SlideShare ist ein Scribd-Unternehmen logo
1 von 11
Product Roadmap Overview

      Sanjay Upadhyaya
      Management Controls




                            1
Product Objectives
• Make Track™ easier to use; reduce contract service costs
    – For the Owner
       • Enterprise deployment/easy to use ERP integration
       • Standardization; optimize contractor selection/utilization
    – For the Contractor
       • Remove redundant effort
       • Many-to-Many connection
• Improve Project Control
    – Project estimating and forecasting
    – Analytics, Alerts




October 24, 2012                Management Controls, Inc. — CONFIDENTIAL   2
Improve existing features/modules


  •       Labor, Equip.& Materials •                 ERP Integration
  •       Lump Sum                          •        Track Estimating
  •       Unit Price                        •        Track Forecasting
  •       Analytics




October 24, 2012             Management Controls, Inc. — CONFIDENTIAL    3
Improve Analytics




October 24, 2012   Management Controls, Inc. — CONFIDENTIAL   4
Improve Analytics




October 24, 2012   Management Controls, Inc. — CONFIDENTIAL   5
Improve Analytics




October 24, 2012   Management Controls, Inc. — CONFIDENTIAL   6
Improve Analytics




October 24, 2012   Management Controls, Inc. — CONFIDENTIAL   7
Project control                                               Turnaround (Day 1)

      2 Years                 1 Year
                                                                                       Turnaround (T/A) 30 + days
   (prior to T/A)         (prior to T/A)
Turnaround Estimating     Plan & Schedule                        Turnaround Cost Control               Turnaround Forecasting




                                       P6                                         Gate System
                                                                                                               Forecasting
       Estimating               Scheduling

                                                                                    Track™                •   Original Estimate
  •   Project                                                                                             •   Commitments
  •   Scope / B.U.                   SAP                                                                  •   Actuals
  •   Equipment List                                                    Track Cost Control                •   Contingencies
  •   Activities                                                        •     Contractors                 •   Cost Impacts
  •   Norm Direct Hours                                                 •     WO/PO/WBS                   •   Productivity
  •   Estimates                  Planning                               •     Location/Site               •   EV / %complete
  •   What-if Scenarios          Contracting                            •     Project                     •   Forecast
  •   Final Estimate                                                    •     Actuals                     •   Reports
                          Planning                                            •   Direct Hrs.
                                                                              •   Indirect Hrs.
                          • Cost Objects                                      •   Activity
                            •   Work Orders                                   •   Contract
                            •   Purchase Orders                               •   Specific $$
                            •   WBS / CBS                               •     L, E, M
                          • Contracts                                   •     T&M, LS, UP
                          • Original Estimate                           •     By Shift
                                                                        •     SEs & TCs back to SAP

  October 24, 2012                 Management Controls, Inc. — CONFIDENTIAL                                                       8
Product strategy                                     2013                   2014                    2015

  Software as a Product:                          Track v6.3              Track v6.3
                                                                          Track v6.3               Track v6.4
  • Perpetual License (or lease)
  • ‘On-premise’ installation OR
  • Hosted (SAVVIS)                               Estimating
                                                                       Continue Track 6.2, 6.3, 6.x series
                                                                       • Provide clients with “on-premise” solution
                                                  Forecasting          • Some clients may prefer to stay on current
  Target Market:                                                         or older versions
  • Existing customers                                                 • Continue product enhancements
  • Traditional large customers                                        • Continue offering and building out a
                                                 SAP & Maximo            “hosted” solution (SAVVIS)
  • SAP/ERP customers                              Integration




                                                     2013                   2014                    2015
  Software-as-a-Service:
  • Scalable for smaller markets
  • Multi-Tenant Architecture                     18-24 month development cycle                 Track v7.0
  • New functionality (e.g. Smart Contracting)

  Target Market:
  • Early “Cloud” adopters                       Focus on Track Future releases
  • Small-Midsize customers/markets              •   Many to Many (multi-tenant) – Track for Contractors
  • Contractors                                  •   Other possibilities – TrackMobile, Asset Tracking




