Engineering Economics
Work Breakdown
Structure
Introduction
 For project budgetary planning and control
purposes, dividing complex projects to simpler
and manageable tasks is the process identified
as Work Breakdown Structure (WBS).
 Usually, the project managers use this method for
simplifying the project execution.
 In WBS, much larger tasks are broken-down to
manageable chunks of work.
 These chunks can be easily supervised and
estimated.
A Work Breakdown Structure
 A work breakdown structure element may be a
product, data, a service, or any combination.
 A WBS also provides the necessary framework
for detailed cost estimating and control along with
providing guidance for schedule development and
control.
Why WBS in a Project?
 Accurate and readable project organization.
 Accurate assignment of responsibilities to the
project team.
 Indicates the project milestones and control
points.
 Helps to estimate the cost, time and risk.
 Illustrate the project scope, so the stakeholders
can have a better understanding of the same.
Purpose of WBS
1. First reason is that it helps more accurately and
specifically to define and organize the scope of
total project.
2. The second reason for using a WBS in your
projects is to help with assigning
responsibilities, resource allocation, monitoring
the project, and controlling the project
3. Finally, it allows you double check all the
deliverables' specifics with the stakeholders and
make sure there is nothing missing or
overlapping.
Work Breakdown Structure
*
Task
*
Work
Activity
Work Breakdown Structure
Work Breakdown Structure: The aggregation of all the work
to be performed in a project. Often called WBS
Activities, Tasks and Functions
 Activity: A major unit of work with precise dates
that consists of smaller activities or tasks. It
culminates in a project milestone.
 Task: Smallest unit of work subject to
management. Small enough for adequate
planning and tracking. Large enough to avoid
micro management
 Project Function: An activity or set of activities
that span the duration of the project
Some Important Definitions
 Project:
 A Project has a duration and consists of functions,
activities and tasks
 Work Package:
 A description of the work to be accomplished in an
activity or task
 Work Product:
 Any tangible item that results from a project function,
activity or task.
 Project Baseline:
 A work product that has been formally reviewed and
agreed upon.
 A project baselines can only be changed through a
formal change procedure
 Project Deliverable:
 A work product to be delivered to the customer
How do you develop a good
WBS?
 Top down approach:
 Start at the highest, top level activities and
systematically develop increasing levels of detail for all
activities.
 Bottom up approach (“Brainstorming”):
 Generate all activities you can think of that will have to
be done and then group them into categories.
 Which one you use depends on
 how familiar you and your team are with the project,
 whether similar projects have successfully been
performed in the past, and
 how many new methods and technologies will be used.
The Top Down WBS
Development
 Specify all activities required for the entire project
to be finished
 Determine all tasks required to complete each
activity
 If necessary, specify sub-activities required to
complete each task
 Continue in this way until you have adequately
detailed your project.
 Top Down WBS Approach is good if
 You are familiar with the problem (or your team)
 You have successfully managed a similar project in
the past
 You are not introducing new methodologies,
methods or tools
The Brainstorming WBS
Development
 On a single list, write any activities you think will have to
be performed for your project.
 Brainstorming means you
 Don’t worry about overlap or level of detail
 Don’t discuss activity wordings or other details
 Don’t make any judgements
 Write everything down
 Then study the list and group activities into a few major
categories with common characteristics
 If appropriate, group identified activities into higher level
activities
 Consider each category you have created and use the
top-down WBS development to determine any additional
activities you may have overlooked.
Displaying Work Breakdown
Structures
Three different formats are usually used:
 Organization-chart format
 Effectively portrays an overview of your project and
the hierarchical relationships of different activities
and tasks.
 Outline format
 Sub-activities and tasks are indented
 Bubble format
 The bubble in the center represents your project
 Lines from the center bubble lead to activities
 Lines from activities lead to tasks
Prepare Report
1.0 Prepare draft report
2.0 Review draft report
3.0 Prepare final report
3.1 Write final report
3.2 Print final report
Review
Draft Report Prepare
Report
Review
Draft Report
Review
Final Report
Print
Final Report
Write
Final Report
Prepare Report
Prepare
Draft Report
Review
Draft Report
Prepare
Final Report
Write
Final Report
Print
Final Report
Org-Chart Format
Outline Format
Bubble Format
WBS Hierarchies
Engineering Economics|Work Breakdown Structure
Engineering Economics|Work Breakdown Structure

Weitere ähnliche Inhalte

Was ist angesagt?

Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)stakeholdermap
 
Project cost & control
Project cost & controlProject cost & control
Project cost & controlAMARAYYA
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve Satish Yadavalli
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overviewMaher Almohamad
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial buildinglckr117
 
Lect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationLect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationMubashir Ali
 
Lecture 5 - Writing a project report
Lecture 5 - Writing a project reportLecture 5 - Writing a project report
Lecture 5 - Writing a project reportVirtu Institute
 
Pdf primavera tutorial
Pdf primavera tutorialPdf primavera tutorial
Pdf primavera tutorialKetut Swandana
 
Ms project presentation
Ms project presentationMs project presentation
Ms project presentationKhem Singh
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectNirtiSingla
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement ignitetribes
 

Was ist angesagt? (20)

S-Curve Presentation- 20130529
S-Curve Presentation- 20130529S-Curve Presentation- 20130529
S-Curve Presentation- 20130529
 
Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)Work Breakdown Structures (WBS)
Work Breakdown Structures (WBS)
 
Wbs For Building Project
Wbs For Building ProjectWbs For Building Project
Wbs For Building Project
 
Project cost & control
Project cost & controlProject cost & control
Project cost & control
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overview
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Lect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost EstimationLect-5: Work Breakdown Structure and Project Cost Estimation
Lect-5: Work Breakdown Structure and Project Cost Estimation
 
Lecture 5 - Writing a project report
Lecture 5 - Writing a project reportLecture 5 - Writing a project report
Lecture 5 - Writing a project report
 
The estimating process
The estimating processThe estimating process
The estimating process
 
Pdf primavera tutorial
Pdf primavera tutorialPdf primavera tutorial
Pdf primavera tutorial
 
Ms project presentation
Ms project presentationMs project presentation
Ms project presentation
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Creating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft projectCreating a work breakdown structure with microsoft project
Creating a work breakdown structure with microsoft project
 
Construction Cost Control
Construction Cost ControlConstruction Cost Control
Construction Cost Control
 
Lect 3 wbs&obs
Lect 3 wbs&obs Lect 3 wbs&obs
Lect 3 wbs&obs
 
Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement Promo_Epc project rule of credit and progress measurement
Promo_Epc project rule of credit and progress measurement
 
MS Project
MS ProjectMS Project
MS Project
 
Primavera P6 Notes for Beginners
Primavera P6 Notes for Beginners Primavera P6 Notes for Beginners
Primavera P6 Notes for Beginners
 
Microsoft Project
Microsoft ProjectMicrosoft Project
Microsoft Project
 

Ähnlich wie Engineering Economics|Work Breakdown Structure

workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfDipakBorse6
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02sayyed sabir
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure pptnazi2020
 
How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)Insaf Ali Soomro PMP
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptssuser8cd298
 
Understanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfUnderstanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfTEWMAGAZINE
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docxevonnehoggarth79783
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope ManagementRKDickey
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jIIT delhi
 
Project scope management
 Project scope management Project scope management
Project scope managementSidraSaleem17
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time ManagementSabrinaScott22
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structureCOEPD HR
 
Work breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxWork breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxErzaScarlet64
 
By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining TawnaDelatorrejs
 

Ähnlich wie Engineering Economics|Work Breakdown Structure (20)

workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdfworkbreakdownstructureppt-130410021152-phpapp02 (1).pdf
workbreakdownstructureppt-130410021152-phpapp02 (1).pdf
 
Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02Workbreakdownstructureppt 130410021152-phpapp02
Workbreakdownstructureppt 130410021152-phpapp02
 
Work breakdown structure ppt
Work breakdown structure pptWork breakdown structure ppt
Work breakdown structure ppt
 
Lect2
Lect2Lect2
Lect2
 
How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)How to create a work breakdown structure (wbs)
How to create a work breakdown structure (wbs)
 
Chapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).pptChapter 2 Work Break down Structure (1).ppt
Chapter 2 Work Break down Structure (1).ppt
 
Understanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdfUnderstanding the Work Breakdown Structure.pdf
Understanding the Work Breakdown Structure.pdf
 
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx6 Work Breakdown Structure  and SchedulingCavan ImagesSto.docx
6 Work Breakdown Structure and SchedulingCavan ImagesSto.docx
 
Team Final_Scope Management
Team Final_Scope ManagementTeam Final_Scope Management
Team Final_Scope Management
 
Work breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran jWork breakdown structure in project management ppt by kiran j
Work breakdown structure in project management ppt by kiran j
 
Babu 143
Babu 143Babu 143
Babu 143
 
Lab exercise 6
Lab exercise 6Lab exercise 6
Lab exercise 6
 
Project scope management
 Project scope management Project scope management
Project scope management
 
SEN-22413 - UNIT - V.pptx
SEN-22413 -  UNIT - V.pptxSEN-22413 -  UNIT - V.pptx
SEN-22413 - UNIT - V.pptx
 
Scope and Time Management
Scope and Time ManagementScope and Time Management
Scope and Time Management
 
Work breakdown structure
Work breakdown structureWork breakdown structure
Work breakdown structure
 
Work breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptxWork breakdown structure (WBS) PRESENTATION.pptx
Work breakdown structure (WBS) PRESENTATION.pptx
 
By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining By now you certainly appreciate how very challenging defining
By now you certainly appreciate how very challenging defining
 
Wbs, gant charts
Wbs, gant chartsWbs, gant charts
Wbs, gant charts
 
Managing Small Projects Introduction
Managing Small Projects   IntroductionManaging Small Projects   Introduction
Managing Small Projects Introduction
 

Mehr von umair khan

SEE Sensitivity Analysis
SEE Sensitivity AnalysisSEE Sensitivity Analysis
SEE Sensitivity Analysisumair khan
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimationumair khan
 
Isomorphic graph
Isomorphic graphIsomorphic graph
Isomorphic graphumair khan
 
game development
game  developmentgame  development
game developmentumair khan
 
Game devolopment
Game devolopmentGame devolopment
Game devolopmentumair khan
 
Digital modulation
Digital modulationDigital modulation
Digital modulationumair khan
 

Mehr von umair khan (10)

Spinal cord
Spinal cordSpinal cord
Spinal cord
 
SEE Sensitivity Analysis
SEE Sensitivity AnalysisSEE Sensitivity Analysis
SEE Sensitivity Analysis
 
Basic Software Effort Estimation
Basic Software Effort EstimationBasic Software Effort Estimation
Basic Software Effort Estimation
 
