CLUJ METROPOLITAN AREA
November 28, 2012




                          (2012-2020)
Metropolitan Area Cluj
November 28, 2012
November 28, 2012



                    Cluj Napoca
Pata Rat in Cluj – Build
                                                     up
                        “Colina Verde” – New Pata-Rât
                    •    Families relocated from Coastei street
                         (central street of Cluj) in December 2010.
                         Substandard social housing in modular
                         dwellings, overcrowded and segregated at
                         the periphery of the city.
                    •    Total inhabitants: 243 persons
                    •    Children below school age: 37
                    •    School age children: 72
                    •    Active-age population (18-64): 140 persons,
                         out of whom 22 were formally employed at
                         the time of relocation. The majority of men
                         have work experience in construction and
                         manual labor, whereas women work in semi-
                         skilled routine service jobs, mostly without a
                         contract. Before relocation, they were
                         relatively well integrated, and all children
                         were in school. Except from four families, all
November 28, 2012




                         of them are ethnic Roma.
Pata Rat in Cluj – Build
                            up
                                  Cantonului street
                              •    Barracks near an old railway station and on the unused
                                   railway lines, donated by charity organizations (Ecce
                                   Homo and Pro Roma) to the families evicted from the city
                                   after 2000. The families are sued by the National Railway
                                   Company for abusive occupation of the land and face the
                                   threat of eviction.
                              •    Total inhabitants: 451 persons
                              •    Children below school age: 101
                              •    School age children: 103, but one-third not attending
                                   school. Half of those attending education are in “special
                                   schools” for children with disabilities.
                              •    Active-age population (18-64): 234 persons, out of whom
                                   65 have some formal work experience and 49 are
                                   currently employed, mostly in cleaning services. The
                                   majority completed only primary education or
                                   gymnasium, but 20 persons have vocational secondary
                                   education or high school.
November 28, 2012




                              •    Almost one-fifth of the inhabitants do not hold valid
                                   identity papers. The settlement is ethnically mixed: cca
                                   60% are Roma, 30% Romanians and 10% Hungarians.
Pata Rat in Cluj – Build up
                    “DALLAS” – OLD PATA-RÂT
                    •   The agglomeration of improvised houses and
                        barracks known as “Dallas” colony. Two
                        international NGOs active there: Pro Roma
                        Foundation and the Association Ajutorul
                        Familiilor.
                    •   Total inhabitants: 271 persons
                    •   Children below school age: 83
                    •   School age children: 58, but half of them not
                        attending school
                    •   Active-age population (18-64): 130 persons,
                        but only 16 have some formal work
                        experience and two are currently employed.
                        They make a living mostly from recycling
                        waste from the nearby garbage dump. The
                        very majority completed only primary
                        education or gymnasium. At least one-fourth
                        do not hold valid identity papers. Around
November 28, 2012




                        85% of the inhabitants declared to be ethnic
                        Roma.
Pata Rat in Cluj – Build up
                                 GARBAGE DUMP
                                 •   At the very end of Pata-Rât street, right near
                                     the garbage dump of the city (“ramp de
                                     guano”). Some of them seasonal “workers”
                                     coming from other regions, earning a living
                                     from recycling waste at the dump.
                                 •   Total inhabitants: 109 persons
                                 •   Children below school age: 37
                                 •   School age children: 26, but none of them
                                     attending school
                                 •   Active-age population (18-64): 46 persons,
                                     out of them 18 have some formal work
                                     experience and two are currently employed.
                                     They make a living mostly from recycling
                                     waste. The very majority completed only
                                     primary education or gymnasium. At least
                                     one-fourth of the inhabitants do not hold
                                     valid identity papers. 90% declared to be
November 28, 2012




                                     ethnic Roma.
November 28, 2012




                    Claudiu Cosier, NW-RDA, 19 December 2011
INTEGRATED HOUSING AND INCLUSION STRATEGY
                            CLUJ NAPOCA METROPOLITAN AREA (2012-2020)