                                                                                                                      9
Architecture (current)
Contractors
                     Standard remote access
                     for contractors                                                           Track Owners
                                                                                               or Contractors



                        Citrix


                                                                                               Track v7.0
                                                                                               Track v6.2
             Track v7.0
             Track v6.2
                Stand-                                                                          “Hosted”
            “On Premise”
                     Alone




                            SAP        ACS                                                                             Contractor B
                         Interface   Interface
                                                                                                              Contractor A
                                                                                          Owner B
                                     ACS                                                                             Owner Systems
                                                                                                                        SAP        ACS
                                                                                Owner A
                                                                                                                     Interface   Interface
                                                                                                    Owner C
          Owner D
                                                                                                                                  ACS



  October 24, 2012                            Management Controls, Inc. — CONFIDENTIAL                                                   10
Architecture (Future)
Contractors
                                                           Contractors
                     Standard remote access                Single point sign on for contractors to
                     for contractors not                   access multiple owners                       Track Owners
                     licensed for Track
                     Connector                                                                          or Contractors



                        Citrix
                                                                                                        Multi-Tenant




                                                                                            Connector
                                     Connector
                                                                                                                              Track for




                                                                                              Track
                                                                                                         Track v7.0         Contractors
                                       Track



             Track v7.0                                                                                                     Functionality
                Stand-                                        SSL                                          “SaaS”
            “On Premise”
                     Alone




                            SAP         ACS                                                                                     Contractor B
                         Interface    Interface
                                                                                                                       Contractor A
                                                                                                 Owner B
                                        ACS                                                                                   Owner Systems
                                                                                                                                  SAP         ACS
                                                                                   Owner A
                                                                                                                               Interface    Interface
                                                                                                           Owner C
          Owner D
                                                                                                                                             ACS



  October 24, 2012                               Management Controls, Inc. — CONFIDENTIAL                                                           11

Weitere ähnliche Inhalte

Was ist angesagt?

Evolving the Product Management Process to Match Company Growth
Evolving the Product Management Process to Match Company GrowthEvolving the Product Management Process to Match Company Growth
Evolving the Product Management Process to Match Company GrowthSVPMA
 
Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008ARC Advisory Group
 
Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)Dassian Inc.
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentationvishalnvora1
 
Baap Blue Dolphin3.6 Brochure
Baap Blue Dolphin3.6 BrochureBaap Blue Dolphin3.6 Brochure
Baap Blue Dolphin3.6 Brochureradhasathya
 
Dassian Workforce Authorization Management (WAM)
Dassian Workforce Authorization Management (WAM)Dassian Workforce Authorization Management (WAM)
Dassian Workforce Authorization Management (WAM)Dassian Inc.
 
OpenErp for carpet industry
OpenErp for carpet industryOpenErp for carpet industry
OpenErp for carpet industryGaurav Kumar
 
Segue presentation 1 17-2013
Segue presentation 1 17-2013Segue presentation 1 17-2013
Segue presentation 1 17-2013Bill Roderick
 
Astute people soft northwest rug - v1
Astute   people soft northwest rug - v1Astute   people soft northwest rug - v1
Astute people soft northwest rug - v1Arvind Rajan
 
Dassian Actual Labor Costing (ALC)
Dassian Actual Labor Costing (ALC)Dassian Actual Labor Costing (ALC)
Dassian Actual Labor Costing (ALC)Dassian Inc.
 
Fidus Corporate Presentation June 2011 (For Printing)
Fidus Corporate Presentation June 2011 (For Printing)Fidus Corporate Presentation June 2011 (For Printing)
Fidus Corporate Presentation June 2011 (For Printing)HR_Dana
 
Fidus Corporate Presentation June 2011 (For Printing)
Fidus Corporate Presentation June 2011 (For Printing)Fidus Corporate Presentation June 2011 (For Printing)
Fidus Corporate Presentation June 2011 (For Printing)khuxley
 
Capability presentation openview
Capability presentation openviewCapability presentation openview
Capability presentation openviewDrupad Parsa
 
