Canatuan Overview
• The Canatuan gold/silver-copper/zinc
mine was the first foreign-invested mine
to reach production after the passage of
the Philippine Mining Act of 1995.
• Located within the Province of
Zamboanga del Norte, on the Philippine
island of Mindanao, in the agricultural
town Siocon.
• 508-hectare property is covered under a
Mineral Profit Sharing Agreement
(“MPSA”) valid from October 23, 1996
until October 23, 2021
• TVI entered the area in 1993 through its
100% owned subsidiary, TVI Resource
Development Inc. (TVIRD)*, which
entered into an Exploration Agreement
with Option to Purchase with Benquet
Corp.
Canatuan
MPSA 508
hectares
• Full-scale operations focused on two
distinct orebodies:
o An upper gold and silver-rich gossan
(oxidized) zone which was mined
between 2004 and 2008 and
processing using Cyanide-in-Leach.
o A lower copper and zinc-rich
sulphide zone which was mined from
2008 to 2014 and processed using
two conventional flotation circuits.
• By the end of operations, nearly 6 million
tonnes of ore were mined and processed
and more than 14 million tonnes of
material was excavated.
• Rehabilitation has been in progress since
2008 and the company has now
commenced agribusiness ventures to
ensure the long-term sustainability of the
area.
Canatuan Overview
Milling
Facilities
Canatuan Deposit Characteristics
• The Canatuan deposit consisted of several
gently dipping to flat-lying, polymetallic massive
sulphide and other sulphide-rich horizons.
• The deposit was bow shaped with a strike
length of approximately 825 metres and a width
ranging from 150 metres to 300 metres.
• The deposit consisted of an upper weathered
gold/silver-rich gossan (oxidized) zone
underlain by a sulphide zone which consisted of
three lenses of massive, banded sulphide.
• The bulk of both the sulphide and gossan
reserves were contained within the lower
sulphide horizon. This horizon was continuous
over the entire strike length of the deposit.
• Both the Gossan and Sulphide deposits were
excavated and processed as part of the Gossan
and Sulphide Phase operations.
Small Scale Mining at Canatuan (pre-TVI)
• Prior to TVI’s involvement in 1994, the Canatuan
area saw many years of small scale, illegal mining
activities carried out by a population in excess of
10,000 small scale miners.
• The area suffered from uncontrolled tailings, waste
management and deforestation.
• Child labor was predominant and few or no safety
measures were implemented.
• In 2002, TVI began purchasing tailings contaminated
with cyanide and mercury from the small scale
mining operators to clean up the area and to act as
feed for a 50 tpd gold extraction pilot plant to verify
mining and metallurgical criteria for larger-scale
operations and to generate early cash flows.
• The pilot plant processed approximately 24,000
tonnes of tailings and an environmental cleanup and
residual tailings management plan was launched in
2002.
• In July 2004, TVIRD commissioned a full-scale
processing plant for the Gossan Phase of
operations (gold-silver) with an initial daily
throughput of 125 dry metric tonnes.
• The processing plant used CIL recovery
methods and produced gold and silver dorĂŠ.
• Processing facilities were incrementally
expanded over 4 years to a maximum daily
production of ~2,500 dry metric tonnes in 2008.
• Initial capital costs were low and mostly funded
by existing cash flows from earlier tailings
processing:
• Prior to 2005: US$16.89 Million
• Sustaining (2005 to 2007): US$12.29 Million
• Project total: US$29.18 Million
Canatuan Gossan Operations 2004 - 2008
0
500
1,000
1,500
2,000
2,500
3,000
2004
2005
2006
2007
2008
Year
MillThroughput(tonnesperday)
Daily Mill Throughput Capacity
Canatuan Gossan Operations 2004 - 2008
Gossan Metal Production (Actual)
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Jul-04
Oct-04
Jan-05
Apr-05
Jul-05
Oct-05
Jan-06
Apr-06
Jul-06
Oct-06
Jan-07
Apr-07
Jul-07
Oct-07
Jan-08
AuEqOz
Calculated Au Calculated Ag Credit
$2.05
$12.04
$34.51
$31.45
$5.90
$0.0
$5.0
$10.0
$15.0
$20.0
$25.0
$30.0
$35.0
$40.0
2004 2005 2006 2007 2008
GrossRevenue
($USMillions)
Gross Revenues for Gossan Operation 2004 - 2008
• AuEq produced: 137,000 ounces (at average operating cost of US$26/tonne milled)
• Gross revenues (2004-2008): US$83.9 Million
• Original reserve estimate: 1.0 million tonnes at 3.12 g/t Au and 119 g/t Ag
• Actual mined amount: 1.9 million tonnes at 2.1 g/t Au and 70 g/t Ag
• Mine life was extended due to increased metal prices and lower cutoff grades
Canatuan Gossan Operations 2004 - 2008
Canatuan Gold DorĂŠ bar
Leaching tanks
Pouring the dore bar
Excavators
Mining Pit
Mill Construction
Canatuan Sulphide Operations 2009 - 2014
• In May 2008, TVI began construction of a sulphide plant
and associated infrastructure to process the underlying
sulphide orebody containing copper and zinc.
• Construction on the sulphide plant was completed on
time and under budget in November of 2008.
• Initial CAPEX for the project was US$23.3 million.
• Reserve Calculation (June 2007)
• Assumed Metal
Prices of $2.00/lb
Cu, $1.04/lb Zn,
$550/oz Au and
$9.50/oz Ag
• Mine Life = 5.5 years
at average mill rate
of approx. 1,560
tonnes per day
Sulphide Plant
Crusher Circuit
Mining Area
Sulphide Operations – Tailings Dam
• For the sulphide operations, TVI completed
construction of a sulphide tailings dam with the
following specifications:
• Available storage of 7.4 million tonnes for
both tailings and overburden material.
• Maximum dam height: 85 metres.
• The dam was built using a four stage
construction program using a zoned earth
embankment design.
• Designed for the Maximum Credible
Earthquake and Probable Maximum Flood.
• Design and construction management by
international engineering firms specializing in
tailings dam design and construction
management.
Canatuan Sulphide Operations 2009 - 2014
• Exclusive copper offtake agreement with MRI Trading
AG was signed in October 2008
• Copper ore processing began in November 2008 and
first copper concentrate shipment was made in March
2009.
• In January 2009, TVI arranged a US$30.1 million 5-
year Omnibus Loan and Security Agreement with LIM
Asia Multi-Strategy Fund Inc. and LIM Asia Special