                    Short term interventions Long term development
                    (2012 -2015)             (2011-2020)
                                                     Implementing a long-term strategy for
                      –Project package financeable   complex solutions to the problems of
                      in this programmatic period    exclusion of vulnerable citizens,
                                                     including Roma, in an integrated and
                                                     sustainable way in Cluj Metropolitan
                      –Emergency Interventions
                                                     Area, which addresses housing needs
                                                     as part of an integrated approach
                                                     including education, health, social
                                                     affairs, employment, security and
                                                     desegregation measures and ensures
November 28, 2012




                                                     equal opportunities for all in all policy
                                                     areas regardless of social status,
                                                     ethnicity and gender.
Social Inclusion Strategy for the Cluj
                            Metropolitan Area (Objectives)

                    Social innovation in terms of empowerment
                    of the citizens at risk of exclusion to
                    participate in the planned housing program
                    and ensuring their ability to sustain the
                    results.
November 28, 2012
Social Inclusion Strategy for the Cluj
                            Metropolitan Area (Objectives)

                    Improving inclusion oriented public and
                    communities services and integrating them
                    with the social housing program
November 28, 2012
Social Inclusion Strategy for the Cluj
                            Metropolitan Area (Objectives)

                    Set-up and realize a social housing system
                    and program in CMA with participation of
                    the target group and social enterprises in
                    planning and implementation of the housing
                    program.
November 28, 2012
Social Inclusion Strategy for the Cluj
                            Metropolitan Area (Objectives)

                    Integrate the social housing programme with
                    the Economic Development Plan of the CMA
                    focused on employment opportunities and
                    job creation for the target group.
November 28, 2012
Social Inclusion Strategy for the Cluj
                            Metropolitan Area (Objectives)

                    Provide model to other similar initiatives in
                    Romania and other countries in Central and
                    Eastern Europe and join the Cluj
                    programme’s development network to
                    other, existing area-based networks across
                    national borders
November 28, 2012
Methodological principle
                    •Participation.      Real progress takes place only
                                         when the ‘target group’ is
                                         actively involved in local
                                         development. This project is
                                         aimed to invest in the local
                                         stakeholders not simply by
                                         providing fund and expertise,
                                         but also by expanding
                                         people’s knowledge, skills
                                         and ownership of the
November 28, 2012




                                         process.
Methodological principle
                    •Participation.               In order to ensure local
                    •Motivation and commitment.   participation of the poor,
                                                  disadvantaged people need to
                                                  feel motivated and committed
                                                  to the goals of development and
                                                  self-confidence to contribute to
                                                  the implementation of them. To
                                                  spur motivation and
                                                  participation in the project it is
                                                  needed to use external coaches.
                                                  Two Coaches will work with the
                                                  communities of the Pata Rât
November 28, 2012




                                                  during the whole project period
                                                  and continue after for minimum
                                                  two years.
Methodological principle
                    •Participation.               Local development must be
                    •Motivation and commitment.   inclusive. It is for everyone in a
                    •Everyone’s development.      community, and should involve
                                                  everyone, including the most
                                                  vulnerable. Everyone can have
                                                  ideas, everyone can contribute.
                                                  The mission is to create the
                                                  capacity of locals to transform
                                                  their perceived needs into
                                                  projects. Experts should not tell
                                                  people how to live, or what to
November 28, 2012




                                                  do. Learning is an interaction
                                                  among equals.
Methodological principle
                    •Participation.                 In order to be effective,
                    •Motivation and commitment.     people need to convey
                    •Everyone’s development.        development knowledge to
                    •Strengthening communication.   others who need it. For this
                                                    purpose, the project will
                                                    establish a Resource Centre
                                                    for Integrated Housing and
                                                    Inclusion that serves as an
                                                    information and coordination
                                                    hub for communicating ‘best
November 28, 2012