Tridiagona Solutions Corporate Presentation
Tridiagona Solutions Corporate PresentationTridiagona Solutions Corporate Presentation
Tridiagona Solutions Corporate Presentationabhijeetsd
 
Why EPM Live? EPM Live Overview and Demo
Why EPM Live? EPM Live Overview and DemoWhy EPM Live? EPM Live Overview and Demo
Why EPM Live? EPM Live Overview and DemoEPM Live
 

Was ist angesagt? (19)

Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Magic of scrum with SAP
Magic of scrum with SAPMagic of scrum with SAP
Magic of scrum with SAP
 
Evolving the Product Management Process to Match Company Growth
Evolving the Product Management Process to Match Company GrowthEvolving the Product Management Process to Match Company Growth
Evolving the Product Management Process to Match Company Growth
 
Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008
 
Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)Dassian Program Plans and Controls (PPC)
Dassian Program Plans and Controls (PPC)
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
 
Project Implenmentation Methodology
Project Implenmentation MethodologyProject Implenmentation Methodology
Project Implenmentation Methodology
 
TPT 2011
TPT  2011TPT  2011
TPT 2011
 
Baap Blue Dolphin3.6 Brochure
Baap Blue Dolphin3.6 BrochureBaap Blue Dolphin3.6 Brochure
Baap Blue Dolphin3.6 Brochure
 
Dassian Workforce Authorization Management (WAM)
Dassian Workforce Authorization Management (WAM)Dassian Workforce Authorization Management (WAM)
Dassian Workforce Authorization Management (WAM)
 
OpenErp for carpet industry
OpenErp for carpet industryOpenErp for carpet industry
OpenErp for carpet industry
 
Segue presentation 1 17-2013
Segue presentation 1 17-2013Segue presentation 1 17-2013
Segue presentation 1 17-2013
 
Astute people soft northwest rug - v1
Astute   people soft northwest rug - v1Astute   people soft northwest rug - v1
Astute people soft northwest rug - v1
 
Dassian Actual Labor Costing (ALC)
Dassian Actual Labor Costing (ALC)Dassian Actual Labor Costing (ALC)
Dassian Actual Labor Costing (ALC)
 
Fidus Corporate Presentation June 2011 (For Printing)
Fidus Corporate Presentation June 2011 (For Printing)Fidus Corporate Presentation June 2011 (For Printing)
Fidus Corporate Presentation June 2011 (For Printing)
 
Fidus Corporate Presentation June 2011 (For Printing)
Fidus Corporate Presentation June 2011 (For Printing)Fidus Corporate Presentation June 2011 (For Printing)
Fidus Corporate Presentation June 2011 (For Printing)
 
Capability presentation openview
Capability presentation openviewCapability presentation openview
Capability presentation openview
 
Tridiagona Solutions Corporate Presentation
Tridiagona Solutions Corporate PresentationTridiagona Solutions Corporate Presentation
Tridiagona Solutions Corporate Presentation
 
Why EPM Live? EPM Live Overview and Demo
Why EPM Live? EPM Live Overview and DemoWhy EPM Live? EPM Live Overview and Demo
Why EPM Live? EPM Live Overview and Demo
 

Ähnlich wie Product Roadmap Overview

Dynamics Day 2012: NAV Update and Roadmap
Dynamics Day 2012: NAV Update and RoadmapDynamics Day 2012: NAV Update and Roadmap
Dynamics Day 2012: NAV Update and RoadmapIntergen
 
Opticon - Construction ERP Overview presentation
Opticon - Construction ERP Overview presentationOpticon - Construction ERP Overview presentation
Opticon - Construction ERP Overview presentationSoftTech Engineers
 
Proj Mgmt is Like Gasoline
Proj Mgmt is Like Gasoline Proj Mgmt is Like Gasoline
Proj Mgmt is Like Gasoline InnoTech
 
Primavera roadmap 2012/2013
Primavera roadmap 2012/2013Primavera roadmap 2012/2013
Primavera roadmap 2012/2013Vladimir Ivanov
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Processstorybridge
 