Situations Master Fund Limited to support mining
operations and complete the residual construction
related to the sulphide plant.
• By June 2010, TVI had completely repaid the US$30.1
million Omnibus Loan and Security Agreement using
cash flows from operations and local financings – well
ahead of schedule.
• On April 25, 2011 TVI announced the commencement
of zinc production at the Canatuan mine. The first
shipment of zinc concentrate was completed on
August 12 that year. Loading concentrate onto transfer barge
Flotation cells
Canatuan Sulphide Financial Summary
• Milling operations
concluded in January
2014.
• Originally anticipated
amount to be mined:
119,800 dmt of copper
concentrate and 6,100
dmt of zinc concentrate.
• Actual mined amount:
199,778 dmt of copper
concentrate and 30,548
dmt of zinc concentrate.
• Gross revenues:
US$393.0 Million
Mill Throughput tonnes per 1,439 2,204 2,389 2,645 2,701 3,068
Copper pound equivalent
produced
thousand
Cu lb eq
26,824 25,312 26,437 28,197 20,296
Copper produced thousand 20,726 19,923 16,680 14,955 10,842
Gold produced oz 6,970 6,316 7,248 11,430 11,026
Silver produced oz 532,108 514,299 486,026 504,626 371,967
Zinc produced thousand 8,847 13,619 9,111
Copper concentrate
produced
dty metric
tonnes
50,403 48,300 34,055 37,231 28,055 1,066
Zinc concentrate produced dry metric 7,924 12,713 9,923
Total Cost per Cu lb eq ($US) 1.05 1.84 2.81 2.67 2.88 2.53
Production cash cost per ($US) 0.61 0.99 1.51 1.40 1.81 1.81
Q1 20142009 2010 2011 2012 2013
$64.12
$78.10
$94.83 $90.42
$44.64
$13.20
$0.00
$20.00
$40.00
$60.00
$80.00
$100.00
2009 2010 2011 2012 2013 2014
GrossRevenue
($USMillions)
Gross Revenues for Sulphide Operations 2009 - 2014
Concentrate sampling
Loaded transfer bargeBarge docking with ship Ship departs for China
Loading concentratesMetallurgical laboratory
Canatuan Sulphide Operations 2009 - 2014
Gossan Operations 2004 – 2008:
• Total Project CAPEX: US$29.18 Million
• AuEq produced: 137,000 ounces
• Gross revenues: US$83.9 Million
Sulphide Operations 2009 – 2014:
• Initial CAPEX: US$28.3 Million
• Total project CAPEX: US$44.8 Million
• Concentrate produced: 199,778 dmt of copper
concentrate and 30,548 dmt of zinc concentrate
• Gross revenues: US$393.0 Million
Canatuan Operational/Financial Summary
Health and Sanitation
• TVI built a health clinic that provides free 24/7
healthcare, health & wellness programs and
activities, and ambulance service to impact
communities.
Responsive Education
• TVI built 10 schools, currently 2,500 students,
56 high school graduates.
• Provided teachers, learning tools, equipment
and 48 college scholarships (10 scholars have
graduated from college to date).
Infrastructure
• TVI built four bridges in partnership with the
Philippine government and a spillway.
• Also built or improved 85 kilometres (52.8
miles) of roads providing access to education,
livelihood and healthcare.
Canatuan Social Commitment
Sustainable Livelihood
• Focused on sustainability, economics and social well-
being of community including micro-finance, technical
skills, training and apprenticeship programs.
Royalty and Support for Ancestral Domain
• Extended technical and financial assistance for
crafting of Ancestral Domain Sustainable
Development and Protection Plan.
• Net royalties paid totaled approximately US$4.5
million over the 10-year period of the Canatuan
operations.
Development for impact communities
• Initiated projects in areas outside Canatuan:
Built Sta. Maria water system.
• Built 11 kilometres (6.8 miles) of farm-to-market
roads.
• Provided employment during shipment days in Sta.
Maria.
Canatuan Social Commitment
Biodiversity
• 50% of mining area remains in original habitat
condition. More than 10% of all Philippine bird
species can be found within the 508-hectare
operations area.
Watershed Management
• 90% of disturbed area subject to natural and
structural sediment controls.
• More than 25 locations within and around the
operations area subject to daily, weekly and
quarterly water quality monitoring.
Reclamation and Rehabilitation
• More than 200,000 trees have been planted since
2004. Greater than 5 times the original tree
density.
• US$2.5 million has been committed for post mining
reclamation in addition to annual progressive
rehabilitation programs.
Canatuan Social Commitment
Tailings Management
• Four tailings storage facilities constructed with
three undergoing reclamation. Current facility is 70
metres (230 feet) high with potential expansion of
20 metres (66 feet).
Monitoring Programs
• Monitoring by third party professionals completed
on weekly, quarterly and annual basis to identify
impacts and any needed mitigation measures.
• Monitoring includes flora and fauna, aquatic
habitat, air quality noise, water quality and health
of host community residents.
Research Programs
• Onsite research and studies for passive wetland
acid mine treatment using indigenous plants.
• Onsite research and studies for tailings
impoundment re-vegetation species.
Canatuan Social Commitment
• On November 1, 2011 TVI received notice that the
Provincial Board of Zamboanga del Norte would be
implementing an Ordinance banning new open pit mines
in the Province of Zamboanga del Norte (Ordinance).
• The Ordinance had direct implications for the producing
Canatuan mine, and on the Company’s exploration plans
for the tenements surrounding Canatuan. TVIRD
immediately filed a Motion for Reconsideration to dispute
the Ordinance.
• The Ordinance was heavily opposed by the communities
near Canatuan, which rallied in support of TVIRD.
• On January 4, 2012 TVI was granted a preliminary
injunction against the Ordinance banning open pit mining
in Zamboanga del Norte. The Court Order effectively
stopped the implementation of the Ordinance and allowed
TVI to continue its operations without legal impediment
while the main case was being litigated in the Court.
• Ultimately, TVI was able to continue its operations until the
all reserves were depleted at the end of 2013.
Canatuan Challenges
Community rally in support of TVI and
opposing new ordinance banning open pit
mines in Zamboanga del Norte
• From 2010 to 2013, TVIRD was the proud recipient of multiple
prestigious awards at the Presidential Mineral Industry