                                                    practices’ to other parts of
                                                    the country and the region.
Methodological principle
                    •Participation.                 Each community will function
                    •Motivation and commitment.     better if it is well organized.
                    •Everyone’s development.        The level of social
                    •Strengthening communication.   organization is related to the
                    •Social organization.           life quality and the economic
                                                    potential of communities too.
November 28, 2012
Methodological principle
                    •Participation.                 The Project offers a broad
                    •Motivation and commitment.     conceptual model which
                                                    addresses some of the
                    •Everyone’s development.
                                                    complexities faced by those
                    •Strengthening communication.   involved in development. These
                    •Social organization.           complexities lie in the variety of
                    •Complexity.                    local needs, the multiplicity of
                                                    people and organizations, the
                                                    complex pattern of public
                                                    bodies and the fact that area-
                                                    based development is both top-
                                                    down and bottom-up in
November 28, 2012




                                                    character, calling upon the
                                                    resources of government and
                                                    the energy of the people.
Methodological principle
                    •Participation.                 Cluj Pole City, as the target
                    •Motivation and commitment.     area, is considered in the
                    •Everyone’s development.        project as a social and
                    •Strengthening communication.   economic whole, comprising
                    •Social organization.           people, nature and other
                    •Complexity.                    resources and know-how.
                    •Area-based approach.
November 28, 2012
Methodological principle
                    •Participation.                 That means to find a way to
                    •Motivation and commitment.     harness the resources and
                    •Everyone’s development.        energies of relevant bodies to
                    •Strengthening communication.   coherent and coordinated
                    •Social organization.           development actions and
                    •Complexity.                    process.
                    •Area-based approach.
                    •Integrated development.
November 28, 2012
Methodological principle
                    •Participation.                 Which can be built up
                    •Motivation and commitment.     through implementation of
                    •Everyone’s development.        the previous principles
                    •Strengthening communication.
                    •Social organization.
                    •Complexity.
                    •Area-based approach.
                    •Integrated development.
                    •Social Cohesion
November 28, 2012
Methodological principle
                    •Participation.
                    •Motivation and commitment.
                    •Everyone’s development.
                    •Strengthening communication.
                    •Social organization.
                    •Complexity.
                    •Area-based approach.
                    •Integrated development.
                    •Social Cohesion
                    •Desegregation
November 28, 2012
The planning and strategic
                                      hierarchy

                    • PIDU (Urban Development Plan of the Growth
                      Pole)
                    • PUG (Urban Plan)
                    • Cluj-Napoca Development Strategy
                    • National Roma Inclusion Strategy
                      – Cluj Roma Inclusion Strategy (to be prepared)
                    • National Poverty Reduction Strategy
November 28, 2012
The institutional hierarchy

                    • Municipality of Cluj Napoca
                    • Growth Pole
                      – NW-RDA
                      – Development Association of Metropolitan
                        Municipalities
                    • Cluj County Council
                    • Line Ministries, Lead Ministries
November 28, 2012




                    • Operational Programs
Preparatory Phase:
                                  2012 OSI – UNDP Project

                    • Community level interventions     OSI – Making the most of EU Funds for
                                                        Roma Initiative
                      in Pata Rat
                    • Participatory assessment          UNDP Regional Roma Inclusion Program
                    • Mapped and re-organized
                      development resources at CMA      Partners:
                                                        • Municipality of Cluj Napoca (Lead);
                      level
                                                        • NW Regional Development Agency;
                    • Partnership development           • Babes Bolyai University
                    • Project package (short term
                      intervention)                     Advisory/Watchdog: gLOC
November 28, 2012




                    • Inclusion Strategy Concept note
                                                        Budget: USD 60.000
                    • Multi-level networking
Capacity Development needs

                    - Community coaching process has started in frame of
                      the UNDP-OSI project
                    - Metropolitan Inclusion Centre has to be set-up
                      (management)
                    - Re-organize public services and social housing
                      regulation;
                    - Create enabling environment for social enterprises
November 28, 2012
Short term interventions (2012 -2015)
                    Linking the present with the future

