Mumbai's population: shot up by 40% in
1951-61 , by 43.80% in 1961 – 1971



Various acute Infrastructural problem



CIDCO was incorporated on 17th March, 1970
under the Indian Companies Act, 1956


Navi
Mumbai
is
a
rapidly
growing, modern metropolis



The largest totally planned city in the
world



Planned to accommodate a target
population of 4 million and jobs of 2
million in near future



The well-planned transport network


World’s largest ”Greenfield” state-of-the-art
international airports, offering world-class
facilities



The proposed second airport for MMR is
located at Navi Mumbai for several reasons



To cater for the future
population, business and
activities of MMR

growth in
commercial


It is both technically feasible and financially
viable.



The Airport master plan will be developed in
modules..
•The site of airport is located in an area of 1140 hectares
accommodating two parallel runways

•It is expected to absorb annually 10 million passengers in its first
operational year 2012, doubling to 20 million by 2020 followed by
30 million passengers in 2025 and ultimately 40 million by 2030.
•The Navi Mumbai Airport is proposed to be developed through
public-private participation
(i)CREATE JOBS

(ii)DIVERTING POPULATION INTO NEW
TOWN


The existing airport is fast reaching saturation



The air travel demand expected to grow



Unable to handle such an increase in demand



Imperative to build a second Airport for MMR.
Includes Cost of Pre-Development Works of 4017
Crores.
 The Airport is proposed to be developed in three
phases.
 In the first phase, North runway & attached taxi way
system, terminal building & concourse (2,69,000 sq.
PHASE
OPERATIONAL YEAR
m.) PROJECT COST(IN CR.)


1

2015

950

2

2020

1031

3

2025

3036
14573


Generation of 1.42 lakh new jobs directly,2 lakh
jobs indirectly



Likely to attract an investment of about 60,000
crores



This boost to industrial development in turn


Further, enhanced cargo facilities will open up
huge opportunities



Proposed Airport will also make the export / import
of cargo more economical, efficient and fast


Re-settlements & Rehabilitation (R&R)



Hill Cutting



Sustainable Green Development



Connectivity





The NMIA project is going to affect number of
households, minor business activities and
structures located in the vicinity of Airport area
and the same are required to be relocated.
approximately 5,000 families will have to be
re-settled due to the NMIA project.
The R&R entitlements include the allotment of
fully developed plot of area equivalent to
loss, besides other benefits in accordance with
the R&R policy


Encompasses a hill



Ten crore cubic metre
of material like murun
and rock



About six crore cubic
metre of rock is
required


Involves various mandatory pre development
activities to be undertaken



They include land development, filling /
reclamation, recurring of the Ulwe river and
shifting of EHVT lines(Extra High Tension )
CIDCO has stressed enormously on the preservation and
enhancement of the natural environment
Measures Taken

Development of 245 Ha Mangrove Park/ Bio-diversity zone on
Waghivali Island, along with regeneration of lush green
mangroves in an area of 310 Ha.
At Kamothe and 60 Ha. at Moha Creek are being proposed for
preserving the ecological balance of the project area.
A large water body to the north is also being retained


1997 Ministry of civil aviation constituted a committee to
examine various sites for a second airport for Mumbai.
Rewas-Mandwa was recommended as suitable site



2000 A sub-committee constituted by the Airports
Authority of India (AAI) examined the Navi Mumbai site
and found it technically and operationally feasible



2006 International Civil Aviation Organisation conducted
simulation study sponsored jointly by Cidco/GoM & AAI.
Study said simultaneous operation is possible



2007 Cidco submitted project feasibility and business plan
to civil aviation ministry which obtained an in-principle
approval from the Union cabinet


2009 Bombay high court accepted Cidco’s
request for amendment of CRZ notifications and
MoEF issued notification permitting greenfield
airport at Navi Mumbai in CRZ areas, subject to
environmental safeguards



2010 Environment and CRZ clearance for NMIA
project granted by MoEF



2013 Forest department gave last of the
mandatory clearances for airport, only land
acquisition remains for the project to take off


The NMIA was soon mired in controversy, based on the
Environmental Impact Assessment.



The Ministry of Environment and Forests (MoEF)
appointed an Expert Appraisal Committee to take
decisions regarding the NMIA and its proposed location.



The CIDCO, the Government of Maharashtra, the Ministry
of Civil Aviation and the MoEF had their points of view.



There was a process of negotiation, review and
modification of plans. Finally, in November 2010, the
approval with conditions was granted


The original option of locating near Rewas
Mandwa-



The other option of locating near Kalyan – Nevali



Recourse channel for Ulwe Creek -



Archeological / Cultural / Historic Sites -



Reclamation of marshy lands


The Government of India has recently released
the Draft National Land Acquisition and
Resettlement and Rehabilitation Bill 2011 (LARR
Bill).