Lean & agile 101 for Astute Entrepreneurs
Lean & agile 101 for Astute EntrepreneursLean & agile 101 for Astute Entrepreneurs
Lean & agile 101 for Astute EntrepreneursClaudio Perrone
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 
Six Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
Six Sigma Session For Production And Project Team By Lt Col Vikram BakshiSix Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
Six Sigma Session For Production And Project Team By Lt Col Vikram BakshiLT COLONEL VIKRAM BAKSHI ( RETD)
 
Project design and management
Project design and managementProject design and management
Project design and managementAndrew Zolnai
 
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Plan4Demand
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wmsSubhan Novianda
 
ERP Implementation cycle
ERP Implementation cycleERP Implementation cycle
ERP Implementation cycleMantavya Gajjar
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeAstute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeArvind Rajan
 
Managing Hard Times With Quality & Project Management
Managing Hard Times With Quality & Project ManagementManaging Hard Times With Quality & Project Management
Managing Hard Times With Quality & Project ManagementHaroon Abbu
 

Ähnlich wie Product Roadmap Overview (20)

Dynamics Day 2012: NAV Update and Roadmap
Dynamics Day 2012: NAV Update and RoadmapDynamics Day 2012: NAV Update and Roadmap
Dynamics Day 2012: NAV Update and Roadmap
 
2013-02-21 Government Contractors Seminar
2013-02-21 Government Contractors Seminar2013-02-21 Government Contractors Seminar
2013-02-21 Government Contractors Seminar
 
Opticon - Construction ERP Overview presentation
Opticon - Construction ERP Overview presentationOpticon - Construction ERP Overview presentation
Opticon - Construction ERP Overview presentation
 
Proj Mgmt is Like Gasoline
Proj Mgmt is Like Gasoline Proj Mgmt is Like Gasoline
Proj Mgmt is Like Gasoline
 
4C Associates
4C Associates4C Associates
4C Associates
 
Primavera roadmap 2012/2013
Primavera roadmap 2012/2013Primavera roadmap 2012/2013
Primavera roadmap 2012/2013
 
The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Process
 
Lean & agile 101 for Astute Entrepreneurs
Lean & agile 101 for Astute EntrepreneursLean & agile 101 for Astute Entrepreneurs
Lean & agile 101 for Astute Entrepreneurs
 
NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
Six Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
Six Sigma Session For Production And Project Team By Lt Col Vikram BakshiSix Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
Six Sigma Session For Production And Project Team By Lt Col Vikram Bakshi
 
Project design and management
Project design and managementProject design and management
Project design and management
 
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
Supply Planning Leadership Exchange: SAP PP/DS What You Need to Know Part 1
 
Digital project process
Digital project processDigital project process
Digital project process
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wms
 
ERP Implementation cycle
ERP Implementation cycleERP Implementation cycle
ERP Implementation cycle
 
Camo
CamoCamo
Camo
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
NAVBUILD - Navision For Construction
NAVBUILD -  Navision For ConstructionNAVBUILD -  Navision For Construction
NAVBUILD - Navision For Construction
 
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft UpgradeAstute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
Astute @ Oracle Open World 2011 - Cost Efficiencies During PeopleSoft Upgrade
 
Managing Hard Times With Quality & Project Management
Managing Hard Times With Quality & Project ManagementManaging Hard Times With Quality & Project Management
Managing Hard Times With Quality & Project Management
 

Mehr von tracksoftware

All About the Admins
All About the AdminsAll About the Admins
All About the Adminstracksoftware
 
Rising Tide of Rate Management
Rising Tide of Rate ManagementRising Tide of Rate Management
Rising Tide of Rate Managementtracksoftware
 
Next-Generation Asset Tracking
Next-Generation Asset TrackingNext-Generation Asset Tracking
Next-Generation Asset Trackingtracksoftware
 
Equipment and Materials Modules: Why You Need Them
Equipment and Materials Modules: Why You Need ThemEquipment and Materials Modules: Why You Need Them
Equipment and Materials Modules: Why You Need Themtracksoftware
 