                    INTEGRATED FLAGSHIP PROJECT
                    FOR INCLUSION
November 28, 2012
Elements of the flagship project
                                 package to be financed
                    - Flats built/reconstructed with participation of the newly
                      trained professionals with contribution of the families who
                      got new flats in the houses (40% people from Pata Rat);
                      Ensure low cost maintenance of the buildings (energy
                      efficiency + renewable energy)
                    - Business Incubator (SME + Social enterprise) established to
                      create long-term job opportunity to people whose skills and
                      knowledge have been increased by different vocational
                      (waste recycling; management of the city’s green areas &
                      produce renewable energy from the green waste
November 28, 2012




                    - Metropolitan Inclusion Centre and Community Buildings
                      providing different public services for inclusion
November 28, 2012
Locations of the integrated
                    housing pilot package in Cluj
November 28, 2012

Weitere ähnliche Inhalte

Mehr von UNDP Eurasia

2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill IlinskiUNDP Eurasia
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill SavrassovUNDP Eurasia
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` ConnellUNDP Eurasia
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri LaneUNDP Eurasia
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno HeuvelUNDP Eurasia
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke TaishiUNDP Eurasia
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga ButoUNDP Eurasia
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David SimmonsUNDP Eurasia
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie KrausUNDP Eurasia
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy PalmerUNDP Eurasia
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina WhalleyUNDP Eurasia
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom AvivUNDP Eurasia
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning LudolphsUNDP Eurasia
 
2018 DRR Financing 2.2 Alexander Frost
2018 DRR Financing 2.2 Alexander Frost2018 DRR Financing 2.2 Alexander Frost
2018 DRR Financing 2.2 Alexander FrostUNDP Eurasia
 
2018 DRR Financing 1.6 Kota Katsumata
2018 DRR Financing 1.6 Kota Katsumata2018 DRR Financing 1.6 Kota Katsumata
2018 DRR Financing 1.6 Kota KatsumataUNDP Eurasia
 
2018 DRR Financing 1.5 Mohamed Al Hadi
2018 DRR Financing 1.5 Mohamed Al Hadi2018 DRR Financing 1.5 Mohamed Al Hadi
2018 DRR Financing 1.5 Mohamed Al HadiUNDP Eurasia
 
2018 DRR Financing 1.4 Thomas Kessler
2018 DRR Financing 1.4 Thomas Kessler2018 DRR Financing 1.4 Thomas Kessler
2018 DRR Financing 1.4 Thomas KesslerUNDP Eurasia
 
2018 DRR Financing 1.3 Rosalind Cook
2018 DRR Financing 1.3 Rosalind Cook2018 DRR Financing 1.3 Rosalind Cook
2018 DRR Financing 1.3 Rosalind CookUNDP Eurasia
 
2018 DRR Financing 1.2 Daniel Stander
2018 DRR Financing 1.2 Daniel Stander2018 DRR Financing 1.2 Daniel Stander
2018 DRR Financing 1.2 Daniel StanderUNDP Eurasia
 
2018 DRR Financing 1.1 Jan Kellett
2018 DRR Financing 1.1 Jan Kellett2018 DRR Financing 1.1 Jan Kellett
2018 DRR Financing 1.1 Jan KellettUNDP Eurasia
 

Mehr von UNDP Eurasia (20)

2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski2018 DRR Financing 5.4 Kirill Ilinski
2018 DRR Financing 5.4 Kirill Ilinski
 
2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov2018 DRR Financing 5.3 Kirill Savrassov
2018 DRR Financing 5.3 Kirill Savrassov
 
2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell2018 DRR Financing 5.2 Clive O` Connell
2018 DRR Financing 5.2 Clive O` Connell
 
2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane2018 DRR Financing 5.1 Rhodri Lane
2018 DRR Financing 5.1 Rhodri Lane
 
2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel2018 DRR Financing 4.3 Onno Heuvel
2018 DRR Financing 4.3 Onno Heuvel
 
2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi2018 DRR Financing 4.2 Yusuke Taishi
2018 DRR Financing 4.2 Yusuke Taishi
 