The LARR Bill seeks to repeal and replace the
Land Acquisition Act 1894.



Right to Fair Compensation and Transparency in
Land Acquisition, Rehabilitation and
Resettlement Act, 2013


The airport requires 2,042 ha (5,050 acres).

Land acquisition is stuck as the villagers
(5,000 families) are demanding a higher
compensation package of 20 crore per acre
 The committee had offered the projectaffected-people (PAP) two rehabilitationrelated compensation options:
a) 12.5% of developed land at the ready
reckoner rates, in addition to monetary
compensation
b) 22.5% developed land in Navi Mumbai.








Each landowner will get 22.5 per cent Of this,
12.5 per cent was part of the original
agreement while 10 per cent will be given
based on the current value of the land.
Farmers will also get triple the size of their
plots to construct houses. And Rs 1,000 per
square metre.
100 shares in the companies which will
develop the airport.
1cr land becomes 3.5 cr.


Concerns such as altering courses of rivers to avoid
flooding, reclamation of land, leveling of
hillocks, hacking hundreds of acres of mangroves &
forests.



The airport is within close vicinity of the Karnala
bird sanctuary.



Aviation experts like Hormuz Mama have raised
concerns regarding the impact of aircraft
operations on birds as well as on flight safety due
to potential instances of bird ingestion into


Construction would damage mangrove cultivation
in the 2,000 hectares, besides the diversion of
Gadhi and Ulwe rivers.



90 per cent of the site i.e 170 hectares are covered
with dense and lush mangroves.



According to the Coastal Regulation Zone
Notification 1991, no development is permitted on
mangroves and other ecologically sensitive areas.



However, in May 2009, this Notification was
amended to make an exception for Mumbai's new
airport.


Noise monitoring will be carried out at critical
locations



A thick green belt should be planned all
around the project site to mitigate noise and
vibrations to the nearby settlements.



The identification of species/plants should be
made based on the botanical studies.



Landscape plan, green belts and open spaces
may be described.


The Environment Impact Assessment (EIA) Study to
obtain Environmental and CRZ Clearance from the
Ministry of Environment and Forests (MoEF).



EIA identifies ways and means for improving the
project environmentally friendly by preventing
minimizing, mitigating or compensating for
adverse impact, so as to achieve a sustainable
development
The coastal land up to 500m from the High Tide Line
(HTL) and a stage of 100m along banks of
creeks, estuaries, backwater and rivers subject to tidal
fluctuations, is called the Coastal Regulation Zone(CRZ).
1.

Diversion of rivers and quarrying/cutting of
mountains/earth is not a permissible activity under CRZ
Notification, 1991.

2.

Examine the details of impact of sea level rise on the
project in the next 100 years.

After amendments the crz gave a clearance.


The 160-hectare Pushpak Nagar to be developed
close to the Navi Mumbai airport site is the next
real-estate gold mine.



Of the 160 hectares, about 105 hectares will go
to the PAPs, while the rest will be used for the
development of civic amenities such as
roads,
sewerage
and
water
supply.

The value of the land here will be minimum Rs
60,000 per sq m, and once the airport work
begins it will touch Rs 1.20 lakh per sq m for sure.








RFQ is a pre-bid process of the
government which narrows down the
interested bidders according to various
criteria
companies like L&T and Reliance
Infrastructure are interested in bidding
for the project.
GVK Infrastructure, the operator of the
Mumbai airport, has the first right of
refusal.
As per the its right, GVK will be
allowed to revise its bid in case it falls
short of the highest bid by 10%.


Thank you

Weitere ähnliche Inhalte

Was ist angesagt?

Re New Mumbai by Arshad Balwa
Re New Mumbai by Arshad BalwaRe New Mumbai by Arshad Balwa
Re New Mumbai by Arshad Balwa
Arshadbalwa
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International Airport
Ankita Kolamkar
 

Was ist angesagt? (20)

Millenium park
Millenium parkMillenium park
Millenium park
 
1. Case study report GIFT CITY Assignment 01.pdf
1. Case study report GIFT CITY Assignment 01.pdf1. Case study report GIFT CITY Assignment 01.pdf
1. Case study report GIFT CITY Assignment 01.pdf
 
Singapore changi airport (wh)
Singapore changi airport (wh)Singapore changi airport (wh)
Singapore changi airport (wh)
 
Re New Mumbai by Arshad Balwa
Re New Mumbai by Arshad BalwaRe New Mumbai by Arshad Balwa
Re New Mumbai by Arshad Balwa
 
