnlich wie Design of sewerage collection system and cost estimation (20)

Sewerage design
Sewerage designSewerage design
Sewerage design
 
Carl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewageCarl m kuttler jr collection and estimation of sewage
Carl m kuttler jr collection and estimation of sewage
 
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
Design of a Minor Storm Water Management System Using XPSWMM for London, Onta...
 
Hydraulicdesignofsewer
HydraulicdesignofsewerHydraulicdesignofsewer
Hydraulicdesignofsewer
 
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptxLectre 1- Real INTRO and SEWER DESIGFN.pptx
Lectre 1- Real INTRO and SEWER DESIGFN.pptx
 
Ee 2
Ee 2Ee 2
Ee 2
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its discharge
 
Collection of sewage & estimation of its discharge
Collection of sewage & estimation of its dischargeCollection of sewage & estimation of its discharge
Collection of sewage & estimation of its discharge
 
Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)Lec 1 (wastewater collection system)
Lec 1 (wastewater collection system)
 
IRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of GuttersIRJET-Design and Fabrication Of Gutters
IRJET-Design and Fabrication Of Gutters
 
Lec-10-Week (7)( Hydraulics of water Distribution System).pdf
Lec-10-Week (7)( Hydraulics of water Distribution System).pdfLec-10-Week (7)( Hydraulics of water Distribution System).pdf
Lec-10-Week (7)( Hydraulics of water Distribution System).pdf
 
Narendra Kumar_NIT warangal
Narendra Kumar_NIT warangalNarendra Kumar_NIT warangal
Narendra Kumar_NIT warangal
 
Ch2.ppt
Ch2.pptCh2.ppt
Ch2.ppt
 
water supply to homes
water supply to homeswater supply to homes
water supply to homes
 
Design of sewerage system
Design of sewerage systemDesign of sewerage system
Design of sewerage system
 
Plumbing and drainage services
Plumbing and drainage servicesPlumbing and drainage services
Plumbing and drainage services
 
pipeline hydraulic design presentation.pptx
pipeline hydraulic design presentation.pptxpipeline hydraulic design presentation.pptx
pipeline hydraulic design presentation.pptx
 
8445806
84458068445806
8445806
 
SEWER DESIGN:
SEWER DESIGN:SEWER DESIGN:
SEWER DESIGN:
 
Sewage, Sewer system, and elevations Module
Sewage, Sewer system, and elevations ModuleSewage, Sewer system, and elevations Module
Sewage, Sewer system, and elevations Module
 

Kürzlich hochgeladen

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Kürzlich hochgeladen (20)

Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 

Design of sewerage collection system and cost estimation

  • 1. Submitted By: VIJAY KUMAR DEPARTMENT OF CIVIL ENGINEERING JAMIA MILLIA ISLAMIA
  • 2. Review of design criteria of existing system of sewerage system. Design of sewerage system. Cost estimation of sewerage system as per Delhi Schedule of Rates 2012 (DSR).
  • 3. To transport water or waste water from one location to another by means of connecting pipes through gravity. To provide a hygienic and healthy environment. Increases the aesthesis and property value.
  • 5. • Collects sanitary sewage & storm water run off in a single pipe system. • Can cause serious water pollution problems due to combined sewer overflows • Caused by large variations in flow between dry and wet weather. • This type of sewer design is no longer used in building new communities.
  • 6. • Used for transporting sewage from houses and commercial buildings • Sanitary sewers serving industrial areas also carry Industrial sewage. • Sanitary sewage is collected with the help of sanitary sewer line • The sanitary sewer is attached to a main sewer. • The main sewer runs directly to the sewage treatment plant.
  • 7. • A storm sewer collects storm water with the help of gutter & catch basin • Gutter allow the storm water to drain from the street directly into the storm sewer.
  • 8. Manhole Drop Manhole Flushing Tank Lamp hole Vent shaft Inverted Siphon Storm Water Inlets /Street Inlets Cover and Frames Catch Basin
  • 9. 1.Straight-Through Manhole 2.Junction Manhole 3.Side Entrance Manhole 4.Drop Manhole 5.Scraper (Service) Type Manhole 6.Flushing Manhole
  • 10.
  • 11.
  • 12.
  • 13. Quantity of sewage to be handled Land use pattern Contour Layout
  • 14. Design period Discharge Self cleansing velocity (Vmin) Scouring velocity (Vmax) Roughness of pipes Depth of sewer Gradient Post monsoon ground water table
  • 15. Design Period of Civil Work (Trunk, Main Branch Sewer & Appurtenances) - 30 Years Sewage Generated - 80% of Total Water supply Flow Assumptions - Minimum Flow Varies from 1/3 to ½ of average flow Ground Water Infiltration -500 to 5,000 litres/km/day Manning’s Roughness Coefficient - 0.013 Velocity of Flow - 0.60 m/s to 3.0 m/s Rate of Flow - 80% Running Full  Minimum Size of Sewer - 150 mm
  • 16. Minimum gradient for sewers shall be designed to fulfill the requirement of self cleansing velocity Present Peak Flow (Cumec) Recommended slope 1 in 0.002 165 0.003 250 0.005 320 0.010 500 0.015 770 0.020 835 0.030 1000
  • 17. Contributory Population Range Peak Factor Up to 20,000 3.0 20,000 to 50,000 2.5 50,000 to 7,50,000 2.25 Above 7,50,000 2.0
  • 18. MANNINGS FORMULA and Q= A x V Where Q = Discharge S = Slope of hydraulic gradient D = Internal dia of pipe line R = Hydraulic radius in m V = Velocity in m/s n = Manning's roughness coefficient
  • 19. The Problem has been taken from the Manual on Sewerage and sewage Treatment-1993 of Central Public Health and Environmental Engineering Organization (CPHEEO).  Layout Plan of Manual.  Ground Levels of various nodes.  Total Population of the Area is two Lacs.  Total Area = 101.02 ha.
  • 20.  Average Length of sewer line between Manhole = 30 m  Water supply = 150 L/C/day  Total Population = 2 lacs  Total Length of sewer line = 7275.12 m  Population Equivalent = (200000/7275.12) = 27.49 Persons/m  Rate of Infiltration = 5000 Lit/Km/Day  Minimum cover to be provided over the crown of the sewer = 1.0 m  Minimum velocity in sewer at peak flow = 0.6 m/s  Maximum Velocity in sewer = 2 m/s  Minimum size of the sewer = 150 mm  Peak factor = 3.0
  • 21. Section From MH-69 to MH-70 Diameter of Sewer Line = 150 mm Min. Velocity = 0.60 m/s Slope of the sewer Line = 1 in 160 Detail Design
  • 22.  Layout Plan of the Area  Sewer Network  Hydraulic Design Sewer Lines  Colour Coding Plan of the Network  Typical L-section of Sewer Line  Typical Details of Appurtenances  Typical Details of Excavation Pipe Bedding
  • 23. Sl. No. Description of Item Maximum Minimum 1 Ground Level 39.00 Mtr. 32.00 Mtr. 2 Discharge 0.625 Cumec 0.0027 Cumec (2.70 Lit.) 3 Slope 1 in 1100 1 in 100 4 Velocity 1.83 m/s 0.61 m/s 5 Dia of Pipe 1000 mm 150 mm
  • 24. Diameter (mm) Length of Pipe (m) 150 Φ 1936.01 200 Φ 2015.31 250 Φ 1169.21 300 Φ 642.06 350 Φ 180.76 400 Φ 233.00 500 Φ 493.86 600 Φ 212.91 900 Φ 305.00 1000 Φ 87.00 Total Length 7275.12 m
  • 25. Circular type manhole 0.91m internal diameter (at bottom) beyond 0.91m to 1.67m 129 Circular type manhole 1.22m internal diameter (at bottom) beyond 1.68 m to 2.29 m : 67 Circular type manhole 1.52 m internal diameter (at bottom) beyond 2.30 m : 60
  • 26.  Total Cost of Excavation(Rs.) = 25.16 Lacs  Total Cost Of Manholes (Rs.) = 33.83 Lacs  Total Cost of Pipes (Rs.) = 33.08 Lacs  Total Cost of Foot Rest (Rs.) = 3.69 Lacs  Cost of P.C.C. (1.2.4) (Rs.) = 1.69 Lacs Total cost of the Project (Rs.) = 97.46 Lacs Avg. cost / Km (Rs.) = 13.40 Lacs
  • 27. Manual on sewerage and sewage treatment (Second edition-1993) Manual on sewerage and sewage treatment (Final Draft-2012) Delhi Schedule of Rates – 2012, Delhi analysis of Rates Vol. I & II, Environmental Engineering Vol. II, by S.K.Garg (Twenty Second Edition) Basic Environmental Engineering by Jeery A.Nathson. www.google.co.in/Images for logo of Jamia, images and photos etc.