2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto2018 DRR Financing 4.1 Olga Buto
2018 DRR Financing 4.1 Olga Buto
 
2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons2018 DRR Financing 3.4 David Simmons
2018 DRR Financing 3.4 David Simmons
 
2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus2018 DRR Financing 3.3 Natalie Kraus
2018 DRR Financing 3.3 Natalie Kraus
 
2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer2018 DRR Financing 3.2 Andy Palmer
2018 DRR Financing 3.2 Andy Palmer
 
2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley2018 DRR Financing 3.1 Karina Whalley
2018 DRR Financing 3.1 Karina Whalley
 
2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv2018 DRR Financing 2.4 Rom Aviv
2018 DRR Financing 2.4 Rom Aviv
 
2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs2018 DRR Financing 2.3 Henning Ludolphs
2018 DRR Financing 2.3 Henning Ludolphs
 
2018 DRR Financing 2.2 Alexander Frost
2018 DRR Financing 2.2 Alexander Frost2018 DRR Financing 2.2 Alexander Frost
2018 DRR Financing 2.2 Alexander Frost
 
2018 DRR Financing 1.6 Kota Katsumata
2018 DRR Financing 1.6 Kota Katsumata2018 DRR Financing 1.6 Kota Katsumata
2018 DRR Financing 1.6 Kota Katsumata
 
2018 DRR Financing 1.5 Mohamed Al Hadi
2018 DRR Financing 1.5 Mohamed Al Hadi2018 DRR Financing 1.5 Mohamed Al Hadi
2018 DRR Financing 1.5 Mohamed Al Hadi
 
2018 DRR Financing 1.4 Thomas Kessler
2018 DRR Financing 1.4 Thomas Kessler2018 DRR Financing 1.4 Thomas Kessler
2018 DRR Financing 1.4 Thomas Kessler
 
2018 DRR Financing 1.3 Rosalind Cook
2018 DRR Financing 1.3 Rosalind Cook2018 DRR Financing 1.3 Rosalind Cook
2018 DRR Financing 1.3 Rosalind Cook
 
2018 DRR Financing 1.2 Daniel Stander
2018 DRR Financing 1.2 Daniel Stander2018 DRR Financing 1.2 Daniel Stander
2018 DRR Financing 1.2 Daniel Stander
 
2018 DRR Financing 1.1 Jan Kellett
2018 DRR Financing 1.1 Jan Kellett2018 DRR Financing 1.1 Jan Kellett
2018 DRR Financing 1.1 Jan Kellett
 

Kürzlich hochgeladen

LC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfLC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfpastor83
 
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)Delhi Call girls
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Morcall Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Morvikas rana
 
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)Delhi Call girls
 
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)Delhi Call girls
 
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)Delhi Call girls
 
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
WOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptxWOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptxpadhand000
 
Pokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy TheoryPokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy Theorydrae5
 
the Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentationthe Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentationbrynpueblos04
 
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...Cara Menggugurkan Kandungan 087776558899
 
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...PsychicRuben LoveSpells
 

Kürzlich hochgeladen (14)

LC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdfLC_YouSaidYes_NewBelieverBookletDone.pdf
LC_YouSaidYes_NewBelieverBookletDone.pdf
 
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Palam (Delhi)
 
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
(Anamika) VIP Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts ...
 
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Morcall Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
call Now 9811711561 Cash Payment乂 Call Girls in Dwarka Mor
 
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Mukherjee Nagar (Delhi)
 
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Jasola (Delhi)
 
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Dashrath Puri (Delhi)
 
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
(Aarini) Russian Call Girls Surat Call Now 8250077686 Surat Escorts 24x7
 
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Tingre Nagar ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
WOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptxWOMEN EMPOWERMENT women empowerment.pptx
WOMEN EMPOWERMENT women empowerment.pptx
 
Pokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy TheoryPokemon Go... Unraveling the Conspiracy Theory
Pokemon Go... Unraveling the Conspiracy Theory
 
the Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentationthe Husband rolesBrown Aesthetic Cute Group Project Presentation
the Husband rolesBrown Aesthetic Cute Group Project Presentation
 
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
KLINIK BATA Jual obat penggugur kandungan 087776558899 ABORSI JANIN KEHAMILAN...
 