Environmental Awards ceremony during the annual Mine Safety
and Environmental Conference.
• 2010 awards included:
• Platinum Achievement Award, Surface Mining Category
• Safest Mines Award, Concentrator Category
• Mining Forest Award, Metallic Category
• Health and Safety Award
• 2011 awards included:
• Titanium Award for Excellence in Environmental Management
• Safest Mining Operation
• Safest Surface Mining Operation
• Safest Mineral Processing, Concentrator Category
• 2012 awards included:
• Presidential Mineral Industry Environment Award – Platinum
Award
• Safest Surface Mining Operation
• Safest Mineral Processing, Concentrator Category
• Best Mining Forest, Metallic Category – 3rd runner up
TVI Named “The Best of the Best”
Results of the Canatuan Experience
 TVI became a ‘partner of choice’ in the
Philippines
 Management earned the reputation for
‘getting things done’ -- on time and under
budget
 Successfully performed under challenging
conditions
 Operated responsibly with industry-leading
social and environmental programs.
 TVI has become the model operator in eyes
of Philippine government and regulators
TVI Management is now focused on repeating its success at
Canatuan in new jurisdictions within the Asia Pacific Region
Thank you. For more information, please contact:
Corporate Head Office:
TVI Pacific Inc.
Suite 2000, 736 - 6th Avenue S.W.
Calgary, Alberta T2P 3T7
Tel: (403) 265-4356
Fax: (403) 264-7028
Email: tvi-info@tvipacific.com
Investor Relations/Media Contact:
Shirley Anthony
Tel: 778-999-2771
E-mail: Shirley.anthony@tvipacific.com
Contact Information
Date Event
April 10, 1992 Benguet Corp, for. R. V. Bosque, files MPSA application
January 20, 1994 Benguet Corp. and TVIRD sign an Exploration Agreement with Option to Purchase
1996
50 tonne/day gold extraction pilot plant is commissioned to generate early cash
flow and verify mining and metallurgical criteria for larger-scale operations
1996-1998 Exploration commences under approved MPSA
October 23, 1996
Philippine Government signs MPSA with Bosque and Benguet Corp; 508.3396
hectares
June 8, 1997 Environmental Compliance Certificate issued for TVIRD Canatuan Project
June 16, 1997 Benguet Corp and TVIRD execute Deed of Assignment
Oct 21, 1997
Certificate of Ancestral Domain Claim issued to Subanons covering 6,523.689
hectares, including the Canatuan MPSA
May 14, 1998 DENR approves assignment of MPSA to TVIRD
1999 TVIRD stops exploration activities
October 2001 TVIRD executes MOU with Siocon Subanon Association, Inc.
October 16, 2002 TVIRD submits Partial Declaration of Mining Feasibility to MGB
Canatuan Property History: 1992 - 2002
Canatuan Property History: 2002 - 2008
Date Event
October 28, 2002 MGB approves MPSA exploration period extension, Partial Declaration of Mining
Feasibility
2002 - 2004 TVIRD buys and processes tailings from illegal small-scale miners (the
“Environmental Cleanup”)
June 12, 2003 Certificate of Ancestral Domain Title issued to Subanons; 8,213 hectares,
including MPSA
November 18, 2003 TVIRD signs MOA with Subanon Council of Elders and SSAI
July 2004 TVIRD commissions full-scale processing plant and begins Gossan Project at 150
dry metric tonnes per day throughput
September 2005 Gossan Mill Production exceeds 700 dmtpd
January 2005 Canatuan achieves steady state throughput of 1,300 dmtpd
May 13, 2006 TVIRD inaugurates Gossan Tailings Dam, applauded by Canadian Ambassador
and DENR Secretary
February 2007 TVIRD confirms additional polymetallic occurrences near Canatuan
April 2007 Canatuan exceeds 2,000 dmtpd average throughput
April 9 2008 Gossan Project decommissioning starts
Canatuan Property History: 2008 - 2010
Date Event
April 7, 2008 TVIRD files updated NI43-101 Technical Report on Sulphide Project
November 11, 2008 TVIRD signs 5-year Offtake agreement with MRI Trading AG for concentrates to
be shipped in lots of approximately 5,000 tonnes.
November 15, 2008 Construction of Sulphide Project is completed
February 9, 2009 Secures US$30.1 million Omnibus Loan and Security Agreement with Lim Asia
Multi-Strategy Fund Inc. and LIM Asia Special Situations Master Fund Limited
March 2009 TVIRD commissions full-scale processing plant and begins Sulphide operations
with initial 5,000 tonne inventory and throughput of 1,500 tonnes per day
March 30, 2009 First shipment of copper concentrate is completed from Sulphide Operations
January 22, 2010 TVIRD reduces debt obligation to $16.2 million (a 46% reduction from the
original loan of $30.1 million)
June 25, 2010 Completes 15th shipment of copper concentrates from Sulphide Operations
June 28, 2010 TVIRD repays $30.1 million Omnibus loan with LIM Asia funds in full
November 23, 2010 TVIRD receives multiple awards from the Philippine government at the annual
Mine Safety and Environmental Conference, including “Platinum Achievement
Award, Surface Mining Category”, “Safest Mines Award, Concentrator Category”,
“Mining Forest Award, Metallic Category” and “Health and Safety Award”
Canatuan Property History: 2011 - 2014
Date Event
April 25, 2011 Announces zinc production start up
August 12, 2011 Completes 23rd shipment of copper concentrate and first shipment of zinc
concentrate
November 14, 2011 TVIRD declared “The Best of the Best” in Presidential Mineral Industry
Environmental and Safety Awards, receiving the “Titanium Award for Excellence
in Environmental Management”, “Safest Mining Operation”, “Safest Surface
Mining Operation” and “Safest Mineral Processing, Concentrator Category”
December 21, 2011 Completes second shipment of zinc concentrate
January 4, 2012 TVIRD wins injunction against ordinance that would ban new open pit mining
November 22, 2012 TVIRD wins again at the annual Mine Safety and Environmental Conference,
receiving the “Presidential Mineral Industry Environment Award – Platinum
Award”, “Safest Surface Mining Operation”, “Safest Mineral Processing,
Concentrator Category” and “Best Mining Forest, Metallic Category – 3rd runner
up”
January 20, 2014 Decommissioning of Sulphide Operations and implementation of Project Closure
plan commences
January 21, 2014 Completes 7th and final shipment of zinc concentrates
February 5, 2014 Completes 39th and final shipment of copper concentrates