Integrating PCF with SAP
Integrating PCF with SAPIntegrating PCF with SAP
Integrating PCF with SAPtracksoftware
 
ERP Integration: Now, More Than Ever
ERP Integration: Now, More Than EverERP Integration: Now, More Than Ever
ERP Integration: Now, More Than Evertracksoftware
 
Track Software -- Shell presentation
Track Software -- Shell presentationTrack Software -- Shell presentation
Track Software -- Shell presentationtracksoftware
 
Track Software -- Customer survey results
Track Software -- Customer survey resultsTrack Software -- Customer survey results
Track Software -- Customer survey resultstracksoftware
 
Track Software -- Track 6.1 and 6.2 Highlights
Track Software -- Track 6.1 and 6.2 Highlights Track Software -- Track 6.1 and 6.2 Highlights
Track Software -- Track 6.1 and 6.2 Highlights tracksoftware
 

Mehr von tracksoftware (13)

Going Global
Going GlobalGoing Global
Going Global
 
All About the Admins
All About the AdminsAll About the Admins
All About the Admins
 
Rising Tide of Rate Management
Rising Tide of Rate ManagementRising Tide of Rate Management
Rising Tide of Rate Management
 
Next-Generation Asset Tracking
Next-Generation Asset TrackingNext-Generation Asset Tracking
Next-Generation Asset Tracking
 
So how do you
So how do youSo how do you
So how do you
 
Equipment and Materials Modules: Why You Need Them
Equipment and Materials Modules: Why You Need ThemEquipment and Materials Modules: Why You Need Them
Equipment and Materials Modules: Why You Need Them
 
Integrating PCF with SAP
Integrating PCF with SAPIntegrating PCF with SAP
Integrating PCF with SAP
 
ERP Integration: Now, More Than Ever
ERP Integration: Now, More Than EverERP Integration: Now, More Than Ever
ERP Integration: Now, More Than Ever
 
Valero 6.2 Upgrade
Valero 6.2 UpgradeValero 6.2 Upgrade
Valero 6.2 Upgrade
 
What's New With 6.2
What's New With 6.2What's New With 6.2
What's New With 6.2
 
Track Software -- Shell presentation
Track Software -- Shell presentationTrack Software -- Shell presentation
Track Software -- Shell presentation
 
Track Software -- Customer survey results
Track Software -- Customer survey resultsTrack Software -- Customer survey results
Track Software -- Customer survey results
 
Track Software -- Track 6.1 and 6.2 Highlights
Track Software -- Track 6.1 and 6.2 Highlights Track Software -- Track 6.1 and 6.2 Highlights
Track Software -- Track 6.1 and 6.2 Highlights
 