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
$ Love Spells^ 💎 (310) 882-6330 in West Virginia, WV | Psychic Reading Best B...
 

Strategy for Housing and Inclusion- Cluj Metropolitan Area

  • 1. CLUJ METROPOLITAN AREA November 28, 2012 (2012-2020)
  • 3. November 28, 2012 Cluj Napoca
  • 4. Pata Rat in Cluj – Build up “Colina Verde” – New Pata-Rât • Families relocated from Coastei street (central street of Cluj) in December 2010. Substandard social housing in modular dwellings, overcrowded and segregated at the periphery of the city. • Total inhabitants: 243 persons • Children below school age: 37 • School age children: 72 • Active-age population (18-64): 140 persons, out of whom 22 were formally employed at the time of relocation. The majority of men have work experience in construction and manual labor, whereas women work in semi- skilled routine service jobs, mostly without a contract. Before relocation, they were relatively well integrated, and all children were in school. Except from four families, all November 28, 2012 of them are ethnic Roma.
  • 5. Pata Rat in Cluj – Build up Cantonului street • Barracks near an old railway station and on the unused railway lines, donated by charity organizations (Ecce Homo and Pro Roma) to the families evicted from the city after 2000. The families are sued by the National Railway Company for abusive occupation of the land and face the threat of eviction. • Total inhabitants: 451 persons • Children below school age: 101 • School age children: 103, but one-third not attending school. Half of those attending education are in “special schools” for children with disabilities. • Active-age population (18-64): 234 persons, out of whom 65 have some formal work experience and 49 are currently employed, mostly in cleaning services. The majority completed only primary education or gymnasium, but 20 persons have vocational secondary education or high school. November 28, 2012 • Almost one-fifth of the inhabitants do not hold valid identity papers. The settlement is ethnically mixed: cca 60% are Roma, 30% Romanians and 10% Hungarians.
  • 6. Pata Rat in Cluj – Build up “DALLAS” – OLD PATA-RÂT • The agglomeration of improvised houses and barracks known as “Dallas” colony. Two international NGOs active there: Pro Roma Foundation and the Association Ajutorul Familiilor. • Total inhabitants: 271 persons • Children below school age: 83 • School age children: 58, but half of them not attending school • Active-age population (18-64): 130 persons, but only 16 have some formal work experience and two are currently employed. They make a living mostly from recycling waste from the nearby garbage dump. The very majority completed only primary education or gymnasium. At least one-fourth do not hold valid identity papers. Around November 28, 2012 85% of the inhabitants declared to be ethnic Roma.
  • 7. Pata Rat in Cluj – Build up GARBAGE DUMP • At the very end of Pata-Rât street, right near the garbage dump of the city (“ramp de guano”). Some of them seasonal “workers” coming from other regions, earning a living from recycling waste at the dump. • Total inhabitants: 109 persons • Children below school age: 37 • School age children: 26, but none of them attending school • Active-age population (18-64): 46 persons, out of them 18 have some formal work experience and two are currently employed. They make a living mostly from recycling waste. The very majority completed only primary education or gymnasium. At least one-fourth of the inhabitants do not hold valid identity papers. 90% declared to be November 28, 2012 ethnic Roma.
  • 8. November 28, 2012 Claudiu Cosier, NW-RDA, 19 December 2011
  • 9. INTEGRATED HOUSING AND INCLUSION STRATEGY CLUJ NAPOCA METROPOLITAN AREA (2012-2020) Short term interventions Long term development (2012 -2015) (2011-2020) Implementing a long-term strategy for –Project package financeable complex solutions to the problems of in this programmatic period exclusion of vulnerable citizens, including Roma, in an integrated and sustainable way in Cluj Metropolitan –Emergency Interventions Area, which addresses housing needs as part of an integrated approach including education, health, social affairs, employment, security and desegregation measures and ensures November 28, 2012 equal opportunities for all in all policy areas regardless of social status, ethnicity and gender.