Weitere ähnliche Inhalte

Was ist angesagt?

Tvi corporate presentation march 2016
Tvi corporate presentation march 2016Tvi corporate presentation march 2016
Tvi corporate presentation march 2016TVI_Pacific
 
Tvi corporate presentation january 2016
Tvi corporate presentation january 2016Tvi corporate presentation january 2016
Tvi corporate presentation january 2016TVI_Pacific
 
20140128 Jourdan Resources Corporate Presentation - Phosphate Exploration in ...
20140128 Jourdan Resources Corporate Presentation - Phosphate Exploration in ...20140128 Jourdan Resources Corporate Presentation - Phosphate Exploration in ...
20140128 Jourdan Resources Corporate Presentation - Phosphate Exploration in ...Michael Dehn
 
Denver gold-2016-final
Denver gold-2016-finalDenver gold-2016-final
Denver gold-2016-finalSemafoCorporate
 
KBL Mining | ASX:KBL | RIS2014 Broken Hill Investor Presentation
KBL Mining | ASX:KBL | RIS2014 Broken Hill Investor PresentationKBL Mining | ASX:KBL | RIS2014 Broken Hill Investor Presentation
KBL Mining | ASX:KBL | RIS2014 Broken Hill Investor PresentationSymposium
 
De Beers in Botswana
De Beers in BotswanaDe Beers in Botswana
De Beers in BotswanaAnglo American
 
Undervalued nickel laterite developer : Axiom Mining (ASX:AVQ)
Undervalued nickel laterite developer : Axiom Mining (ASX:AVQ)Undervalued nickel laterite developer : Axiom Mining (ASX:AVQ)
Undervalued nickel laterite developer : Axiom Mining (ASX:AVQ)rcresearch
 
Botswana Diamonds plc 2021 Annual Report
Botswana Diamonds plc 2021 Annual ReportBotswana Diamonds plc 2021 Annual Report
Botswana Diamonds plc 2021 Annual ReportJames AH Campbell
 
EGM PRESENTATION TO SHAREHOLDERS 2014
EGM PRESENTATION TO SHAREHOLDERS 2014EGM PRESENTATION TO SHAREHOLDERS 2014
EGM PRESENTATION TO SHAREHOLDERS 2014Foyson Resources
 
Tvi pacific corporate presentation 08.10.2021 final
Tvi pacific corporate presentation   08.10.2021 finalTvi pacific corporate presentation   08.10.2021 final
Tvi pacific corporate presentation 08.10.2021 finalTVI_Pacific
 
Jourdan Resources Corporate Presentation December 2013
Jourdan Resources Corporate Presentation December 2013Jourdan Resources Corporate Presentation December 2013
Jourdan Resources Corporate Presentation December 2013Michael Dehn
 
North Arrow Minerals - January Corporate Update
North Arrow Minerals - January Corporate UpdateNorth Arrow Minerals - January Corporate Update
North Arrow Minerals - January Corporate Updatenarminerals
 
Teranga Gold Investor Presentation - January 2014
Teranga Gold Investor Presentation - January 2014Teranga Gold Investor Presentation - January 2014
Teranga Gold Investor Presentation - January 2014Teranga Gold
 
Commerce Resources Corp. Receives the 2015 e3 Plus Award from the AEMQ
Commerce Resources Corp. Receives the 2015 e3 Plus Award from the AEMQCommerce Resources Corp. Receives the 2015 e3 Plus Award from the AEMQ
Commerce Resources Corp. Receives the 2015 e3 Plus Award from the AEMQCommerce Resources Corp. (TSXv:CCE)
 
ANACONDA_ER_Issue 3 2015_BROCH
ANACONDA_ER_Issue 3 2015_BROCHANACONDA_ER_Issue 3 2015_BROCH
ANACONDA_ER_Issue 3 2015_BROCHSarah Louise Brooks
 
North Arrow Exploration & Corporate Update October, 11 2018
North Arrow Exploration & Corporate Update October, 11 2018North Arrow Exploration & Corporate Update October, 11 2018
North Arrow Exploration & Corporate Update October, 11 2018narminerals
 
Information Memorandum: Capital Raise, Three Rivers Prospecting
Information Memorandum: Capital Raise, Three Rivers ProspectingInformation Memorandum: Capital Raise, Three Rivers Prospecting
Information Memorandum: Capital Raise, Three Rivers ProspectingAshley Mangano
 

Was ist angesagt? (20)

Tvi corporate presentation march 2016
Tvi corporate presentation march 2016Tvi corporate presentation march 2016
Tvi corporate presentation march 2016
 
Tvi corporate presentation january 2016
Tvi corporate presentation january 2016Tvi corporate presentation january 2016
Tvi corporate presentation january 2016
 
20140128 Jourdan Resources Corporate Presentation - Phosphate Exploration in ...
20140128 Jourdan Resources Corporate Presentation - Phosphate Exploration in ...20140128 Jourdan Resources Corporate Presentation - Phosphate Exploration in ...
20140128 Jourdan Resources Corporate Presentation - Phosphate Exploration in ...
 
Antimony: ‘Highest Risk’ Element
Antimony: ‘Highest Risk’ ElementAntimony: ‘Highest Risk’ Element
Antimony: ‘Highest Risk’ Element
 
Denver gold-2016-final
Denver gold-2016-finalDenver gold-2016-final
Denver gold-2016-final
 
KBL Mining | ASX:KBL | RIS2014 Broken Hill Investor Presentation
KBL Mining | ASX:KBL | RIS2014 Broken Hill Investor PresentationKBL Mining | ASX:KBL | RIS2014 Broken Hill Investor Presentation
KBL Mining | ASX:KBL | RIS2014 Broken Hill Investor Presentation
 
Antimony
AntimonyAntimony
Antimony
 
De Beers in Botswana
De Beers in BotswanaDe Beers in Botswana
De Beers in Botswana
 
Undervalued nickel laterite developer : Axiom Mining (ASX:AVQ)
Undervalued nickel laterite developer : Axiom Mining (ASX:AVQ)Undervalued nickel laterite developer : Axiom Mining (ASX:AVQ)
Undervalued nickel laterite developer : Axiom Mining (ASX:AVQ)
 
Botswana Diamonds plc 2021 Annual Report
Botswana Diamonds plc 2021 Annual ReportBotswana Diamonds plc 2021 Annual Report
Botswana Diamonds plc 2021 Annual Report
 
EGM PRESENTATION TO SHAREHOLDERS 2014
EGM PRESENTATION TO SHAREHOLDERS 2014EGM PRESENTATION TO SHAREHOLDERS 2014
EGM PRESENTATION TO SHAREHOLDERS 2014
 
Tvi pacific corporate presentation 08.10.2021 final
Tvi pacific corporate presentation   08.10.2021 finalTvi pacific corporate presentation   08.10.2021 final
Tvi pacific corporate presentation 08.10.2021 final
 
Jourdan Resources Corporate Presentation December 2013
Jourdan Resources Corporate Presentation December 2013Jourdan Resources Corporate Presentation December 2013
Jourdan Resources Corporate Presentation December 2013
 
EDW Fact Sheet
EDW Fact SheetEDW Fact Sheet
EDW Fact Sheet
 
North Arrow Minerals - January Corporate Update
North Arrow Minerals - January Corporate UpdateNorth Arrow Minerals - January Corporate Update
North Arrow Minerals - January Corporate Update
 
Teranga Gold Investor Presentation - January 2014
Teranga Gold Investor Presentation - January 2014Teranga Gold Investor Presentation - January 2014
Teranga Gold Investor Presentation - January 2014
 
Commerce Resources Corp. Receives the 2015 e3 Plus Award from the AEMQ
Commerce Resources Corp. Receives the 2015 e3 Plus Award from the AEMQCommerce Resources Corp. Receives the 2015 e3 Plus Award from the AEMQ
Commerce Resources Corp. Receives the 2015 e3 Plus Award from the AEMQ
 