Gopi Talav
Gopi Talav Gopi Talav
Gopi Talav
 
Gujarat International Finance Tech City - Gift
Gujarat International Finance Tech City - GiftGujarat International Finance Tech City - Gift
Gujarat International Finance Tech City - Gift
 
Terminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International AirportTerminal 3_Indira Gandhi International Airport
Terminal 3_Indira Gandhi International Airport
 
Architectural Portfolio
Architectural PortfolioArchitectural Portfolio
Architectural Portfolio
 
Open spaces
Open spacesOpen spaces
Open spaces
 
TOD in India
TOD in IndiaTOD in India
TOD in India
 
Mumbai and the mmr (rajiv misra)
Mumbai and the mmr (rajiv misra)Mumbai and the mmr (rajiv misra)
Mumbai and the mmr (rajiv misra)
 
ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)ZONES OF DELHI(AJ)
ZONES OF DELHI(AJ)
 
Town planning case study Palava city, Lodha.
Town planning case study Palava city, Lodha.Town planning case study Palava city, Lodha.
Town planning case study Palava city, Lodha.
 
Presentation GIFT City.pdf
Presentation GIFT City.pdfPresentation GIFT City.pdf
Presentation GIFT City.pdf
 
Pune city
Pune cityPune city
Pune city
 
Building bye laws
Building bye lawsBuilding bye laws
Building bye laws
 
MUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGIONMUMBAI METROPOLITIAN REGION
MUMBAI METROPOLITIAN REGION
 
Navi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptxNavi Mumbai International Airport.pptx
Navi Mumbai International Airport.pptx
 
Sabarmati riverfront
Sabarmati riverfrontSabarmati riverfront
Sabarmati riverfront
 
Institutional Campus - Library Study & Case Study (Panjab University Punjab ...
Institutional Campus - Library Study  & Case Study (Panjab University Punjab ...Institutional Campus - Library Study  & Case Study (Panjab University Punjab ...
Institutional Campus - Library Study & Case Study (Panjab University Punjab ...
 

Andere mochten auch (8)

Eia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaEia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (Nmia
 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airport
 
Ryan khargar, navi mumbai
Ryan khargar, navi mumbaiRyan khargar, navi mumbai
Ryan khargar, navi mumbai
 
Law presentation
Law presentationLaw presentation
Law presentation
 
Environment Impact Assessment
Environment Impact Assessment Environment Impact Assessment
Environment Impact Assessment
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
 
Marketing management project on hair oil class 12th by faizan khan
Marketing management project on hair oil class 12th by faizan khanMarketing management project on hair oil class 12th by faizan khan
Marketing management project on hair oil class 12th by faizan khan
 
MARKETING MANAGEMENT - JEANS
MARKETING MANAGEMENT - JEANSMARKETING MANAGEMENT - JEANS
MARKETING MANAGEMENT - JEANS
 

Ähnlich wie legal aspects of navi mumbai international airport

Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
Geeva Chandana
 

Ähnlich wie legal aspects of navi mumbai international airport (20)

Crz goals purpose & act
Crz goals  purpose & actCrz goals  purpose & act
Crz goals purpose & act
 
EIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & AquacultureEIA an introduction - Case study wrt Coastal development & Aquaculture
EIA an introduction - Case study wrt Coastal development & Aquaculture
 
2015 final order and ec to mundra
2015 final order and ec to mundra2015 final order and ec to mundra
2015 final order and ec to mundra
 
KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIA
 
Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010Zorlu pakistan eia april 2010
Zorlu pakistan eia april 2010
 
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...
IRJET- Environmental Impact Assessment on River Jhelum for Inland Water Trans...
 
Combine coal transshipment project report
Combine coal transshipment project reportCombine coal transshipment project report
Combine coal transshipment project report
 
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
ENVIRONMENTAL IMPACT ASSESSMENT FOR ANDHERI (E)- DAHISAR (E) CORRIDOR OF MUMB...
 
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...
Thesis Defence: Methods to Enhance the Safe and Green Ship Recycling Capacity...
 
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
Ministry of transport 2nd transport and economic corridor-lapsset by p.s dr c...
 
Construction Law: An Indian Perspective
Construction Law: An Indian PerspectiveConstruction Law: An Indian Perspective
Construction Law: An Indian Perspective
 
EIA Report of Orange Line Train
EIA Report of Orange Line TrainEIA Report of Orange Line Train
EIA Report of Orange Line Train
 
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...
Esia Pakistan international bulk terminal - PROPOSED COAL, CLINKER & CEMENT T...
 