  • 10. Social Inclusion Strategy for the Cluj Metropolitan Area (Objectives) Social innovation in terms of empowerment of the citizens at risk of exclusion to participate in the planned housing program and ensuring their ability to sustain the results. November 28, 2012
  • 11. Social Inclusion Strategy for the Cluj Metropolitan Area (Objectives) Improving inclusion oriented public and communities services and integrating them with the social housing program November 28, 2012
  • 12. Social Inclusion Strategy for the Cluj Metropolitan Area (Objectives) Set-up and realize a social housing system and program in CMA with participation of the target group and social enterprises in planning and implementation of the housing program. November 28, 2012
  • 13. Social Inclusion Strategy for the Cluj Metropolitan Area (Objectives) Integrate the social housing programme with the Economic Development Plan of the CMA focused on employment opportunities and job creation for the target group. November 28, 2012
  • 14. Social Inclusion Strategy for the Cluj Metropolitan Area (Objectives) Provide model to other similar initiatives in Romania and other countries in Central and Eastern Europe and join the Cluj programme’s development network to other, existing area-based networks across national borders November 28, 2012
  • 15. Methodological principle •Participation. Real progress takes place only when the ‘target group’ is actively involved in local development. This project is aimed to invest in the local stakeholders not simply by providing fund and expertise, but also by expanding people’s knowledge, skills and ownership of the November 28, 2012 process.
  • 16. Methodological principle •Participation. In order to ensure local •Motivation and commitment. participation of the poor, disadvantaged people need to feel motivated and committed to the goals of development and self-confidence to contribute to the implementation of them. To spur motivation and participation in the project it is needed to use external coaches. Two Coaches will work with the communities of the Pata Rât November 28, 2012 during the whole project period and continue after for minimum two years.
  • 17. Methodological principle •Participation. Local development must be •Motivation and commitment. inclusive. It is for everyone in a •Everyone’s development. community, and should involve everyone, including the most vulnerable. Everyone can have ideas, everyone can contribute. The mission is to create the capacity of locals to transform their perceived needs into projects. Experts should not tell people how to live, or what to November 28, 2012 do. Learning is an interaction among equals.
  • 18. Methodological principle •Participation. In order to be effective, •Motivation and commitment. people need to convey •Everyone’s development. development knowledge to •Strengthening communication. others who need it. For this purpose, the project will establish a Resource Centre for Integrated Housing and Inclusion that serves as an information and coordination hub for communicating ‘best November 28, 2012 practices’ to other parts of the country and the region.
  • 19. Methodological principle •Participation. Each community will function •Motivation and commitment. better if it is well organized. •Everyone’s development. The level of social •Strengthening communication. organization is related to the •Social organization. life quality and the economic potential of communities too. November 28, 2012
  • 20. Methodological principle •Participation. The Project offers a broad •Motivation and commitment. conceptual model which addresses some of the •Everyone’s development. complexities faced by those •Strengthening communication. involved in development. These •Social organization. complexities lie in the variety of •Complexity. local needs, the multiplicity of people and organizations, the complex pattern of public bodies and the fact that area- based development is both top- down and bottom-up in November 28, 2012 character, calling upon the resources of government and the energy of the people.
  • 21. Methodological principle •Participation. Cluj Pole City, as the target •Motivation and commitment. area, is considered in the •Everyone’s development. project as a social and •Strengthening communication. economic whole, comprising •Social organization. people, nature and other •Complexity. resources and know-how. •Area-based approach. November 28, 2012