ANACONDA_ER_Issue 3 2015_BROCH
ANACONDA_ER_Issue 3 2015_BROCHANACONDA_ER_Issue 3 2015_BROCH
ANACONDA_ER_Issue 3 2015_BROCH
 
North Arrow Exploration & Corporate Update October, 11 2018
North Arrow Exploration & Corporate Update October, 11 2018North Arrow Exploration & Corporate Update October, 11 2018
North Arrow Exploration & Corporate Update October, 11 2018
 
Information Memorandum: Capital Raise, Three Rivers Prospecting
Information Memorandum: Capital Raise, Three Rivers ProspectingInformation Memorandum: Capital Raise, Three Rivers Prospecting
Information Memorandum: Capital Raise, Three Rivers Prospecting
 

Andere mochten auch

Tvi Express Presentation
Tvi Express PresentationTvi Express Presentation
Tvi Express PresentationNickea Bennett
 
Canadian Mining In The Philippines - Impact Magazine
Canadian Mining In The Philippines - Impact MagazineCanadian Mining In The Philippines - Impact Magazine
Canadian Mining In The Philippines - Impact MagazineNo to mining in Palawan
 
Nike
NikeNike
Nikec_tops
 
Estudo de caso - Marca - Nike
Estudo de caso  - Marca - NikeEstudo de caso  - Marca - Nike
Estudo de caso - Marca - NikeJuliani Pavan
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing processShreenath Bohra
 

Andere mochten auch (8)

Tvi Express Presentation
Tvi Express PresentationTvi Express Presentation
Tvi Express Presentation
 
Canadian Mining In The Philippines - Impact Magazine
Canadian Mining In The Philippines - Impact MagazineCanadian Mining In The Philippines - Impact Magazine
Canadian Mining In The Philippines - Impact Magazine
 
Impact Mining Vol46-n03
Impact Mining Vol46-n03Impact Mining Vol46-n03
Impact Mining Vol46-n03
 
Nike
NikeNike
Nike
 
Estudo de caso - Marca - Nike
Estudo de caso  - Marca - NikeEstudo de caso  - Marca - Nike
Estudo de caso - Marca - Nike
 
TVI
TVITVI
TVI
 
1. cement ppt
1. cement ppt1. cement ppt
1. cement ppt
 
Cement manufacturing process
Cement manufacturing processCement manufacturing process
Cement manufacturing process
 

Ähnlich wie TVI's Canatuan Mine - A Philippine Mining Success Story

Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story PresentationTVI_Pacific
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015TVI_Pacific
 
#MP2013 Presentation by the Minister of Mines and Steel Development
#MP2013 Presentation by the Minister of Mines and Steel Development#MP2013 Presentation by the Minister of Mines and Steel Development
#MP2013 Presentation by the Minister of Mines and Steel DevelopmentFMINigeria
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012FirstQuantum
 
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...No to mining in Palawan
 
20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutionalAdnet Communications
 
Mining 101: The Basics of Mining and the Philippine Industry
Mining 101: The Basics of Mining and the Philippine IndustryMining 101: The Basics of Mining and the Philippine Industry
Mining 101: The Basics of Mining and the Philippine IndustryPhilippine Press Institute
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate PresentationAdnet Communications
 
20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutionalAdnet Communications
 
Corporate Presentation July 2013
Corporate Presentation July 2013Corporate Presentation July 2013
Corporate Presentation July 2013Crocodile Gold
 
Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Metals
 
Investor Presentation | Millennium Materials (ASX:MOY) | Gold Investment Symp...
Investor Presentation | Millennium Materials (ASX:MOY) | Gold Investment Symp...Investor Presentation | Millennium Materials (ASX:MOY) | Gold Investment Symp...
Investor Presentation | Millennium Materials (ASX:MOY) | Gold Investment Symp...Symposium
 
Blackheath Resources Inc. July 2012 Investor Presentation
Blackheath Resources Inc. July 2012 Investor PresentationBlackheath Resources Inc. July 2012 Investor Presentation
Blackheath Resources Inc. July 2012 Investor Presentationmmadvisory
 
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Conferences
 
IRON SAND
IRON SANDIRON SAND
IRON SANDB SUGANDI
 
Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Gold Corp
 

Ähnlich wie TVI's Canatuan Mine - A Philippine Mining Success Story (20)

Canatuan Story Presentation
Canatuan Story PresentationCanatuan Story Presentation
Canatuan Story Presentation
 
Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015Canatuan story presentation october 27 2015
Canatuan story presentation october 27 2015
 
#MP2013 Presentation by the Minister of Mines and Steel Development
#MP2013 Presentation by the Minister of Mines and Steel Development#MP2013 Presentation by the Minister of Mines and Steel Development
#MP2013 Presentation by the Minister of Mines and Steel Development
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
 
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
Sec Ramon J. P. Paje -INSTITUTING POLICY REFORMS IN MINERAL RESOURCES DEVELOP...
 
20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional20120410 ipt-presentation-institutional
20120410 ipt-presentation-institutional
 
Presentation
PresentationPresentation
Presentation
 
Mining 101: The Basics of Mining and the Philippine Industry
Mining 101: The Basics of Mining and the Philippine IndustryMining 101: The Basics of Mining and the Philippine Industry
Mining 101: The Basics of Mining and the Philippine Industry
 
20121029 ipt presentation
20121029 ipt presentation20121029 ipt presentation
20121029 ipt presentation
 
Impact Silver Corporate Presentation
Impact Silver Corporate PresentationImpact Silver Corporate Presentation
Impact Silver Corporate Presentation
 
20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional20120319 ipt-presentation-institutional
20120319 ipt-presentation-institutional
 
20120912 ipt presentation
20120912 ipt presentation20120912 ipt presentation
20120912 ipt presentation
 
Corporate Presentation July 2013
Corporate Presentation July 2013Corporate Presentation July 2013
Corporate Presentation July 2013
 
Astur Gold Corp
Astur Gold CorpAstur Gold Corp
Astur Gold Corp
 
Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Presenation September 2016
Lion One Presenation September 2016
 
Investor Presentation | Millennium Materials (ASX:MOY) | Gold Investment Symp...
Investor Presentation | Millennium Materials (ASX:MOY) | Gold Investment Symp...Investor Presentation | Millennium Materials (ASX:MOY) | Gold Investment Symp...
Investor Presentation | Millennium Materials (ASX:MOY) | Gold Investment Symp...
 
Blackheath Resources Inc. July 2012 Investor Presentation
Blackheath Resources Inc. July 2012 Investor PresentationBlackheath Resources Inc. July 2012 Investor Presentation
Blackheath Resources Inc. July 2012 Investor Presentation
 
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
 
IRON SAND
IRON SANDIRON SAND
IRON SAND
 
Avion Presentation Aug 2010
Avion Presentation Aug 2010Avion Presentation Aug 2010
Avion Presentation Aug 2010
 

KĂźrzlich hochgeladen

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...tanu pandey
 
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...Call Girls In Delhi Whatsup 9873940964 Enjoy Unlimited Pleasure
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girladitipandeya
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663Call Girls Mumbai
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfProbe Gold
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableSheetaleventcompany
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxindia IPO
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024TeckResourcesLtd
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 

KĂźrzlich hochgeladen (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...Vijayawada ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready F...
Vijayawada ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready F...
 
