SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Will the Kanwatheertha belt benefit ?
The Kovalam-Poovar belt, is to be redeveloped by Kerala Tourism “to a world-class
tourism destination by 2042.”

The Vision and Development plan for “30 years beyond today” for Kovalam-Poovar
Tourism Corridor has not witnessed planned development, is stated by the karalla
tourism . Unauthorized constructions and illegal sand is sold in cities .The coastal
belt consisting of various beach destinations, starting from Poovar beach in the
south to Kanwatheertha beach in the north, offers the best tourism products and
Kovalam beach is the preferred destination of tourists from all over the world.The
government has accorded administrative sanction for preparing the vision
document. Kerala Tourism has invited consortiums for carrying out consultancy
services for the study and preparation of the proposed 30-year master plan for the
corridor

The Tourism Department has insisted that the development, which will be in a
phased manner, should include social, cultural, and heritage aspects in addition to
infrastructure. In infrastructure, civil constructions, roads and highways, water
and power, parking, transportation, solid and liquid waste collection and disposal,
water harvesting and welfare of local community have been included. Ready-to-
implement development schemes are being envisaged.

the primary objective should be to prepare a projected image of the corridor,
considering the physical, environmental, social, and cultural attributes, and
standard of living of local community. Benchmarking will be done with similar
Indian or foreign tourism corridors. Preparation of a 30-year macro-level plan for
tourism development of the corridor is the second objective.The third objective is to
prepare micro-level destination-development plan for five or six destinations in the
corridor.

Deadlines

The interim report on macro-level plan will have to be submitted within two
months by the agency concerned. The interim report on master plan and project
report for destinations will have to be submitted within three months. The draft
final master plan, both macro level and micro level, will have to be submitted in
four-and-a-half months, and the final report, in six months.

                                                              By vaishnavi lakeisha

Weitere ähnliche Inhalte

Ähnlich wie Will the Kanwatheertha belt benefit

Vyttila Mobility hub
Vyttila Mobility hubVyttila Mobility hub
Vyttila Mobility hubDhanuraj D
 
Pc i khan pur fery project 12 m
Pc i khan pur fery project 12 mPc i khan pur fery project 12 m
Pc i khan pur fery project 12 mhayat alishah
 
Public-Private Partnership for Sustainable Urbanization of Cochin
Public-Private Partnership for Sustainable Urbanization of CochinPublic-Private Partnership for Sustainable Urbanization of Cochin
Public-Private Partnership for Sustainable Urbanization of CochinCentre for Public Policy Research
 
Ravi Riverfront Urban Development Project - Excerpts from the Announcement
Ravi Riverfront Urban Development Project - Excerpts from the AnnouncementRavi Riverfront Urban Development Project - Excerpts from the Announcement
Ravi Riverfront Urban Development Project - Excerpts from the AnnouncementKKM Architects
 
What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...sonalidalal4
 
The Ravi Riverfront Urban Development Project
The Ravi Riverfront Urban Development ProjectThe Ravi Riverfront Urban Development Project
The Ravi Riverfront Urban Development ProjectKKM Architects
 
Introduction to Tranporation Engineering.pptx
Introduction to Tranporation Engineering.pptxIntroduction to Tranporation Engineering.pptx
Introduction to Tranporation Engineering.pptxPinkiDeb4
 
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTS
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTSPLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTS
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTSJIT KUMAR GUPTA
 
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMCHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMThe King
 
aditya presentation new (1).pdf
aditya presentation new (1).pdfaditya presentation new (1).pdf
aditya presentation new (1).pdfAdhiraj Rajput
 
BANGLADESH TOURISM FOUNDATION
BANGLADESH TOURISM FOUNDATIONBANGLADESH TOURISM FOUNDATION
BANGLADESH TOURISM FOUNDATIONKhaled Hasan
 
Adp 2018 19 concept publicity promotion product place perception
Adp 2018 19 concept  publicity promotion product place perceptionAdp 2018 19 concept  publicity promotion product place perception
Adp 2018 19 concept publicity promotion product place perceptionhayat alishah
 
Highway engineering section 1
Highway engineering section 1Highway engineering section 1
Highway engineering section 1vhjadhav
 
INCORPORATING LOCAL TRANSPORTATION IN EXISTING RAILWAY STATIONS IN LUCKNOW
INCORPORATING LOCAL TRANSPORTATION IN EXISTING RAILWAY STATIONS IN LUCKNOWINCORPORATING LOCAL TRANSPORTATION IN EXISTING RAILWAY STATIONS IN LUCKNOW
INCORPORATING LOCAL TRANSPORTATION IN EXISTING RAILWAY STATIONS IN LUCKNOWIRJET Journal
 

Ähnlich wie Will the Kanwatheertha belt benefit (20)

Vyttila Mobility hub
Vyttila Mobility hubVyttila Mobility hub
Vyttila Mobility hub
 
Nl infrastructure sep 26 - oct 2, 2015
Nl infrastructure sep 26 - oct 2, 2015Nl infrastructure sep 26 - oct 2, 2015
Nl infrastructure sep 26 - oct 2, 2015
 
Pc i khan pur fery project 12 m
Pc i khan pur fery project 12 mPc i khan pur fery project 12 m
Pc i khan pur fery project 12 m
 