queue
queuequeue
queue
 
Isomorphic graph
Isomorphic graphIsomorphic graph
Isomorphic graph
 
Hashing data
Hashing dataHashing data
Hashing data
 
Counters
CountersCounters
Counters
 
game development
game  developmentgame  development
game development
 
Game devolopment
Game devolopmentGame devolopment
Game devolopment
 
Digital modulation
Digital modulationDigital modulation
Digital modulation
 

Kürzlich hochgeladen

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 

Engineering Economics|Work Breakdown Structure

  • 3. Introduction  For project budgetary planning and control purposes, dividing complex projects to simpler and manageable tasks is the process identified as Work Breakdown Structure (WBS).  Usually, the project managers use this method for simplifying the project execution.  In WBS, much larger tasks are broken-down to manageable chunks of work.  These chunks can be easily supervised and estimated.
  • 4. A Work Breakdown Structure  A work breakdown structure element may be a product, data, a service, or any combination.  A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
  • 5. Why WBS in a Project?  Accurate and readable project organization.  Accurate assignment of responsibilities to the project team.  Indicates the project milestones and control points.  Helps to estimate the cost, time and risk.  Illustrate the project scope, so the stakeholders can have a better understanding of the same.
  • 6. Purpose of WBS 1. First reason is that it helps more accurately and specifically to define and organize the scope of total project. 2. The second reason for using a WBS in your projects is to help with assigning responsibilities, resource allocation, monitoring the project, and controlling the project 3. Finally, it allows you double check all the deliverables' specifics with the stakeholders and make sure there is nothing missing or overlapping.
  • 7. Work Breakdown Structure * Task * Work Activity Work Breakdown Structure Work Breakdown Structure: The aggregation of all the work to be performed in a project. Often called WBS
  • 8. Activities, Tasks and Functions  Activity: A major unit of work with precise dates that consists of smaller activities or tasks. It culminates in a project milestone.  Task: Smallest unit of work subject to management. Small enough for adequate planning and tracking. Large enough to avoid micro management  Project Function: An activity or set of activities that span the duration of the project
  • 9. Some Important Definitions  Project:  A Project has a duration and consists of functions, activities and tasks  Work Package:  A description of the work to be accomplished in an activity or task  Work Product:  Any tangible item that results from a project function, activity or task.  Project Baseline:  A work product that has been formally reviewed and agreed upon.  A project baselines can only be changed through a formal change procedure  Project Deliverable:  A work product to be delivered to the customer
  • 10. How do you develop a good WBS?  Top down approach:  Start at the highest, top level activities and systematically develop increasing levels of detail for all activities.  Bottom up approach (“Brainstorming”):  Generate all activities you can think of that will have to be done and then group them into categories.  Which one you use depends on  how familiar you and your team are with the project,  whether similar projects have successfully been performed in the past, and  how many new methods and technologies will be used.
  • 11. The Top Down WBS Development  Specify all activities required for the entire project to be finished  Determine all tasks required to complete each activity  If necessary, specify sub-activities required to complete each task  Continue in this way until you have adequately detailed your project.  Top Down WBS Approach is good if  You are familiar with the problem (or your team)  You have successfully managed a similar project in the past  You are not introducing new methodologies, methods or tools
  • 12. The Brainstorming WBS Development  On a single list, write any activities you think will have to be performed for your project.  Brainstorming means you  Don’t worry about overlap or level of detail  Don’t discuss activity wordings or other details  Don’t make any judgements  Write everything down  Then study the list and group activities into a few major categories with common characteristics  If appropriate, group identified activities into higher level activities  Consider each category you have created and use the top-down WBS development to determine any additional activities you may have overlooked.
  • 13. Displaying Work Breakdown Structures Three different formats are usually used:  Organization-chart format  Effectively portrays an overview of your project and the hierarchical relationships of different activities and tasks.  Outline format  Sub-activities and tasks are indented  Bubble format  The bubble in the center represents your project  Lines from the center bubble lead to activities  Lines from activities lead to tasks
  • 14. Prepare Report 1.0 Prepare draft report 2.0 Review draft report 3.0 Prepare final report 3.1 Write final report 3.2 Print final report Review Draft Report Prepare Report Review Draft Report Review Final Report Print Final Report Write Final Report Prepare Report Prepare Draft Report Review Draft Report Prepare Final Report Write Final Report Print Final Report Org-Chart Format Outline Format Bubble Format

Hinweis der Redaktion

  1. “formally reviewed and agreed upon” does not mean a baseline is frozen! Avoid this term by any means!
  2. Break Example for previous slide: You are at the beach, you are building a sandcastl e, somebody else too, soon you are noticing that the wall, your wall!, is used by the oterh kid. War! Sandwar! This type of war is typical, if you mix approaches, for example if you mix the functional WBS with the product component approach.