@9999965857 🫦 Sexy Desi Call Girls Janakpuri 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Janakpuri 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Janakpuri 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Janakpuri 💓 High Profile Escorts Delhi 🫶
 
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
(👉゚9999965857 ゚)👉 Russian Call Girls Aerocity 👉 Delhi 👈 : 9999 Cash Payment F...
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Abids high-profile Call Girl
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
 
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
✂️ 👅 Independent Goregaon Escorts With Room Vashi Call Girls 💃 9004004663
 
Corporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdfCorporate Presentation Probe May 2024.pdf
Corporate Presentation Probe May 2024.pdf
 
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service AvailableCall Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
Call Girls Chandigarh Just Call 8868886958 Top Class Call Girl Service Available
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptx
 
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our EscortsVIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
VIP Amritsar Call Girl 7001035870 Enjoy Call Girls With Our Escorts
 
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi  : 9999 Cash Pa...
(‿ˠ‿) Independent Call Girls Laxmi Nagar 👉 9999965857 👈 Delhi : 9999 Cash Pa...
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Amritsar 7001035870 Enjoy Call Girls With Our Escorts
 
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
(INDIRA) Call Girl Kashmir Call Now 8617697112 Kashmir Escorts 24x7
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 

TVI's Canatuan Mine - A Philippine Mining Success Story

  • 1. Building for the future through our past success… Canatuan – A TVI Success Story
  • 2. Canatuan Overview • The Canatuan gold/silver-copper/zinc mine was the first foreign-invested mine to reach production after the passage of the Philippine Mining Act of 1995. • Located within the Province of Zamboanga del Norte, on the Philippine island of Mindanao, in the agricultural town Siocon. • 508-hectare property is covered under a Mineral Profit Sharing Agreement (“MPSA”) valid from October 23, 1996 until October 23, 2021 • TVI entered the area in 1993 through its 100% owned subsidiary, TVI Resource Development Inc. (TVIRD)*, which entered into an Exploration Agreement with Option to Purchase with Benquet Corp. Canatuan MPSA 508 hectares
  • 3. • Full-scale operations focused on two distinct orebodies: o An upper gold and silver-rich gossan (oxidized) zone which was mined between 2004 and 2008 and processing using Cyanide-in-Leach. o A lower copper and zinc-rich sulphide zone which was mined from 2008 to 2014 and processed using two conventional flotation circuits. • By the end of operations, nearly 6 million tonnes of ore were mined and processed and more than 14 million tonnes of material was excavated. • Rehabilitation has been in progress since 2008 and the company has now commenced agribusiness ventures to ensure the long-term sustainability of the area. Canatuan Overview Milling Facilities
  • 4. Canatuan Deposit Characteristics • The Canatuan deposit consisted of several gently dipping to flat-lying, polymetallic massive sulphide and other sulphide-rich horizons. • The deposit was bow shaped with a strike length of approximately 825 metres and a width ranging from 150 metres to 300 metres. • The deposit consisted of an upper weathered gold/silver-rich gossan (oxidized) zone underlain by a sulphide zone which consisted of three lenses of massive, banded sulphide. • The bulk of both the sulphide and gossan reserves were contained within the lower sulphide horizon. This horizon was continuous over the entire strike length of the deposit. • Both the Gossan and Sulphide deposits were excavated and processed as part of the Gossan and Sulphide Phase operations.
  • 5. Small Scale Mining at Canatuan (pre-TVI) • Prior to TVI’s involvement in 1994, the Canatuan area saw many years of small scale, illegal mining activities carried out by a population in excess of 10,000 small scale miners. • The area suffered from uncontrolled tailings, waste management and deforestation. • Child labor was predominant and few or no safety measures were implemented. • In 2002, TVI began purchasing tailings contaminated with cyanide and mercury from the small scale mining operators to clean up the area and to act as feed for a 50 tpd gold extraction pilot plant to verify mining and metallurgical criteria for larger-scale operations and to generate early cash flows. • The pilot plant processed approximately 24,000 tonnes of tailings and an environmental cleanup and residual tailings management plan was launched in 2002.
  • 6. • In July 2004, TVIRD commissioned a full-scale processing plant for the Gossan Phase of operations (gold-silver) with an initial daily throughput of 125 dry metric tonnes. • The processing plant used CIL recovery methods and produced gold and silver dorĂŠ. • Processing facilities were incrementally expanded over 4 years to a maximum daily production of ~2,500 dry metric tonnes in 2008. • Initial capital costs were low and mostly funded by existing cash flows from earlier tailings processing: • Prior to 2005: US$16.89 Million • Sustaining (2005 to 2007): US$12.29 Million • Project total: US$29.18 Million Canatuan Gossan Operations 2004 - 2008 0 500 1,000 1,500 2,000 2,500 3,000 2004 2005 2006 2007 2008 Year MillThroughput(tonnesperday) Daily Mill Throughput Capacity
  • 7. Canatuan Gossan Operations 2004 - 2008 Gossan Metal Production (Actual) 0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 Jul-04 Oct-04 Jan-05 Apr-05 Jul-05 Oct-05 Jan-06 Apr-06 Jul-06 Oct-06 Jan-07 Apr-07 Jul-07 Oct-07 Jan-08 AuEqOz Calculated Au Calculated Ag Credit $2.05 $12.04 $34.51 $31.45 $5.90 $0.0 $5.0 $10.0 $15.0 $20.0 $25.0 $30.0 $35.0 $40.0 2004 2005 2006 2007 2008 GrossRevenue ($USMillions) Gross Revenues for Gossan Operation 2004 - 2008 • AuEq produced: 137,000 ounces (at average operating cost of US$26/tonne milled) • Gross revenues (2004-2008): US$83.9 Million • Original reserve estimate: 1.0 million tonnes at 3.12 g/t Au and 119 g/t Ag • Actual mined amount: 1.9 million tonnes at 2.1 g/t Au and 70 g/t Ag • Mine life was extended due to increased metal prices and lower cutoff grades
  • 8. Canatuan Gossan Operations 2004 - 2008 Canatuan Gold DorĂŠ bar Leaching tanks Pouring the dore bar Excavators Mining Pit Mill Construction
  • 9. Canatuan Sulphide Operations 2009 - 2014 • In May 2008, TVI began construction of a sulphide plant and associated infrastructure to process the underlying sulphide orebody containing copper and zinc. • Construction on the sulphide plant was completed on time and under budget in November of 2008. • Initial CAPEX for the project was US$23.3 million. • Reserve Calculation (June 2007) • Assumed Metal Prices of $2.00/lb Cu, $1.04/lb Zn, $550/oz Au and $9.50/oz Ag • Mine Life = 5.5 years at average mill rate of approx. 1,560 tonnes per day Sulphide Plant Crusher Circuit Mining Area
