Projects
Competencies
Team profile
System integration tools
System verification tools
Management tools
1 © Research and Engineering Center www.rec-global.com 2011-06-27
3. Automotive
Cooperation with Continental AG
Responsibility for customizing products to customer
specific requirements
Integration approach definition and execution
Test approach definition (test levels, acceptance/release criteria,
test process definition), test plan preparation
Test specification preparation, tests execution:
Module tests
Integration tests
System tests
Test automation (mostly based on in-house solution ATE)
Python scripting
C++ (Test F-Block/ Test shadow)
2 © Research & Engineering Center, Wrocław, Poland
4. Telecommunication
Cinterion Wireless Modules
Responsibility for:
Protocol stack tests
AT commands functional testing
GPRS/EDGE/HSDPA/CSD functional testing
JVM, VME testing
Conformity tests (GCF)
Conformance Testing for 2G/2.5G Technologies: GSM, GPRS,
EDGE, AMR (900/1800)
Conformance Testing for 3G Technologies: W-CDMA,
UMTS, HSDPA (FDD I)
SIM/USIM Testing
Radiated Spurious Emissions testing
Field Trials
GCF Qualified Networks
Skills:
Mobile technologies: GSM/CSD/GPRS/EDGE/UMTS/HSDPA
Eclipse environment
CRTU protocol testing platform
Java,.C/C++
Test automation - Pegasus
3 © Research & Engineering Center, Wrocław, Poland
5. Web applications
Cooperation with Polish Government,
City of Wroclaw and PICZO.com
Responsibility for:
Test concept preparation
Test case implementation and execution
Analysis of customer requirements – iterative
approach
Test automation
Aceptance tests with customer
Technology
Java
Perl
MySQL
Test automation (mostly based on in-house
solution ATE)
Python scripting
JUnit
Selenium tool
4 © Research and Engineering Center www.rec-global.com 2011-06-27
6. Competencies
5 © Research and Engineering Center www.rec-global.com 2011-06-27
7. Competences
• Integration Verification
• Integration of SW modules, • Planning of test approach,
also coming from test plan preparation
geographically distributed • Test execution on various levels:
Reviews
locations
Module testing
• Gathering quality metrics Integration testing
with according to customer System testing
demands • Test techniques:
Specification based (functional and
• Resolution of conflicts in non-functional)
version control system Structure based
• Support for development in Experience based
problem resolving • Test strategy adjusted to
development model: V-model,
• Integration approach Agile, mixture...
adaptation for customer
needs
6 © Research & Engineering Center, Wrocław, Poland
8. Verification levels
Customer Product
Request
Acceptance Testing
System
System Validation Acceptance tests
Requirements
System Verification
System
Technical Solution Integration
Module Testing
(by developers)
Test Plan
System
Architecture Development
& Testing
7 © Research and Engineering Center www.rec-global.com 2011-06-27
9. Quality first!
Acceptance criteria definition - example
Weekly criteria
KPI’s – as defined by customer + REC internal
Test report covering feature to be released given week
Test scope: at least 30% of system requirements covered by test cases, 100% of features to be released in given week
Major release criteria
Summary of KPI’s, performed on delivery + clear statement about KPI’s for major release
Test coverage: 60% of system requirements covered by test cases, 100% of features
Review of test report performed by Customer
Acceptance tests, performed on selected test cases – the scope must be defined before implementation starts, details to
be confirmed at least 4 weeks before milestone. REC will provide compliance statement, considering available reources.
Exceptions
Introduced into release statement
The list of missing/not executed tests should be provided. For all the cases PL’s should be awared at least 4 weeks before
milestone
10. Our team
• Test techniques based on
• ISEB foundation
• ISEB intermediate
• Experience in telecommunication
• GCF, protocol stack, but also Intelligent Network – performance verification
• Experience into embedded systems
• Wireless
• Automotive # $Id: 541.py 726 2009-04-16 09:26:02Z wro00119 $
a = AcsPlugin()
a.logger.info('test case $Id: 541.py 726 2009-04-16 09:26:02Z wro00119 $ begin')
#enable notifications on VehicleFunctionsFB
• Experience in Web applications EnableNotificationsOnFBlock(a, 0x005, 0x04)
#--------------------PRECONDITIONS-------------------------
a.logger.info('### preconditions begin')
• skills statusFront.params = ['0', '55', '45', '55', '45', '83', '0x01', '0x02', '0']
a.putMessage(statusFront)
a.ignoreResults(10)
a.logger.info('### preconditions end')
• Perl #-------------------------STEPS----------------------------
# log begin of steps
a.logger.info('### step 1 begin')
• Python # simulate rotary turn (on the user side) through TShadowACS:
turnRotary.params = ['3', '-1', '(1,1)']
• C,C++ a.putMessage(turnRotary)
#we’re waiting for result on the network side (we’re receiving request send to HVAC module
a.logger.info('### get result for step 1')
• Java ret1 = a.waitFor(1.5, hvacTest)
ret2 = a.waitFor(1.5, hvacTest)
• Unix # condition for setting test result
if not(ret1 and ret2 and ret1.paramsi[2] == 1 and ret1.paramsi[4] == 11 and ret2.paramsi[4]
== 0):
• Oracle, MySQL raise TestStepFailed #step 1 failed
9 © Research & Engineering Center, Wrocław, Poland 2011-06-27
11. System integration – tools
support
Version control systems
Telelogic change (together with baselines concept)
SVN
Clear Case
Expertise:
- Installation
- Configuration
- Maintenance
- Support for geographically distributed development sites
- Support for development – conflict resolution, trainings
10 © Research & Engineering Center, Wrocław, Poland
12. System verification – tools
support
ATE (automated test environment)
•Very high flexibility – python plugins allow us
to adapt ATE to many different applications
and communication protocols.
•Detection of tool technical failures, i.e. bugs
in test cases, bugs in plugins. If test case
fails, it throws specific exception –
„TestStepFailed”. Test case maturity levels.
•Automatically generated test reports,
coverage reports (like requirements
coverage)
•Support for various development models,
including agile approach.
•Automation: list of requirements, test cases
(description) and test case automation (code)
kept in one, consistent database.
11 © Research & Engineering Center, Wrocław, Poland 2011-06-27
13. System verification – automation
tools
Pegasus SWT
• Test runner
• Eclipse enviroment on RCP
platform
•Test Cases written in Java
• Parallel tests execution
• Full event log file from executed
test cases
• Communication with all HW
interfaces (RS232, USB, I2C,
SPI....)
12 © Research and Engineering Center www.rec-global.com 2011-06-27
14. System verification – automation
tools
Selenium - tool for automation Web testing
Selenium IDE tool JUnit test case
Automatic tests execution
using Selenium server
13 © Research and Engineering Center www.rec-global.com
15. System verification – incident
tracking tools
ClearQuest
• project task tracking
• bug reporting
• bug tracking
• interface to version control
systems
• easy access to complete
incidents history
14 © Research and Engineering Center www.rec-global.com
16. System verification – incident
tracking tools
TRAC – project management and bug reporting
tracker
• web-based tool
• project task tracking
• bug reporting
• integrated Wiki
• interface to version
control systems
15 © Research and Engineering Center www.rec-global.com 2011-06-27
17. Methods for quality assurance
in the REC Group
For further information please contact:
Roman Sorokiewicz on roman.sorokiewicz@rec-
global.com or
Tel: +48 (71) 711-8070; +48 660 430 104
16 © Research and Engineering Center www.rec-global.com 2011-06-27