  • 22. Methodological principle •Participation. That means to find a way to •Motivation and commitment. harness the resources and •Everyone’s development. energies of relevant bodies to •Strengthening communication. coherent and coordinated •Social organization. development actions and •Complexity. process. •Area-based approach. •Integrated development. November 28, 2012
  • 23. Methodological principle •Participation. Which can be built up •Motivation and commitment. through implementation of •Everyone’s development. the previous principles •Strengthening communication. •Social organization. •Complexity. •Area-based approach. •Integrated development. •Social Cohesion November 28, 2012
  • 24. Methodological principle •Participation. •Motivation and commitment. •Everyone’s development. •Strengthening communication. •Social organization. •Complexity. •Area-based approach. •Integrated development. •Social Cohesion •Desegregation November 28, 2012
  • 25. The planning and strategic hierarchy • PIDU (Urban Development Plan of the Growth Pole) • PUG (Urban Plan) • Cluj-Napoca Development Strategy • National Roma Inclusion Strategy – Cluj Roma Inclusion Strategy (to be prepared) • National Poverty Reduction Strategy November 28, 2012
  • 26. The institutional hierarchy • Municipality of Cluj Napoca • Growth Pole – NW-RDA – Development Association of Metropolitan Municipalities • Cluj County Council • Line Ministries, Lead Ministries November 28, 2012 • Operational Programs
  • 27. Preparatory Phase: 2012 OSI – UNDP Project • Community level interventions OSI – Making the most of EU Funds for Roma Initiative in Pata Rat • Participatory assessment UNDP Regional Roma Inclusion Program • Mapped and re-organized development resources at CMA Partners: • Municipality of Cluj Napoca (Lead); level • NW Regional Development Agency; • Partnership development • Babes Bolyai University • Project package (short term intervention) Advisory/Watchdog: gLOC November 28, 2012 • Inclusion Strategy Concept note Budget: USD 60.000 • Multi-level networking
  • 28. Capacity Development needs - Community coaching process has started in frame of the UNDP-OSI project - Metropolitan Inclusion Centre has to be set-up (management) - Re-organize public services and social housing regulation; - Create enabling environment for social enterprises November 28, 2012
  • 29. Short term interventions (2012 -2015) Linking the present with the future INTEGRATED FLAGSHIP PROJECT FOR INCLUSION November 28, 2012
  • 30. Elements of the flagship project package to be financed - Flats built/reconstructed with participation of the newly trained professionals with contribution of the families who got new flats in the houses (40% people from Pata Rat); Ensure low cost maintenance of the buildings (energy efficiency + renewable energy) - Business Incubator (SME + Social enterprise) established to create long-term job opportunity to people whose skills and knowledge have been increased by different vocational (waste recycling; management of the city’s green areas & produce renewable energy from the green waste November 28, 2012 - Metropolitan Inclusion Centre and Community Buildings providing different public services for inclusion
  • 32. Locations of the integrated housing pilot package in Cluj November 28, 2012

Hinweis der Redaktion

  1. Map of Cluj showing Roma population
  2. There is an acute lack of valid, reliable and accurate data on the number of persons, Roma and non-Roma, who face severe, multiple deprivation and residential segregation in the Cluj Metropolitan Area, and in particular in Pata-Rat. The latest available data in October 2010 consist of the 2002 Census, the 2003 Poverty Map report of CASPIS and two small-scale social inquiries carried out in the Pata-Rat area by academics of the Babes-Bolyai University, in February 2010, and by the social workers of the Cluj-Napoca Municipality, May 2010. In order to implement the project, accurate, comprehensive, and multifaceted data on the target group is quintessential
  3. There is an acute lack of valid, reliable and accurate data on the number of persons, Roma and non-Roma, who face severe, multiple deprivation and residential segregation in the Cluj Metropolitan Area, and in particular in Pata-Rat. The latest available data in October 2010 consist of the 2002 Census, the 2003 Poverty Map report of CASPIS and two small-scale social inquiries carried out in the Pata-Rat area by academics of the Babes-Bolyai University, in February 2010, and by the social workers of the Cluj-Napoca Municipality, May 2010. In order to implement the project, accurate, comprehensive, and multifaceted data on the target group is quintessential