  • 10. Sulphide Operations – Tailings Dam • For the sulphide operations, TVI completed construction of a sulphide tailings dam with the following specifications: • Available storage of 7.4 million tonnes for both tailings and overburden material. • Maximum dam height: 85 metres. • The dam was built using a four stage construction program using a zoned earth embankment design. • Designed for the Maximum Credible Earthquake and Probable Maximum Flood. • Design and construction management by international engineering firms specializing in tailings dam design and construction management.
  • 11. Canatuan Sulphide Operations 2009 - 2014 • Exclusive copper offtake agreement with MRI Trading AG was signed in October 2008 • Copper ore processing began in November 2008 and first copper concentrate shipment was made in March 2009. • In January 2009, TVI arranged a US$30.1 million 5- year Omnibus Loan and Security Agreement with LIM Asia Multi-Strategy Fund Inc. and LIM Asia Special Situations Master Fund Limited to support mining operations and complete the residual construction related to the sulphide plant. • By June 2010, TVI had completely repaid the US$30.1 million Omnibus Loan and Security Agreement using cash flows from operations and local financings – well ahead of schedule. • On April 25, 2011 TVI announced the commencement of zinc production at the Canatuan mine. The first shipment of zinc concentrate was completed on August 12 that year. Loading concentrate onto transfer barge Flotation cells
  • 12. Canatuan Sulphide Financial Summary • Milling operations concluded in January 2014. • Originally anticipated amount to be mined: 119,800 dmt of copper concentrate and 6,100 dmt of zinc concentrate. • Actual mined amount: 199,778 dmt of copper concentrate and 30,548 dmt of zinc concentrate. • Gross revenues: US$393.0 Million Mill Throughput tonnes per 1,439 2,204 2,389 2,645 2,701 3,068 Copper pound equivalent produced thousand Cu lb eq 26,824 25,312 26,437 28,197 20,296 Copper produced thousand 20,726 19,923 16,680 14,955 10,842 Gold produced oz 6,970 6,316 7,248 11,430 11,026 Silver produced oz 532,108 514,299 486,026 504,626 371,967 Zinc produced thousand 8,847 13,619 9,111 Copper concentrate produced dty metric tonnes 50,403 48,300 34,055 37,231 28,055 1,066 Zinc concentrate produced dry metric 7,924 12,713 9,923 Total Cost per Cu lb eq ($US) 1.05 1.84 2.81 2.67 2.88 2.53 Production cash cost per ($US) 0.61 0.99 1.51 1.40 1.81 1.81 Q1 20142009 2010 2011 2012 2013 $64.12 $78.10 $94.83 $90.42 $44.64 $13.20 $0.00 $20.00 $40.00 $60.00 $80.00 $100.00 2009 2010 2011 2012 2013 2014 GrossRevenue ($USMillions) Gross Revenues for Sulphide Operations 2009 - 2014
  • 13. Concentrate sampling Loaded transfer bargeBarge docking with ship Ship departs for China Loading concentratesMetallurgical laboratory Canatuan Sulphide Operations 2009 - 2014
  • 14. Gossan Operations 2004 – 2008: • Total Project CAPEX: US$29.18 Million • AuEq produced: 137,000 ounces • Gross revenues: US$83.9 Million Sulphide Operations 2009 – 2014: • Initial CAPEX: US$28.3 Million • Total project CAPEX: US$44.8 Million • Concentrate produced: 199,778 dmt of copper concentrate and 30,548 dmt of zinc concentrate • Gross revenues: US$393.0 Million Canatuan Operational/Financial Summary
  • 15. Health and Sanitation • TVI built a health clinic that provides free 24/7 healthcare, health & wellness programs and activities, and ambulance service to impact communities. Responsive Education • TVI built 10 schools, currently 2,500 students, 56 high school graduates. • Provided teachers, learning tools, equipment and 48 college scholarships (10 scholars have graduated from college to date). Infrastructure • TVI built four bridges in partnership with the Philippine government and a spillway. • Also built or improved 85 kilometres (52.8 miles) of roads providing access to education, livelihood and healthcare. Canatuan Social Commitment
  • 16. Sustainable Livelihood • Focused on sustainability, economics and social well- being of community including micro-finance, technical skills, training and apprenticeship programs. Royalty and Support for Ancestral Domain • Extended technical and financial assistance for crafting of Ancestral Domain Sustainable Development and Protection Plan. • Net royalties paid totaled approximately US$4.5 million over the 10-year period of the Canatuan operations. Development for impact communities • Initiated projects in areas outside Canatuan: Built Sta. Maria water system. • Built 11 kilometres (6.8 miles) of farm-to-market roads. • Provided employment during shipment days in Sta. Maria. Canatuan Social Commitment
  • 17. Biodiversity • 50% of mining area remains in original habitat condition. More than 10% of all Philippine bird species can be found within the 508-hectare operations area. Watershed Management • 90% of disturbed area subject to natural and structural sediment controls. • More than 25 locations within and around the operations area subject to daily, weekly and quarterly water quality monitoring. Reclamation and Rehabilitation • More than 200,000 trees have been planted since 2004. Greater than 5 times the original tree density. • US$2.5 million has been committed for post mining reclamation in addition to annual progressive rehabilitation programs. Canatuan Social Commitment
  • 18. Tailings Management • Four tailings storage facilities constructed with three undergoing reclamation. Current facility is 70 metres (230 feet) high with potential expansion of 20 metres (66 feet). Monitoring Programs • Monitoring by third party professionals completed on weekly, quarterly and annual basis to identify impacts and any needed mitigation measures. • Monitoring includes flora and fauna, aquatic habitat, air quality noise, water quality and health of host community residents. Research Programs • Onsite research and studies for passive wetland acid mine treatment using indigenous plants. • Onsite research and studies for tailings impoundment re-vegetation species. Canatuan Social Commitment
  • 19. • On November 1, 2011 TVI received notice that the Provincial Board of Zamboanga del Norte would be implementing an Ordinance banning new open pit mines in the Province of Zamboanga del Norte (Ordinance). • The Ordinance had direct implications for the producing Canatuan mine, and on the Company’s exploration plans for the tenements surrounding Canatuan. TVIRD immediately filed a Motion for Reconsideration to dispute the Ordinance. • The Ordinance was heavily opposed by the communities near Canatuan, which rallied in support of TVIRD. • On January 4, 2012 TVI was granted a preliminary injunction against the Ordinance banning open pit mining in Zamboanga del Norte. The Court Order effectively stopped the implementation of the Ordinance and allowed TVI to continue its operations without legal impediment while the main case was being litigated in the Court. • Ultimately, TVI was able to continue its operations until the all reserves were depleted at the end of 2013. Canatuan Challenges Community rally in support of TVI and opposing new ordinance banning open pit mines in Zamboanga del Norte