Product Roadmap Overview

  • 1. Product Roadmap Overview Sanjay Upadhyaya Management Controls 1
  • 2. Product Objectives • Make Track™ easier to use; reduce contract service costs – For the Owner • Enterprise deployment/easy to use ERP integration • Standardization; optimize contractor selection/utilization – For the Contractor • Remove redundant effort • Many-to-Many connection • Improve Project Control – Project estimating and forecasting – Analytics, Alerts October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 2
  • 3. Improve existing features/modules • Labor, Equip.& Materials • ERP Integration • Lump Sum • Track Estimating • Unit Price • Track Forecasting • Analytics October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 3
  • 4. Improve Analytics October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 4
  • 5. Improve Analytics October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 5
  • 6. Improve Analytics October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 6
  • 7. Improve Analytics October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 7
  • 8. Project control Turnaround (Day 1) 2 Years 1 Year Turnaround (T/A) 30 + days (prior to T/A) (prior to T/A) Turnaround Estimating Plan & Schedule Turnaround Cost Control Turnaround Forecasting P6 Gate System Forecasting Estimating Scheduling Track™ • Original Estimate • Project • Commitments • Scope / B.U. SAP • Actuals • Equipment List Track Cost Control • Contingencies • Activities • Contractors • Cost Impacts • Norm Direct Hours • WO/PO/WBS • Productivity • Estimates Planning • Location/Site • EV / %complete • What-if Scenarios Contracting • Project • Forecast • Final Estimate • Actuals • Reports Planning • Direct Hrs. • Indirect Hrs. • Cost Objects • Activity • Work Orders • Contract • Purchase Orders • Specific $$ • WBS / CBS • L, E, M • Contracts • T&M, LS, UP • Original Estimate • By Shift • SEs & TCs back to SAP October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 8
  • 9. Product strategy 2013 2014 2015 Software as a Product: Track v6.3 Track v6.3 Track v6.3 Track v6.4 • Perpetual License (or lease) • ‘On-premise’ installation OR • Hosted (SAVVIS) Estimating Continue Track 6.2, 6.3, 6.x series • Provide clients with “on-premise” solution Forecasting • Some clients may prefer to stay on current Target Market: or older versions • Existing customers • Continue product enhancements • Traditional large customers • Continue offering and building out a SAP & Maximo “hosted” solution (SAVVIS) • SAP/ERP customers Integration 2013 2014 2015 Software-as-a-Service: • Scalable for smaller markets • Multi-Tenant Architecture 18-24 month development cycle Track v7.0 • New functionality (e.g. Smart Contracting) Target Market: • Early “Cloud” adopters Focus on Track Future releases • Small-Midsize customers/markets • Many to Many (multi-tenant) – Track for Contractors • Contractors • Other possibilities – TrackMobile, Asset Tracking 9
  • 10. Architecture (current) Contractors Standard remote access for contractors Track Owners or Contractors Citrix Track v7.0 Track v6.2 Track v7.0 Track v6.2 Stand- “Hosted” “On Premise” Alone SAP ACS Contractor B Interface Interface Contractor A Owner B ACS Owner Systems SAP ACS Owner A Interface Interface Owner C Owner D ACS October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 10
  • 11. Architecture (Future) Contractors Contractors Standard remote access Single point sign on for contractors to for contractors not access multiple owners Track Owners licensed for Track Connector or Contractors Citrix Multi-Tenant Connector Connector Track for Track Track v7.0 Contractors Track Track v7.0 Functionality Stand- SSL “SaaS” “On Premise” Alone SAP ACS Contractor B Interface Interface Contractor A Owner B ACS Owner Systems SAP ACS Owner A Interface Interface Owner C Owner D ACS October 24, 2012 Management Controls, Inc. — CONFIDENTIAL 11