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORT
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORTEIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORT
EIA on Construction impact on NAVI MUMBAI INTERNATIONAL AIRPORT
 
Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3Kicc presentation development of port of lamu manda bay 3
Kicc presentation development of port of lamu manda bay 3
 
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
THE EAST AND CENTRAL AFRICA REGIONAL DEVELOPMENT. Why Kenya remain the hegemo...
 
Presentation on DMRC
Presentation on DMRCPresentation on DMRC
Presentation on DMRC
 
Chapter 3 Project Description - EIA Report - La Cambuse Hotel
Chapter 3 Project Description - EIA Report - La Cambuse HotelChapter 3 Project Description - EIA Report - La Cambuse Hotel
Chapter 3 Project Description - EIA Report - La Cambuse Hotel
 
Development control regulations kochi report
Development control regulations kochi reportDevelopment control regulations kochi report
Development control regulations kochi report
 
Paper
PaperPaper
Paper
 

Kürzlich hochgeladen

Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
Matteo Carbone
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Kürzlich hochgeladen (20)

B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 

legal aspects of navi mumbai international airport

  • 1.
  • 2.  Mumbai's population: shot up by 40% in 1951-61 , by 43.80% in 1961 – 1971  Various acute Infrastructural problem  CIDCO was incorporated on 17th March, 1970 under the Indian Companies Act, 1956
  • 3.  Navi Mumbai is a rapidly growing, modern metropolis  The largest totally planned city in the world  Planned to accommodate a target population of 4 million and jobs of 2 million in near future  The well-planned transport network
  • 4.  World’s largest ”Greenfield” state-of-the-art international airports, offering world-class facilities  The proposed second airport for MMR is located at Navi Mumbai for several reasons  To cater for the future population, business and activities of MMR growth in commercial
  • 5.  It is both technically feasible and financially viable.  The Airport master plan will be developed in modules..
  • 6. •The site of airport is located in an area of 1140 hectares accommodating two parallel runways •It is expected to absorb annually 10 million passengers in its first operational year 2012, doubling to 20 million by 2020 followed by 30 million passengers in 2025 and ultimately 40 million by 2030. •The Navi Mumbai Airport is proposed to be developed through public-private participation
  • 8.  The existing airport is fast reaching saturation  The air travel demand expected to grow  Unable to handle such an increase in demand  Imperative to build a second Airport for MMR.
  • 9. Includes Cost of Pre-Development Works of 4017 Crores.  The Airport is proposed to be developed in three phases.  In the first phase, North runway & attached taxi way system, terminal building & concourse (2,69,000 sq. PHASE OPERATIONAL YEAR m.) PROJECT COST(IN CR.)  1 2015 950 2 2020 1031 3 2025 3036 14573
  • 10.  Generation of 1.42 lakh new jobs directly,2 lakh jobs indirectly  Likely to attract an investment of about 60,000 crores  This boost to industrial development in turn
  • 11.  Further, enhanced cargo facilities will open up huge opportunities  Proposed Airport will also make the export / import of cargo more economical, efficient and fast
  • 12.  Re-settlements & Rehabilitation (R&R)  Hill Cutting  Sustainable Green Development  Connectivity
  • 13.    The NMIA project is going to affect number of households, minor business activities and structures located in the vicinity of Airport area and the same are required to be relocated. approximately 5,000 families will have to be re-settled due to the NMIA project. The R&R entitlements include the allotment of fully developed plot of area equivalent to loss, besides other benefits in accordance with the R&R policy
  • 14.  Encompasses a hill  Ten crore cubic metre of material like murun and rock  About six crore cubic metre of rock is required
  • 15.  Involves various mandatory pre development activities to be undertaken  They include land development, filling / reclamation, recurring of the Ulwe river and shifting of EHVT lines(Extra High Tension )
  • 16. CIDCO has stressed enormously on the preservation and enhancement of the natural environment Measures Taken Development of 245 Ha Mangrove Park/ Bio-diversity zone on Waghivali Island, along with regeneration of lush green mangroves in an area of 310 Ha. At Kamothe and 60 Ha. at Moha Creek are being proposed for preserving the ecological balance of the project area. A large water body to the north is also being retained
  • 17.  1997 Ministry of civil aviation constituted a committee to examine various sites for a second airport for Mumbai. Rewas-Mandwa was recommended as suitable site  2000 A sub-committee constituted by the Airports Authority of India (AAI) examined the Navi Mumbai site and found it technically and operationally feasible  2006 International Civil Aviation Organisation conducted simulation study sponsored jointly by Cidco/GoM & AAI. Study said simultaneous operation is possible  2007 Cidco submitted project feasibility and business plan to civil aviation ministry which obtained an in-principle approval from the Union cabinet