  • 20. • From 2010 to 2013, TVIRD was the proud recipient of multiple prestigious awards at the Presidential Mineral Industry Environmental Awards ceremony during the annual Mine Safety and Environmental Conference. • 2010 awards included: • Platinum Achievement Award, Surface Mining Category • Safest Mines Award, Concentrator Category • Mining Forest Award, Metallic Category • Health and Safety Award • 2011 awards included: • Titanium Award for Excellence in Environmental Management • Safest Mining Operation • Safest Surface Mining Operation • Safest Mineral Processing, Concentrator Category • 2012 awards included: • Presidential Mineral Industry Environment Award – Platinum Award • Safest Surface Mining Operation • Safest Mineral Processing, Concentrator Category • Best Mining Forest, Metallic Category – 3rd runner up TVI Named “The Best of the Best”
  • 21. Results of the Canatuan Experience  TVI became a ‘partner of choice’ in the Philippines  Management earned the reputation for ‘getting things done’ -- on time and under budget  Successfully performed under challenging conditions  Operated responsibly with industry-leading social and environmental programs.  TVI has become the model operator in eyes of Philippine government and regulators TVI Management is now focused on repeating its success at Canatuan in new jurisdictions within the Asia Pacific Region
  • 22. Thank you. For more information, please contact: Corporate Head Office: TVI Pacific Inc. Suite 2000, 736 - 6th Avenue S.W. Calgary, Alberta T2P 3T7 Tel: (403) 265-4356 Fax: (403) 264-7028 Email: tvi-info@tvipacific.com Investor Relations/Media Contact: Shirley Anthony Tel: 778-999-2771 E-mail: Shirley.anthony@tvipacific.com Contact Information
  • 23. Date Event April 10, 1992 Benguet Corp, for. R. V. Bosque, files MPSA application January 20, 1994 Benguet Corp. and TVIRD sign an Exploration Agreement with Option to Purchase 1996 50 tonne/day gold extraction pilot plant is commissioned to generate early cash flow and verify mining and metallurgical criteria for larger-scale operations 1996-1998 Exploration commences under approved MPSA October 23, 1996 Philippine Government signs MPSA with Bosque and Benguet Corp; 508.3396 hectares June 8, 1997 Environmental Compliance Certificate issued for TVIRD Canatuan Project June 16, 1997 Benguet Corp and TVIRD execute Deed of Assignment Oct 21, 1997 Certificate of Ancestral Domain Claim issued to Subanons covering 6,523.689 hectares, including the Canatuan MPSA May 14, 1998 DENR approves assignment of MPSA to TVIRD 1999 TVIRD stops exploration activities October 2001 TVIRD executes MOU with Siocon Subanon Association, Inc. October 16, 2002 TVIRD submits Partial Declaration of Mining Feasibility to MGB Canatuan Property History: 1992 - 2002
  • 24. Canatuan Property History: 2002 - 2008 Date Event October 28, 2002 MGB approves MPSA exploration period extension, Partial Declaration of Mining Feasibility 2002 - 2004 TVIRD buys and processes tailings from illegal small-scale miners (the “Environmental Cleanup”) June 12, 2003 Certificate of Ancestral Domain Title issued to Subanons; 8,213 hectares, including MPSA November 18, 2003 TVIRD signs MOA with Subanon Council of Elders and SSAI July 2004 TVIRD commissions full-scale processing plant and begins Gossan Project at 150 dry metric tonnes per day throughput September 2005 Gossan Mill Production exceeds 700 dmtpd January 2005 Canatuan achieves steady state throughput of 1,300 dmtpd May 13, 2006 TVIRD inaugurates Gossan Tailings Dam, applauded by Canadian Ambassador and DENR Secretary February 2007 TVIRD confirms additional polymetallic occurrences near Canatuan April 2007 Canatuan exceeds 2,000 dmtpd average throughput April 9 2008 Gossan Project decommissioning starts
  • 25. Canatuan Property History: 2008 - 2010 Date Event April 7, 2008 TVIRD files updated NI43-101 Technical Report on Sulphide Project November 11, 2008 TVIRD signs 5-year Offtake agreement with MRI Trading AG for concentrates to be shipped in lots of approximately 5,000 tonnes. November 15, 2008 Construction of Sulphide Project is completed February 9, 2009 Secures US$30.1 million Omnibus Loan and Security Agreement with Lim Asia Multi-Strategy Fund Inc. and LIM Asia Special Situations Master Fund Limited March 2009 TVIRD commissions full-scale processing plant and begins Sulphide operations with initial 5,000 tonne inventory and throughput of 1,500 tonnes per day March 30, 2009 First shipment of copper concentrate is completed from Sulphide Operations January 22, 2010 TVIRD reduces debt obligation to $16.2 million (a 46% reduction from the original loan of $30.1 million) June 25, 2010 Completes 15th shipment of copper concentrates from Sulphide Operations June 28, 2010 TVIRD repays $30.1 million Omnibus loan with LIM Asia funds in full November 23, 2010 TVIRD receives multiple awards from the Philippine government at the annual Mine Safety and Environmental Conference, including “Platinum Achievement Award, Surface Mining Category”, “Safest Mines Award, Concentrator Category”, “Mining Forest Award, Metallic Category” and “Health and Safety Award”
  • 26. Canatuan Property History: 2011 - 2014 Date Event April 25, 2011 Announces zinc production start up August 12, 2011 Completes 23rd shipment of copper concentrate and first shipment of zinc concentrate November 14, 2011 TVIRD declared “The Best of the Best” in Presidential Mineral Industry Environmental and Safety Awards, receiving the “Titanium Award for Excellence in Environmental Management”, “Safest Mining Operation”, “Safest Surface Mining Operation” and “Safest Mineral Processing, Concentrator Category” December 21, 2011 Completes second shipment of zinc concentrate January 4, 2012 TVIRD wins injunction against ordinance that would ban new open pit mining November 22, 2012 TVIRD wins again at the annual Mine Safety and Environmental Conference, receiving the “Presidential Mineral Industry Environment Award – Platinum Award”, “Safest Surface Mining Operation”, “Safest Mineral Processing, Concentrator Category” and “Best Mining Forest, Metallic Category – 3rd runner up” January 20, 2014 Decommissioning of Sulphide Operations and implementation of Project Closure plan commences January 21, 2014 Completes 7th and final shipment of zinc concentrates February 5, 2014 Completes 39th and final shipment of copper concentrates