Hinweis der Redaktion

  1. As Track has grown with added features and functionality we realize that it has become increasingly complex. Our over arching objective has always been to make Track easy to use, and in a production environment user profiles that limit what tasks a user can perform help with this however we are also going to look at improved workflow management to help with usability. Along with this, we are going to continue to provide new features and benefits will help control and reduce contract service costs.For example for the owner we want make to help make enterprise deployments are seamless and provide smooth integration with ERP systems. We will continue to add features like the easy button that automatically adds missing ins/outs, or report scheduling, or per diem-handling. We want to support Owner efforts for standardization of contractor management practices across sites. We are going to build tools that will help in this effort and in fact we have session running tomorrow about Labor Rate Management that you may be interested in.For the contractor we want to reduce redundancy where possible with contractor focused functionality. In the past, when contractors had to enter allocations into their own system and then re-enter this information in Track we removed this redundancy by enabling this information to be imported and then compared to the calculated net billable hours in Track. For contractors that work with multiple owners that use Track it can be very laborious to constantly login and logout of each Track system to perform their daily tasks. With our new architecture for Track 7.0 we will eliminate this by enabling contractors to login once and view all the owners that work with through a drop down. I will be discussing our planned architecture later during this presentation.We are improving Project control with added tools to help with Turnarounds and Capital projects with estimating and forecasting and I will provide an overview of these in a upcoming slides. In addition to these tools we are looking to improve our analytics and alerting.
  2. Our goal is to continue to build on our existing feature set within Track v6.x. With Labor, Equipment and Materials we are looking at technology that may enable you to track where equipment is located and if it is being used though asset tracking. In our session tomorrow one our technology partners will be demonstrating some of this capability. With ERP integration we have already release our SAP Integration Module and will be adding integration with Maximo. As I mentioned already Track Estimating and Forecasting will covered in a few minutes.
  3. Designed for those with budget responsibility or project teams we have created our analytics functionality in Track. You can view this as analytics or as dashboard and what we are trying to do here is push information out to decision makers. We have 9 analytic views and here are a few examples. On the top left chart here we are looking at Labor, Equipment and Material spend by contractor, you will notice these red/green thresholds that you can set to help with your analysis. You can set a target level and a ceiling level and then look where things are moving away from the norm. In this case this bar has exceeded the ceiling in September and you can drill down to perform root cause analysis as to why this occurred.
  4. In terms of improving project control you may not be aware of the additional tools we have for Turnarounds or large capital projects. Track Estimating on the left of this diagram is used for early stage budgetary estimating of scope, activities and costs for work list items. It designed to be used 18-24 months before the start of the turnaround. The output of this tool would then feed a system such as Primavera, where you would combine this estimate with all the other information in Primavera to build an Original Estimate. Once the Turnaround begins you are familiar with Track and it’s capabilities, however what you may not be aware of is Track Forecasting. This product which you may have heard of as PCF will help a cost engineer compare the original estimate from Primavera, the commitments from SAP and the daily actuals from Track. It will make allowances for contingencies such as generators not included in the original estimate, or for cost impacts such as a turbine that has just blown up, or flooding in the refinery. All this will help evaluate productivity, earned value analysis and ultimately with a forecast. The output from Track Forecasting will then feed the Estimating tool and help determine a better estimate for future Turnarounds
  5. Before I discuss our product strategy, I want to address the people here that attended last years user’s conference. Last year we had plans very similar to what I am about to describe and you may be asking yourself why aren’t we further along. Good question. Last year we began working with a client with an enormously large site. For example, most of you in the audience have sites that process $100MM per year though our software. This one client site was processing this amount and more per month though Track. At this point we decided to step back and allocate dev resources to make sure our software was optimized to handle the largest daily volume imaginable. So with that said, let’s take a look at the top half of this slide. We are going to continue to build our on premise and hosted Track 6.x series. Presently we are at Track v6.2 and as we move to 2013 we will release Track v6.3 that will include new features such as ad-hoc reporting. Allowing for user customization of reports. We will also be enhancing our Estimating and Forecasting products, along with adding a Maximo integration module. This development plan will continue out into 2014, 15 etc. Parallel to this on the lower half of this graphic is our plans to re-architect Track. This architecture will multi-tenant. You may ask what does this mean. The best way I can describe this to you is to imagine an apartment building. There is a security guard at the door and there are many tenants inside the apartment. Only those with keys can enter their apartment, and all these tenants are sharing the resources of the building such as the plumbing, electricity etc. That is what I mean by be a multi-tenant architecture. So, over the next 18-24 months we will be redesigning Track and build into it the same functionality as the Track v6.4 or Track v6.5 that will be shipping at that time.So what does that look like …
  6. Presently with Track we have the option to install our software on-premise or in our hosted environment. On premise users can login securely either remotely or behind their firewall and run Track and access their data. In our hosted we have owners today that are logging into their own Track environment that is integrated with their SAP and to multiple ACS systems.
  7. For Track 7.0 everything looks very similar to what we have in place today. Both on-premise and hosted. The main difference is that Track v7.0 is multi-tenant and we have added these interfaces called Track Connectors. In the on-premise environment nothing really changes for contractors that wish to only work with one owner. However for contractors with multiple owners running Track we now have this Track connector that they can license that will allow them though a single login to view all the owners they are working with. They will also benefit from additional functionality that we will build into Track that is tailored for contractors. If the owner agrees, we can also install a connector at the on-premise location to enable these licensed contractors to connect to this Track installation. Everything else, with SAP integration and ACS connectivity works as smoothly as it does today.Thank you for your time today. I hope this was informative. Any questions?