Nl infrastructure aug 1-aug 7 2015
Nl infrastructure aug 1-aug 7 2015Nl infrastructure aug 1-aug 7 2015
Nl infrastructure aug 1-aug 7 2015
 
Public-Private Partnership for Sustainable Urbanization of Cochin
Public-Private Partnership for Sustainable Urbanization of CochinPublic-Private Partnership for Sustainable Urbanization of Cochin
Public-Private Partnership for Sustainable Urbanization of Cochin
 
Ravi Riverfront Urban Development Project - Excerpts from the Announcement
Ravi Riverfront Urban Development Project - Excerpts from the AnnouncementRavi Riverfront Urban Development Project - Excerpts from the Announcement
Ravi Riverfront Urban Development Project - Excerpts from the Announcement
 
What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...What do you understand by Infrastructure Planning Explain the role of Infrast...
What do you understand by Infrastructure Planning Explain the role of Infrast...
 
Nl infrastructure aug 22 - aug 28, 2015
Nl infrastructure aug 22 - aug 28, 2015Nl infrastructure aug 22 - aug 28, 2015
Nl infrastructure aug 22 - aug 28, 2015
 
The Ravi Riverfront Urban Development Project
The Ravi Riverfront Urban Development ProjectThe Ravi Riverfront Urban Development Project
The Ravi Riverfront Urban Development Project
 
Introduction to Tranporation Engineering.pptx
Introduction to Tranporation Engineering.pptxIntroduction to Tranporation Engineering.pptx
Introduction to Tranporation Engineering.pptx
 
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTS
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTSPLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTS
PLANNING THE CAPITAL CITY OF CHANDIGARH : PROBLEMS, LESSONS AND PROSPECTS
 
Experience Record
Experience RecordExperience Record
Experience Record
 
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURMCHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
CHANDIGARH - CITY DEVELOPMENT PLAN UNDER JNNURM
 
aditya presentation new (1).pdf
aditya presentation new (1).pdfaditya presentation new (1).pdf
aditya presentation new (1).pdf
 
BANGLADESH TOURISM FOUNDATION
BANGLADESH TOURISM FOUNDATIONBANGLADESH TOURISM FOUNDATION
BANGLADESH TOURISM FOUNDATION
 
Nl infrastructure july 4 - july 10, 2015
Nl infrastructure july 4 - july 10, 2015Nl infrastructure july 4 - july 10, 2015
Nl infrastructure july 4 - july 10, 2015
 
Adp 2018 19 concept publicity promotion product place perception
Adp 2018 19 concept  publicity promotion product place perceptionAdp 2018 19 concept  publicity promotion product place perception
Adp 2018 19 concept publicity promotion product place perception
 
Highway engineering section 1
Highway engineering section 1Highway engineering section 1
Highway engineering section 1
 
HRIDAY Scheme.pptx
HRIDAY Scheme.pptxHRIDAY Scheme.pptx
HRIDAY Scheme.pptx
 
INCORPORATING LOCAL TRANSPORTATION IN EXISTING RAILWAY STATIONS IN LUCKNOW
INCORPORATING LOCAL TRANSPORTATION IN EXISTING RAILWAY STATIONS IN LUCKNOWINCORPORATING LOCAL TRANSPORTATION IN EXISTING RAILWAY STATIONS IN LUCKNOW
INCORPORATING LOCAL TRANSPORTATION IN EXISTING RAILWAY STATIONS IN LUCKNOW
 

Will the Kanwatheertha belt benefit

  • 1. Will the Kanwatheertha belt benefit ? The Kovalam-Poovar belt, is to be redeveloped by Kerala Tourism “to a world-class tourism destination by 2042.” The Vision and Development plan for “30 years beyond today” for Kovalam-Poovar Tourism Corridor has not witnessed planned development, is stated by the karalla tourism . Unauthorized constructions and illegal sand is sold in cities .The coastal belt consisting of various beach destinations, starting from Poovar beach in the south to Kanwatheertha beach in the north, offers the best tourism products and Kovalam beach is the preferred destination of tourists from all over the world.The government has accorded administrative sanction for preparing the vision document. Kerala Tourism has invited consortiums for carrying out consultancy services for the study and preparation of the proposed 30-year master plan for the corridor The Tourism Department has insisted that the development, which will be in a phased manner, should include social, cultural, and heritage aspects in addition to infrastructure. In infrastructure, civil constructions, roads and highways, water and power, parking, transportation, solid and liquid waste collection and disposal, water harvesting and welfare of local community have been included. Ready-to- implement development schemes are being envisaged. the primary objective should be to prepare a projected image of the corridor, considering the physical, environmental, social, and cultural attributes, and standard of living of local community. Benchmarking will be done with similar Indian or foreign tourism corridors. Preparation of a 30-year macro-level plan for tourism development of the corridor is the second objective.The third objective is to prepare micro-level destination-development plan for five or six destinations in the corridor. Deadlines The interim report on macro-level plan will have to be submitted within two months by the agency concerned. The interim report on master plan and project report for destinations will have to be submitted within three months. The draft final master plan, both macro level and micro level, will have to be submitted in four-and-a-half months, and the final report, in six months. By vaishnavi lakeisha