  • 18.  2009 Bombay high court accepted Cidco’s request for amendment of CRZ notifications and MoEF issued notification permitting greenfield airport at Navi Mumbai in CRZ areas, subject to environmental safeguards  2010 Environment and CRZ clearance for NMIA project granted by MoEF  2013 Forest department gave last of the mandatory clearances for airport, only land acquisition remains for the project to take off
  • 19.  The NMIA was soon mired in controversy, based on the Environmental Impact Assessment.  The Ministry of Environment and Forests (MoEF) appointed an Expert Appraisal Committee to take decisions regarding the NMIA and its proposed location.  The CIDCO, the Government of Maharashtra, the Ministry of Civil Aviation and the MoEF had their points of view.  There was a process of negotiation, review and modification of plans. Finally, in November 2010, the approval with conditions was granted
  • 20.  The original option of locating near Rewas Mandwa-  The other option of locating near Kalyan – Nevali  Recourse channel for Ulwe Creek -  Archeological / Cultural / Historic Sites -  Reclamation of marshy lands
  • 21.  The Government of India has recently released the Draft National Land Acquisition and Resettlement and Rehabilitation Bill 2011 (LARR Bill).  The LARR Bill seeks to repeal and replace the Land Acquisition Act 1894.  Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013
  • 22.  The airport requires 2,042 ha (5,050 acres). Land acquisition is stuck as the villagers (5,000 families) are demanding a higher compensation package of 20 crore per acre  The committee had offered the projectaffected-people (PAP) two rehabilitationrelated compensation options: a) 12.5% of developed land at the ready reckoner rates, in addition to monetary compensation b) 22.5% developed land in Navi Mumbai. 
  • 23.     Each landowner will get 22.5 per cent Of this, 12.5 per cent was part of the original agreement while 10 per cent will be given based on the current value of the land. Farmers will also get triple the size of their plots to construct houses. And Rs 1,000 per square metre. 100 shares in the companies which will develop the airport. 1cr land becomes 3.5 cr.
  • 24.  Concerns such as altering courses of rivers to avoid flooding, reclamation of land, leveling of hillocks, hacking hundreds of acres of mangroves & forests.  The airport is within close vicinity of the Karnala bird sanctuary.  Aviation experts like Hormuz Mama have raised concerns regarding the impact of aircraft operations on birds as well as on flight safety due to potential instances of bird ingestion into
  • 25.  Construction would damage mangrove cultivation in the 2,000 hectares, besides the diversion of Gadhi and Ulwe rivers.  90 per cent of the site i.e 170 hectares are covered with dense and lush mangroves.  According to the Coastal Regulation Zone Notification 1991, no development is permitted on mangroves and other ecologically sensitive areas.  However, in May 2009, this Notification was amended to make an exception for Mumbai's new airport.
  • 26.  Noise monitoring will be carried out at critical locations  A thick green belt should be planned all around the project site to mitigate noise and vibrations to the nearby settlements.  The identification of species/plants should be made based on the botanical studies.  Landscape plan, green belts and open spaces may be described.
  • 27.  The Environment Impact Assessment (EIA) Study to obtain Environmental and CRZ Clearance from the Ministry of Environment and Forests (MoEF).  EIA identifies ways and means for improving the project environmentally friendly by preventing minimizing, mitigating or compensating for adverse impact, so as to achieve a sustainable development
  • 28. The coastal land up to 500m from the High Tide Line (HTL) and a stage of 100m along banks of creeks, estuaries, backwater and rivers subject to tidal fluctuations, is called the Coastal Regulation Zone(CRZ). 1. Diversion of rivers and quarrying/cutting of mountains/earth is not a permissible activity under CRZ Notification, 1991. 2. Examine the details of impact of sea level rise on the project in the next 100 years. After amendments the crz gave a clearance.
  • 29.  The 160-hectare Pushpak Nagar to be developed close to the Navi Mumbai airport site is the next real-estate gold mine.  Of the 160 hectares, about 105 hectares will go to the PAPs, while the rest will be used for the development of civic amenities such as roads, sewerage and water supply. The value of the land here will be minimum Rs 60,000 per sq m, and once the airport work begins it will touch Rs 1.20 lakh per sq m for sure.
  • 30.     RFQ is a pre-bid process of the government which narrows down the interested bidders according to various criteria companies like L&T and Reliance Infrastructure are interested in bidding for the project. GVK Infrastructure, the operator of the Mumbai airport, has the first right of refusal. As per the its right, GVK will be allowed to revise its bid in case it falls short of the highest bid by 10%.